SIMDAT - Introduction

Four sectors of international economic importance:

Automotive

Pharmaceutical

Aerospace

Meteorology

Seven Grid-technology development areas:

Grid infrastructure

Distributed Data Access

VO Administration

Workflows

Ontologies

Analysis Services

Knowledge Services

The solution of industrially relevant complex problems using data-centric Grid technology.

SIMDAT is coordinated by Fraunhofer SCAI

SIMDAT

(Clemens Thole)

Key Grid Technologies

Key technologies:

Knowledge Services

Integration of Analysis Services

 Ontologies

 Workflow

Administration of Virtual Organizations

Access to Remote Data Repositories

Integrated Grid Infrastructures

SIMDAT

SIMDAT - Strategy

 SIMDAT takes an ambitious route to drive Grid technology to the heart of industrial process:

PM 18 PM 30 PM 48

Phase 1

: Connectivity

Phase 2

: Interoperability

Phase 3

: Knowledge

•Grid infrastructure operational

•Distributed DB access operational

•Base on WSRF or WS

SIMDAT

•Federate data repositories

•Initial virtual data repository

•Pull in NextGRID results

(and others)

•Operate knowledge capture, discovery&mining

•Leverage NG workflow capabilities

•Base on NG Grid stuff

Project Structure

Automotive

Pharma Aerospace

Meteo Grid technology research

Knowledge Discovery

Analysis Services

Ontologies

Workflow

Virtual Organisations

Distributed Data Access

Integrated Grid

Infrastructure Prototypes

Technology

Champions

Fraunhofer

MSC

Ontoprise

Inforsense

BAE Systems

Intel

SIMDAT

End Users

SIMDAT Partners

Capability Providers

Grid Technologists

SIMDAT

Key Requirements – First 18 Months

 Distributed access to (central) databases

 unlimited distributed read access

(limited) distributed upgrades/writes

 use DB to store small–medium datasets

 use DB to store references to large datasets

 provide monitoring, auditing

 Start integrating with upper layers

 engineering PSE, PDM systems

 bioscience middleware (Lion SRS, ...)

 meteo prediction and archival systems

SIMDAT

Key Requirements – Months 18–30

 Work towards virtualization

 federate DBs distributed across partners/sites

 unlimited distributed read access

(limited) distributed update/write

 virtualize SQL queries and data formats

 support different DB implementations (IBM Oracle, ...)

 integrate provenance information

 accommodate large entries

 introduce messaging layer?

 Integrate Grid developments

 other FP6 projects (NextGRID, ...)

 rest of the world

SIMDAT

Key Requirements – Months 30–48

 Complete virtualization

 unlimited distributed read, update, write

 distributed DB management

 integration of ontology–based data/query processing

 integration of advanced workflow techniques

 identify and start to address performance issues

 Integrate Grid developments

 results of FP6 projects

 rest of the world

SIMDAT

First SIMDAT Phase

First three–six months

 consolidate requirements by application areas

 provide gap analysis with OGSA–DAI

 prioritize requirements and produce roadmap

 identify risks and setup mitigation strategy

Months 6–12

 integrate first Grid infrastructure&data access functionality