Boston Atlanta New York www.geocomp.com Technologies to manage risk for infrastructure Active Risk Management and Sequencing October 7, 2010 Letter No. ARMS-015 Frank Tramontozzi, PE, Chief Engineer Attn M Shoukry A Elnahal, PE, Director ABP & Amy Getchell, PM ABP MassDOT Highway Division 10 Park Plaza Boston, MA 02116 RE: Active Risk Management and Sequencing, DCR RFR #387 SUBJECT: VHB’s Existing Conditions and Model Development Methodology Memorandum, Updated October 7, 2010 Dear Ms. Getchell, As you requested, attached is the memorandum from Don Cooke at VHB entitled “Existing Conditions and Model Development Methodology” dated June 11, 2010 and revised October 7, 2010. This memo provides a revision to the memo previously submitted and includes revisions to the analysis at Charles Circle to mimic the lane configurations assumed by Jacobs. Should you have any questions please contact me or Dori Ross at 978-635-0012, or by e-mail at wam@geocomp.com or dross@geocomp.com. Sincerely yours, W. Allen Marr, P.E. Project Executive Cc D. Ross, GCC D. Cook, VHB C. Cuevas, GCC 1145 Massachusetts Ave. Boxborough, MA 01719 Tel 978 635 0012 Fax 978 635 0266 Transportation Land Development Environmental S e r v i c e s 101 Walnut Street P. O. Box 9151 Watertown, MA 02471-9151 617 924 1770 FAX 617 924 2286 Memorandum To: Allen Marr Dori Ross Geocomp Corporation Date: Project No.: From: Donald Cooke, P.E., P.T.O.E. Re: June 11, 2010 Revised: October 7, 2010 10989 Existing Conditions and Model Development Methodology Executive Summary To assist the ABP Charles River Basin program in determining potential traffic impacts due to construction activities within the study area, a Charles River basin subarea travel demand model was developed for the Active Risk Management and Sequencing contract. The subarea model was developed based on the Central Transportation Planning Staff (CTPS) Regional Travel Demand Model. The subarea Charles River basin area includes all of the City of Cambridge (except North Cambridge), the City of Boston from Charlestown to Allston, the northern portion of the Town of Brookline, the eastern portion of the Town of Watertown and the southeastern portion of the City of Somerville. The subarea model was developed to be compatible with the regional model to allow evaluation of broader characteristics that the subarea was not designed to assess. The subarea model was calibrated using information provided from a variety of sources. It can be used to assist in determining traffic pattern shifts due to many factors including construction, and the origin and destination of bridge users. It provides output that can be used for detailed operational analyses at many different intersections. An intersections level of service analysis was also performed as part of this work. The intersections level of service analysis was conducted using the Synchro software package (version 7.0). Counts obtained from a variety of sources were utilized to determine the existing conditions at 42 study intersections (determined from the Phase 1 Charles River Basin Infrastructure Synchronization Project). It should be noted that several of the 42 study area locations consist of multiple intersections that were analyzed separately to appropriately model operating conditions. In total, 54 individual signalized intersections and six unsignalized intersections were analyzed to comprise the 42 locations. This analysis indicated that 27of the signalized intersections operate at LOS E or LOS F during at least one peak hour, and all six unsignalized intersections operate at LOS E or LOS F during at least one peak hour. This is indicative of the congested roadway and intersection network within the basin. These relatively poor levels of peak hour operation highlight the need to closely evaluate and monitor issues such as traffic during the risk assessment and management process. As the ABP project’s progress, the travel demand model will allow VHB, as part of the Partners in Active Risk Management (PARM) team, to review and evaluate any number of construction staging or project sequencing alternatives as part of the risk analysis. We anticipate this tool being a Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 powerful asset to MassDOT in decision making around the Charles River Basin ABP projects. This model, tied directly to an intersection analysis tool (Synchro) and interfaced with CTPS’ regional model, will allow the Partners in Active Risk Management (PARM) team to fully identify and review all aspects of the transportation environment within the basin. The establishment of existing conditions, documented herein, represents the first step in understanding the transportation environment. This data and analysis will serve as a record, and as the base condition for future alternatives development and evaluation. Subsequent technical memoranda and reports are anticipated to address and support project sequencing and construction staging on a bridge by bridge and basin-wide basis. Introduction VHB has developed a Charles River basin subarea travel demand model as a tool to assist in the gathering of transportation related information. This information will support the Partners in Active Risk Management (PARM) team’s efforts to conduct the active risk management and sequencing project for the MassDOT’s Accelerated Bridge Program. This memorandum details the methodology used to develop the model and provides associated accident, capacity and LOS analyses for a number of locations within the area. Subarea Model Development VHB created a focused Charles River basin travel demand model based on and compatible with the larger Central Transportation Planning Staff (CTPS) regional model. The subarea model includes all of the City of Cambridge (except North Cambridge), the City of Boston from Charlestown to Allston, the northern portion of the Town of Brookline, the eastern portion of the Town of Watertown and the southeastern portion of the City of Somerville. The compatibility between the two models allows the Charles River basin subarea model to interact with the CTPS regional model to assess broader characteristics such as regional traffic shifts (i.e., route changes outside the basin area), mode shifts, and transit mitigation, as well as more detailed pedestrian and bicycle patterns, which are not included in the subarea model. The subarea model was developed using Caliper’s TransCAD software. Code Roadway Network Using information provided by CTPS and the statewide GIS roadway layer, VHB coded the relevant roadway segments and intersections within the