, , Enclosure NATIONAL FIRE PLAN COMMUNITY 3A -Project ASSISTANCE Application Summary Form AND WILDLAND for Fuels Treatment /2; URBAN INTERFACE PROJECTS Projects Applicant Applicant/Organization: Friends of the Greensprings (FOG) Phone: (541) 482-2706 Type of Applicant: (enter appropriate letter in box) OJ FAX: (541) 482-2859 A. State B. County C. Municipal Township E. Interstate F. Intermunicipal G. SpecialDistrict .D. Emall. greener@mlnd.net H. Independent SchoolDistrict I. State-Controlled Institutionof HigherLearning J. PrivateUniversity K. IndianTribe L. NonprofitOrganization M. Other (Specify) Address (Street or P. O. Box, City, State, Zip): 15097 Hwy 66, Ashland, OR 97520 Project Coordinator Project Coordinator (Name and Title): Gerald Green, Chairman Organ ization/Jurisdiction: Friends of the Greensprings Phone: 482-2706 I FAX: (541) 1 Email: greener@mind.net Project Information Project Title: FOG Community Fuels Reduction Project Proposed Project Start Date: Jan 1, 2005 Proposed Project End Date: Dec 31, 2007 Federal Funding Request: $195,328 Total Project Cost $334,558 Are you submitting multiple projects? If so, please prioritize, and explain if the projects are stand alone, sequential or other: Yes, these component parts are all sequential. The priorities are listed with each part below. Brief Project Summary: Who, What, Where, Desired Outcomes in relation to NFP Goals and Community Risk Assessment and Mitigation Plans (This should summarize page 2). This project is an extension of FOG's current grant and would enable us to focus on these four components: 1. Defensible Space grants for an additional 130 homes, 130 acres treated, (highest priority), 2. Continuation of mapping and further work on the area-wide comprehensive fire plan (second highest), 3. Extended fuel breaks for an additional 114 homes, 256 acres treated, (third highest), 4. Three Strategic Project defensible Community fuel breaks, 74 acres treated, Project I,.ocation: County: Adjacent to C-SNM Jackson Nam!t:A F~dfral, State or Tribal contact with whom you coordinated this proposal:Paul Galloway Community Assistance Tech. RRNF , ,""', (fourth highest). asks landowners to join and cost share in a voluntary effort to reduce high fuel loads and create home on their Proiect an areao:Wide-comDreh .fire Dlan. Federal Congressional District: Dist. 2 I Telephone number of Contact:541-560-3404 Enclosure 3A (Page 1 of 3) -Project Narrative Description Applications fimding mustincludea narrativeresponsethatdescribestIle proposal. Pleasedo not submitresponseslonger thanonepage' single space,for 12-pitch font. Describeprojectincludin2,but notlimitedto: Address. project location(e.g.,Watershed, .project relationshipto the communityrisk assessment and theseitems neighboringcommunity) mitigationplan asapplicable:.anticipated outcomes .amount or extentof actions(acres,numberof homes,etc.) .community partnersandtheir .project timeline and matchingor contributedfunds role(s) .proponent's ability to completeproject For this project,explainthe level of cooperation,coordinationor s1rategic planning,througha "Local Coordination Group." If you haven'tworked with a local coordinationgroup, why not? This project asks landowners adjacent to or intermingled in Cascade-SiskiyouNational Monument (CSNM) to join a voluntary community effort to reduce fuels and create defensible spacearound their homesites. About 102,000 acres of checkerboard C-SNM, BLM and private lands extend from 1-5 eastward to the Jenny Creek drainage and from the California/Oregon border northward to the Hyatt Lake Recreation area. This project representsa continuation of our current grant. 484 homesites have previously been identified and our efforts have beento initially get defensible spacegrants for all of these homes. As these grants are completed a determination is made by the ODF officer as to whether the site needs additional extended fuel break work. We are also involved in developing a comprehensive fire plan for this area that meets the needs of the private landowners, but also mesheswith our neighbor's plans, Fire Dist. #5, ODF, BLM, C-SNM and JacksonCo. Over the last eight years, FOG has formed neighborhood fire action plans and is now involved in joining these neighborhood plans into an overall comprehensive plan for the whole 101,760 acres. In previous grants, heavy fuel loads were located and grant money was applied to homes and extended acreagesin high risk areas. This grant will attempt to complete 75% of the total defensible home spacesand begin to focus on extended fuel reduction acreagesand strategic, identified fuel breaks. Priorities for this project are as follows: (1) GIS mapping component of upgraded fire plan $5340 (2) Defensible Spacefuel reduction at 130 new homesites 130 acres 50/50 cost share $42,500 (3) Extended acreagefuel reductions at 114 homesites 256 acres 50/50 cost share $84,480 (4) 100 foot wide community fuel break following the CORP Railroad lines from their intersection with Slide Creek southward 4 about miles to the intersection with 1-5, 30 acres $15,000 (5) 100 foot wide community fuel break following the Talent Irrigation District canal from Greensprings Reservoir eastward about 4 miles to