A global approach for a Sustainable ICT ITU green standard week www.huawei.com HUAWEI TECHNOLOGIES CO., LTD. The Challenge The Solution • Reduce the energy consumption to reduce the impact on climate change. • Give the possibility to use ICT service everywhere to every one • Efficient solution for ICT and Simple system dedicate to rural areas • Standard on equipment power/energy consumption The SDO contributions • Standard on impact of equipment System (LCA… Methodology etc.) HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 2 Agenda Different impact factors Solutions Our contributions HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 3 The impact of a system during the life Cycle Carbon footprint for 10,000 subscribers during one year - Worst case scenario ton Clearly the major impact is during the use of the network The energy used to give a service is more than 50% of the total impact. 1600 1400 1300 1200 1000 1000 FTTCab 730 780 800 FTTB 690 FTTH 600 400 400 160 200 310 180 78 15 28 6 10 10 3.9 Logistics Assembly of netw ork devices 12 42 54 89 -14 -10 0 -200 Production of components in netw ork devices Production of site materials Deployment (installation) of netw ork devices Use of netw ork End-of-life -6 treatment of netw ork w aste Main life-cycle phases Carbon footprint of next generation fixed networks. Gianluca Griffa, Lorenzo Radice, Claudio Bianco ,Anders Andrae, Zhu Bin, Han Dong, Paolo Gemma, Luo Shudong Intelec 2010 Orlando HUAWEI TECHNOLOGIES Co., Ltd. 1200 HUAWEI Confidential Page 4 TOTAL The influence of low power mode ton CO2e Sensitivity analyses - 10,000 users during one year 1400 1200 1000 800 600 400 200 0 1300 1200 1000 1000 950 14 car/year 930 770 590 530 680 580 220 High power CPE Low power CPE FTTCab HUAWEI TECHNOLOGIES Co., Ltd. High power CPE Low power CPE FTTB High power CPE Worst deployment Best deployment Low power CPE FTTH HUAWEI Confidential Page 5 Agenda Different impact factors Solutions Our contributions HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 6 Wireless system possibility Carrier voltage Avg Power 10 5 Hotspot and office Multi-Carrier S222 Residents 00:00 06:00 08:00 18:00 24:00 These features are applicable for GSM and UMTS HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 7 area 22:00-23:00 20:00-21:00 18:00-19:00 16:00-17:00 14:00-15:00 Intelligent Shutdown S333 S111 12:00-13:00 0 10:00-11:00 off adjustable 15 8:00-9:00 off voltage 20 6:00-7:00 on on down some PSUs fixed 25 4:00-5:00 on Shut intelligent voltage regulation 30 2:00-3:00 on PSUs power on traffic Multi-carrier 0:00-1:00 All Low traffic Power (W) / sector High smart control Avg PSU Time Fixed access system possibility Advanced ADSL2+ L2/L3 Low Power Mode L2 mode can reduce power consumption by 30%~40% L3 model can reduce power consumption nearly to 0. But still under standardization because the crosstalk problems L2 mode implementation can save about 11.7 kWh for day for equipment (1024 ports) about 4 Mwh in a year about 2 tons of CO2 VDSL2 low power HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 8 Infrastructure solution Cooling For 1 kw site save 4 kwh/year Solution for Different Scenarios Ground- P Air-con Heat Thermal Exchanger Electric Cooling 50% 60% Free Battery cooling cooling indoor cabinet 70% Coupled Heat Pump Systems 60% 85%* HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 9 Higher Efficiency power station Efficiency curve of rectifiers Customer Heat emission (4%) High 50A benefit Output efficiency i power supply >96% Load Replace Max 96.8% 88% 98.00% Energy 96.00% 15A with 94.00% 92.00% consumption of a 3KW site each year (KWH) Consumptio n in total Energy loss 88% power energy loss saving 32850 1314 6570 5256 90.00% 88.00% 86.00% 0 1.5 3 4.5 6 HUAWEI TECHNOLOGIES Co., Ltd. 7.5 9 10.5 12 13.5 15 16.5 HUAWEI Confidential Reducing 80% energy loss Page 10 Dynamic DC management to avoid hot spot Temperature in a data center is NOT balanced VM VM VM VM VM VM VM VM VM VM In the DC Facility, the node in area possess different cooling condition. VM can be moved from the PM of heat hotspot, result in balanced cooling level and higher working temperature, thus lower PUE When all VM of certain PM being moved to other PM (without hotspot), that PM can be power off to improve the power efficiency. * VM: Virtual Machine Page 11 HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Power OFF VM VM VM VM VM VM Apps live migration technologies 0.26 tonns CO2 Apps All apps can be migrated lively ,including 1. Live Migration VMs. Live migration must happen in same 2. cluster. 3. Each DC support 1024 clusters. 4. One cluster has 1024 nodes maximally. 1. APP4 APP2 APP5 seconds. Service broken time: shorter than 300 milliseconds. Shut APP1 APP4 APP2 APP5 APP3 APP6 Page HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential APP6 APP3 Live migration time: shorter than 35 Product 2. APP1 12 down Simple system for rural areas Only 4 men 2 days to deploy one site Green Energy, “0” maintenance Zero CO2 emission, minimum routine maintenance HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 13 Agenda Different impact factors Solutions Our contributions HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Page 14 The need of standardardization International standard EMS TC111 TC108 Product environmental protection Environment NA standard TC207 • 14006:zoology design guide • 14045:EE evaluation principle • SG15: GPON energy saving protocol • SG5 energy saving definition, method, ICT and climate change ITU-T Huawei global contribute in SDO organizations EU standard and safety China ST2 TEE TC4 BB CoC DC CoC Power supply CoC EE Server Core network UPS CoC BB Site Digital TV CoC BTS DC LCA CN CPE AN User Optical network Router RBS HUAWEI TECHNOLOGIES Co., Ltd. HUAWEI Confidential Environmental protection standard Power supply standard BST ATTM standard TC5 TC9 & CN of TD-SCDMA and WCDMA;BTS of GSM Environment standard • Power consumption, weight, size … • WN, CN, ON, DN, A&S Page 15 and safety Huawei reduce hits footprint Virtual Beijing Dalas Desktop Cloud in Huawei Shanghai Shenzhen Project Plan Virtual A 2009.10: 400 staff on trial 2010.5: officially 8K R&D staff at Shanghai center are moved to virtual desktop 2011 & beyond: move all 60K R&D staff around the globe from PC to virtual desktop Overall B Desktop C D E F Objectives Computer # CPU Utilization Power Consumption Hardware Preparation Cycle Maintenance efficiency HUAWEI TECHNOLOGIES Co., Ltd. Tradition Cloud Based NC Improvement 10000 PCs+ 100 CI servers 390 servers+10000 TC 40% on CAPEX <5% >60%(VDI+CI) 10x 78MW 22MW 71% >3 months <1 month 30% <100 /person >1000 /person 9x HUAWEI Confidential Page 16 HUAWEI TECHNOLOGIES Co., Ltd. For contact: paolo.gemma@huawei.com HUAWEI Confidential