Contributions

advertisement
Contributions
Web
[ C 22
]
IFA
[C
22 ]
Local
[C
22 ]
Received
2013-01-16
[ C 11
]
(Rev.1)
[C
11 ]
[C
11 ]
2013-01-15
[ C 20
]
[C
20 ]
[C
20 ]
2013-01-16
[ C 10
]
(Rev.1)
[C
10 ]
[C
10 ]
2013-01-15
[ C 27
]
(Rev.1)
[ C 73
]
[C
27 ]
[C
27 ]
2013-01-16
[C
73 ]
[C
73 ]
2013-01-18
[ C 21
]
[C
21 ]
[C
21 ]
2013-01-16
[ C 11
]
(Rev.1)
[C
11 ]
[C
11 ]
2013-01-15
[ C 10
]
(Rev.1)
[C
10 ]
[C
10 ]
2013-01-15
China
Telecommunications
Corporation
[ C 69
]
[C
69 ]
[C
69 ]
2013-01-18
Korea (Rep. of)
[ C 56
]
[ C 55
]
[ C 54
]
[ C 39
]
(Rev.1)
[ C 18
]
[C
56 ]
[C
55 ]
[C
54 ]
[C
39 ]
[C
56 ]
[C
55 ]
[C
54 ]
[C
39 ]
2013-01-17
[C
18 ]
[C
18 ]
2013-01-15
[ C 15
[C
[C
2013-01-15
TELEKOMUNIKACJA
POLSKA S.A.
TELEKOMUNIKACJA
POLSKA S.A.
TELEKOMUNIKACJA
POLSKA S.A.
International
Electrotechnical
Commission
Electronics and
Telecommunications
Research Institute
(ETRI)
ZTE Corporation
2013-01-17
2013-01-17
2013-01-17
Source
Nippon Telegraph and
Telephone Corporation
(NTT)
China
Telecommunications
Corporation
Nippon Telegraph and
Telephone Corporation
(NTT)
China
Telecommunications
Corporation
Nippon Telegraph and
Telephone Corporation
(NTT)
Nippon Telegraph and
Telephone Corporation
(NTT)
Nippon Telegraph and
Telephone Corporation
(NTT)
China
Telecommunications
Corporation
Title
Information for Standardization
related to Lightning Isolation
Transformers
Surge protective devices connected
to HVDC power distribution
systems for telecommunications Requirements and tests
Necessities of power induction
mitigation for tension members of
optical fiber cable
Study and proposal for the drafting
of a new recommendation
K.Powertrans" Lightning Protection
of Base Station's Dedicated
transformer "
Experimental results of a reinfoeced
Isolation HGW
Questions
Q2/5
Proposal of study items for safety
requirements and overvoltage
protections for 400-VDC systems
New study proposals of lightning
protections of telecommunication
installations
Surge protective devices connected
to HVDC power distribution
systems for telecommunications Requirements and tests
Study and proposal for the drafting
of a new recommendation
K.Powertrans" Lightning Protection
of Base Station's Dedicated
transformer "
2nd draft of K.mpis: Measurement
of human exposure levels when a
wireless installation is put into
service
Proposed Appendix to ITU-T
Recommendation K.52 - software
Updated version of the software
EMF-estimator (v 3.0.0)
Handbook on human exposure to
EMF
Q7/5 - EMF Handbook Scope
Q5/5
Proposal for the revision of the
definition of RF frequency
Q7/5
Contribution to K.guide about
Q7/5
Q2/5,
Q5/5
Q3/5
Q3/5,
Q5/5
Q4/5
Q5/5
Q5/5,
Q2/5
Q5/5,
Q3/5
Q7/5
Q7/5
Q7/5
Q7/5
Q7/5
]
15 ]
15 ]
[ C 14
]
[C
14 ]
[C
14 ]
2013-01-15
ZTE Corporation
[ C 13
]
[C
13 ]
[C
13 ]
2013-01-15
[ C 77
]
[C3]
[C
77 ]
[C
3]
[C
77 ]
[C3
]
2013-01-18
Alcatel-Lucent France,
France Télécom
Orange, GSM
Association, Telefon
AB - LM Ericsson,
Vodafone Group
Services Ltd.
Deutsche Welle
[ C 30
]
(Rev.1)
[ C 23
]
[C
30 ]
[C
30 ]
2013-01-17
[C
23 ]
[C
23 ]
2013-01-16
[ C 12
]
(Rev.1)
[C
12 ]
[C
12 ]
2013-01-15
China
Telecommunications
Corporation
[ C 16
]
[C
16 ]
[C
16 ]
2013-01-15
ZTE Corporation
[ C 88
]
[ C 79
]
[ C 76
]
[C
88 ]
[C
79 ]
[C
76 ]
[C
88 ]
[C
79 ]
[C
76 ]
2013-01-18
Telecom Italia S.p.A.
2013-01-18
France Télécom Orange
2013-01-18
Dem. Rep. of the Congo
[ C 75
]
[ C 72
]
[ C 67
]
(Rev.1)
[ C 59
]
[C
75 ]
[C
72 ]
[C
67 ]
[C
75 ]
[C
72 ]
[C
67 ]
2013-01-18
United States
2013-01-18
Korea (Rep. of)
2013-01-18
Korea (Rep. of)
[C
59 ]
[C
59 ]
2013-01-17
[ C 53
]
[ C 51
]
[C
53 ]
[C
51 ]
[C
53 ]
[C
51 ]
2013-01-17
Rwanda Utilities
Regulatory Authority
(RURA)
France Télécom Orange
2013-01-17
France Télécom Orange
2013-01-14
Ministry of Industry
and Information
Technology (MIIT)
Nippon Telegraph and
Telephone Corporation
(NTT)
Nippon Telegraph and
Telephone Corporation
(NTT)
reduction techniques of the human
exposure caused by mobile phones
Ambient environmental
temperature influence on SAR
measurement in test room
Case studies to address inherently
compliant sites in the K.mpis
recommendation
Q7/5
Q7/5
Impact of LTE signals on cable-TV
reception
Proposals for the drafting of K,mhn
- Chapter 7 Guidance to identify
and address interference
Radiation Immunity Test Results
using 1 kHz 80% AM and Wireless
Communication Signals
New study proposals for noise
troubles of telecommunication
equipment and services caused by
power switching noises
Study and proposal for the drafting
of a new recommendation
K.IDCEV "Requirement of
Environment Conditions for
IDC(Internet Data Center)"
Consideration on new air-interface
technologies influence in LTE OTA
testing
Power supply efficiency and power
factor
Position of France Telecom for
finalizing study battery
The case for greater due diligence
by the ICT Sector and the need to
focus on the environment
Comments on L.UPA portable
Q8/5
Proposal for updates of
L.rareMetals_measurement
Proposal for inclusion of an
Appendix in L.rareMetalsmeasurement
Environmental Impact Reduction
including E-Waste
Q13/5
Slides for discussion of L.UPA
portable
Early draft for L.UPA portable
Q13/5
Q8/5
Q9/5
Q9/5
Q10/5,
Q17/5
Q11/5
Q13/5
Q13/5
Q13/5
Q13/5
Q13/5
Q13/5
Q13/5
[ C 45
]
[C
45 ]
[C
45 ]
2013-01-17
UNEP
[ C 38
]
[C
38 ]
[C
38 ]
2013-01-17
Canada
[C8]
[C
8]
[C8
]
2013-01-14
[C7]
[C
7]
[C7
]
2013-01-14
Ministry of Industry
and Information
Technology (MIIT)
Ministry of Industry
and Information
Technology (MIIT)
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
Telecom Italia S.p.A.,
Telefónica, S.A.
Development of a handbook on
life-cycle management of ICT
equipment
Study on Environmental protection
and recycling solution for Li-ion
and Li-ion polymer batteries for
mobile phones.
The proposal on the final
conclusion of the battery study
report
The proposal on the draft of
universal power adapter
solution(UPA) for portable ICT
devices
Proposal to create a Focus Group
on Smart and Sustainable Cities
[ C 78
]
[C
78 ]
[C
78 ]
2013-01-18
European Broadcasting
Union
Proposal to the ITU for
environmental standards study
[ C 60
]
[ C 52
]
[C
60 ]
[C
52 ]
[C
60 ]
[C
52 ]
2013-01-17
N/A
document withdrawn
2013-01-17
Climate Associates Ltd.
[ C 46
]
[C
46 ]
[C
46 ]
2013-01-17
The ITU Association of
Japan
[ C 44
]
[C
44 ]
[C
44 ]
2013-01-17
NEC Corporation
[ C 17
]
[C
17 ]
[C
17 ]
2013-01-15
Rwanda Utilities
Regulatory Authority
(RURA)
[C2]
[C
2]
[C2
]
2012-12-03
Agence de Régulation
des
Télécommunications
(ART)
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
Telecom Italia S.p.A.,
Telefónica, S.A.
Introducing the research project
BATS (Broadband Access via
integrated Terrestrial & Satellite
systems)
Proposed contents of a handbook
on setting up low-cost sustainable
telecom infrastructure in rural areas
in developing nations
Proposal for the Handbook on good
practices - Setting up a low cost
sustainable telecommunication
infrastructure for rural
communications in developing
countries
Infrastructure sharing as a
sustainable solution for extending
telecommunication network
coverage at law cost to rural areas
in developing countries
Suggestions for a sustainable
solution for extending
telecommunication network
coverage to rural areas in
developing countries
Proposal to create a Focus Group
on Smart and Sustainable Cities
Q13/5
Q13/5
Q13/5
Q13/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q16/5,
Q17/5,
Q18/5
Q14/5
Q14/5
Q14/5
Q14/5
Q14/5
Q14/5
Q14/5,
Q13/5,
Q15/5,
[ C 81
]
[ C 19
]
[C
81 ]
[C
19 ]
[C
81 ]
[C
19 ]
2013-01-18
Telefónica, S.A.