Larry Barham's property 29.75 acres $14,875 (6) 100 foot wide Corral Creek Road community fuel break from Hwy 66 northward for 6250 feet. 14.3 acres $7150 (7) Project Manager position will overseeproject, file progress reports and upgradesto the fire plan. $7000 (8) Provide project outreach, processrequests, schedule,coordinate fuel reduction work $18,350 (9) Provide reflective house numerals and backing plates for 200 homes not within Fire Dist. #5 $633 Total Project $195,328 FOG will provide ODF with the homeowner requests for fire consultation. ODF will authorize work and provide field pre-and post-inspections at eachhome or project. Landowners will have all responsibility and liability for work done on their property. Contractors will be engaged by landowners at their discretion, and will look to landowners for satisfaction of all contract terms. ODF will process approved fire workplans, and provide direct payment to landowners on all completed projects. Enclosure 3A (Page 2 of 3) -Project Evaluation Criteria Applications for funding mustincludenarrativeresponsestlIat addressthe following threecriteria. Be sureyou addresseveryone briefl, et thorou .Limit our res onsesto the area rovided. 1. Reducin Hazardous Fuels 50 oints A. Describe the community infrastructure that will be protected. B. Explain how the proposal reduces fire behavior in high hazard areas by describing the fuels to be disposed or removed, and the techniques and timing of the treatments. C. How will the proposed treatments be maintained in future years? D. How will you use multimonitorin to im rove this and future ro'ects? The main infrastructure protected in this project are the 484 homes, Pinehurst School, Oregon Extension of Houghton College, Green Springs Inn, Pinehurst Inn, Box R Ranch Resort, Camper's Cove, Hyatt Lake Resort, Greensprings Christian Fellowship, Greensprings Power Plant, Buckhorn Springs Resort, Callahan's Lodge and the Hyatt Lake Recreation area. Homesite Fuel reductions and extended acreage requests are determined by the ODF evaluation. FOG has identified high fuel areas from BLM fire hazard GIS maps and backed that up with on the ground evaluations that verify the map information. Homesites in high fuel areas have been given priority in previous grants and in this application. Homeowners in many areas find dense, mixed conifer, second growth interspersed with Manzanita and Buckbush. Homeowners will prune to remove ladder fuels, thin from below to reduce stem density, remove brush species and break, pile and bum or chip the slash during low fire danger periods. In addition, three, 100 foot wide community fuel breaks are planned that expand existing fuel breaks and offer the most potential of being able to stop large fires moving cross country. Yearly inspections of the strategic fire breaks and homesites can be organized by ODF during their annual contact with the residents of the project area. Additional work can be recommended to the homeowner at that time, by the ODF Community Fire Officer. Project trains landowners to recognize and treat fuel buildup through annual fire training. Homeowner evaluation, ODF inspections and FOG assistance to the frail and elderly, along with continued FOG sponsored, educational workshops on firefighting and related topics will form the basis of the monitoring effort. FOG also anticipates a good deal of community input as a comprehensive fire plan is developed for the area. C-SNM's fife management plan is expected to be released this year and that also will involve community input and adjustment of FOG's plan to bring it into alignment. Enclosure 3A (Page 3 of 3) -Project Evaluation Criteria 2. Increasin2Local Capacity(25points) A. How would the proposalimprove or leadto the improvementof the local economyin termsof jobs and sustainableeconomicactivity? B. How manyjobs are expectedto be createdor retainedand for how long?(Pleasedistinguishbetween essentiallyyear-roundand seasonal jobs). C. Whattools and skills will be gainedor utilized as a resultof this project? D. Will biomassbe utilized; if so, in what mannerand how much? Homesite fuel reduction begins a process of landowner involvement which sustains local jobs for thinning, pruning, and slashdisposal initially on 1- acre, but later on extended fuel breaks, forest managementplans, and forest stand improvement. Currently 11 resident individuals actively work year around in the proposal area, three as forestry consultants and eight on five fuels crews. There is a resident contract excavator for brush removal and water source ponds, and two portable sawmill contractors. The BLM and ODF will continue to co-fund a year-round Community Forest Officer to handle the increasedworkload; Service Forester will continue as part ofODF StewardshipForestry. FOG will continue to be an available model to other Oregon communities. Skills gained by the homeowners at FOG sponsoredworkshops range from learning how to use firefighting tools to sizing water tanks and distribution systemsto cover their defensible space. Homeowners gain an awarenessof fire and become much more proactive once they start to get involved. The neighborhoods begin to look out for each other and develop communication