CASEY ARBORWAY PROJECT Preliminary Design Public Hearing February 27, 2013 Tonight’s Agenda 1.Design Overview 2.Construction Overview 3.Question and Answer Public Comment Comments on the proposed project must be submitted in writing by March 13, 2013, via mail or email to: Mr. Thomas F. Broderick, P.E., Chief Engineer Massachusetts Department of Transportation 10 Park Plaza Boston, MA 02116 Attention: Mr. Paul King - Accelerated Bridge Program Project File Number: 605511 Email comments to: dot.feedback.highway@state.ma.us The Public Agency Partnership The Partnership Continues – MassDOT – designer/builder of new roadway – MBTA – owner/operator of transit facilities – DCR – owner of surface roadway and signals – City of Boston – owner of adjacent roadways, parks and maintains signals Project Overview Project Area Surface Streets Designed Around the Overpass Existing Surface Street Path Opportunity to Replace Critical Missing Link T Preliminary Design Plan SOUTHWEST CORRIDOR PARK ARBORWAY YARD ARNOLD ARBORETUM FRANKLIN PARK COURT HOUSE UPPER LEVEL BUSWAY ARBORWAY GARDENS SHEA SQUARE FOREST HILLS CEMETERY Focus Area 1 Focus Area 2 Focus Area 3 Route 39 Bus and Taxi Swap Taxi Pick up and Drop Off New Route 39 Bus Bay Public Open Space Focus Areas: Shea Square SOUTHWEST CORRIDOR PARK ARBORWAY YARD ARNOLD ARBORETUM FRANKLIN PARK COURT HOUSE UPPER LEVEL BUSWAY ARBORWAY GARDENS SHEA SQUARE FOREST HILLS CEMETERY Public Open Space Focus Areas: Southwest Corridor Park SOUTHWEST CORRIDOR PARK ARBORWAY YARD ARNOLD ARBORETUM FRANKLIN PARK COURT HOUSE UPPER LEVEL BUSWAY ARBORWAY GARDENS SHEA SQUARE FOREST HILLS CEMETERY Public Open Space Focus Areas: MBTA Plaza SOUTHWEST CORRIDOR PARK ARBORWAY YARD ARNOLD ARBORETUM FRANKLIN PARK COURT HOUSE UPPER LEVEL BUSWAY ARBORWAY GARDENS SHEA SQUARE FOREST HILLS CEMETERY Construction Staging Construction Staging • Construction will last approximately 2 ½ years, beginning in early Spring of 2014, end in fall of 2016 • Bridge will close to traffic in summer of 2014 • Will need to construct temporary roadway first to remove traffic from bridge • Temporary upper busway constructed to accommodate the Route 39 bus Design & Construction Schedule Accelerated Bridge Program Opportunity Project Schedule Preliminary Design Submission October 2012 Detailed Design Submission by Spring 2013 Final Design Summer 2013 Advertise Fall 2013 PLANNING STUDY 2011 PRELIMINARY DESIGN 2012 TO FINAL DESIGN 2013 Construction Completion September 2016 DEMOLITION AND CONSTRUCTION 2014 2015 Community Involvement Throughout Project Select Alternative Preliminary To Final Design Review Construction Staging & Traffic Management Planning and Phasing Construction Management Meetings 2016 Design Process • Preliminary Design – nearly completed. Preliminary design has limited detail, and focuses on: – Road and curb location – Traffic Signal phasing and timing – MEPA Certificate issued • Detailed Design – Includes additional design detail (plans/specifications) based on preliminary design review; open space and landscaping design • Final Plans, Specifications and Estimates (PSE) – Finalizes all construction-related documents Detailed Design Elements Being Developed • Open space and landscaping • Signalization details and roadway configuration • Parking & pick-up/drop-off (including school buses) • Non-peak design variations • Stormwater/water quality improvements Detailed Design Elements Being Developed • Upper busway/Washington Street • Shea Square and Morton Street • Construction staging and traffic management • Green design elements • Maintenance and Operations Plan Public Comment Comments on the proposed project must be submitted in writing by March 13, 2013, via mail or email to: Mr. Thomas F. Broderick, P.E., Chief Engineer Massachusetts Department of Transportation 10 Park Plaza Boston, MA 02116 Attention: Mr. Paul King - Accelerated Bridge Program Project File Number: 605511 Email comments to: dot.feedback.highway@state.ma.us Elected Official Comment Question and Answer