Example of climate change resilient
telecommunications infrastructure
Requirements for a website portal
on 'ICT and adaptation to climate
change'
Proposal to create a Focus Group
on Smart and Sustainable Cities
2013-01-15
Egypt
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
Telecom Italia S.p.A.,
Telefónica, S.A.
[ C 87
]
[C
87 ]
[C
87 ]
2013-01-18
Telecom Italia S.p.A.
[ C 82
]
[C
82 ]
[C
82 ]
2013-01-18
Telefónica, S.A.
[ C 58
]
[ C 57
]
[ C 24
]
[C9]
[C
58 ]
[C
57 ]
[C
24 ]
[C9
]
[C
86 ]
2013-01-17
GSM Association
2013-01-17
GSM Association
2013-01-16
Fujitsu Limited
2013-01-14
Alcatel-Lucent France
[ C 86
]
[C
58 ]
[C
57 ]
[C
24 ]
[C
9]
[C
86 ]
2013-01-18
Telecom Italia S.p.A.,
Telefónica, S.A.
Proposal to define categories of
handsets for the mobile handsets
eco-rating
Criteria to consider when
evaluating pros-and cons of ecorating programs for mobile phones
GSMA HERTF Review of Network
Eco Rating Schemes
Draft Questions for the GSMA Eco
Rating Methodology
Introduction of Eco label and Eco
rating programmes in Japan
Q16/5: Questionnaire on Emission
Factors Databases
Proposal to create a Focus Group
on Smart and Sustainable Cities
[ C 78
]
[C
78 ]
[C
78 ]
2013-01-18
European Broadcasting
Union
Proposal to the ITU for
environmental standards study
[ C 70
]
[C
70 ]
[C
70 ]
2013-01-18
Korea (Rep. of)
[ C 66
]
[C
66 ]
[C
66 ]
2013-01-17
[ C 65
]
[C
65 ]
[C
65 ]
2013-01-17
[ C 64
]
[C
64 ]
[C
64 ]
2013-01-17
Electronics and
Telecommunications
Research Institute
(ETRI)
Electronics and
Telecommunications
Research Institute
(ETRI)
Electronics and
Telecommunications
Proposal for best practices for cloud
data centers as revision of ITU-T
L.1300
Proposed modification of clause 12
of ITU-T L.1300Rev
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5
Q15/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q17/5,
Q18/5
Q17/5
Q17/5
Proposed modification of clause 11
of ITU-T L.1300Rev
Q17/5
Proposed modification of clause 8
of ITU-T L.1300Rev
Q17/5
[ C 63
]
[C
63 ]
[C
63 ]
2013-01-17
[ C 62
]
[C
62 ]
[C
62 ]
2013-01-17
[ C 31
]
[C
31 ]
[C
31 ]
2013-01-17
Research Institute
(ETRI)
Electronics and
Telecommunications
Research Institute
(ETRI)
Electronics and
Telecommunications
Research Institute
(ETRI)
Japan
[ C 26
]
[C
26 ]
[C
26 ]
2013-01-16
Fujitsu Limited
[ C 25
]
[C
25 ]
[C
25 ]
2013-01-16
[C5]
(Rev.1)
[C
5]
[C5
]
2013-01-14
[C4]
[C
4]
[C4
]
2013-01-14
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
Hitachi, Ltd., Nippon
Telegraph and
Telephone Corporation
(NTT)
Ministry of Industry
and Information
Technology (MIIT)
Ministry of Industry
and Information
Technology (MIIT)
Telecom Italia S.p.A.,
Telefónica, S.A.
[ C 78
]
[C
78 ]
[C
78 ]
2013-01-18
European Broadcasting
Union
Proposal to the ITU for
environmental standards study
[ C 12
]
(Rev.1)
[C
12 ]
[C
12 ]
2013-01-15
China
Telecommunications
Corporation
[ C 89
]
[C
89 ]
[C
89 ]
2013-01-18
European Union
[ C 85
]
[C
85 ]
[C
85 ]
2013-01-18
Climate Associates
Ltd., European Union,
France Télécom
Orange, Telefon AB -
Study and proposal for the drafting
of a new recommendation
K.IDCEV "Requirement of
Environment Conditions for
IDC(Internet Data Center)"
Conclusions and Recommendations
for ITU in L 1410 & L 1420 as a
result of the Pilot testing on ICT
Methodologies
Proposal of revised based text for
L.methodology ICT in Cities
(L.1440), following the October
2012 WP3/5 meeting
Proposed modification of clause 7
of ITU-T L.1300Rev
Q17/5
Proposal for reflection of '2012
Best Practices for the EU Code of
Conduct on Data Centres v3.0.8' in
ITU-T L.1300Rev
Proposal of power consumption
saving technique of the whole data
center by integrated control of ICT
devices and air-conditioning
equipment
Proposal of energy efficient
datacenter by measuring and
controlling air conditioning
environment by optical fiber
thermometric technology
Proposed scope and draft skeleton
of Recommendation
L.DC_minimum set
Q17/5
The first draft of L.M&M_infra
Q17/5
New work item proposal on
assessment of energy efficiency on
infrastructure in data center
Proposal to create a Focus Group
on Smart and Sustainable Cities
Q17/5
Q17/5
Q17/5
Q17/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q16/5,
Q18/5
Q17/5,
Q10/5
Q18/5
Q18/5
[ C 84
]
[C
84 ]
[C
84 ]
2013-01-18
LM Ericsson,
Telefónica, S.A.
France Télécom Orange
[ C 83
]
[C
83 ]
[C
83 ]
2013-01-18
Telefónica, S.A.
[ C 80
]
[C
80 ]
[C
80 ]
2013-01-18
France Télécom Orange
[ C 71
]
[ C 68
]
[C
71 ]
[C
68 ]
[C
71 ]
[C
68 ]
2013-01-18
Korea (Rep. of)
2013-01-18
Korea (Rep. of)
[ C 61
]
[C
61 ]
[C
61 ]
2013-01-17
Telefon AB - LM
Ericsson
[ C 50
]
[C
50 ]
[C
50 ]
2013-01-17
[ C 49
]
[C
49 ]
[C
49 ]
2013-01-17
[ C 48
]
[C
48 ]
[C
48 ]
2013-01-17
Electronics and
Telecommunications
Research Institute
(ETRI)
Electronics and
Telecommunications
Research Institute
(ETRI)
Electronics and
Telecommunications
Research Institute
(ETRI)
[ C 47
]
[C
47 ]
[C
47 ]
2013-01-17
[ C 43
]
[C
43 ]
[C
43 ]
2013-01-17
[ C 42
]
[C
42 ]
[C
42 ]
2013-01-17
Telefon AB - LM
Ericsson
[ C 41
]
[C
41 ]
[C
41 ]
2013-01-17
Telefon AB - LM
Ericsson
[ C 40
]
[C
40 ]
[C
40 ]
2013-01-17
Telefon AB - LM
Ericsson
Electronics and
Telecommunications
Research Institute
(ETRI)
Telefon AB - LM
Ericsson
Suggestion to start a revision of
L.1420, suggestion of elements to
be taken into account
Clarification of emission avoidance
term and importance for the ICT
sector to keep the term in the ICT
Projects Methodology text
Information on France Telecom
Orange Labs and Paris Diderot
university paper on research on ICT
impact assessment method in the
ITU-T Kaleidoscope 2013
Proposal for indicating both ICT
GHG and ICT energy projects
Methodology for assessment of
GHG emission reduction enabled
by ICT based Real-time Navigation
Service
ICT Projects: Comments on current
draft of ICT in Projects
Recommendation (TD 33)
Proposal for refining clause 6 and
12 by resolving their editor notes
Q18/5
Proposal for adding the project plan
documentation form as informative
Q18/5
Clarifications between ITU-T
L.1410 and ITU-T L.methodology
ICT projects and Corresponding
proposal for refinement of ITU-T
L.methodology ICT projects
Proposal for removal of GHG
emission avoidance and update of
the definition of GHG emission
reduction
L.1440 ICT Cities: Proposed
revised text for chapter 7.1
Establishing the city boundaries
L.1440 ICT in Cities: Proposed
draft initial text for chapter 9.3
Methodology for the assessment of
ICT services in cities
L.1440 ICT in Cities: Proposed
draft text for chapter 6 General
principles for impact assessment of
ICT in cities
Comments and proposed new text
for baseline text ICT in Cities
Recommendation
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
[ C 37
]
[C
37 ]
[C
37 ]
2013-01-17
Japan
Proposal for addition of an
assessment case study of Home
Energy Management System to
ITU-T L.1410
Proposal for addition of an
assessment case study of Building
Energy Management System to
ITU-T L.1410
Proposal for addition of an
assessment case study of Waste
Disposal area to ITU-T L.1410
Proposal for addition of an
assessment case study of Supply
Chain Management System to ITUT L.1410
Proposal for addition of an
assessment case study of Office
Efficiency area to ITU-T L.1410
Proposal for addition of assessment
case studies to ITU-T L.1410
Q18/5
[ C 36
]
(Rev.1)
[C
36 ]
[C
36 ]
2013-01-17
Japan
[ C 35
]
(Rev.1)
[ C 34
]
(Rev.1)
[C
35 ]
[C
35 ]
2013-01-17
Japan
[C
34 ]
[C
34 ]
2013-01-17
Japan
[ C 33
]
(Rev.1)
[ C 32
]
(Rev.1)
[ C 29
]
(Rev.1)
[ C 28
]
[C
33 ]
[C
33 ]
2013-01-17
Japan
[C
32 ]
[C
32 ]
2013-01-17
Japan
[C
29 ]
[C
29 ]
2013-01-16
United Kingdom
Q18/5
Telecom Italia S.p.A.,
Telefónica, S.A.
