Agenda • Introductions • Project Background • Purpose and Need • Initial Build Alternatives • Draft Build Alternative • Next Steps • Discussion and Comments Project Background The NNEIRI study area includes 470 route miles on 3 segments SPG-MTL: 309 miles Partnership between MassDOT, VTrans, and FRA with Support and Coordination from Agencies and Stakeholders BOS-SPG: 99 miles SPG-NH: 62 miles Purpose and Need Purpose • Providing additional regional travel options through quality passenger rail • Connecting major cities in New England with smaller cities and rural areas • Creating a competitive rail transportation alternative to the available automobile, bus, and air Purpose and Need Need • Benefits that could be achieved to the regional economy and livability from improved connections across the region. • The Corridor has a wide variety of economic engines that are disbursed that could provide greater benefits to residents and employees through improved connections. • Improvements to intercity rail service would enhance options for the mobility and connectivity that is needed in the Corridor for the region to grow and prosper. Initial Alternatives Considered • 18 preliminary options with variations of Speed, Equipment, Track Engineering • Stakeholder, Public, and Agency Coordination for Alternatives Evaluation • 3 Build Alternatives and a No Build Alternative Considered Service Comparison Capital Cost Comparisons New Track (Miles) New Turnouts Bridge Rehab (Feet) Bridge Redecking (Feet) Railroad Crossing Upgrades Trainsets Alt. 1 24.6 35 1,170 400 9 11 Alt. 2 75.6 73 1,905 1,575 19 17 Alt. 3* 75.6 73 1,905 1,575 19 18 *Alternative 3 assumes using tilt equipment and higher speeds which increase the price. Alternative Analysis Summary Alt NB No Build No Additional Capital Costs No Additional Operating Support 71,000 Annual Riders Corridor Service $615-785 Million Capital Costs $24 Million Operating Support 597,000 Annual Riders Corridor Service with Speed Improvements $1,065–1,350 Million Capital Costs $39 Million Operating Support 1,052,500 Annual Riders Corridor Service with Speed and Equipment Improvements $1,255-1,590 Million Capital Costs $48 Million Operating Support 1,170,700 Annual Riders Alternatives Evaluation Draft Build Alternative Services BOS •NHV 8 Boston to New Haven Roundtrips BOS •MTL 1 Boston to Montreal Roundtrip NHV-• MTL 1 Additional New Haven to Montreal Roundtrip Draft Build Alternative Services BOS NHV Boston to New Haven – 8 Roundtrips between Boston and New Haven – All Local Service Making All Station Stops – Frequency is Optimal Due to High Projected Ridership on the Inland Route Corridor Draft Build Alternative Infrastructure BOS NHV Boston to New Haven – Ensuring the Corridor meets standards for signals and grade crossings. – Allow passenger trains to operate up to 79 mph where track geometry allows. – Second track between Worcester and Springfield – Worcester Union Station Platform Capacity – Palmer Station Construction Provision Draft Build Alternative BOS NHV Boston to New Haven Methodology – Infrastructure Constraints • Capacity Constraints on NHHS Corridor • Speed Constraints led to 79 MPH Maximum Speed – Ridership • BOS to SPG Low Ridership • High BOS to NHV Ridership • Express Service Ineffective – Cost • Higher Speeds Ineffective • Boston to Springfield Service Ineffective and Costly Draft Build Alternative Services BOS MTL NHVMTL Boston to Montreal New Haven to Montreal – 1 Roundtrip from Boston to Montreal – 1 Roundtrip from New Haven to Montreal – Local Service Making All Station Stops – Provides for Potential MassDOT Service between Springfield and Brattleboro Draft Build Alternative Infrastructure BOS MTL NHVMTL Boston to Montreal New Haven to Montreal – Track Class Upgrade: Allow trains to operate to 79 mph where track geometry allows. – Installation Centralized Traffic Control (CTC) – New and Extended Sidings in Massachusetts and Vermont – Frequency is Optimal Due to High Ridership Demand to Montreal and NYC from Vermont Draft Build Alternative BOS MTL NHVMTL Boston to Montreal New Haven to Montreal – Infrastructure Constraints • Capacity Constraints at Montreal Central Station • Speed Constraints led to 79 MPH Maximum Speed – Ridership • BOS to MTL Lower Ridership • High NHV to MTL Ridership • Express Service Ineffective – Cost • Higher Speeds Ineffective BOS NHV BOS MTL NHVMTL Alt 2 Comparison Alternative 2 Draft Build Alternative 79 MPH 79 MPH Yes No BOS-NHV Roundtrips 8 8 BOS-MTL Roundtrips 3 1 NHV-MTL Roundtrips (Including Vermonter) 3 2 Worcester to Springfield Double Track Yes Yes Additional Vermont Sidings Yes Yes Infrastructure Cost (Excluding Trainsets) $610-760M TBD 1,052,500 TBD Top Speed Express Service Annual Ridership BOS NHV BOS MTL NHVMTL Next Steps National Environmental Policy Act (NEPA) • Based on screening of the initial Build Alternatives, the NEPA process is expected to be in the form of a Tier 1 Environmental Assessment (EA). • The Tier I EA will be developed for review and approval from FRA and state and cooperating federal agencies BOS NHV BOS MTL NHVMTL Next Steps Stakeholder Engagement and Public Meetings • Opportunity for Stakeholder and Public Comment • Stakeholder Meeting will Provide Technical Feedback on the Draft Build Alternative. BOS NHV BOS MTL NHVMTL Next Steps Service Development Plans (SDP) • Independent but coordinated plans to be developed for each Corridor. • The plans will provide blueprint for the development of service in each Corridor. • The SDPs establish a policy for the implementation of service on the NNEIRI Corridor. • The SDPs will include: • Methodology and Plan Development • Benefit and Cost Analysis • Financial Plan • Risk Assessment BOS NHV BOS MTL NHVMTL Next Steps • Service Levels • Infrastructure Provisions • Methodology for Service and Infrastructure Provisions Thank You! Please send follow-up meeting comments to: scott.bascom@state.vt.us ammie.rogers@state.ma.us www.mass.gov/massdot/norther nnewenglandrail