DESIGN PUBLIC HEARING THURSDAY, AUGUST 5, 2010 AT PHILLIPSTON TOWN HALL 50 THE COMMON PHILLIPSTON, MASSACHUSETTS 01331 7:00 PM FOR THE PROPOSED Route 2 over Route 2A Project File No. 603495 Bridge No. P-09-004 (19B) IN THE TOWN OF PHILLIPSTON, MASSACHUSETTS COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS DEPARTMENT OF TRANSPORTATION (HIGHWAY DIVISION) LUISA PAIEWONSKY HIGHWAY DIVISION ADMINISTRATOR FRANK A. TRAMONTOZZI, P.E. CHIEF ENGINEER THE COMMONWEALTH OF MASSACHUSETTS MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION NOTICE OF A PUBLIC HEARING Project File No. 603495 A Design Public Hearing will be held by MassDOT – Highway Division (Project No. 603495) to discuss the proposed replacement of the Route 2 Bridge over State Road (Route 2A) in Phillipston, MA. WHERE: Phillipston Town Hall 50 The Common Phillipston, MA 01331 WHEN: Thursday, August 5, 2010 at 7:00pm PURPOSE: The purpose of this hearing is to provide the public with the opportunity to become fully acquainted with the proposed bridge replacement project. All views and comments made at the hearing will be reviewed and considered to the maximum extent possible. PROPOSAL: The proposed project consists of the replacement of the Route 2 Bridge over State Road (Route 2A), Bridge No. P-09-004, in Phillipston. The project will include replacement of the bridge superstructure, modifications to the bridge substructure, reconstruction of Route 2 approaches to provide 16’-6” vertical clearance, temporary Exit 18 ramp widening to accommodate an 8-day Route 2 detour, and minor modifications to the intersections of Ward Hill Road with the Route 2 eastbound off-ramp and Route 2A with Exit 18 eastbound and westbound ramps. Right-of-way acquisition is not required for this project. Written views received by MassDOT subsequent to the date of this notice and up to five (5) days prior to the date of the hearing shall be displayed for public inspection and copying at the time and date listed above. Plans will be on display one-half hour before the hearing begins, with an engineer in attendance to answer questions regarding this project. A project handout will be made available on the MassDOT website listed below. Written statements and other exhibits in place of, or in addition to, oral statements made at the Public Hearing regarding the proposed undertaking are to be submitted to Frank A. Tramontozzi, P.E., Chief Engineer, MassDOT Highway Division, 10 Park Plaza, Boston, MA 02116, ATTN: Design-Build Program, Project File No. 603495. Such submissions will also be accepted at the hearing. Mailed statements and exhibits intended for inclusion in the public hearing transcript must be postmarked within ten (10) business days of this Public Hearing. Project Inquiries may be emailed to dot.feedback.highway@state.ma.us. The community has declared that this facility is accessible to all in compliance with the ADA / Title II. However, persons in need of ADA / Title II accommodations should contact Angela Rudikoff by phone VOICE at (617) 9737005, TDDY (617) 973-7306, or email angela.rudikoff@eot.state.ma.us. Requests must be made at least 10 days prior to the date of the public hearing. In case of inclement weather, hearing cancellation announcements will be posted on the MassDOT website http://www.mass.gov/mhd. LUISA PAIEWONSKY HIGHWAY DIVISION ADMINISTRATOR Boston, Massachusetts FRANK A. TRAMONTOZZI, P.E. CHIEF ENGINEER WHAT IS A PUBLIC HEARING? WHY A PUBLIC HEARING? To provide an assured method whereby the Commonwealth of Massachusetts can furnish to the public information concerning the State’s highway construction proposals, and to afford every interested resident of the area an opportunity to be heard on any proposed project. At the same time, the hearings afford the Commonwealth an additional opportunity to receive information from local sources which would be of value to the State in making its final decisions to what design should be advanced for development. WHY NOT A VOTE ON HIGHWAY PLANS? The hearings are not intended to be a popular referendum for the purpose of determining the nature of a proposed improvement by a majority of those present. They do not relieve the duly constituted officials of a State highway department of the necessity for making decisions in State highway matters for which they are charged with full responsibility. WHAT DOES A PUBLIC HEARING ACCOMPLISH? It is designed to ensure the opportunity for, or the availability of, a forum to provide factual information which is pertinent to the determination of the final alternative considered by the state to best serve the public interest, and on which improvement projects are proposed to be undertaken. It is important that the people of the area express their views in regard to the proposal being presented, so that views can be properly recorded in the minutes of the meeting. These minutes will be carefully studied and taken into consideration in the determination of the final design. TO SAFEGUARD THE PROPERTY OWNER If your property, or a portion of it, must be taken by the State for a highway in the interest of all people of the Commonwealth, your rights are fully protected under the law. Briefly, here are some of the answers to questions you might ask. 1. WHO CONTACTS ME? Representatives of the Right of Way Bureau of the Massachusetts Department of Transportation. They will explain the procedure to be followed in acquiring and paying for the property. An appraiser may ask questions needed to arrive at a fair price for your property. 2. WHAT IS A FAIR PRICE FOR MY PROPERTY? Every offer is made to insure that an equitable value is awarded to you for the property, or to appraise the “damage” to the property as a result of the taking. MassDOT appraisers, independent appraisers, MassDOT “Review Appraisers” and a Real Estate Review Board may all contribute in arriving at a fair price. The State also pays a proportionate part of the real estate tax for the current year, and interest from the date the property is acquired. 3. MUST I ACCEPT THE DEPARTMENT’S OFFER? No. If, after the figure established as a fair market value has been offered to the owner, the owner feels he or she is not being offered a fair price, he or she has the right within two years to appeal to the courts. PENDING a court decision, he or she can be paid a “protanto” (or “for the time being”) amount that in no way prejudices the court appeal. 