Development of a methodology in
relation to the role of ICT in the
carbon footprint of a City
Consequential life cycle assessment
of telepresence systems compared
to electric vehicles
Proposal to create a Focus Group
on Smart and Sustainable Cities
[C
28 ]
[C
28 ]
2013-01-16
Huawei Technologies
Co. Ltd.
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
[ C 78
]
[C
78 ]
[C
78 ]
2013-01-18
European Broadcasting
Union
Proposal to the ITU for
environmental standards study
[ C 74
]
[C
74 ]
[C
74 ]
2013-01-18
Proposal of Scope and basic system
configuration for L.archtecture
[C
6]
[C6
]
2013-01-14
[ C 86
]
[C
86 ]
[C
86 ]
2013-01-18
Nippon Telegraph and
Telephone Corporation
(NTT)
Ministry of Industry
and Information
Technology (MIIT)
Telecom Italia S.p.A.,
Telefónica, S.A.
[C6]
[C1]
[C
1]
[C1
]
2012-12-03
WTSA-12
Questions assigned to ITU-T Study
Group 5 by WTSA-12
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q16/5,
Q17/5
Q19/5
Proposal on L.architecture contents
Q19/5
Proposal to create a Focus Group
on Smart and Sustainable Cities
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
QALL/5
Collective Letters
Web
[ COL 1
]
+Add.1
IFA
[
COL
1]
Local
[
COL
1]
Received
2012-10-29
Source
SG 5
Title
Meeting of Study Group 5; Geneva, 29 January - 7
February 2013
Reports
Web
[R1]
IFA
[R
1]
Local
[R1
]
Received
2013-11-26
Source
SG 5
Title
Report of the meeting of Study Group 5
(Geneva , 29 January-7 February 2013)
Questions
QALL/5
Temporary Documents (GEN)
Web
[ TD
159GEN ]
IFA
[ TD
159GEN
]
[ TD
116GEN
]
[ TD
171GEN
]
Local
[ TD
159GEN
]
[ TD
116GEN
]
[ TD
171GEN
]
Received
2013-02-05
Source
Rapporteur Q1/5
Title
Report of Q1/5
Questions
Q1/5
2013-02-04
Rapporteur Q1/5
Agenda for Question 1/5
Q1/5
2013-02-06
Chairman WP1/5
Report of WP1/5
[ TD
69GEN
]
[ TD
69GEN
]
2013-01-30
Chairman WP1/5
Interim Report of the Working Party
1/5 meeting
[ TD 2GEN ]
[ TD
2GEN
]
[ TD
2GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 1/5 meeting
[ TD
115GEN ]
(Rev.1)
[ TD
91GEN ]
(Rev.1)
[ TD
77GEN ]
(Rev.1)
[ TD
76GEN ]
[ TD
115GEN
]
[ TD
91GEN
]
[ TD
77GEN
]
[ TD
76GEN
]
[ TD
115GEN
]
[ TD
91GEN
]
[ TD
77GEN
]
[ TD
76GEN
]
2013-02-04
Rapporteur Q2/5
Question 2/5 Meeting Report
Q1/5,
Q2/5,
Q3/5,
Q4/5,
Q5/5
Q1/5,
Q2/5,
Q3/5,
Q4/5,
Q5/5
Q1/5,
Q2/5,
Q3/5,
Q4/5,
Q5/5
Q2/5
2013-02-01
Rapporteur Q2/5
OLS: Liaison on Ethernet port
isolation between ITU-T SG5 Q2
and the IEEE 802.3 Group
Q2/5
2013-01-31
Rapporteur Q2/5
Series connected GDTs for d.c.
power applications for Kapl1 section
of TD 798
Q2/5
2013-01-31
Rapporteur Q2/5
SG 5 Discussion thread on
Definitions and lightning isolation
transformers
Q2/5
[ TD
116GEN ]
(Rev.1)
[ TD
171GEN ]
(Rev.12)
[ TD
69GEN ]
[ TD
75GEN ]
[ TD
75GEN
]
[ TD
171GEN
]
[ TD
75GEN
]
[ TD
171GEN
]
2013-01-31
Rapporteur Q2/5
Agenda and Status Report of
Question 2/5
Q2/5
2013-02-06
Chairman WP1/5
Report of WP1/5
[ TD
69GEN
]
[ TD
69GEN
]
2013-01-30
Chairman WP1/5
Interim Report of the Working Party
1/5 meeting
[ TD 2GEN ]
[ TD
2GEN
]
[ TD
2GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 1/5 meeting
[ TD
158GEN ]
[ TD
158GEN
]
[ TD
119GEN
]
[ TD
117GEN
]
[ TD
90GEN
]
[ TD
79GEN
]
[ TD
171GEN
]
[ TD
158GEN
]
[ TD
119GEN
]
[ TD
117GEN
]
[ TD
90GEN
]
[ TD
79GEN
]
[ TD
171GEN
]
2013-02-05
Rapporteur Q3/5
Report of Q3/5
Q2/5,
Q1/5,
Q3/5,
Q4/5,
Q5/5
Q2/5,
Q1/5,
Q3/5,
Q4/5,
Q5/5
Q2/5,
Q1/5,
Q3/5,
Q4/5,
Q5/5
Q3/5
2013-02-04
Rapporteur Q3/5
Inductance level between disruptive
network and disturbed network
Q3/5
2013-02-04
Rapporteur Q3/5
Report on the collaboration with
CIGRE
Q3/5
2013-02-01
Rapporteur Q3/5
Report on the collaboration with
CIGRE
Q3/5
2013-01-31
Rapporteur Q3/5
Agenda and status report for
Question 3/5
Q3/5
2013-02-06
Chairman WP1/5
Report of WP1/5
[ TD
69GEN
]
[ TD
69GEN
]
2013-01-30
Chairman WP1/5
Interim Report of the Working Party
1/5 meeting
[ TD
2GEN
]
[ TD
2GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 1/5 meeting
Q3/5,
Q1/5,
Q2/5,
Q4/5,
Q5/5
Q3/5,
Q1/5,
Q2/5,
Q4/5,
Q5/5
Q3/5,
Q1/5,
Q2/5,
Q4/5,
Q5/5
[ TD
171GEN ]
(Rev.12)
[ TD
69GEN ]
[ TD
119GEN ]
[ TD
117GEN ]
[ TD
90GEN ]
[ TD
79GEN ]
(Rev.1)
[ TD
171GEN ]
(Rev.12)
[ TD
69GEN ]
[ TD 2GEN ]
[ TD
152GEN ]
(Rev.1)
[ TD
144GEN ]
[ TD
152GEN
]
[ TD
144GEN
]
[ TD
108GEN
]
[ TD
66GEN
]
[ TD
65GEN
]
[ TD
48GEN
]
[ TD
47GEN
]
[ TD
45GEN
]
[ TD
28GEN
]
[ TD
171GEN
]
[ TD
152GEN
]
[ TD
144GEN
]
[ TD
108GEN
]
[ TD
66GEN
]
[ TD
65GEN
]
[ TD
48GEN
]
[ TD
47GEN
]
[ TD
45GEN
]
[ TD
28GEN
]
[ TD
171GEN
]
2013-02-05
Rapporteur Q4/5
Report of Q4/5
Q4/5
2013-02-05
Rapporteur Q2/5
Corrigendum 1 to ITU-T K.44
Q4/5
2013-02-04
Rapporteur Q2/5
References for Ethernet cable
current capability
Q4/5
2013-01-30
Rapporteur Q4/5
Forum Discussion (Q4 potential
topics)
Q4/5
2013-01-30
Rapporteur Q4/5
Forum Discussion (LITs)
Q4/5
2013-01-25
Chairman SG5
Influence of the topology of the
customer installation on the
efficiency of the SPD
Q4/5
2013-01-25
Chairman SG5
K.44 Comments
Q4/5
2013-01-24
Chairman SG5
Agenda and Status Report of
Question 4/5 (formerly Q4 & Q11)
Q4/5
2012-12-11
Chairman SG5
Proposed Corrigendum to K.44
Q4/5
2013-02-06
Chairman WP1/5
Report of WP1/5
[ TD
69GEN
]
[ TD
69GEN
]
2013-01-30
Chairman WP1/5
Interim Report of the Working Party
1/5 meeting
[ TD 2GEN ]
[ TD
2GEN
]
[ TD
2GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 1/5 meeting
[ TD
137GEN ]
[ TD
137GEN
[ TD
137GEN
2013-02-05
Rapporteurs Q5/5
OLS: Q5 Liaison reply to ETSI
(TD18)
Q4/5,
Q1/5,
Q2/5,
Q3/5,
Q5/5
Q4/5,
Q1/5,
Q2/5,
Q3/5,
Q5/5
Q4/5,
Q1/5,
Q2/5,
Q3/5,
Q5/5
Q5/5
[ TD
108GEN ]
[ TD
66GEN ]
[ TD
65GEN ]
[ TD
48GEN ]
(Rev.1)
[ TD
47GEN ]
[ TD
45GEN ]
(Rev.1)
[ TD
28GEN ]
[ TD
171GEN ]
(Rev.12)
[ TD
69GEN ]
(Rev.1)
[ TD
135GEN ]
[ TD
125GEN ]
(Rev.1)
[ TD
103GEN ]
[ TD
94GEN ]
(Rev.1)
[ TD
92GEN ]
[ TD
80GEN ]
[ TD
185GEN ]
[ TD
171GEN ]
(Rev.12)
[ TD
69GEN ]
[ TD
18GEN ]
[ TD 2GEN ]
[ TD
139GEN ]
[ TD
]
[ TD
135GEN
]
[ TD
125GEN
]
[ TD
103GEN
]
[ TD
94GEN
]
[ TD
92GEN
]
[ TD
80GEN
]
]
[ TD
135GEN
]
[ TD
125GEN
]
[ TD
103GEN
]
[ TD
94GEN
]
[ TD
92GEN
]
[ TD
80GEN
]
[ TD
185GEN
]
[ TD
171GEN
]
2013-02-05
Rapporteur Q5/5
Lightning protection of Base
Station's dedicated transformer
Q5/5
2013-02-04
