HEAVY CONSTRUCTION EQUIPMENT This kind of work uses heavy construction vehicles, including dump trucks, concrete trucks, and earth moving and trenching equipment, all of which are quite loud during operations. The contractor may keep equipment within the work area for the duration of the project. OPEN HOLES AND TRENCHES If it is necessary to maintain an open hole or trench, the contractor is required to make the area safe with fences, barricades, or other methods. Please be cautious as you enter and exit your property. ASHLEY PARK/WESTERLY HILLS PHASE III STORM DRAINAGE IMPROVEMENT PROJECT Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 June 2008 Dear Resident: storm drainage improvement project Our goal is to minimize the impact of any construction. The designers of this project have taken great care to develop a construction plan that will minimize inconveniences to you. However, the very nature of this work often makes it necessary to temporarily reduce or detour traffic flow and close streets. We will help you locate parking if your driveway is blocked temporarily. ASHLEY PARK/WESTERLY HILLS PHASE III WHAT TO EXPECT DURING CONSTRUCTION OUR COMMITMENT TO YOU Charlotte-Mecklenburg Storm Water Services (Storm Water) continues to work on the Ashley Park/Westerly Hills Phase III Storm Drainage Improvement Project. The bid phase began in February 2008 and the bid opening occurred on April 8, 2008. United Construction was selected as the lowest responsible bidder as the contractor for the project and the construction contract was approved by City Council on May 12, 2008. Start of construction for the project is anticipated to begin in June 2008. Some common concerns regarding construction are listed on the flip side of this card. Please take a few moments to read this information to understand the temporary disruptions associated with drainage improvement projects. For more information, please visit our website at http://stormwater.charmeck.org and click on Storm Water Projects, Storm Water Projects again, and then Ashley Park/Westerly Hills. This project has transferred to Jackie Harris as the City’s Project Manager. If you have any questions feel free to contact her or one of the other project team members: On-Site Construction Inspector: Donna Bost: 704-400-1987 E-Mail: dbost@ci.charlotte.nc.us Construction Manager: Gary Stansbury: 704-336-2667 E-Mail: gstansbury@ci.charlotte.nc.us Project Manager: Jackie Harris: 704-336-6770 E-Mail: jbharris@ci.charlotte.nc.us