UNDER CONSTRUCTION robinhood/dooley STORM DRAINAGE IMPROVEMENT PROJECT Dear Resident: October 2013 Construction continues for Charlotte-Mecklenburg Storm Water Services’ Robinhood/Dooley Storm Drainage Improvement Project. Ferebee has installed new and larger storm drainage pipe under the road at Lake Forest Drive and Eastbourne Road. New storm pipe has also been installed up Eastbourne and much of Woodbridge Road between Eastbourne and Rolling Hill Road. To accommodate this storm pipe several hundred feet of waterline had to be relocated. Concrete curb and gutter is being installed and the pavement patched, with full roadway resurfacing to follow when the entire area is complete. A portion of Robinhood Circle near Harri-Ann Drive will be closed temporarily in the near future while rock is removed under the roadway area to accommodate the installation of a larger culvert for the stream. Other upcoming work includes additional storm pipe installations along Lake Forest Drive in the area of Rolling Hill Road. For more information about this project, please visit our website to view project updates at: http://stormwater.charmeck.org. Click on Storm Water Projects drop down menu in the green bar, then Active Projects and Robinhood/Dooley. Concrete curb and gutter is being installed along Woodbridge Road. If you have any questions, please contact one of the following members: Project Manager: On-site Construction Inspector: David Perry: 704-336-4202 Heather Broome: 704-634-1039 E-mail: dperry@charlottenc.gov Email: hbroome@charlottenc.gov Construction Supervisor: Steve Canter: 704-704-336-7047 Email: scanter@charlottenc.gov Engineering & Property Management Storm Water Services Division 600 East Fourth Street Charlotte, North Carolina 28202 Robinhood/Dooley Project Update HIGHLIGHTS