Rapporteur Q5/5
Report of Question 5/5
Q5/5
2013-02-04
Rapporteur Q5/5
Q5/5
2013-02-01
Rapporteur Q5/5
The second draft of new
Recommendation K.dbs "Lightning
protection of Distributed Base
Station"
Lightning current waveform on DC
power conductor along tower
2013-02-01
Rapporteur Q5/5
Q5 Agenda
Q5/5
2013-01-31
Rapporteur Q5/5
Q5/5
[ TD
185GEN
]
[ TD
171GEN
]
2013-02-06
ITU-T SG5
The proposal of new
Recommendation "Lightning
protection, earthing and bonding:
total solution for Radio Base Station
site"
OLS: Liaison reply to ETSI EE
Liaison
2013-02-06
Chairman WP1/5
Report of WP1/5
[ TD
69GEN
]
[ TD
69GEN
]
2013-01-30
Chairman WP1/5
Interim Report of the Working Party
1/5 meeting
[ TD
18GEN
]
[ TD
2GEN
]
[ TD
18GEN
]
[ TD
2GEN
]
2012-12-11
ETSI TC EE
Incoming LS: Liaison to ITU-T SG5
on ETSI standard for Earthing and
bonding of 400 VDC
Q5/5,
Q1/5,
Q2/5,
Q3/5,
Q4/5
Q5/5,
Q1/5,
Q2/5,
Q3/5,
Q4/5
Q5/5,
Q19/5
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 1/5 meeting
[ TD
139GEN
]
[ TD
[ TD
139GEN
]
[ TD
2013-02-05
Rapporteur Q6/5
Progress Report of Q6/5
Q5/5,
Q1/5,
Q2/5,
Q3/5,
Q4/5
Q6/5
2013-01-30
Rapporteur Q6/5
Agenda and status report for
Q6/5
Q5/5
Q5/5,
Q19/5
72GEN ]
72GEN
]
[ TD
170GEN
]
72GEN
]
[ TD
170GEN
]
[ TD
118GEN ]
[ TD
118GEN
]
[ TD
105GEN ]
(Rev.1)
[ TD
170GEN ]
(Rev.1)
Question 6/5
2013-02-05
Chairman WP2/5
Report of WP2/5
[ TD
118GEN
]
2013-02-04
ITU-T SG9
[ TD
105GEN
]
[ TD
105GEN
]
2013-02-04
ITU-T SG5
[ TD
70GEN ]
[ TD
70GEN
]
[ TD
70GEN
]
2013-01-30
Chairman WP2/5
Incoming LS: Reply LS to ITU-R
WP 1A and WPs 5A, 5B and 5C on
impact from wired
telecommunication (including PLT)
on radiocommunication systems
OLS: SG5 activities related to
interference between radio signal
and device or cable connected to
wired broadband networks and cable
television networks
Interim Report of the Working Party
2/5 meeting
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
142GEN ]
(Rev.1)
[ TD
138GEN ]
(Rev.1)
[ TD
136GEN ]
[ TD
142GEN
]
[ TD
138GEN
]
[ TD
136GEN
]
[ TD
123GEN
]
[ TD
114GEN
]
[ TD
110GEN
[ TD
142GEN
]
[ TD
138GEN
]
[ TD
136GEN
]
[ TD
123GEN
]
[ TD
114GEN
]
[ TD
110GEN
2013-02-05
Rapporteurs Q7/5
Report of Q7/5
2013-02-05
Rapporteur Q7/5
OLS: Work under study in ITU-T
Q7/5
Q7/5
2013-02-05
Rapporteur Q7/5
Recent activities of ICNIRP
Q7/5
2013-02-04
Rapporteur Q7/5
Appendix VI to ITU-T
Recommendation K.52
Q7/5
2013-02-04
Rapporteur Q7/5
Updated version of the software
EMF-estimator v 3.0.0
Q7/5
2013-02-04
Rapporteurs Q7/5
IEC TC106 / IEEE standards update
Q7/5
[ TD
123GEN ]
(Rev.1)
[ TD
114GEN ]
[ TD
110GEN ]
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q6/5,
Q8/5,
Q19/5
Q6/5,
Q8/5
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q7/5
]
[ TD
109GEN
]
[ TD
60GEN
]
]
[ TD
109GEN
]
[ TD
60GEN
]
[ TD
52GEN
]
[ TD
15GEN
]
[ TD
170GEN
]
[ TD
70GEN ]
[ TD
109GEN ]
2013-02-04
Rapporteur Q7/5
Proposed 'EMF Handbook' supplement to IEC MT3
contribution
Q7/5
2013-01-29
Rapporteur Q7/5
Agenda: Question 7/5
Q7/5
[ TD
52GEN
]
[ TD
15GEN
]
[ TD
170GEN
]
2013-01-28
Liaison rapporteur
IEC TC106
Comments from MMF regarding the
African countries EMF information
guide
Q7/5
2012-12-11
ITU-R WP1/C
Q7/5
2013-02-05
Chairman WP2/5
Incoming LS: Liaison statement to
ITU-T SG5 on New
Recommendation ITU-T K.91
(K.guide)
Report of WP2/5
[ TD
70GEN
]
[ TD
70GEN
]
2013-01-30
Chairman WP2/5
Interim Report of the Working Party
2/5 meeting
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
106GEN ]
(Rev.1)
[ TD
82GEN ]
(Rev.1)
[ TD
74GEN ]
(Rev.1)
[ TD
62GEN ]
[ TD
106GEN
]
[ TD
82GEN
]
[ TD
74GEN
]
[ TD
62GEN
]
[ TD
61-
[ TD
106GEN
]
[ TD
82GEN
]
[ TD
74GEN
]
[ TD
62GEN
]
[ TD
61-
2013-02-04
Rapporteur Q8/5
Progress Report of Q8/5
2013-01-31
Rapporteur Q8/5
Rapporteur's presentation on
Question 8/5
Q8/5
2013-01-30
Rapporteurs Q8/5
3rd revision of draft
Recommendation K.mhn
Q8/5
2013-01-29
Rapporteur Q8/5
Proposed Revision of K.74
(08/2009)
Q8/5
2013-01-29
Rapporteur Q8/5
Agenda and status report for
Question 8/5
Q8/5
[ TD
60GEN ]
(Rev.12)
[ TD
52GEN ]
[ TD
15GEN ]
[ TD
170GEN ]
(Rev.1)
[ TD
61-
Q7/5,
Q6/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q7/5,
Q6/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q7/5,
Q6/5,
Q8/5,
Q9/5,
Q10/5,
Q11/5
Q8/5
GEN ]
(Rev.12)
[ TD
12GEN ]
GEN
]
GEN
]
[ TD
12GEN
]
[ TD
9GEN
]
[ TD
8GEN
]
[ TD
7GEN
]
[ TD
5GEN
]
[ TD
170GEN
]
[ TD
12GEN
]
[ TD
9GEN
]
[ TD
8GEN
]
[ TD
7GEN
]
[ TD
5GEN
]
[ TD
170GEN
]
2012-12-11
ITU-R WP1B
2012-12-11
ITU-T SG9
2012-12-11
[ TD
118GEN ]
[ TD
118GEN
]
[ TD
105GEN ]
(Rev.1)
Incoming LS: Involvement of the
ITU-R WP 1B in the activities on
narrow-band wireless home
networking (NWHN)
Incoming LS: Reply LS to ITU-R
WP6A on coexistence of wired and
wireless communications systems
Q8/5
ITU-T SG9
Incoming LS: Reply LS to ETSI
ATTM-AT3 on work of ITU-T SG5
on K.mhn
Q8/5
2012-12-11
ITU-T SG9
Incoming LS: Reply LS to SG 5 on
draft new Recommendation K.mhn
Q8/5
2012-12-11
ITU-R WP6A
Incoming LS: Coexistence of wired
and wireless communications
systems
Q8/5
2013-02-05
Chairman WP2/5
Report of WP2/5
[ TD
118GEN
]
2013-02-04
ITU-T SG9
[ TD
105GEN
]
[ TD
105GEN
]
2013-02-04
ITU-T SG5
[ TD
70GEN ]
[ TD
70GEN
]
[ TD
70GEN
]
2013-01-30
Chairman WP2/5
Incoming LS: Reply LS to ITU-R
WP 1A and WPs 5A, 5B and 5C on
impact from wired
telecommunication (including PLT)
on radiocommunication systems
OLS: SG5 activities related to
interference between radio signal
and device or cable connected to
wired broadband networks and cable
television networks
Interim Report of the Working Party
2/5 meeting
Q8/5,
Q6/5,
Q7/5,
Q9/5,
Q10/5,
Q11/5
Q8/5,
Q6/5,
Q19/5
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
140GEN ]
[ TD
140GEN
[ TD
140GEN
2013-02-05
Rapporteur Q9/5
Progress Report of Q9/5
[ TD 9GEN ]
[ TD 8GEN ]
[ TD 7GEN ]
[ TD 5GEN ]
[ TD
170GEN ]
(Rev.1)
Q8/5
Q8/5,
Q6/5
Q8/5,
Q6/5,
Q7/5,
Q9/5,
Q10/5,
Q11/5
Q8/5,
Q6/5,
Q7/5,
Q9/5,
Q10/5,
Q11/5
Q9/5
]
[ TD
73GEN
]
[ TD
68GEN
]
]
[ TD
73GEN
]
[ TD
68GEN
]
[ TD
170GEN ]
(Rev.1)
[ TD
170GEN
]
[ TD
70GEN ]
[ TD
73GEN ]
2013-01-30
Rapporteur Q9/5
Agenda and Status Report of
Question 9/5
Q9/5
2013-01-30
Rapporteurs Q9/5
Q9/5
[ TD
170GEN
]
2013-02-05
