ID Number 2007-48 Fuels Treatment Projects Application NATIONAL FIRE PLAN COMMUNITY ASSISTANCE AND WILDLAND URBAN INTERFACE PROJECTS Applicant Applicant/Organization: Chelan County Conservation District Type of Applicant: L (Nonprofit Organization) Email: mike.rickel@wa.nacdnet.net Phone: 509-664-0268 FAX: 509-664-0255 Please Call Ahead for FAX: Off Please Call Ahead for FAX: Off Address (Street or P. O. Box, City, State, Zip): 301 Yakima Street, Room 307 Wenatchee, WA 98801 Project Coordinator Project Coordinator (Name and Title): Mr. Mike Rickel, Natural Resource Specialist Organization/Jurisdiction: Chelan County Conservation District Email: mike.rickel@wa.nacdnet.net Phone: 509-664-0268 FAX: 509-664-0255 Project Information Project Title: Chumstick Watershed Fuels Reduction Project Location: Leavenworth, Chelan County, WA County: Chelan Congressional District: 4 Latitude: 47.644 Longitude: -120.675 State the desired outcome in relation to NFP Goals and the Community Wildfire Protection Plan (CWPP). Project Objectives: The Chumstick Watershed Fuels Reduction Committee is an umbrella group overseeing approximately 18,000 ac of private land and 1,800 people in 600 homes within a 50,000-ac watershed. This project would implement treatments recommended to reduce hazardous fuels within defensible space based on assessments (NFP-299) completed under a previous grant. Fuels treatment would be completed on 200 homes, and hazards beyond homesites would be reduced on 200 ac, and biomass would be utilized. Treatments beyond homes would focus on ingress/egress safety for residents and fire suppression personnel, and strategic fuel breaks, based on priorites in our CWPP, and in coordination with adjoining USFS fuels reduction projects. This would implement the NFP goal of hazardous fuel reduction. A fuels specialist-consultant would manage subcontracts and a grant administrator would develop agreements, similar to the model used successfully to conduct assessments on homes in the project area. Name of CWPP: Name of Communit(y/ies) at Risk: Leavenworth Area CWPP Leavenworth, WA Proposed Project Start Date: 03/01/2007 Proposed Project End Date: 12/31/2008 Federal Funding Request: $200,000.00 Total Project Cost: $264,000.00 Yes Are you submitting multiple projects? If YES indicate the relationship of the projects to one another: A (Stand Alone) If YES, please list the titles of projects by priority and briefly explain their relationship. Priority #1: Chumstick Watershed Fuels Reduction (ID No. 2007-48). #2: Chelan County Biomass Utlization (ID No. 2007-98). Both projects implement high priority aspects of the Leavenworth CWPP. The #2 project would allow better utilization of biomass generated from #1, and encompasses a much larger area, and is in coordination with a larger group including Leavenworth Neighbors, Ponderosa, Peshastin, Squilchuck CWPPs, Chelan Co. PUD, USFS, WADNR, U of WA, LongView Fibre, and Yakama Nation. Name of Federal, State or Tribal contact with whom you coordinated this proposal: Organization/Jurisdiction: USDA Forest Service, Wenatchee River Ranger Dist 1) Vaughan Marable, District Ranger Phone 509-548-6977 Ext. 200 2) Len Riggen Phone Washington DNR 509-925-0969 3) Kelly O'Brien Phone Email vdmarable@fs.fed.us Email len.riggin@wadnr.gov Chelan County Fire District 3 509-548-7711 Email chief3@nwi.net Project Planning Information Name of Local Coordinating Group: Chelan County (Fire Advisory Board) LCG For this project, explain the level of cooperation, coordination or strategic planning, through a "Local Coordination Group." If you have not worked with a local coordination group, why not? Extensive coordination with LCG, including CCFD#3, USFS, WADNR, and implementing Leavenworth CWPP. List federal lands that are adjacent to the project and proximity. USFS intermingled with project area. BLM and USFWS within 3 miles A) Is there a current hazardous fuels treatment or one that is planned in the next three years on federal land that is adjacent to this project? Yes B) Specifically is this project adjacent to a current prescribed burn project or one that is planned in the next three years on Forest Service lands? Yes Please indicate planned treatments and associated acres: Treatment Thinning Acres 7375 Treatment Biomass Removal Acres 650 Treatment Hand Pile Burn Acres 2875 Treatment Grazing Acres 3050 Treatment Acres 0 If you have a treatment type other than standard types above: Treatment Broadcast Burn Acres 2500 Project Evaluation Criteria Applications for funding must include narrative responses that address the following criteria. Be sure you address every one briefly, yet thoroughly. 