Public Informational Meeting July 11, 2013 CASEY ARBORWAY PROJECT

advertisement
CASEY ARBORWAY PROJECT
Public Informational Meeting
July 11, 2013
Tonight’s Agenda
1. Project Design Status
2. Update on Key Items
a) Operations & Maintenance following project
completion
b) Open Space/Landscape Design
c) Headhouse Design
d) Construction Staging
3. Schedule and Next Steps
4. Open House
Public Comment
Comments on the proposed project must be
submitted in writing by July 25, 2013, via mail or email
to:
Patricia Leavenworth, P.E., Chief Engineer
Massachusetts Department of Transportation
10 Park Plaza
Boston, MA 02116
Attention: Mr. Paul King - Accelerated Bridge Program
Project File Number: 605511
Email comments to: dot.feedback.highway@state.ma.us
The Public Agency Partnership
The Partnership Continues
– MassDOT – designer/builder of new roadway
– MBTA – owner/operator of transit facilities
– DCR – owner of surface roadway and signals
– City of Boston – owner of adjacent roadways,
parks and maintains signals
Project Overview
SOUTHWEST
CORRIDOR PARK
ARBORWAY YARD
ARNOLD
ARBORETUM
FRANKLIN
PARK
COURT
HOUSE
UPPER LEVEL
BUSWAY
ARBORWAY
GARDENS
FEBRUARY 27, 2013
SHEA
SQUARE
FOREST HILLS
CEMETERY
Project Design Status
Project Design Status
• Worked on 75% plans from January – April 2013
• Incorporation of comments received at Preliminary
Design Public Hearing
• Submission of 75% Plans, Specifications, and Cost
Estimate on April 17, 2013
• 2 DAG Meetings since Preliminary Design Hearing
• Ongoing City/State agency meetings
• Numerous neighborhood and agency coordination
meetings
Project Design Status
• Work ongoing towards Final Plans,
Specifications, and Cost Estimate (PS&E)
• Design updates since 75% submission:
– Slight roadway alignment change due to headhouse
– Frontage Road (Courthouse/Arborway Gardens)
– Open Space/Landscape Design
Roadway Design Modifications
Proposed Headhouse
now 7’+/- from curb
Trees Saved
Reduced buffer from 25’ to 9’
to save mature trees
Opening Year Alternative
Opening Year Alternative
Original Design
Opening Year Alternative
• Traffic volumes were developed for the opening year.
• Bottom line - not able to reduce the number of thru lanes.
• Under current design, left turns are not permitted at the two
major intersections (Arborway/South St & Arborway/Washington
St)
• Evaluated allowing left turns during the off-peak hours - two
concepts
• Concept 1 allows EB & WB left turns at the 2 intersections
• Concept 2 allows the WB left to occur at the intersection of
Arborway/Washington St in the bus only lane.
Opening Year Alternative
Concept 1
Concept 1 degrades
overall traffic operations,
and requires a significant
amount of additional
signage and technical
equipment.
OFF-PEAK ONLY
Opening Year Alternative
Concept 2
Concept 2 is easily
implemented and did not
significantly degrade traffic
operations.