4. WHAT WILL HAPPEN TO MY HOUSE? The owner will have the opportunity to buy back his or her house, provided he or she has a location to which it can be moved; and the proper permits for its removal. If the owner does not wish to repurchase, the house will be advertised for bids. The highest bidder, who must also have a location and permits for removal, will be awarded the house. 5. WHAT HAPPENS IF I MUST RELOCATE? In addition to the fair market value of the property, the Department pays certain relocation benefits for both owners and tenants of acquired residences and businesses who meet eligibility requirements. Assistance in relocation is also provided. Department brochures are available for details on these benefits. SOURCE: Google Maps SPS New England 98 Elm Street Salisbury, MA 01952-1804 TranSystems 38 Chauncy Street Suite 200 Boston, MA 02111 LOCATION MAP Route 2 over Route 2A Millbury, MA Route 2 over Route 2A Bridge No. P-09-004 Phillipston, MA Project Location The Bridge Replacement Contract is located in the Town of Phillipston, Massachusetts. The limits of work are approximately 500 feet east and west of the bridge. Purpose The purpose of this contract is to remove and replace the existing bridge superstructure carrying Route 2 over Route 2A and increase vertical clearance over Route 2A. Existing Conditions Bridge P-09-004 carries Route 2 over Route 2A in Phillipston between the Exit 18 eastbound off- and onramps. Route 2 is a two-lane divided limited access highway consisting of one travel lane and a right (outside) shoulder in each direction, with a median strip separating eastbound and westbound traffic. The vertical alignment of Route 2 is on an approximately 2.8% grade. Route 2A is a two-lane undivided unlimited access highway consisting of one lane and a right (outside) shoulder in each direction. There are overhead utility lines under the existing bridge, supported on wooden utility poles along the west side of Route 2A. The existing bridge has a single span steel stringer superstructure with a concrete deck resting on concrete abutments. The existing vertical clearance under the bridge is approximately 14’-7”. The many steel stringer show signs of significant collision damage. Scope of Work The work shall consist of replacing the existing superstructure with a new superstructure consisting of steel stringers and a concrete deck. The existing abutments and wing walls will be reused with new concrete caps. The vertical clearance under the bridge will be increased to 16’-6”. The roadway profile of Route 2 will be raised to accommodate the increased clearance under the bridge. The new superstructure will be built on temporary shoring adjacent to the bridge. During an eight-day one week shut down, Route 2 traffic will be detoured via the Exit 18 eastbound off- and on-ramps so that the existing superstructure can be removed, the new superstructure can be rolled into place, and the Route 2 approaches can be raised. Other work elements include minor reconfiguration of the intersection of Ward Hill Road with the Exit 18 eastbound off-ramp to better delineate traffic movements; and restriping the intersections of Route 2A with Exit 18 eastbound and westbound on-ramps to provide left turn lanes for Route 2A traffic entering the Route 2 on-ramps. Utilities Currently, no utilities are carried across the bridge. The existing areal utilities that currently pass under the bridge will be relocated underground. Right-of-Way Impacts No right-of-way impacts are anticipated. All work is within the state highway layout. Maintenance of Traffic during Construction The bridge will be open to traffic except during the one week shutdown necessary to demolish the existing structure and roll in the new bridge in place. To accommodate the short term shutdown, the Exit 18 eastbound off- and on-ramps will be temporarily widened and two-way Route 2 traffic will be diverted onto these ramps and a portion of Route 2A between them. Route 2A traffic will be detoured via Exit 17 to the west and Exit 19 to the east. Ward Hill Road access to and from the Route 2 eastbound off-ramp will be closed for the duration of the Route 2 detour. The temporarily widened ramps will be restored to their preconstruction condition upon termination of the Route 2 detour. Project Status The Plans on display this evening are 75% complete. Comments from this evening will be reviewed and addressed in the final design. Construction is anticipated to be complete by the end of this year. Project Costs At this time, the estimated cost of construction is approximately $3 million. Funding for the construction of this project will be by the Commonwealth of Massachusetts. THE COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF TRANSPORTATION – HIGHWAY DIVISION FEDERAL AID PROJECT Phillipston, MA. ROUTE 2 OVER ROUTE 2A Project File No. 603495 This sheet is provided for your comments. Your input is solicited and appreciated. Please return your sheet, with comments, to a staff member at the meeting, or mail to: Frank A. Tramontozzi, P.E., Chief Engineer Massachusetts Department of Transportation 10 Park Plaza, Boston, MA 02116-3973 The final date for receipt of written statements and exhibits for inclusion into the official hearing transcript will be ten (10) days after the Public Hearing. _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ _______________________________________________________________________________________ ____________ Name _________________________________ Title ____________________________ Organization __________________________________________________________________ Address __________________________________________________________________ __________________________________________________________________ Please Fold and Tape ________________________ Please Place Appropriate Postage Here ________________________ ________________________ Frank A. Tramontozzi, P.E. Chief Engineer Massachusetts Department of Transportation (Highway Division) 10 Park Plaza Boston, MA 02116-3973 RE: Public Hearing ROUTE 2 OVER ROUTE 2A PHILLIPSTON, MA Project File No. 603495