Chairman WP2/5
Draft ITU-T Recommendation
K.BTS - Electromagnetic
Compatibility Requirement and
Measurement Methods for Cellular
Mobile Communication Base
Station Equipment ( framework and
structure)
Report of WP2/5
[ TD
70GEN
]
[ TD
70GEN
]
2013-01-30
Chairman WP2/5
Interim Report of the Working Party
2/5 meeting
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
122GEN ]
(Rev.1)
[ TD
85GEN ]
[ TD
122GEN
]
[ TD
85GEN
]
[ TD
84GEN
]
[ TD
83GEN
]
[ TD
170GEN
]
2013-02-04
Rapporteur Q10/5
Report of Q10/5
2013-01-31
Rapporteur Q10/5
Revised Draft of K.secmiti
"Mitigation methods against EM
security threats"
Q10/5
2013-01-31
Rapporteur Q10/5
Status Report for Question 10/5
Q10/5
2013-01-31
Rapporteur Q10/5
Draft Agenda for Question 10/5
Q10/5
[ TD
170GEN ]
(Rev.1)
[ TD
122GEN
]
[ TD
85GEN
]
[ TD
84GEN
]
[ TD
83GEN
]
[ TD
170GEN
]
2013-02-05
Chairman WP2/5
Report of WP2/5
[ TD
70-
[ TD
70-
[ TD
70-
2013-01-30
Chairman WP2/5
Interim Report of the Working Party
2/5 meeting
Q10/5,
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q11/5
Q10/5,
Q6/5,
[ TD
68GEN ]
[ TD
84GEN ]
[ TD
83GEN ]
Q9/5,
Q6/5,
Q7/5,
Q8/5,
Q10/5,
Q11/5
Q9/5,
Q6/5,
Q7/5,
Q8/5,
Q10/5,
Q11/5
Q9/5,
Q6/5,
Q7/5,
Q8/5,
Q10/5,
Q11/5
Q10/5
GEN ]
GEN
]
GEN
]
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
120GEN ]
(Rev.1)
[ TD
64GEN ]
[ TD
120GEN
]
[ TD
64GEN
]
[ TD
170GEN
]
[ TD
120GEN
]
[ TD
64GEN
]
[ TD
170GEN
]
2013-02-04
Rapporteur Q11/5
Report of Question 11/5
Q7/5,
Q8/5,
Q9/5,
Q11/5
Q10/5,
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q11/5
Q11/5
2013-01-30
Rapporteur Q11/5
Agenda: Question 11/5
Q11/5
2013-02-05
Chairman WP2/5
Report of WP2/5
[ TD
70GEN ]
[ TD
70GEN
]
[ TD
70GEN
]
2013-01-30
Chairman WP2/5
Interim Report of the Working Party
2/5 meeting
[ TD 3GEN ]
[ TD
3GEN
]
[ TD
3GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 2/5 meeting
[ TD
192GEN ]
(Rev.12)
[ TD
182GEN ]
[ TD
192GEN
]
[ TD
192GEN
]
2013-02-07
Rapporteur Q12/5
OLS: Liaison on definition of
Information and Communication
Technology, ICT
Q11/5,
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5
Q11/5,
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5
Q11/5,
Q6/5,
Q7/5,
Q8/5,
Q9/5,
Q10/5
Q12/5
[ TD
182GEN
]
[ TD
176GEN
]
[ TD
174GEN
]
[ TD
[ TD
182GEN
]
[ TD
176GEN
]
[ TD
174GEN
]
[ TD
2013-02-06
Rapporteur Q12/5
Question 12/5 Meeting Report
Q12/5
2013-02-06
Rapporteur Q13/5
Report of Q13/5
Q13/5
2013-02-06
ITU-T SG5
Q13/5
2013-02-05
Rapporteur Q13/5
OLS: Liaison on Collaboration with
IEC TC 111 on Environmental
Impact Reduction including EWaste
OLS: Liaison on Collaboration with
[ TD
170GEN ]
(Rev.1)
[ TD
176GEN ]
(Rev.1)
[ TD
174GEN ]
(Rev.1)
[ TD
Q13/5
134GEN ]
(Rev.1)
[ TD
133GEN ]
(Rev.13)
[ TD
98GEN ]
134GEN
]
[ TD
133GEN
]
134GEN
]
[ TD
133GEN
]
[ TD
98GEN
]
[ TD
96GEN
]
IEC TC 100 and IEEE Project 1823
on power adapter standards
2013-02-05
Rapporteur Q13/5
Proposal new work item - Technical
paper on life-cycle management of
ICT equipment
Q13/5
[ TD
98GEN
]
[ TD
96GEN
]
2013-02-04
Editors
Meeting output of ITU-T
L.rareMetals-measurement
Q13/5
2013-02-04
Rapporteur Q13/5
Proposal new work item on Green
batteries solution for mobile phone
and other ICT devices
Q13/5
[ TD
81GEN
]
[ TD
81GEN
]
2013-01-31
Rapporteur Q13/5
Agenda: Question 13/5
Q13/5
[ TD
39GEN
]
[ TD
38GEN
]
[ TD
180GEN
]
[ TD
39GEN
]
[ TD
38GEN
]
[ TD
180GEN
]
2013-01-18
Chairman SG5
Input from IEEE UPAMD P1823
chairman on P1823 used in
gotomeeting 3rd December 2012
Q13/5
2013-01-18
Chairman SG5
Status Report of Question 21/5 (now
Question 13/5)
Q13/5
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
131GEN ]
(Rev.1)
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
93GEN ]
(Rev.1)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
63GEN ]
[ TD
63GEN
[ TD
63GEN
2013-01-29
TSB
Liaison Report Request From JTC
1/SC 39 for the 2013 JTC 1/SC 39
Plenary
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q16/5,
Q17/5,
[ TD
96GEN ]
(Rev.13)
[ TD
81GEN ]
(Rev.12)
[ TD
39GEN ]
[ TD
38GEN ]
[ TD
180GEN ]
(Rev.12)
]
]
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
26GEN ]
[ TD
26GEN
]
[ TD
23GEN
]
[ TD
26GEN
]
[ TD
23GEN
]
2012-12-11
CEN-CENELEC EcoCG
Incoming LS: ToR CEN-CENELEC
Ecodesign Coordination Group
2012-12-11
JCA-Cloud
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
[ TD
22GEN ]
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
175GEN ]
(Rev.1)
[ TD
175GEN
]
[ TD
175GEN
]
2013-02-06
Rapporteur Q14/5
[ TD
153GEN ]
(Rev.1)
[ TD
97GEN ]
(Rev.1-
[ TD
153GEN
]
[ TD
97GEN
]
[ TD
153GEN
]
[ TD
97GEN
]
2013-02-05
Rapporteur Q14/5
OLS: Use of spectrum and radio
technology low cost sustainable
telecommunication infrastructure for
rural communications in developing
countries
Report of Q14/5
2013-02-04
Rapporteur Q14/5
[ TD
23GEN ]
Proposed Handbook Umbrella Text
and outline for Question 14/5
(Setting up a low cost sustainable
telecommunication infrastructure for
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q16/5,
Q17/5,
Q18/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5
Q14/5
Q14/5
2)
[ TD
86GEN
]
[ TD
58GEN
]
[ TD
40GEN
]
[ TD
180GEN
]
[ TD
86GEN
]
[ TD
58GEN
]
[ TD
40GEN
]
[ TD
180GEN
]
2013-01-31
Rapporteur Q14/5
rural communications in developing
countries)
Agenda for Question 14/5
2013-01-29
Chairman SG5
Q14/5 Status Report
Q14/5
2013-01-18
Chairman SG5
Q 14/5 Handbook Framework
Q14/5
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
131GEN ]
(Rev.1)
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
93GEN ]
(Rev.1)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
30GEN ]
[ TD
30GEN
]
[ TD
23GEN
]
[ TD
30GEN
]
[ TD
23GEN
]
2012-12-18
FG DR&NRR
2012-12-11
JCA-Cloud
Incoming LS: Liaison answer on
"Request to FG DR&NRR for
information on climate change
adaptation and ICTs"
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q15/5
[ TD
[ TD
2012-12-11
JCA-Cloud
[ TD
86GEN ]
[ TD
58GEN ]
[ TD
40GEN ]
[ TD
180GEN ]
(Rev.12)
[ TD
23GEN ]
[ TD
Incoming LS: Invitation to
Q14/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
22GEN ]
22GEN
]
22GEN
]
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
190GEN ]
[ TD
190GEN
]
[ TD
151GEN
]
[ TD
150GEN
]
[ TD
148GEN
]
[ TD
