FOR OFFICIAL USE ONLY Project Application ID: Funding Request: 2011-000 $ 0 NATIONAL FIRE PLAN WILDLAND-URBAN INTERFACE COMMUNITY ASSISTANCE GRANT PROPOSAL Applicant Information 1 Applicant/Organization Washington State Department of Natural Resources Type of Applicant:: State/County Contact Person: Darrel Johnston Address: P.O. 47000 1111Washington Street SE City Olympia State WA Zip: 98504-7037 : : Phone: 360-902-2112 Ext. FAX: 360-902-1757 Call Ahead for FAX: Phone (Work/Cell): 360-902-2112 Email: darrel.johnston@dnr.wa.gov Project Information 2 Name of Project: Lake Wenatchee/Ponderosa Fuel Reduction Proposed Start Date: 2011 Proposed End Date: City: Leavenworth State: County: Chelan Congressional District: Latitude (decimal degrees): 47.5895 Longitude (decimal degrees): Please indicate planned treatments and associated acres 2013 WA 4th -120.6562 150 Total Actual Project Acres: Treatment (1) Acres Treatment (2) Acres Total Treatment Acres Thinning 150 Chipping 50 Treatment (3) Acres Treatment (4) Acres 550 Pruning 150 0 Treatment (5) Acres Treatment (6) Acres Cost Per Acre Hand Pile 100 0 Treatment (other-A) Acres Treatment (other-B) Acres $363.64 Hand Pile Burn 100 0 Please indicate how this project relates to a Community Wildfire Protection Plan (CWPP): This project is identified in the CWPP. yes Is the project adjacent to federal land fuels reduction projects completed within the last three years or planned with the next three years? yes Is the project in a high priority landscape area identified in the State-wide Assessment? yes Lake Wenatchee-Plain, Ponderosa, and Chelan County Wildfire Name of CWPP and Protection Plans. Lake Wenatchee, Plain and Ponderosa Communities. Community at Risk: Page 1 Project Area Description All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. Provide a brief overview of the project and the project area. (If applying for a fuels reduction project, identify vegetation types, fire regime) [1500 Characters Maximum] 3 The desired outcome is to reduce the risk of catastrophic wildfire through a coordinated effort of fuel reduction across private and federal lands within the Wildland Urban Interface (WUI) of the Lake Wenatchee, Plain, and Ponderosa communities in Central Washington. The project focuses on non-federal lands and is one of many fuels reduction projects in a multi-year strategy targeting areas that are designated as a high priority within Chelan County as part of the overall Chelan Countywide CWPP as well as the Ponderosa and Lake Wenatchee community level CWPPs. The project area is within the Wenatchee Watershed Resource Inventory Area identified as a high priority landscape for fuels reduction in DNR’s Statewide Forest Resource Assessment and Strategy. It complements the USFS fiscal year 2012 Natatoc/Plain project (see map). This project will focus on the development of strategically located shaded fuel breaks and defensible space treatments. Treatment areas consist primarily of overstocked Ponderosa Pine and Douglas fir habitat types. The objective is to alter stand spacing and structure resulting in stand compositons more representative of historical naturally occuring open conditions that reduce the threat of catstrophic wildfire and provide a better diversity of wildlife habitat. Slash disposal will utilize biomass options whenever possible. Feedback from the CWPP process confirms the willingness of landowners to participate in hazardous fuels reduction. Project Timeline All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. Provide a timeline for the project. [500 Characters Maximum] 4 October 2011: Draft contracts and solicit bids for contract crew(s). November 2011: Conduct promotion and landowner outreach/recruitment. Award and sign contracts. December 2011-November 2013: Conduct field visits, project layout, project mapping, fuels reduction initiation, project unit compliance, invoicing and documentation. December 2013: Complete final report. Agreement Expires. Page 2 Scope of Work All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. Provide a brief scope of work which clearly describes how grant funds will be spent. (This should be more specific than the project description) [1500 Characters Maximum] 5 Grant funds will be used to hire local contractors to assist landowners with overstocked tree thinning, brush removal, limb pruning and slash disposal. Where economical, biomass may be removed and utilized. On favorable terrain, masticating machines may be used. On steeper slopes, hand crews will pile and burn or use chippers to dispose of slash. Grant funds will support DNR staff who will coordinate with partnering agencies, conduct outreach (promote community fire prevention/firewise education), prioritize specific project areas, perform environmental review, conduct wildfire risk assessments, work with landowners to develop projects, coordinate with contractors, perform project unit compliance, manage contracts and monitor the project. This project has been developed in collaboration with the Wenatchee River Ranger District to assure fuel treatments are complementary across ownerships and with the Cascadia Conservation District who is working on individual home assessments and community level assessments. The costs shown in the budget are estimates derived from work completed under other contracts awarded by DNR. The project is adjacent to the USFS fiscal year 2012 Natapoc/Plain project (see map). Contact for the USFS fuels management program on the Wenatchee River Ranger District is Michelle Ellis (Division Chief Wenatchee River Division) 509-548-2581. Interagency Collaboration All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 6 Specify the private, local, tribal, county, state, federal and/or non-governmental [501(c)(3)] organizations that will contribute to or participate in the completion of this project. Describe briefly the contributions each partner will make (i.e. – donating time/equipment, funding, etc.) [500 Characters Maximum] Lake Wenatchee, Ponderosa, and Plain community groups Cascadia Conservation District Firewise facilitation/ assessment crews NCW RC&D- Time/support/biomass utilization collaboration USFS (Wenatchee River District)-support/project collaboration WADNR-time/support Chelan County NRCS-support Chelan County Public Works-time and Support WADFW-collaboration/time WSU Extension- support Chelan County Fire District #4 & 9- support collaboration Lake Chelan State Park-Planning and practice coordination “TAPASH” Interagency