FOR OFFICIAL USE ONLY Project Application ID: Funding Request: Matching Share: Total Project Cost: 2008-026 $200,000 $200,000 $400,000 NATIONAL FIRE PLAN WILDLAND-URBAN INTERFACE COMMUNITY ASSISTANCE GRANT PROPOSAL Applicant Information 1 Applicant/Organization Oregon Dept of Forestry/ Central Oregon District Type of Applicant: State Contact Person: Mary Helen Smith/ Russ Lane Address: 2600 State Street, Operations Building "D" City Salem State Oregon Zip: 97310 Phone: 5039457341 Ext. FAX: Call Ahead for FAX: Phone (Work/Cell): Email: msmith@odf.state.or.us Project Information 2 Name of Project: Grant County Community Fuel Breaks/Evacuation Corr Proposed Start Date: April 15, 2008 Proposed End Date: City: John Day + below State: County: Grant Congressional District: Longitude (decimal degrees): Latitude (decimal degrees): 44.4688 Please indicate planned treatments and associated acres April 15, 2010 Oregon 5 -118.8458 Total Actual Project Acres: 1050 Treatment (1) Acres Treatment (2) Acres Total Treatment Acres Thinning 500 Machine Pile 350 Treatment (3) Acres Treatment (4) Acres 1050 Hand Pile 200 0 Treatment (5) Acres Treatment (6) Acres Cost Per Acre 0 0 Treatment (other-A) Acres Treatment (other-B) Acres $ 380.95 0 0 Please indicate how this project relates to a Community Wildfire Protection Plan (CWPP): This community has a wildfire protection plan that follows the Healthy Forest Restoration Act CWPP guidelines. yes This project is identified in the CWPP. yes Name of CWPP Grant County CWPP Name of Community at John Day, Canyon City, Prairie City, Dayville, Long Ck, Seneca, Mt Vernon Risk: Page 1 Project Area Description All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 3 Provide a brief overview of the project and the project area. (If applying for a fuels reduction project, identify vegetation types, fire regime) [1500 Characters Maximum] This project will treat and modify fuels adjacent and near US and State Highways and numerous county roads, identified in the Grant County CWPP. These transportation routes were selected for their importance as strategic fuel breaks and/or evacuation routes to move the public away from active wildfires. The primary purpose of this project is to provide for public and firefighter safety as the public moves away; and firefighters move to and from active fires. Secondarily, treated corridors throughout the county will provide "compartments" in which very large fires can be contained and provide strategic anchor points for control/burnout operations. Transportation in Grant County is limited and alternatives are few to non-existent. In the event of catastrophic fire, it is critically important that these routes remain open and safe for public and emergency traffic. Many of these routes traverse heavily forested areas. Treating and modifying fuels near these corridors will increase the liklihood that they will remain open when they are impacted by fire, or at least hasten their return to use. The targeted vegetation types will be mid-elevation dry pine forests and higher elevation mixed conifer forests. Some treatment may occur in juniper-dominated rangeland fuels, but this is expected to be a minor portion of the overall project. All of this work will fall within areas represented by Fire Regimes I and II. Project Timeline All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 4 Provide a timeline for the project. [500 Characters Maximum] April 15, 2008- June 15, 2008 - Outreach, contact interested participants June 15, 2008-April 15 2010 - Implementation, completion of projects October 1, 2008-October 1, 2013 - Monitoring of completed projects Page 2 Scope of Work All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 5 Provide a brief scope of work which clearly describes how grant funds will be spent. (This should be more specific than the project description) [1500 Characters Maximum] The grant funds will be used as cost-share assistance to private landowners to help reimburse the expense of treating and modifying fuels on their property near transportation corridors. The primary treatments will be thinning of small-diameter trees (ladder fuels) and hand-piling and/or machine piling of slash. Landowners will have the option of using contractors or their own labor and equipment. They will be reimbursed based on existing Oregon Department of Forestry standard rates that are used in other federal grant programs such as FLEP and Forest Health Protection. Landowners will directly contribute not less than 25% of the