MAJOR CONSTRUCTION ITEMS • CONSTRUCTION OF WESTBOUND CASEY ARBORWAY • ST. SOUTH AR BO RW A YR D. • • SOUTHWEST CORRIDOR PARK • • • AS HI NG TO N ST . CAS E CAS Y ARBOR EY A RBO WAY WB RWA Y EB • W ARBORWAY YARD & EASTBOUND MORTON ST. WITHIN WORK AREAS. CONSTRUCTION OF SOUTHBOUND SOUTH ST., WASHINGTON ST. & HYDE PARK AVE. CONSTRUCTION OF FRONTAGE RD. & MORTON ST. CONSTRUCTION OF NORTHERN PLAZA & SOUTHWEST CORRIDOR PARK. DEMOLITION OF SHEA CIRCLE, NEW WASHINGTON ST. & TEMP. ARBORWAY. CONSTRUCTION OF SHEA SQUARE. CONSTRUCTION OF CIRCUIT DRIVE, ORCHARDHILL ROAD, ARBORWAY ROAD, & FOREST HILLS ST. CONSTRUCTION OF SOUTH ST. AT WASHINGTON ST. • FOREST HILLS STREET: CLOSURE AT SHEA CIRCLE • SOUTH/ WASHINGTON INTERSECTION: • • • • • • BUS LANE BUS LEGEND LAN E REDUCED TO 1 LANE IN EACH DIRECTION (NB & SB) MID-BLOCK CROSSING: CLOSURE ARBORWAY ROAD: CLOSURE ORCHARDHILL ROAD: ONE-LANE, TWO DIRECTION TRAFFIC WASHINGTON/ HYDE PARK INTERSECTION: REDUCED TO 1 LANE IN EACH DIRECTION (NB & SB) CASEY ARBORWAY WESTBOUND: LEFT TURN TO HYDE PARK AVE. PROHIBITED SOUTH STREET IN-ONLY AT INTERSECTION WITH WASHINGTON ST. CASEY ARBORWAY WB ONLY . CASEY ARBORWAY EB ONL Y ES R O T S LL I H ST F COURTHOUSE FRONTAGE RO DR./ S L L I H T FORES DRIVE T I U C R CI AD SIGNALIZED INTERSECTION T. RD. TRAFFIC FLOW ARROW WEST ROXBURY COURTHOUSE CHURCH H ORC ARBORWAY GARDENS HILL ARD FOREST HILLS STATION DRUM CEMETERY TH S U O S N RESTRICTED MOVEMENTS RD. COMPLETED WORK GT ON S T. MORTON ST. EB . MORTON ST WA PROPOSED WORK ZONE MORTON SH IN RD. U O IC AST ST. WB D. SR ILL ST H RE ST . HY DE P AR KA VE . FO TEMPORARY PAVEMENT WE R TO YALE TER. TEMPORARY WALKWAY WA SH ING TO NS T. STAGE 4 UK RA IN EW AY CASEY ARBORWAY PROJECT CONSTRUCTION MANAGEMENT DRAFT FOR REVIEW JULY 18, 2012 The drawing shown here is subject to change and revision as the design progresses to the 25% submittal stage. 60 0 60 120 SCALE 1" = 60'