Cooperative to improve forest health on a landscape approach. Members include. USFS, YIN, DNR, Nature Conservency, Cowiche Canyon Conservency, and WDFW. Page 3 Project Longevity / Maintenance All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 7 Clearly describe how the proposed treatments will be maintained over time. [500 Characters Maximum] A Fuels Reduction Agreement must be signed by the landowner before any fuels treatment can occur. The Agreement contains standard language requiring the practice be maintained for a minimum of ten years which is standard for all DNR SE Region administered grants. Project compliance will be conducted by experienced DNR foresters. Random compliance checks will be completed by community fire planning partners to ensure project work is being maintained by landowners. Biomass Utilization All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. For the purpose of this application, biomass utilization is defined as any practicable end-use of the material that has value, or the trading of capital for the woody material. 8 Biomass from treatment(s) will be utilized. (check one) yes no 1) If yes, how is it planned to be used, or what is the end-result (wood products, steam/energy, mulch etc.) [500 Characters Maximum] This is a fuels reduction project. However, merchantable products may be removed and hauled to local mills, subject to prevailing market conditions. Biomass utilization is unlikely given current market conditions and lack of biomass facilities within a reasonable trucking distance. The most likely form of biomass removed would be hog fuel. Biomass in the form of firewood may be utilized by participating landowners. 2) Identify company or contractors involved in project utilization. [250 Characters Maximum] At this time there are no companies involved or contractors involved in project utilization due a lack of biomass receiving facilities. 3) Estimate anticipated value of biomass to be removed ($/Green Ton; $/Bone-dry Ton; $/Hundred Cubic Feet (CCF), $/Acre Treated) [250 Characters Maximum]. Any dollars earned should be identified as program income on project budget sheet. At this time biomass is not marketable in this area due to lack of local mills. Page 4 Project Budget Cost Category Description Federal Agency Matching Share Applicant Partner 1 Partner 2 Total Personnel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $16,800.00 $0.00 $16,800.00 $6,048.00 $0.00 Subtotal $6,048.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $6,048.00 $0.00 $6,048.00 $1,100.00 $0.00 Subtotal $1,100.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,100.00 $0.00 $1,100.00 $0.00 $0.00 Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,650.00 $0.00 Subtotal $1,650.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,650.00 $0.00 $1,650.00 $169,744.00 $0.00 Subtotal $169,744.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $169,744.00 $0.00 $169,744.00 $4,658.00 $0.00 Subtotal $4,658.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,658.00 $0.00 $4,658.00 $16,800.00 $0.00 Subtotal $16,800.00 Planning & Implementation Fringe Benefits Planning & Implementation Travel Planning & Implementation Equipment Supplies Planning & Implementation Contractual Fuel Reduction Crew Other Indirect Charges Total Costs $200,000.00 $0.00 $0.00 $0.00 $200,000.00 Project (Program) Income1 1 Program income is the gross revenue generated by a grant or cooperative agreement supported activity during the life of the grant. Program income can be made by recipients from fees charged for conference or workshop attendance, from rental fees earned from renting out real property or equipment acquired with grant or cooperative agreement funds, or from the sale of commodities or items developed under the grant or cooperative agreement. The use of Program Income during the project period will require prior approval by the granting agency. Application Instructions: All blocks are fill-in enabled and character locked. Applicants must fit all information into the allotted space. The application can be no longer than 5 pages. Applications that have been modified to go beyond 5 pages and any attachments (except the required map) will not be considered by the review committee. Application guidelines by box number: Box 1 Basic applicant information. Box 2 Project information includes basic information about location, CWPP, ect. – Total Treated Acres and Cost Per Acre (total treatment acres/ total project cost = CPA); please note these fields are automatically calculated. – Latitude and longitude (http://www.census.gov/cgi-bin/gazetteer ) Click the word “Map” to find specific location. Click a spot on the map to find Lat-Long. You may also determine the Congressional District for this area by turning this feature “On,” which is located to the left of the map. Box 3 The project area description should give a brief overview of the project and details or specifics. Box 4 The project timeline should include: begin/end dates, milestones, quarterly accomplishments, etc. Box 5 The scope of work should explain exactly how the grant dollars will be spent on this project. Unlike the overview, this will provide the specific details of the project. Please remember to be concise. Box 6 Clearly show collaborative elements and partners associated with the project. Box 7 Project longevity, planned maintenance, and monitoring for specified amount of time. Identify change of fuels condition and length of time treatment will be effective. Box 8 The Check box must be selected to indicate if the project is going to include biomass utilization. Questions 1 through 3 in Box 8 must be answered to demonstrate the quantity, value, and manner of the marketing or utilization of biomass production. Project Budget Page The totals in these boxes add automatically when all data is entered into the fields. You must press enter or tab to the next box before it will automatically add. Grant Criteria for Scoring Eligibility Considerations: Project is identified in a CWPP completed by March 16, 2011 Adjacent to a federal land fuels reduction project planned within the next three years and/or adjacent to a community at risk Yes = Eligible In a high priority landscape area as identified in the State-wide Assessment The federal share of the project budget is a maximum of $200,000 Include an electronic map clearly identifying the project area on non-federal ground and the adjacent federal project or projects (must be smaller than 2 Mb) No = Ineligible