Future Floodplains Two Floodways Higher Standards CRS Bill Tingle, CFM, PG Floodplain Administrator Future Land Use Floodplain Pilot Study on Two Drainage Basins Future land use flood heights about 2.4’ on average higher than excising landuse flood levels. Some as much a 9.0’ Higher Two floodplains?? FEMA Floodplain 100-year flood Primarily used to rate flood insurance policies Community or “Ultimate” Floodplain 100-year flood Full Buildout in the watershed Used adopted District Plans Two Floodways FEMA Floodway – based on 0.5’ Surcharge Community Encroachment Area – based on 0.1’ Surcharge Old 1.0’ Floodway – 50% Floodway / 50% Flood Fringe 0.1’ Floodway - 75% Floodway / 25% Fringe FEMA Floodplain (Existing Conditions) Community Encroachment Area (0.1’ Floodway)) FEMA Floodway (0.5’Floodway) “Community” Floodplain (Future Conditions) Higher Standards Higher Standards Pre- 2007 Ordinance Revisions Future Conditions Floodplain 0.1’ (Community) and 0.5’ (FEMA) Floodways Cumulative Substantial Improvement 1’-2’ Freeboards Replacement Mobile Homes above BFE+1’ Critical Facilities above 500-year Higher Standards 2007 Modifications 2 types Floodplain Development Permits Permit Time Limits Flood Increases on Existing Buildings Floodplain Fill Certification Levee Requirements Dry Land Access to Buildings During a Flood Parking Lot Elevation Requirements Substantial Improvements Floodplain Development Permits Overview FEMA requires Floodplain Development Permits Can be administratively burdensome For all “Development” in the floodplain Floodplain Development Permits “Development” means any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials. Floodplain Development Permits The Floodplain Administrator shall perform, but not be limited to, the following duties: “Review all floodplain development applications and issue permits for all proposed development within Special Flood Hazard Areas to assure that the requirements of this ordinance have been satisfied.” Floodplain Development Permits Allow for two types of permits: General Floodplain Development Permit (GFDP) to "Permit" certain man-made activities, no impact on flood heights Individual Floodplain Development Permit (IFDP) required for all other man-made activities, potential to impact flood heights Benefits: Reduce/eliminate paperwork and permitting time FEMA / Model Ordinance compliant Drainage System Maintenance Permit Time Limits Project must begin construction within two years Or a new permit is required Flood Increases on Existing Buildings Clearly defined in ordinance Development in FEMA Floodway – NO Increase on buildings (per 44 cfr) Development in Community Encroachment Area – Increase up to 0.1’ but must obtain variance if on building. Flood Increases on Existing Buildings Community Encroachment Area Existing Floodprone Bldgs Proposed Building Floodplain Fill Certification Projects with fill in the Community Encroachment Area Require a “As-built” map showing the elevations of the ground after work is finished Benefits Reduce the instances of fill or structures being mistakenly placed within the Community Encroachment Area Levee Requirements Overview Levees are earthen berms or man-made walls Built along a creek bank to protect an area from flooding Require monitoring and maintenance All levees have a limited lifespan Levee Requirements Conditions for Approval: Levee location Type of improvements the levee is designed to protect Notification of surrounding property owners Levee maintenance requirements Current floodplain lines do not change No community maintenance of private levees Levee Requirements Benefits Greater restrict the location of levees in the floodplain (public and private) Provide awareness of the function and limitations of levees Access to buildings during flood Dryland Access -Dryland Access means a gravel, paved or concrete access route, at least 12’ wide, which is above the Community Base Flood Elevation and connects an Habitable Building to a Dry Public Street. Dryland Access – Exemptions If the property does not have access to a dry public street, exemptions apply to: -Substantially Improved buildings anywhere within the Floodplain -New buildings outside the Community Encroachment Area Driveway must connect to highest point of street on property -Driveway must be no lower than street Dryland Access – Whitehall Retail Gravel Drive – 12’ Wide Dryland Access Benefits: Assist emergency response vehicles in reaching flood prone buildings Occupants can more safely exit the building during a flood Parking Lot Requirements New or substantially improved non-single family buildings Water depths no more than six inches during a flood (future conditions) Required for all parking areas Variance is available Flood Impacts on Parking Lots Community Base Flood Level FEMA Base Flood Level Compliant Elevated Building Floor Cumulative Substantial Improvements 25% “improvements” within 10 year period New Construction - construction of a replacement structure commenced after total demolition, or renovation/rehabilitation of an existing structure that results in the partial or complete removal of 2 external walls and has a total cost equal to or exceeding 50 percent of the market value of the structure “In Between” Floodplain Structures 600 Buildings with Floor above FEMA BFE +1’ but Below Community BFE +1’ Substantial Improvement Problem City Council Compromise OK if Floor above FEMA +1’, but…. “In Between” Floodplain Structures Must Record Affidavit on Deed that States Acknowledgment of exemption to not meet local ordinance requirements There is potential for flooding in the future Flood insurance may be required in the future FEMA Substantial Improvements may apply in future There will be no local matching flood mitigation funds in the future for this property. Charlotte-Mecklenburg CRS City of Charlotte - Class 5 Mecklenburg County - Class 6 Town of Pineville - Class 6 Save Policy Holders Approximately $160,000 on Annual Premiums How Did We Obtain Class 5?? 1. Higher Standards 2. Drainage System Maintenance 3. Acquisition & Relocation 4. Flood Data Maintenance 5. Open Space 6. Outreach Projects 7. Flood Warning 8. Map Information 9. Elevation Certificates 10.Additional Flood Data 11.Floodplain Management Planning Higher Standards • 1’- 2’ Freeboard •Cumulative Substantial Improvement, •Critical Facilities outside 500-year •CFMs on Staff •Natural Beneficial Functions (Water Quality Buffers, etc) Drainage System Maintenance Storm Water Operations Division Blockage Removal State Stream Dumping Law Encroachments / Notices of Violation Vegetation Management Acquired parcel maintenance Acquisition Acquired 195 buildings resulting in 120 acres of open space Before After Flood Data Maintenance - Flood Map Layers in GIS System - Reference Mark Inventory and Inspections Open Space Hundreds of Acres of Floodplains are permanent open space Many are deed restricted to prevent future building. Outreach Projects •Direct Mailings to 5000+ Floodprone Property Owners •Flyers •Radio Spots •Billboards Outreach Projects (Cont) Exhibits at Realtors Expo and other events Flood Warning •Flood Threat Recognition •Dissemination •Storm Ready Community Map Information - Provide Flood Map Information to Inquirers - Publicize Service Elevation Certificates - Require Completed Elevation Certificate for New Construction - Maintain in Database - ECs for all Pre and Post FIRM Buildings - Available on Web Additional Flood Data - Future Conditions Mapping - Two Floodways - Cooperating Technical Partner (CTP) - Non-FEMA $ Funding $ for Mapping Mitigation Planning FEMA Required All-Hazards Plan Was Developed to Maximize CRS Credits Mitigation Planning All “The End”