MECKLENBURG COUNTY Land Use and Environmental Services Agency <insert delivery method, US MAIL, CERTIFIED, ELECTRONIC MAIL, or FACSIMILE> Re: Incomplete Storm Water Management Permit Application Application # -P Dear : Please be advised that the Storm Water Management Permit Application that you submitted for has been found to be incomplete. The following information is needed to complete the application: Name of Development Street Name & Number Original Tax Parcel Number Total Area of Project (acres) Total Disturbed Area (acres) % Built Upon Fee Paid Amendment to Permit # Type of Development: Commercial; Residential; Mixed Use; Subdivision (As defined in the Post-Construction Storm Water Ordinance) Jurisdiction/Town Zoning Designation Resubmittal: Yes or No (If yes provide notification date that resubmittal was required) Owner’s Name Owner’s Address Owner’s Phone Number Owner’s Fax Number Owner’s Email Address Financial Responsible Party (FRP) (must be N.C. Agent) FRP Address FRP Phone Number FRP Email PEOPLE ● PRIDE ● PROGRESS ● PARTNERSHIP 700 N. Tryon Street ● Suite 205 ● Charlotte, NC 28202-2236 ● (704) 336-5500 ● FAX (704) 336-4391 http://stormwater.charmeck.org Designer’s Name Designer’s Address Designer’s Phone Number Designer’s Fax Number Designer’s Email Watershed District Where Project is Located Project Density based on Drainage Area: Low Density; High Density; N/A Pollutant Removal Efficiency Required: None; 85% TSS; 70% TP; LID (Huntersville) Buffers Required: Yes or No (Buffers must be delineated on the attached plan as per the Administrative Manual.) Volume Control Provided for 1-Year, 24-Hour Storm during Post-Construction: Yes; No; Huntersville; Other Peak Control Provided: 10-year, 6-hour; 25-year, 6-hour; Huntersville; Other Specify Open Space Required: None; 25%; 17.5%; 15%; 10%; Huntersville Sewer: Charlotte-Mecklenburg Utilities; Private Wastewater System; Septic System Total Phosphorus Mitigation Approved: Yes or No (If Yes, attach approved and signed copy of Form #PCO9.) Development / Redevelopment Mitigation Approved: Yes or No (If Yes, attach approved and signed copy of Form #PCO13.) Open Space Mitigation Approved: Yes No (If Yes, attach approved and signed copy of Form #PCO15.) Six (6) sets of plans with two (2) sets of calculations for all BMPs, including the storm sewer system, to be installed for compliance with the water quality, volume and peak control requirements of the Post-Construction Storm Water Ordinance. All designs must be in accordance with the Mecklenburg County Post-Construction Storm Water Ordinance Design Manual. All plans and calculations must be sealed by a professional designer. All plans must contain the following: BMP Inset Table with specifics on each BMP, including: BMP Type (wet pond, wetland, bioretention, etc.); BMP location, size and elevation; location and elevation of BMP inlets and outlets; latitudinal / longitudinal coordinates of BMP; drainage area in acres; BMP surface area in square feet; percent imperviousness of area draining to BMP; fee credit; BMP name (project or subdivision name – BMP type – number); length of swale (in flow direction (ft)-Grass Swale); maximum pool depth in feet (for wet ponds and bioretention systems); mulch depth in feet (for bioretention systems); depth of sand in feet (for bioretention systems); BMP address; jurisdiction; basin ID; owner name; owner address; owner phone number; and owner email. Details showing BMP dimensions, including top and bottom of storage area as well as depth and storage volume. Easements for all BMPs and drainageways. Existing and proposed paved roads, buildings, structures and utilities. Basin contours labeled and tied into existing contours. Construction sequence. North arrow. Vicinity map. Parcel Tax Number. Jurisdiction. Legible scale. Property boundary and adjoining property boundaries and owners. Watershed District. Delineation of on-site drainage areas including number of acres. Latitudinal / longitudinal coordinates of storm sewer system inlets and outlets. BMP calculations illustrating compliance. Six (6) sets of plans delineating stream and/or lake buffers for compliance with PostConstruction Storm Water Ordinance requirements. All buffers must be measured horizontally on a line perpendicular to the surface water, landward from the top of the bank on each side of the stream. All plans must be sealed by a professional designer and contain the following: Buffers clearly marked and labeled on plans as “Water Quality Buffer.” Plans must also label the outside boundary of the buffer and each of the buffer zones as well as the top of the stream bank from where the buffer is measured. Standard buffer notes must appear on the plans (see S.W.I.M. Implementation Guidelines). All storm water outfalls must be clearly indicated on plans and shown ending prior to the buffer. Stream crossings and utility installations in the buffer. Six (6) sets of plans delineating the proposed undisturbed open space area for compliance with Post-Construction Storm Water Ordinance requirements. All plans must be sealed by a professional designer and contain the following: Existing and proposed paved roads, buildings, structures and utilities. North arrow. Vicinity map. Parcel Tax Number. Jurisdiction. Legible scale. Property boundary and adjoining property boundaries and owners. Watershed District. Boundaries and description of existing vegetation and proposed limits of clearing and grading (locate all trees 6-inches in diameter or larger for special or conditional uses). Area clearly marked and labeled on plans as “UNDISTURBED OPEN SPACE.” The outside boundary dimensions and total area must be indicated on the plans. An Operation and Maintenance Agreement and Maintenance Plan must be attached to the Storm Water Management Permit Application for each BMP included in the project. In addition to the above, the following is needed for the application to be considered complete: Please be aware that if a revised application is not re-submitted to this Office within sixty (60) calendar days from the date of receipt of this notice, the application shall be considered withdrawn, and a new submittal for the same or substantially the same project shall be required along with the appropriate fee. The submittal of an incomplete application shall not suffice to meet the deadline. If you have any questions, you can contact me at Sincerely, CC: Form #PCO6 Town Planning Department .