MAJOR CONSTRUCTION ITEMS
• CONSTRUCTION OF WESTBOUND CASEY ARBORWAY
•
ST.
SOUTH
AR
BO
RW
A
YR
D.
•
•
SOUTHWEST
CORRIDOR PARK
•
•
•
AS
HI
NG
TO
N
ST
.
CAS
E
CAS Y ARBOR
EY A
RBO WAY WB
RWA
Y EB
•
W
ARBORWAY YARD
& EASTBOUND MORTON ST. WITHIN WORK AREAS.
CONSTRUCTION OF SOUTHBOUND SOUTH ST.,
WASHINGTON ST. & HYDE PARK AVE.
CONSTRUCTION OF FRONTAGE RD. & MORTON ST.
CONSTRUCTION OF NORTHERN PLAZA &
SOUTHWEST CORRIDOR PARK.
DEMOLITION OF SHEA CIRCLE, NEW WASHINGTON
ST. & TEMP. ARBORWAY.
CONSTRUCTION OF SHEA SQUARE.
CONSTRUCTION OF CIRCUIT DRIVE, ORCHARDHILL
ROAD, ARBORWAY ROAD, & FOREST HILLS ST.
CONSTRUCTION OF SOUTH ST. AT WASHINGTON ST.
• FOREST HILLS STREET: CLOSURE AT SHEA CIRCLE
• SOUTH/ WASHINGTON
INTERSECTION:
•
•
•
•
•
•
BUS LANE
BUS
LEGEND
LAN
E
REDUCED TO 1 LANE IN EACH
DIRECTION (NB & SB)
MID-BLOCK CROSSING: CLOSURE
ARBORWAY ROAD:
CLOSURE
ORCHARDHILL ROAD:
ONE-LANE, TWO DIRECTION
TRAFFIC
WASHINGTON/ HYDE PARK
INTERSECTION:
REDUCED TO 1 LANE IN EACH
DIRECTION (NB & SB)
CASEY ARBORWAY
WESTBOUND:
LEFT TURN TO HYDE PARK AVE.
PROHIBITED
SOUTH STREET
IN-ONLY AT INTERSECTION WITH
WASHINGTON ST.
CASEY ARBORWAY WB
ONLY
.
CASEY ARBORWAY EB
ONL
Y
ES
R
O
T
S
LL
I
H
ST
F
COURTHOUSE FRONTAGE RO
DR./
S
L
L
I
H
T
FORES
DRIVE
T
I
U
C
R
CI
AD
SIGNALIZED
INTERSECTION
T.
RD.
TRAFFIC FLOW ARROW
WEST ROXBURY
COURTHOUSE
CHURCH
H
ORC
ARBORWAY GARDENS
HILL
ARD
FOREST HILLS
STATION
DRUM
CEMETERY
TH S
U
O
S
N
RESTRICTED MOVEMENTS
RD.
COMPLETED
WORK
GT
ON
S
T.
MORTON
ST. EB
.
MORTON ST




WA
PROPOSED WORK ZONE
MORTON
SH
IN
RD.
U
O
IC
AST
ST. WB
D.
SR
ILL


ST
H
RE
ST
.
HY
DE
P
AR
KA
VE
.
FO
TEMPORARY PAVEMENT
WE
R


TO
YALE TER.
TEMPORARY WALKWAY
WA
SH
ING
TO
NS
T.
STAGE 4
UK
RA
IN
EW
AY
CASEY ARBORWAY PROJECT
CONSTRUCTION MANAGEMENT
DRAFT FOR REVIEW
JULY 18, 2012
The drawing shown here is subject to
change and revision as the design
progresses to the 25% submittal stage.
60
0
60
120
SCALE 1" = 60'