El t i Pl Electronic Plans Management Training Accept/Reject a Review Date EPM – Accept/Reject p j a Review Date The Electronic Plan Management system (EPM) is an online tool designed to allow architects, engineers and designers the ability to oversee engineers, their projects as they go through the plan review and permitting process. All pertinent information related to the project is visible on the dashboard, with real time updates. The web address is: htt // http://epm.mecklenburgcountync.gov kl b t EPM – Accept/Reject p j a Review Date Once an application has been submitted submitted, Mecklenburg County Code Enforcement will process the information, estimate time for the project and schedule a date for the review. review Once the project has been scheduled it will scheduled, appear on the Open Actions tab. Click on the Project Number. EPM – Accept/Reject p j a Review Date By clicking on the project number, the system goes into the History of the project. At the bottom is Schedule Review Tentative. Click on the PDF to see the d t il on th details the Scheduled Review date. EPM – Accept/Reject p j a Review Date The Schedule PDF gives details such as the date of the review, the estimated cost, cost the submittal date and the cancellation date. When finished viewing the document, close the screen using the x at the top of the page. EPM – Accept/Reject p j a Review Date In order to Accept/Reject the review date, click on Accept/Reject Review Date in the tree view on the left side of the screen. EPM – Accept/Reject p j a Review Date If the date is acceptable, click Accept Review St t Date State D t and d click Submit. EPM – Accept/Reject p j a Review Date If the date is not acceptable click acceptable, Decline Review Start Date. Then, it is necessaryy to choose either: The plans will be ready for review on: and indicate a date or Don Don’tt know when the plans will be ready for review. Then click submit. This will send the information to MCCE so the coordinator can schedule a new date for review. EPM – Accept/Reject p j a Review Date If the date is rejected, rejected the coordinator will reschedule the project and the new date will appear on the History page. Repeat the previous steps to Accept or Reject the date. date EPM – Accept/Reject p j a Review Date When the review date is accepted, it appears on the History page. EPM – Accept/Reject p j a Review Date On the Open Actions tab, it indicates the Gate is open. This means the plans are ready to be submitted to Mecklenburg County Code Enforcement Enforcement. EPM – Accept/Reject p j a Review Date Thank you for using this training demonstration If you have additional demonstration. questions on Accept/Reject a Review Date, please contact: OnSchedule Coordinators 704-336-3837 x 1