190GEN
]
[ TD
151GEN
]
[ TD
150GEN
]
[ TD
148GEN
]
2013-02-07
Rapporteur Q15/5
Draft Circular-letter on ICT and
Adaptation to Climate Change
2013-02-05
Rapporteur Q15/5
OLS: Request for information and
designation of a liaison person
Q15/5
2013-02-05
Rapporteur Q15/5
OLS: Request for information and
designation of a focal point
Q15/5
2013-02-05
Rapporteur Q15/5
Q15/5
[ TD
147GEN
]
[ TD
104GEN
]
[ TD
100GEN
]
[ TD
57GEN
]
[ TD
147GEN
]
[ TD
104GEN
]
[ TD
100GEN
]
[ TD
57GEN
]
2013-02-05
Rapporteur Q15/5
OLS: Information concerning
progress of work in setting up the
requirements for the ICT and
Adaptation to Climate Change
Portal
Report of Q15/5
2013-02-04
Rapporteur Q15/5
ICT and Adaptation to Climate
Change - Report on Portal
Requirements
Q15/5
2013-02-04
Rapporteurs Q15/5
ICT and Adaptation to Climate
Change - Questionnaire
Q15/5
2013-01-29
Chairman SG5
Agenda for meeting of Q15/5
Q15/5
[ TD
151GEN ]
(Rev.1)
[ TD
150GEN ]
(Rev.1)
[ TD
148GEN ]
(Rev.1)
[ TD
147GEN ]
(Rev.1)
[ TD
104GEN ]
(Rev.1)
[ TD
100GEN ]
(Rev.1)
[ TD
57GEN ]
(Rev.12)
contribute to the cloud computing
roadmap population
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q14/5,
Q13/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5
Q15/5
[ TD
49GEN ]
[ TD
49GEN
]
[ TD
180GEN
]
[ TD
49GEN
]
[ TD
180GEN
]
2013-01-25
Chairman SG5
Q15/5 Status Report
Q15/5
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
149GEN ]
(Rev.12)
[ TD
131GEN ]
(Rev.1)
[ TD
149GEN
]
[ TD
149GEN
]
2013-02-05
Rapporteur Q15/5
OLS: Request for regular updating
of work progress and designation of
a liaison person for follow up
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q19/5
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
93GEN ]
(Rev.1)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
30GEN ]
[ TD
30GEN
]
[ TD
23GEN
]
[ TD
30GEN
]
[ TD
23GEN
]
2012-12-18
FG DR&NRR
2012-12-11
JCA-Cloud
Incoming LS: Liaison answer on
"Request to FG DR&NRR for
information on climate change
adaptation and ICTs"
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
[ TD
180GEN ]
(Rev.12)
[ TD
23GEN ]
[ TD
22GEN ]
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q14/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
191GEN ]
[ TD
191GEN
]
[ TD
169GEN
]
[ TD
168GEN
]
[ TD
167GEN
]
[ TD
166GEN
]
[ TD
165GEN
]
[ TD
164GEN
]
[ TD
163GEN
]
[ TD
162GEN
]
[ TD
161GEN
]
[ TD
191GEN
]
[ TD
169GEN
]
[ TD
168GEN
]
[ TD
167GEN
]
[ TD
166GEN
]
[ TD
165GEN
]
[ TD
164GEN
]
[ TD
163GEN
]
[ TD
162GEN
]
[ TD
161GEN
]
2013-02-07
Rapporteur Q16/5
Draft Circular letter on
Questionnaire on Emission Factors
Databases
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
2013-02-05
Rapporteur Q16/5
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
OLS: Development of a
Recommendation for ecospecifications and rating criteria for
mobile phones eco-rating programs
Report of Q16/5
[ TD
169GEN ]
(Rev.1)
[ TD
168GEN ]
(Rev.1)
[ TD
167GEN ]
(Rev.1)
[ TD
166GEN ]
(Rev.1)
[ TD
165GEN ]
(Rev.1)
[ TD
164GEN ]
(Rev.1)
[ TD
163GEN ]
(Rev.1)
[ TD
162GEN ]
(Rev.1)
[ TD
161GEN ]
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q15/5,
Q13/5,
Q14/5,
Q16/5,
Q17/5,
Q18/5,
Q19/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
Q16/5
[ TD
160GEN ]
[ TD
160GEN
]
[ TD
124GEN
]
[ TD
160GEN
]
[ TD
124GEN
]
2013-02-05
Rapporteur Q16/5
Questionnaire on Emission Factors
Databases
Q16/5
2013-02-04
Rapporteur Q16/5
Q16/5
[ TD
43GEN
]
[ TD
37GEN
]
[ TD
31GEN
]
[ TD
180GEN
]
[ TD
43GEN
]
[ TD
37GEN
]
[ TD
31GEN
]
[ TD
180GEN
]
2013-01-22
Chairman SG5
Proposal new work item on the
Development of a Recommendation
(Handbook?) for eco-specifications
and rating criteria for mobile phones
eco-rating programs
Question 16/5 Draft Agenda
2013-01-18
Chairman SG5
Q16/5 Status Report
Q16/5
2012-12-18
Chairman SG5
Q16/5 e-meeting (7 December 2012)
Q16/5
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
131GEN ]
(Rev.1)
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
93GEN ]
(Rev.1)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
63GEN ]
[ TD
63GEN
]
[ TD
63GEN
]
2013-01-29
TSB
Liaison Report Request From JTC
1/SC 39 for the 2013 JTC 1/SC 39
Plenary
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
[ TD
124GEN ]
(Rev.12)
[ TD
43GEN ]
(Rev.1)
[ TD
37GEN ]
[ TD
31GEN ]
[ TD
180GEN ]
(Rev.12)
Q16/5
[ TD
26GEN ]
[ TD
26GEN
]
[ TD
23GEN
]
[ TD
26GEN
]
[ TD
23GEN
]
2012-12-11
CEN-CENELEC EcoCG
Incoming LS: ToR CEN-CENELEC
Ecodesign Coordination Group
2012-12-11
JCA-Cloud
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
[ TD
22GEN ]
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
189GEN ]
[ TD
189GEN
]
[ TD
173GEN
]
[ TD
189GEN
]
[ TD
173GEN
]
2013-02-07
Rapporteur Q17/5
OLS: Reply Liaison to IEA
2013-02-06
WP3/5
OLS: Reply LS to JTC 1/SC 39 on
green data centres standardization
matters
Q17/5
[ TD
172GEN
]
[ TD
172GEN
]
2013-02-06
Rapporteur Q17/5
Report of Q17/5
Q17/5
[ TD
146GEN
]
[ TD
127GEN
]
[ TD
146GEN
]
[ TD
127GEN
]
2013-02-05
Rapporteur Q17/5
The first draft of Technical
Paper_infrastructure best practices
Q17/5
2013-02-05
WP3/5
OLS: Reply LS CEN-CENELEC
Ecodesign Coordination Group
Q17/5
[ TD
23GEN ]
[ TD
173GEN ]
(Rev.12)
[ TD
172GEN ]
(Rev.13)
[ TD
146GEN ]
[ TD
127GEN ]
(Rev.1)
Q16/5,
Q13/5,
Q17/5,
Q18/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q16/5,
Q13/5,
Q14/5,
Q15/5,
Q17/5,
Q18/5,
Q19/5
Q17/5
[ TD
121GEN ]
(Rev.12)
[ TD
112GEN ]
(Rev.1)
[ TD
111GEN ]
[ TD
107GEN ]
(Rev.1)
[ TD
102GEN ]
[ TD
101GEN ]
(Rev.12)
[ TD
89GEN ]
[ TD
88GEN ]
[ TD
87GEN ]
(Rev.1)
[ TD
78GEN ]
[ TD
46GEN ]
[ TD
44GEN ]
[ TD
27GEN ]
[ TD
121GEN
]
[ TD
121GEN
]
2013-02-04
WP3/5
OLS: Reply LS
CEN/CENELEC/ETSI Coordination
Group on Green Data Centres
Q17/5
[ TD
112GEN
]
[ TD
111GEN
]
[ TD
107GEN
]
[ TD
112GEN
]
[ TD
111GEN
]
[ TD
107GEN
]
2013-02-04
Rapporteur Q17/5
Energy efficiency Metrics and
measurement for power and cooling
equipments for telecommunications
Q17/5
2013-02-04
Editor
First draft of Recommendation
L.DC_minimum set
Q17/5
2013-02-04
Rapporteur Q17/5
Q17/5
[ TD
102GEN
]
[ TD
101GEN
]
[ TD
102GEN
]
[ TD
101GEN
]
2013-02-04
Editors
Proposal new work item on Data
center infrastructure energy
efficiency assessment methodology