1. Reducing Hazardous Fuels (40 points) A. Describe the community infrastructure that will be protected. This should include how this project implements all or part of the CWPP strategy. (15 points) Response: Fire protection will be improved for 600 homes and businesses in the project area, as well as ingress/egress routes that support fire suppression activities and resident evacuation, as well as the neighboring communities of Leavenworth and Plain. Fire risk will be reduced for commercial private timber land, two major power transmission lines, a railway, and a county highway. This proposal implements 5 of the 10 fuel feduction priorities from the Mitigation Action Plan of the Leavenworth Area CWPP. B. Explain how the proposal reduces fire behavior in high hazard areas by describing the fuels to be disposed or removed, the techniques and timing of the treatments, and the treatment location relative to the values to be protected. (15 points) Response: Defensible space in the immediate vicinity of structures, 30 to 300', depending on vegetation type and topography, would be the highest priority for treatment. Fuels removed would be based on risk assessments completed under an earlier grant. Biomass would be utilized by chipping and spreading, firewood, merchantable small-diameter material sent to the mill, or piled and burned. Thus thinning and ladder fuel removal would decrease fire intensity and flame lengths, and reduce the risk of crown fire and structure ignition. Strategic fuel break coordination between private and federal parties C. Explain how the project is designed to reduce smoke production impacts that affect public health. (10 points) Response: Most biomass removed from defensible space will be unmerhantable, so chipping and spreading would be utilized to reduce smoke. The Chelan County chipper will be used to the maximum extent possible for this material. If piles are burned, professional fuels reduction specialists will burn them or advise landowners to burn at high temperatures when they are dry, cured, and no inversion exists. Larger material (mostly) from fuelbreaks would be sent to the local mill or burned more efficiently as firewood. 2. Increasing Local Capacity (20 points) A. How would the implementation of the proposed project improve or lead to the improvement of the local economy in terms of jobs and sustainable economic activity assuming that these grant funds would be used as "seed monies" for future projects. i.e. How many community supported jobs would be created and for how long would they expect to last? (10 points) Response: Based on similar work completed by our neighbors to the south, 15 local contractors have been identified. Administrators and fuels-specialists would oversee and coordinate. Experienced personnel are already working in adjacent areas on similar projects, and will continue. Initial work would take 2 years, with maintenance ongoing indefinitely. Successful completion would lessen impacts of fire and smoke to Leavenworth's multi-million dollar tourism industry. B. Will biomass that is produced by the project be utilized; if so, in what manner and how much? (10 points) Response: Biomass will be utilized extensively by sending merchantable material (and subsidizing some non-merchantable) to our local mill, chipping smaller material and using as mulch, or using some for firewood. The large Chelan County chipper will be staged in our area and used. Defensible space will produce modest amounts of biomass, while fuelbreaks will produce large quantities. Other biomass utililization options are being explored in the County, and we will take advantage of all opportunities. 3. Demonstrating Community and Intergovernmental Collaboration (20 Points) A. Describe how this project has been collaborated and coordinated with adjacent landowners, local/state/Tribal/federal agencies, and community groups such as neighborhood associations. (10 points) Response: Extensive collaboration has occurred producing the Leavenworth CWPP among Chumstick Watershed Fuels Reduction Committee (local landowners), CCCD, CCFD #3, WA DNR, the USFS, the Leavenworth Neighborhoods Fuels Reduction group (our neighbors to the south), and Ponderosa CWPP (neighbors to the northwest). The project implements the LCWPP. Strategic fuelbreaks will be coordinated with Ponderosa CWPP and USFS, who is beginning planning for a large fuels reduction project (Chumstick) here in 2006. B. Describe the communities/partners contributions to this project such as: cash or in-kind contributions, cost share agreements, equipment, or labor (including volunteer work). (10 points) Response: Committee members have & continue to contribute 100s of hours of vol. time (in-kind $). Implementation of a