links and responseplans that are ready to go in case of fire. Poles, rails and posts are the main biomass products, with some small scale portable lumber milling. Firewood is marketed locally or kept for homeowner use. Demonstrating Community and Intergovernmental Collaboration (25 Points) A. How will this project implementa communityrisk assessment and mitigationplan?Includenameof plan, date it was prepared,andlocal contactto get a copy of the plan if requested. B. How hasthis treatmentbeencoordinatedwith adjacentlandownersand local/Stateffribal/Federalagencies? C. Identify the cooperators/partners involved in implementationof this project. D. Describethe extentof currentlocal supportfor the project, includinganycost-sharin~agreements. FOG completed the Emigrant Creek Watershed AssessmentProject in 2001 and the Keene Creek Watershed Assessmentin 2004. Both of these projects integrate wildfire planning with wildlife values and watershed protection across all ownerships within the project area. Copies of these plans are available from FOG or the Medford, Ashland and Southern Oregon University libraries. Both studies identified uplands and mapped high fuel areas with respectto homesites in the area. Initial grants treated homesite's defensible spacesin the most severely overgrown areas. Critical community fuel breaks were identified and high priority treatment completed. For three years, FOG has periodically convened an inter-agency federal and state group to addressgaps and overlap problems affecting all landowners. Fire District #5, ODF, BLM, Boise, US Timber, Superior Lumber, Central Oregon Pacific Railroad, J.H. Baxter, Timber Products, Talent Irrigation District, ODOT, JacksonCounty, BOR are all kept abreastof the fire planning situation in the area. Most of the individual contracts awardedto homeowners by ODF have a 50/50 cost share match. FOG has seeninvolvement grow steadily over the last five years. At the completion of this grant, we estimate that 75% of the possible homesites will have defensible spacework completed. Homeowner extended breaks and community fuel break work will be ongoing. FOG's comprehensive fire plan for the area will be established and aligned with our neighbors. Enclosure \ "",,, .J , " Tasks Work Form Time Frame; Convene FOG Wildfire Committee Meetings Plan fire training , 3A -Project .: Responsible March. April, May 05 and 06"~' meeting ( ..;,!;,,';'.'/-, Update Neighborhood mailing lists , Update Grnnt progress Schedule neighborhood meetings Mail neighborhood meeting invitations !':.' ..." , :,' ' , Identify disabled and handi~ped landowners Provide telephone follo~p' An'ange and host neighborhood meetings ,,' , ..\! 'f' ,',,::cf': , " Community .'- 4 1,1;" ~ ;:' ". ,~:' 1\.' i Community Coordinator ' - "'::7:...~~,.. )' "~;~' \"c ~// \ ,'. -, ..\;' " \. , ,~j' Report status tQ..WildfireCommiltee and"-'-.:ToFOGboard ,-",'j'" ," ,,":.. .' C Coordinator , , , ,\\. .~ Project Manager ?:,,:,: " ,,' '"-'" ., """,,,' "' May 05,and May 06 ,J , ' '~ j ," ,,' , ' Feb 05 tbru 06 J ", :',:'"" ;"',., Generate quarterly reports and process requests for reimbursement '- work Project Manager ..' ,'1,".. ," ".,i'\' C, ;; Identify fuel break sites and coordinateifield;... i' ' ,;,,:"' Sept. '()5~~, ,'. '\' ' ;~\"\;',~".'::"( ."j"'.:"" ,j ,'"v ',~ Flag sites, write prescriptions, get landowner ,\\ ""~ \ {,v-"~'"~1.j.~'" .,,' ~i' ; , -' -,,~\. ~i4' ,~ "i' ,~, " 'I ..' Conllnunity Coordinator and Project Manager ,,', ',..-," . authorization. utility clearnnces and contractor;, ,sept tbru Oct 05, 06 Project Manager Processfire consulation requests to ODF Project Manager participation Generate special lists for ODF seasonalcrews \,\ ,\' Ian. 05,06 Community Coordinator Oct 05 and 06 Community Coordinator I)ec 06 Project Manager Coordinate with yearly work schedule Schedule and host recognition events An'ange publicity Write final project report Party Enclosure 3D Project Budget Cost Category Description Federal Agency Personnel ~ommunity Cooroinator Project Manager Applicant Partner 1 ODF/BLM Subtotal Partner 2 Total Landowners 13,500 7,000 20,500 13,500 7,000 20,500 Fringe Benefits Independent contractors none Subtotal Travel Project travel Subtotal 480 150 630 480 150 630 Equipment House Numerals/Backing 633 633 Subtotal 633 633 Subtotal 1800 570 2,370 Supplies Plinting/Postage/Maili~ pffice/Field Supplies 1200 3000 570 3570 1200 Contractual Fuel Reduction contracts Processed by ODF 164,005 10,000 126,980 300,985 Subtotal 164,005 10,000 126,980 30~ GIS mapping ~isk Management, Office, Fiscal Subtotal 5,340 2,000 7,340 900 900 195,328 2,250 Other Total Costs 5,340 2,900 8,240 10,000 126,980 334,558 Project (Program) Income1 (using deductive alternative) Programincomeis the grossrevenuegeneratedby a grant or cooperativeagreementsupportedactivity duringthe life of the ~t Programincomecan be madeby recipientsfrom feeschargedfor conferenceor workshopattendance,from rentalfees:acned from renting out real propertyor equipmentacquiredwith grantor cooperativeagreementfunds, or from the sale of:ommodities or itemsdevelopedunderthe grant or cooperativeagreement.The useof ProgramIncomeduringthe projectperiod nayrequire prior approvalby the grantingagency.