project costs through direct payments to contractors or in-kind contributions of labor and equipment time. Adjacent USFS project areas include: Thorn Salvage, Dad's Creek,16 Road Stewardship, and Canyon Creek WUI projects. Interagency Collaboration All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 6 Specify the private, local, tribal, county, state, federal and/or non-governmental [501(c)(3)] organizations that will contribute to or participate in the completion of this project. Describe briefly the contributions each partner will make (i.e. – donating time/equipment, funding, etc.) [500 Characters Maximum] Oregon Department of Forestry - Technical Assistance, equipment Oregon Department of Transportation - Technical Assistance, equipment Grant County Road Department - Tech Assist, equipment, use of facilities Private Landowners - Equipment, Contract Services, Labor Page 3 Project Longevity / Maintenance All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. 7 Clearly describe how the proposed treatments will be maintained over time. [500 Characters Maximum] Projects and prescriptions are designed to be self-sustaining for a minimum of 10 years. Landowners are required to sign a 10-year maintenance agreement. Stewardship foresters conduct follow-up contacts within three years to see if landowners need additional assistance. Ownership changes are tracked through county assessment rolls and new owners are contacted to ensure maintenance is carried forward and to see if new owners need technical assistance. Biomass Utilization All information for the project must fit into the space provided below. Attachments will not be considered by the review committee. For the purpose of this application, biomass utilization is defined as any practicable end-use of the material that has value, or the trading of capital for the woody material. 8 Biomass from treatment(s) will be utilized. (check one) yes no 1) If yes, how is it planned to be used, or what is the end-result (wood products, steam/energy, mulch etc.) [500 Characters Maximum] Small Diameter Logs, hog fuel (steam/energy) and post/pole. Estimate 5,000 tons of biomass will be utilized. 2) Identify company or contractors involved in project utilization. [250 Characters Maximum] Prairie Wood Products; Kinzua Corporation - Small Logs Co-Gen Company - Steam/energy Post/Pole - Browning Wood Products; Parma Post and Pole 3) Estimate anticipated value of biomass to be removed ($/Green Ton; $/Bone-dry Ton; $/Hundred Cubic Feet (CCF), $/Acre Treated) [250 Characters Maximum] Estimated delivered value of biomass in this area is $15 per bone dry ton, for a total of $225,000 Page 4 Project Budget Cost Category Description Federal Agency Matching Share Applicant ODOT Total Grant County Personnel $30,000.00 NRS 2 and/or NRS 1 $6,000.00 3% Salem Protect Admin Subtotal $36,000.00 $94,000.00 $94,000.00 $6,500.00 $0.00 $6,500.00 $5,000.00 $0.00 $5,000.00 $135,500.00 $0.00 $135,500.00 $0.00 $0.00 Subtotal $0.00 $34,000.00 $0.00 $34,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $34,000.00 $0.00 $34,000.00 $0.00 $0.00 Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,000.00 $5,000.00 $6,000.00 $1,000.00 $15,000.00 $16,000.00 $2,000.00 $20,000.00 $22,000.00 $4,340.00 $0.00 Subtotal $4,340.00 $0.00 $0.00 $0.00 $500.00 $0.00 $500.00 $500.00 $0.00 $500.00 $5,340.00 $0.00 $5,340.00 $150,000.00 $0.00 Subtotal $150,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00 $0.00 $150,000.00 $37,500.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $37,500.00 $0.00 $37,500.00 Fringe Benefits Other Payroll expenses Travel Equipment $5,000.00 use of vehicle, chipper, atv $0.00 Facility use Subtotal $5,000.00 Supplies Field supplies Contractual Contractor reimbursements Other $0.00 Landowner contributions $4,660.00 2.33% BusServ Indirect Subtotal $4,660.00 Total Costs $200,000.00 $37,500.00 $165,500.00 $13,000.00 $21,500.00 $400,000.00 Project (Program) Income1 (using deductive alternative) 1 Program income is the gross revenue generated by a grant or cooperative agreement supported activity during the life of the grant. Program income can be made by recipients from fees charged for conference or workshop attendance, from rental fees earned from renting out real property or equipment acquired with grant or cooperative agreement funds, or from the sale of commodities or items developed under the grant or cooperative agreement. The use of Program Income during the project period may require prior approval by the granting agency. Page 5