Mary Alexander s t o r m d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work Dear Resident: Charlotte-Mecklenburg Storm Water Services and consulting engineer, Land Design, Inc., have begun the design phase for the Mary Alexander Storm Drainage Improvement Project. Design work includes locating utilities, verifying pipe clearances, creating computer generated maps and resolving any utility/pipe conflicts. For more information about this project, please visit our website stormwater.charmeck.org and click on Storm Water Projects dropdown menu in the green bar, then Active Projects and Mary Alexander. Representatives from the Project Team may need to enter your property to collect additional survey data on the existing storm drainage system. While State law authorizes access to private property for this purpose, no buildings or structures will be entered or disturbed. The survey work is scheduled to begin this month and may take several weeks to complete. SURVEY CREW AHEAD If you have any questions, please contact Project Manager Steven McCraney at 704-432-0967 or smccraney@charlottenc.gov. October 2014 HURRICANE SEASON ...Arthur, Bertha, Cristobal, Dolly. They may sound harmless, but hurricanes and tropical storms can bring name? JUNE 1 - NOVEMBER 30, 2014 Engineering & Property Management HURRICANEStorm SEASON ISServices JUNE 1—NOVEMBER 30, 2014. Water Division 600 East Fourth Street Charlotte, North Carolina 28202 BUILD YOUR 2014 forecast: A .R .K A wareness R esponsibility . • 11 named tropical storms K nowledge • 3 hurricanes • 11 named tropical storms 2014 forecast: • 3 hurricanes 75% of Charlotte’s flooding happens during the months of hurricane season. Whether it’s heavy rain from a named storm or an unexpected cloudburst, Charlotte’s flood chances increase dramatically in the summer. Get flood safety information at StormWater.CharMeck.org June 201 30320-I-021