considering environmental
conditions and running conditions
L.1300 "Best practices for green
data centres": First output text
2013-02-04
Rapporteur Q17/5
OLS: Liaison on Recommendation
L.ref
Q17/5
[ TD
89GEN
]
[ TD
88GEN
]
[ TD
87GEN
]
[ TD
78GEN
]
[ TD
46GEN
]
[ TD
44GEN
]
[ TD
27GEN
[ TD
89GEN
]
[ TD
88GEN
]
[ TD
87GEN
]
[ TD
78GEN
]
[ TD
46GEN
]
[ TD
44GEN
]
[ TD
27GEN
2013-02-01
ETSI EE liaison
officer
STF 439 on KPI definition status
report
Q17/5
2013-02-01
ITU liaison rapporteur
to EU JRC
EU Code of Conduct for Broadband
equipment V1.4.1
Q17/5
2013-02-01
Rapporteur Q17/5
Agenda: Question 17/5
Q17/5
2013-01-31
Rapporteur Q17/5
Draft of the new Recommendation
ITU-T L.REF
Q17/5
2013-01-24
TSB
IEA Workshop on Networked
Standby and a policy framework
draft
Q17/5
2013-01-22
Chairman SG5
Supplement on energy efficiency for
telecommunication equipment
Q17/5
2012-12-11
Broadband Forum
Incoming LS: Liaison on
Recommendation L.ref: Energy
efficiency reference values for
Q17/5
Q17/5
]
]
[ TD
25GEN
]
[ TD
180GEN
]
[ TD
25GEN
]
[ TD
180GEN
]
2012-12-11
CEN/CENELEC/ETSI
CG GDC
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
131GEN ]
(Rev.1)
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
130GEN ]
(Rev.12)
[ TD
93GEN ]
(Rev.1)
[ TD
130GEN
]
[ TD
130GEN
]
2013-02-05
Rapporteurs Q19/5
OLS:Liaison reply on smart grids &
home networks (TD20)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
63GEN ]
[ TD
63GEN
]
[ TD
63GEN
]
2013-01-29
TSB
Liaison Report Request From JTC
1/SC 39 for the 2013 JTC 1/SC 39
Plenary
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
26GEN ]
[ TD
26GEN
]
[ TD
23GEN
]
[ TD
26GEN
]
[ TD
23GEN
]
2012-12-11
CEN-CENELEC EcoCG
Incoming LS: ToR CEN-CENELEC
Ecodesign Coordination Group
2012-12-11
JCA-Cloud
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
[ TD
25GEN ]
[ TD
180GEN ]
(Rev.12)
[ TD
23GEN ]
telecommunication equipment and
infrastructure
Incoming LS: Activities of the
CEN/CENELEC/ETSI Coordination
Group on Green Data Centres
Q17/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q16/5,
Q18/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q17/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q18/5,
Q19/5
Q18/5
[ TD
22GEN ]
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
178GEN ]
[ TD
178GEN
]
[ TD
177GEN
]
[ TD
157GEN
]
[ TD
154GEN
]
[ TD
143GEN
]
[ TD
113GEN
]
[ TD
56GEN
]
[ TD
55GEN
]
[ TD
178GEN
]
[ TD
177GEN
]
[ TD
157GEN
]
[ TD
154GEN
]
[ TD
143GEN
]
[ TD
113GEN
]
[ TD
56GEN
]
[ TD
55GEN
]
2013-02-06
Rapporteur Q18/5,
Editors
Output of Q18/5 meeting relatively
to L.ICT in cities
2013-02-06
Rapporteur Q18/5
OLS: Liaison to IEC TC111 WG4,
reply to incoming Liaison TD 34
Q18/5
2013-02-05
Rapporteur Q18/5,
Editor
Draft text of Supplement to
L.methodology ICT Projects, RNS
Q18/5
2013-02-05
Rapporteur Q18/5
Report of Q18/5
Q18/5
2013-02-05
Rapporteur Q18/5
Draft Recommendation ITU-T
L.methodology ICT projects for
Consent
Q18/5
2013-02-04
Editors
Draft ITU-T L.methodology ICT
projects
Q18/5
2013-01-29
Chairman SG5
Draft detailed time plan for
Question 18/5
Q18/5
2013-01-29
ITU-T SG16
Incoming LS: Reply LS to ITU-T
SG 5 on impact of telepresence
systems on reducing greenhouse gas
(GHG) emissions
Q18/5
[ TD
177GEN ]
[ TD
157GEN ]
[ TD
154GEN ]
(Rev.1)
[ TD
143GEN ]
[ TD
113GEN ]
(Rev.1)
[ TD
56GEN ]
[ TD
55GEN ]
(Rev.1)
[ TD
54GEN ]
[ TD
54GEN
]
[ TD
34GEN
]
[ TD
33GEN
]
[ TD
180GEN
]
[ TD
54GEN
]
[ TD
34GEN
]
[ TD
33GEN
]
[ TD
180GEN
]
2013-01-29
Chairman SG5
Status Report of Question 18/5
Q18/5
2013-01-18
Liaison rapporteur
IEC TC111 WG4
Final draft of IEC TR 62725 Ed.1.0
Q18/5
2013-01-15
Editors
Q18/5
2013-02-06
Chairman WP3/5
Output of ITU-T L.methodology
ICT projects produced at ITU-T
Q18/5 e-meetings, 3 and 19
December 2012
Working Party 3/5 Report
[ TD
131GEN ]
(Rev.1)
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
130GEN ]
(Rev.12)
[ TD
93GEN ]
(Rev.1)
[ TD
130GEN
]
[ TD
130GEN
]
2013-02-05
Rapporteurs Q19/5
OLS:Liaison reply on smart grids &
home networks (TD20)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
63GEN ]
[ TD
63GEN
]
[ TD
63GEN
]
2013-01-29
TSB
Liaison Report Request From JTC
1/SC 39 for the 2013 JTC 1/SC 39
Plenary
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
26GEN ]
[ TD
26GEN
]
[ TD
26GEN
]
2012-12-11
CEN-CENELEC EcoCG
Incoming LS: ToR CEN-CENELEC
Ecodesign Coordination Group
[ TD
34GEN ]
[ TD
33GEN ]
[ TD
180GEN ]
(Rev.12)
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q16/5,
Q17/5
[ TD
23GEN ]
[ TD
23GEN
]
[ TD
23GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
[ TD
22GEN ]
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD 4GEN ]
(Rev.1)
[ TD
4GEN
]
[ TD
4GEN
]
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
132GEN ]
(Rev.1)
[ TD
129GEN ]
[ TD
132GEN
]
[ TD
129GEN
]
[ TD
128GEN
]
[ TD
67GEN
]
[ TD
132GEN
]
[ TD
129GEN
]
[ TD
128GEN
]
[ TD
67GEN
]
2013-02-05
Rapporteur Q19/5
2013-02-05
Rapporteurs Q19/5
OLS: Information from Q19 for
information to Focus Group Disaster
Relief, Network Resilience and
Recovery (TD13)
OLS: Liaison reply to ETSI (TD18)
2013-02-05
Rapporteur Q19/5
Report of Q19/5
Q19/5
2013-01-30
Rapporteur Q19/5
Draft agenda and timetable for
Q19/5 meeting
Q19/5
[ TD
36GEN
]
[ TD
35GEN
]
[ TD
[ TD
36GEN
]
[ TD
35GEN
]
[ TD
2013-01-18
Chairman SG5
Second draft of recommendation of
architecture of DC power feeding
systems (L.architecture)
Q19/5
2013-01-18
Rapporteur Q19/5
Work progress and status report of
Question 19/5 during interim period
Q19/5
2013-02-06
ITU-T SG5
OLS: Liaison reply to ETSI EE
Q19/5,
[ TD
128GEN ]
(Rev.1)
[ TD
67GEN ]
(Rev.12)
[ TD
36GEN ]
(Rev.1)
[ TD
35GEN ]
(Rev.1)
[ TD
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q18/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q19/5
Q19/5
Q19/5
185GEN ]
185GEN
]
[ TD
180GEN
]
185GEN
]
[ TD
180GEN
]
[ TD
149GEN ]
(Rev.12)
[ TD
131GEN ]
(Rev.1)
[ TD
149GEN
]
[ TD
180GEN ]
(Rev.12)
Liaison
Q5/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q15/5
2013-02-06
Chairman WP3/5
Working Party 3/5 Report
[ TD
149GEN
]
2013-02-05
Rapporteur Q15/5
OLS: Request for regular updating
of work progress and designation of
a liaison person for follow up