fuels reduction demo project at Redtail Canyon Farm in our project area has contributed $15K in-kind, & field trips & future demos will continue. Two Firewise workshops were conducted, with vol. coordination, & more are planned. USFS & CCFD#3 would contribute $13.5K as in-kind or equip. Landowners sweat equity & equip. would contribute $50.5K. USFS could spend >$ 4. Managing Cost Efficiency (20 points) Discuss the process you used to arrive at your cost structure for the main Project Budget areas such as personnel, equipment, supplies and other (i.e. overhead). In your response please justify: cost per acre, purchase of equipment, percent of overhead, percent of partner or matching funds, and portion of administration cost. (20 points) Response: For defensible space treatments, we estimate an avg. cost of $600/home, and an avg. area of 0.75 ac, or $800/ac. For 200 homes proposed, this totals $120K. For fuels reduction on 5 miles of ingress/egress routes, to 100' on either side, we estimate a cost of $800/ac over an area of 120 ac, totalling $96K. For strategic fuel breaks, we estimate a cost of $600/ac, so remaining $48K would accomplish 80 ac, or ~2 linear miles at 200-400' wide. Any cost savings from defensible space or road work would be used to lengthen fuel break. Future grants will be sought here as well to complete fuelbreaks. These average costs account for overhead (25% of salaries and benefits), matching funds (32% of grant total), and administration costs. Defensible space is highest priority, to be funded and accomplished first, followed by ingress/egress, and finally strategic fuelbreaks. Strategic fuelbreaks on private property would be planned in cooperation with USFS that has intermingled lands, and is beginning planning for a landscape-scale fuels reduction project in the Chumstick in 2006, and could accomplish NEPA. This would further leverage budget, as well as effectiveness of fuelbreak, and efficiency of project to complete. USFS will likely spend ~$500K in next 3 years on the Chumstick Fuels reduction project not claimed as matching on budget sheet. Cooperation with adjacent Ponderosa CWPP on fuelbreak planning and implementation will also leverage efficiency. Project Work Form Tasks Time Frame Prioritize landowners to participate in this phase of treatments Spring - Summer 2007 Hire consulting fuels specialist-contract administrator to coordinate work with landowners Summer 2007 Complete defensible space work Implement land-scape scale recommendations beyond defensible space from CWPP. Ingress/egress and fuelbreaks. Public Education and outreach Final project report Responsible Party Chumstick Fuels Reduction Committe, CCFD#3, CCCD CCCD, Chumstick Fuels Reduction Committee Summer 2007 - Fall 2008 Contract administrator with oversight from CCCD Fall 2007 - Fall 2008 Contract administrator with oversight from CCCD Ongoing December 2008 Chumstick Fuels Reduction Committee with cooperation with conctractors and agencies and adjacent hazardous fuels reduction groups. CCCD Project Budget Cost Category Description Federal Agency Applicant Chelan Co. FD US Forest #3 Service Landowners Partner 1 Partner 2 Partner 3 Total Personnel $20,000.00 $0.00 $0.00 $0.00 $0.00 $20,000.00 $0.00 $0.00 $2,000.00 $10,000.00 $50,000.00 $62,000.00 $20,000.00 $0.00 $2,000.00 $10,000.00 $50,000.00 $82,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $500.00 $1,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $500.00 $1,500.00 $0.00 $0.00 $0.00 $500.00 $0.00 $500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $500.00 $0.00 $500.00 Fuels Consultant $30,000.00 $0.00 $0.00 $0.00 $0.00 $30,000.00 Fuels Reduction $150,000.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $180,000.00 $0.00 $0.00 $0.00 $0.00 $180,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $200,000.00 $0.00 $2,000.00 $11,500.00 $50,500.00 $264,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Administrator Cooperators Subtotal Fringe Benefits Subtotal Travel Subtotal Equipment GIS/Computers Subtotal Supplies Maps Subtotal Contractual Subtotal Other Subtotal Total Costs Project (Program) Income 1 (using deductive alternative) Program income is the gross revenue generated by a grant or cooperative agreement supported activity during the life of the grant. Program income can be made by recipients from fees charged for conference or workshop attendance, from rental fees earned from renting out real property or equipment acquired with grant or cooperative agreement funds, or from the sale of commodities or items developed under the grant or cooperative agreement. The use of Program Income during the project period may require prior approval by the granting agency. 1