Blenhein storm drainage improvement project YOUR STORM WATER FEES AT WORK Dear Resident: Charlotte-Mecklenburg Storm Water Services continues to work on the Blenhein Storm Drainage Improvement Project. The project goals are to update infrastructure, reduce flooding of structures and streets, provide emergency access, reduce erosion and increase stream capacity. The engineering consultant, HDR, is working on producing the 70% design documents and plats for easements. A public meeting will be held to share the design and explain where easements are needed. Staff continues to work with the residents needing to be relocated from flood-prone areas. The City has begun demolishing the empty houses. Demolition of the houses can take a couple months as each house must be tested for asbestos and have any asbestos removed before the house can be demolished. For more information about this project, please visit our website http://stormwater.charmeck.org and click on Storm Water Projects, Active Projects, then Blenhein. If you have any questions about this project, please contact Project Manager Greg Cole at gcole@charlottenc.gov or 704-336-4824. June 2013 Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 .. . • Unusual creek conditions: odd smells, color changes, dead fish or foam • Improper dumping of substances into storm drains: grease, trash, paint or other pollution • Poorly stored chemicals, sewage overflows, erosion from construction sites or broken pipes Keep our area waterways clean by calling 311 or visiting stormwater.charmeck.org to report conditions.