M a r g a r e t Tu r n e r R o a d storm drainage improvement project YOUR STORM WATER FEES AT WORK Dear Resident: Charlotte-Mecklenburg Storm Water Services has hired engineering consultant The Isaacs Group to study possible drainage improvements in the Margaret Turner project area. This project will focus on the storm drainage issues along Margaret Turner Road. This project will also analyze the downstream channel that flows from the Margaret Turner Road cul-de-sac north towards Pressley Road. Representatives from Project Team may need to enter your property to collect survey data on the existing storm drainage system. While State law authorizes access to private property for this purpose, no buildings or structures will be entered or disturbed. For more information about this project, please visit our website at stormwater.charmeck.org and click on Storm Water Projects drop down menu in the green bar, then Active Projects and Margaret Turner Road. If you have any questions, please contact Project Manager Tom Purvis at tpurvis@charlottenc.gov or 704-336-3660. March 2014 SURVEY CREW AHEAD Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202