Greenhaven/Pierson s t o r m d r a i n a g e i m p r o v e m e n t p r o j e c t your storm water fees at work Dear Resident: Charlotte-Mecklenburg Storm Water Services and design consultant, Parsons-Brinkerhoff, Inc (PB) continue to work through the planning phase of the Greenhaven/Pierson Drive Storm Drainage Improvement Project. The existing conditions analysis and city design standards analysis of this project has been reviewed and completed. City staff and PB are now working to analyze and evaluate several alternatives to determine a preferred option for design. A public meeting will be scheduled to present the preferred option and solicit input from residents. Meeting details will be mailed to residents approximately two weeks prior to the meeting. For more information about this project, visit our website: http://stormwater.charmeck.org. Click on the Storm Water Projects drop down menu in the green bar, then Active Projects and Greenhaven/Pierson. If you have any questions, please contact Project Manager Harold Smith at hsmith@charlottenc.gov or 704-432-5532. June 2013 Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 ... • Unusual creek conditions: odd smells, color changes, dead fish or foam • Improper dumping of substances into storm drains: grease, trash, paint or other pollution • Poorly stored chemicals, sewage overflows, erosion from construction sites or broken pipes Keep our area waterways clean by calling 311 or visiting stormwater.charmeck.org to report conditions.