Ivey’s Pond and Dam

advertisement
Ivey’s Pond and Dam
rehabilitation project
October 20, 2010
YOUR STORM WATER FEES AT WORK
Dear Resident,
Charlotte-Mecklenburg Storm Water Services held its
second public meeting for the Ivey’s Pond and Dam
Rehabilitation Project on September 20, 2010 at South
County Regional Library.
The meeting presented recent changes to the Ivey’s Pond
and Dam Rehabilitation Project due to developments during
the permitting process. Meeting highlights:
• Christopher Fleck, consulting engineer with Dewberry,
gave a brief overview of project and project history.
• Mr. Fleck explained changes in project:
1. Design revisions were driven by regulatory changes, commitments to the residents, and cost savings.
2. Changes include reduced structure sizes, new alignment and outlet structure, and converting existing outlet into a pond drain.
Engineering & Property Management
Storm Water Services Division
600 East Fourth Street
Charlotte, North Carolina 28202
I v e y ’s Po n d P r o j e c t U p d a te
HIGHLIGHTS FROM PUBLIC MEETING
3. While the changes will delay the start of construction, they should result in a shorter construction period.
For more information about this project or detailed meeting
minutes, please visit our website http://stormwater.
charmeck.org and click on Storm Water Projects, Storm
Water Projects again, then Ivey’s Pond.
If you have any questions about this project, please contact
Project Manager, Greg Cole at 704-336-4647 or email
gcole@charlottenc.gov.