Operations and Maintenance Plan
O&M Plan Overview
• Three plans developed based on anticipated
need:
– Snow and ice removal
– Operations and Maintenance
– Police Jurisdiction
• Continue to discuss and refine
Snow and Ice Removal
Operations and Maintenance
Police Jurisdiction
Open Space/Landscape Design
Corridor Plan
Forest Hills
Station Plaza
Shea Square
Bike Path
Shade Trees
Corridor
Shade Trees
Arborway Sign
Flowering Trees
Seating Terraces
Existing Trees
Shea Square
Franklin Park
Signature Trees
Existing Stone
Walls to Remain
Shea Square
View West
NORTH|ARBORWAY YARDS
Crabapple Groves
INSPIRATION: Existing
Crabapples in Franklin Park
Corridor Planting
Different colors/bloom times
SOUTH|ARBORWAY GARDENS
Magnolia Groves
INSPIRATION: Existing
Magnolias adjacent SWCP
Multi-Colored Collection
Corridor Plan
A
A
B
B
Corridor Section A
COURTHOUSE
Corridor Section B
ARBORWAY GARDENS
SWCP/Forest Hills Station Plazas
MBTA Tracks
(Below)
South St
Southwest
Corridor Park
Entrance
Entrance Plaza
Infiltration paving
and planting
Lawn
Bike Path
Possible Stage
Area / Vent
Structure
MBTA North
Head House
Median
Entrance Plaza
Vent Structure
Infiltration paving
and planting
Bike Path
Bike Parking
Specimen Plant
Collection on
Slopes
Enclosed and
Exterior
MBTA Forest Hills
Head House
SWCP/Forest Hills Station Plazas
Programming Overlay
To be updated by CSS
DELIVERY TRUCK
10’x10’ Tent
VENDOR CART
Southwest Corridor Park Plaza
North Side Plan
Buffer Planting
MBTA Tracks
Below
South West
Corridor Park
Bike Path
Infiltration
Paving, Planting,
and Seating
Pickup/Dropoff
Median
Lawn
Small
Flowering
Trees
Bike Path
MBTA North
Head House
Bike Parking
Possible Stage
Area/Vent
Structure
Buffer Edge
Southwest Corridor Park Plaza
View from Southwest Corridor
Forest Hills Station Plaza
South Side Plan
Corner Paving
Sidewalk
Infiltration
Paving, Planting,
and Seating
Cab Stand
Reinstalled
Stone Walls
Existing Vent
Structure
Bike Path
Specimen Plant
Collection on
Slopes
Bike Path
Open Plaza
Bike Parking
(Enclosed and
Exterior)
MBTA Forest Hills
Head House
Reinstalled
Art
Existing
Stairs
Forest Hills Station Plaza
View from Southwest Corner | Straight Wall Option
Forest Hills Station Plaza
View from Southwest Corner | Stepped Wall Option
Washington Street Planting
Headhouse
Southwest Corridor Park Plaza
View from Southwest Corridor
Construction Staging
Construction Staging
• Construction will last approximately 2 ½ years; begin
in early spring of 2014 and end in fall of 2016
• Will need to construct temporary roadway to remove
traffic from bridge
• Bridge will close WB beginning in summer 2014 permanently in fall of 2014
• Upper busway constructed to accommodate the
Route 39 bus in fall of 2014
Construction Staging
• 7 Stages of Construction anticipated
• Key elements of construction
– Shift roadway temporarily to north
– Platform, headhouse, and vent grate construction
– Construct upper busway
– Demo bridge
– Substantial completion of Casey Arborway at-grade
Schedule and Next Steps
Accelerated Bridge Program Opportunity
Project Schedule
Preliminary Design
Submission
October 2012
Detailed Design Submission
by Spring 2013
Final Design Summer 2013
Advertise Fall 2013
PLANNING
STUDY
2011
PRELIMINARY
DESIGN
2012
TO FINAL DESIGN
2013
Construction Completion
September 2016
DEMOLITION AND CONSTRUCTION
2014
2015
Community Involvement Throughout Project
Select
Alternative
Preliminary To Final Design Review
Construction Staging & Traffic Management
Planning and Phasing
Construction Management Meetings
2016
Next Steps
• DAG Meetings:
– August 2013
– September 2013
• Final Plans, Specifications and Estimates (PSE) –
– Finalizes all construction-related documents
– August/September 2013
• Advertisement Date
– October 2013
• Outreach during Construction
Detailed Design elements being developed
• Open space and landscape design
• Final signal phasing and timing
• Upper busway/Washington Street
• Opening Year alternative
• Stormwater/water quality improvements
Detailed Design elements being developed
• Construction staging and traffic
management
• Maintenance and Operations Plan
• Parking & pick-up/drop-off (including
school buses)
Public Comment
Comments on the proposed project should be
submitted in writing by July 25, 2013, via mail or email
to:
Patricia Leavenworth, P.E., Chief Engineer
Massachusetts Department of Transportation
10 Park Plaza
Boston, MA 02116
Attention: Mr. Paul King - Accelerated Bridge Program
Project File Number: 605511
Email comments to: dot.feedback.highway@state.ma.us
Elected Official Comment
Open House