1 Longfellow Bridge Project 2 Longfellow Bridge Project DB Entity WSC Attendees: Bill Shea, Project Executive Peter Rapp, Project Manager Rob Collari, Project Design Coordinator Jamie Sparks, Superintendent Patricia Palmiere, Project Manager STV Attendees: Mark Ennis, Design Project Manager Tetra Tech Attendees: Erik Maki, Senior Project Manager Regina Villa Associates Attendees: Nancy Farrell, Project Principal Kate Barrett, Vice President for Public Involvement Amanda Agueda, Public Participation Assistant 3 Design Considerations Restore Structural Integrity – Arch Ribs – Spandrel Columns – Roadway Deck – Substructure – Seismic Restraints 4 Design Considerations 5 Design Considerations 6 Design Considerations 7 Design Considerations Restore Historic Elements – Towers – Railings/Fascia – Arches/Columns 8 Structure Design/Modeling Structure Analysis 9 Structure Design/Modeling Pedestrian Bridge 10 Structure Design/Modeling Pedestrian Bridge 11 Structure Design/Modeling Pedestrian Bridge 12 Design Considerations Protect and Enhance Environment 13 Improve Bike/Pedestrian/ADA Accessibility 14 WSC Approach to Construction Construction Staging ADA, Bicycle and Pedestrian Accessibility Maintain Navigable Channel Noise Baseline Monitoring and Mitigation Plan Work Hours 15 WSC Schedule Begin Bridge Reconstruction July 2013 Substantial Completion September 30, 2016 Complete Track Reconstruction October 2015 16 WSC Proposed Weekend Diversions 25 Total 25 17 Longfellow Bridge Construction Video 18 WSC Proposed Sequencing General Overview Construction of the bridge is in 4 construction phases, but it takes 6 traffic stages to perform the 4 construction phases 19 WSC Traffic Detour Routes Construction Activities – June 2013 to September 2016 20 WSC Advanced Signage Plan Construction Activities – April 2013 to June 2013 21 WSC Charles River Navigation Plan 22 WSC Proposed Traffic Stage 1 Construction Activities – April 2013 to August 2014 23 WSC Proposed Traffic Stage 1 Construction Activities – April 2013 to August 2014 24 WSC Proposed Traffic Stage 2 Construction Activities – August 2014 to September 2014 25 WSC Proposed Traffic Stage 3 Construction Activities – October 2014 to March 2015 26 WSC Proposed Traffic Stage 4 Construction Activities – April 2015 to August 2015 27 WSC Proposed Traffic Stage 5 Construction Activities – September 2015 to October 2015 28 WSC Proposed Traffic Stage 6 Construction Activities – November 2015 to September 2016 29 Bridge Complete/Final Traffic Pattern 30 WSC Communications Objectives Seek stakeholder input/support to finalize design elements, as feasible Provide frequent and timely construction updates • Meetings and briefings • E-blast updates/advisories • Website • Social media • Press advisories • Dedicated hotline and email • Business coordination 31 WSC Next Steps • Meet again in early summer for update and 75% design • Dedicated hotline and email announced prior to start of major construction 32 WSC Contact For more information, questions or comments contact: Stephanie Boundy, MassDOT Accelerated Bridge Program Public Outreach Coordinator stephanie.boundy@state.ma.us 857-368-8904 www.massdot.state.ma.us/charlesriverbridges/LongfellowBridge 33 34 Pinch Points Construction Activities – April 2013 to June 2013 35