[ TD
131GEN
]
[ TD
131GEN
]
2013-02-05
ITU-T SG5
OLS: Information from Q19 for
JCA cloud roadmap (TD22)
[ TD
130GEN ]
(Rev.12)
[ TD
118GEN ]
[ TD
130GEN
]
[ TD
130GEN
]
2013-02-05
Rapporteurs Q19/5
OLS:Liaison reply on smart grids &
home networks (TD20)
[ TD
118GEN
]
[ TD
118GEN
]
2013-02-04
ITU-T SG9
[ TD
93GEN ]
(Rev.1)
[ TD
93GEN
]
[ TD
93GEN
]
2013-02-01
Chairman WP3/5
Incoming LS: Reply LS to ITU-R
WP 1A and WPs 5A, 5B and 5C on
impact from wired
telecommunication (including PLT)
on radiocommunication systems
Proposal new work item on
Environmental impact assessment of
broadcasting services
[ TD
63GEN ]
[ TD
63GEN
]
[ TD
63GEN
]
2013-01-29
TSB
Liaison Report Request From JTC
1/SC 39 for the 2013 JTC 1/SC 39
Plenary
[ TD
41GEN ]
[ TD
41GEN
]
[ TD
41GEN
]
2013-01-18
TSB
Information from JTC 1/SC 39
[ TD
23GEN ]
[ TD
23GEN
[ TD
23GEN
2012-12-11
JCA-Cloud
Incoming LS: Reply to LS on JCA
Cloud on Cloud Computing
Standard Roadmap
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q17/5,
Q18/5
Q19/5,
Q6/5,
Q8/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q13/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q13/5,
Q14/5,
]
]
[ TD
22GEN ]
[ TD
22GEN
]
[ TD
22GEN
]
2012-12-11
JCA-Cloud
Incoming LS: Invitation to
contribute to the cloud computing
roadmap population
[ TD
20GEN ]
[ TD
20GEN
]
[ TD
20GEN
]
2012-12-11
JCA-SG&HN
Incoming LS: Activities related to
smart grid
[ TD
18GEN ]
[ TD
18GEN
]
[ TD
4GEN
]
[ TD
18GEN
]
[ TD
4GEN
]
2012-12-11
ETSI TC EE
Incoming LS: Liaison to ITU-T SG5
on ETSI standard for Earthing and
bonding of 400 VDC
2012-12-06
Chairman SG5
Draft agenda and timetable for
Working Party 3/5 meeting
[ TD
188GEN
]
[ TD
187GEN
]
[ TD
186GEN
]
[ TD
184GEN
]
[ TD
188GEN
]
[ TD
187GEN
]
[ TD
186GEN
]
[ TD
184GEN
]
2013-02-07
Chairman SG5
Major achievements of WP1, WP2,
WP3
2013-02-07
Rapporteur Q2/5
Amendment 1 to ITU-T
Recommendation K.44
QALL/5
2013-02-07
JCA Chairman & CoChairman
Report of the twelfth meeting of
JCA on ICT&CC (5 February 2013)
QALL/5
2013-02-06
TSB
WP1/5, WP2/5 & WP3/5 work
programme
QALL/5
[ TD
183GEN
]
[ TD
183GEN
]
2013-02-06
TSB
Outgoing liaison statements
QALL/5
[ TD
181GEN
[ TD
181GEN
2013-02-06
Vice-Chairman SG5
Creation of Asia Pacific Regional
Group for SG5
QALL/5
[ TD 4GEN ]
(Rev.1)
[ TD
188GEN ]
(Rev.1)
[ TD
187GEN ]
[ TD
186GEN ]
[ TD
184GEN ]
(Rev.12)
[ TD
183GEN ]
(Rev.13)
[ TD
181GEN ]
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
Q19/5,
Q5/5
Q19/5,
Q13/5,
Q14/5,
Q15/5,
Q16/5,
Q17/5,
Q18/5
QALL/5
(Rev.1)
[ TD
179GEN ]
[ TD
156GEN ]
(Rev.14)
[ TD
155GEN ]
(Rev.1)
[ TD
145GEN ]
(Rev.12)
[ TD
141GEN ]
[ TD
126GEN ]
[ TD
99GEN ]
[ TD
95GEN ]
(Rev.1)
[ TD
71GEN ]
(Rev.13)
[ TD
59GEN ]
(Rev.1)
[ TD
53GEN ]
(Rev.1)
[ TD
51GEN ]
[ TD
50-
]
[ TD
179GEN
]
[ TD
156GEN
]
]
[ TD
179GEN
]
[ TD
156GEN
]
[ TD
155GEN
]
[ TD
145GEN
]
2013-02-06
Chairman SG5 RG
ARB
Meeting Report of the ARB-RG for
SG5
QALL/5
2013-02-05
Chairman SG5
List of Rapporteurs and Associate
Rapporteurs
QALL/5
[ TD
155GEN
]
[ TD
145GEN
]
2013-02-05
Chairman SG5
Management Team of Study Group
5
QALL/5
2013-02-05
Chairman SG5
OLS: Creation of a new Focus
Group on "Smart and Sustainable
Cities" (FG-SSC)
QALL/5
[ TD
141GEN
]
[ TD
126GEN
]
[ TD
99GEN
]
[ TD
95GEN
]
[ TD
71GEN
]
[ TD
141GEN
]
[ TD
126GEN
]
[ TD
99GEN
]
[ TD
95GEN
]
[ TD
71GEN
]
2013-02-05
ITU-T SG2
Incoming LS: Telecommunication
Management and OAM Project Plan
QALL/5
2013-02-05
Vice-Chairman SG5
Draft agenda for the creation of SG5
A-P Regional Group
QALL/5
2013-02-04
Chairman SG5 RG
Americas
Report of SG5 RG Americas
QALL/5
2013-02-01
Chairman SG5 RG
AFR
Report of SG5 RG-AFR Meeting
QALL/5
2013-01-30
Chairman SG5
Terms of reference of FG-SSC
QALL/5
[ TD
59GEN
]
[ TD
53GEN
]
[ TD
51GEN
]
[ TD
50-
[ TD
59GEN
]
[ TD
53GEN
]
[ TD
51GEN
]
[ TD
50-
2013-01-29
TSB
List of Participants
QALL/5
2013-01-28
Chairman SG5
Chairman's Introductory
presentation
QALL/5
2013-01-28
Interim Chairman SG5
RG-AFR
Draft agenda of the meeting of SG5
RG-AFR
QALL/5
2013-01-25
TSB
ITU-T SG5 Newcomers' session
QALL/5
GEN ]
(Rev.1)
[ TD
42GEN ]
[ TD
32GEN ]
(Rev.112)
[ TD
29GEN ]
(Rev.13)
[ TD
24GEN ]
[ TD
21GEN ]
[ TD
19GEN ]
[ TD
17GEN ]
[ TD
16GEN ]
[ TD
14GEN ]
[ TD
13GEN ]
[ TD
11GEN ]
[ TD
10GEN ]
GEN
]
[ TD
42GEN
]
[ TD
32GEN
]
GEN
]
[ TD
42GEN
]
[ TD
32GEN
]
[ TD
29GEN
]
2013-01-18
Chairman SG5
ITU-T Study Group 5 List of
Editors
QALL/5
2013-01-15
TSB
Draft time plan for the meeting of
Study Group 5
QALL/5
[ TD
29GEN
]
2012-12-11
Chairman SG5
ITU-T Study Group 5 List of
Representatives
QALL/5
[ TD
24GEN
]
[ TD
21GEN
]
[ TD
19GEN
]
[ TD
24GEN
]
[ TD
21GEN
]
[ TD
19GEN
]
2012-12-11
ITU-R WPs 5A, 5B
and 5C
Incoming LS: Impact from wired
telecommunication (including PLT)
on radiocommunication systems
QALL/5
2012-12-11
FG Smart Cable
Incoming LS: LS on FG SmartCable
activities and meetings
QALL/5
2012-12-11
ITU-D SG1
QALL/5
[ TD
17GEN
]
[ TD
16GEN
]
[ TD
14GEN
]
[ TD
13GEN
]
[ TD
11GEN
]
[ TD
10GEN
]
[ TD
17GEN
]
[ TD
16GEN
]
[ TD
14GEN
]
[ TD
13GEN
]
[ TD
11GEN
]
[ TD
10GEN
]
2012-12-11
JCA-COP
Incoming LS: Invitation to
participate in and provide input to
the work of the Correspondence
Group on the Elaboration of a
Working Definition of the Term
"ICT"
Incoming LS: Liaison to ITU-T
Study Groups, ITU Sectors, TSAG,
CWG-COP
2012-12-11
JCA-IoT
Incoming LS: Internet of Things
Work Plan
QALL/5
2012-12-11
ITU-D Q23/1
Incoming LS: Strategies and policies
concerning human exposure to
electromagnetic fields
QALL/5
2012-12-11
FG DR&NRR
QALL/5
2012-12-11
ITU-R WP1A
2012-12-11
JCA-IoT
Incoming LS: Establishment of
Focus Group on Disaster Relief
Systems, Network Resilience and
Recovery
Incoming LS: Developments on
coexistence of wired
telecommunication (including PLT)
and radiocommunication systems
Incoming LS: Liaison Statement to
all ITU-T Study Groups on
participation to IoT-GSI events
QALL/5
QALL/5
QALL/5
[ TD 6GEN ]
[ TD 1GEN ]
(Rev.15)
[ TD
6GEN
]
[ TD
1GEN
]
[ TD
6GEN
]
[ TD
1GEN
]
2012-12-11
ITU-T SG9
Incoming LS: Reply LS to JCA-CIT
on draft document on Conformance
and Interoperability Testing needs
QALL/5
2012-12-06
Chairman SG5
Draft agenda for Study Group 5
meeting
QALL/5
Download