Charles River basin. The expanded transportation network also includes identification and coding of internal and external traffic analysis zones (TAZs). The defined set of 837 TAZs (811 internal and 26 external) will be used to track and understand trip patterns through and around the study area. The trip patterns will be used to identify and evaluate anticipated diversions of traffic related to construction activities. Figure 1 illustrates the subarea network, which provides an additional level of roadway and TAZ detail compared to that available with the CTPS regional model. Develop Origin-Destination Matrix VHB developed a morning peak hour (AM) and evening peak hour (PM) Origin-Destination (O-D) seed matrix based on trip patterns extracted from the CTPS regional travel demand model. This matrix was utilized to obtain the final calibrated O-D matrix This methodology ensures that the subarea model is consistent with CTPS’s basic trip patterns within the basin. Calibrate Seed O-D Matrix VHB calibrated the O-D matrix based on existing ground counts including both turning movement counts as well as hourly data. VHB input count data for over 600 nodes as shown in Figure 2. Additionally, count data were input for a number of roadway segments including Storrow Drive, Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 2 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 Soldier’s Field Road, Greenough Boulevard, I-90, I-93, Route 1, the Callahan and Sumner Tunnels, among others. These counts were obtained from a variety of sources including: EOT MassDOT Phase 1 Study (BETA) CTPS City of Boston (Boston Transportation Department) City of Cambridge Town of Brookline Private developments (Assembly Square and Harvard University) VHB (included both in-house data and new data collected as part of this effort) Based on the counts along with the seed O-D matrix, the TransCAD software established a compatible O-D matrix that replicated existing morning and evening peak hour volumes. Calibrate Model VHB used observed volumes and conditions to calibrate the subarea model. Model Limitations The Charles River basin subarea travel demand model has been developed to assist in the understanding of traffic shifts due to construction activities within the study area. As such, it is not intended to: Forecast future conditions beyond the duration of the ABP program (June 2016) (it is anticipated that the model will be periodically updated, including incorporating traffic volume growth, based on newly acquired count data and significant land use changes); Evaluate regional traffic shifts (i.e., route changes outside the basin area); Determine mode shifts (ie single occupancy, shared ride, transit, non-vehicular); Provide detailed modeling of pedestrians and bicyclists. These limitations in the subarea model will be addressed and supported by interaction with the CTPS regional model. Capacity Analysis VHB utilized the Synchro software package (version 7.0) to evaluate the existing level of service (LOS) conditions at 42 intersections. These intersections are illustrated in Figure 3, and represent the same locations evaluated under the Phase 1 Charles River Basin Infrastructure Synchronization Project completed by the BETA Group, Inc. in August 2008. Initial Traffic Data Collection VHB compiled available traffic volume information as detailed above. Further, VHB utilized available Synchro models from the City of Boston, City of Cambridge, Town of Brookline, Harvard University, and Assembly Square as the basis for the Synchro model development. These models were reviewed, supplemented and modified where appropriate based on field work performed by VHB. Figures 4 through 9 illustrate the morning and evening peak hour traffic volumes at the study intersections. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 3 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 Capacity and LOS Analysis Utilizing the Synchro model developed for this study, capacity and level of service (LOS) analyses were conducted for the 42 study locations. Table 1 and Table 2 summarize the signalized and unsignalized analyses, respectively. It should be noted that several of the 42 study area locations consist of multiple intersections that were analyzed separately to appropriately model operating conditions. In total, 54 signalized intersections and six unsignalized intersections were analyzed representing the 42 locations. As shown in Table 1, 27 of the 54 signalized intersections studied operate at LOS D or better during both the morning and evening peak hours. The remaining 27 signalized intersections operate at LOS E or LOS F during at least one peak hour. As shown in Table 2, all six unsignalized intersections operate at LOS E or LOS F during at least one peak hour. This is indicative of the congested roadway and intersection network within the basin. The high levels of congestion identified by poor LOS along certain corridors will limit the ability of these routes to serve as alternate routes during various bridge construction projects. Further, the identification of intersection by intersection operations will facilitate the identification of problem areas and related development of mitigation. These relatively poor levels of peak hour operation highlight the need to closely evaluate and monitor issues such as traffic during the risk assessment and management process. As the ABP project’s progress, the travel demand model will allow VHB, as part of the Partners in Active Risk Management (PARM) team, to review and evaluate any number of construction staging or project sequencing alternatives as part of the risk analysis. We anticipate this tool being a powerful asset to MassDOT in decision making around the Charles River Basin ABP projects. This model, tied directly to an intersection analysis tool (Synchro) and interfaced with CTPS’ regional model, will allow the Partners in Active Risk Management (PARM) team to fully identify and review all aspects of the transportation environment within the basin. The establishment of existing conditions, documented herein, represents the first step in understanding the transportation environment. This data and analysis will serve as a record, and as the base condition for future alternatives development and evaluation. Subsequent technical memoranda and reports are anticipated to address and support project sequencing and construction staging on a bridge by bridge and basin-wide basis. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 4 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 5 Table 1 Signalized Intersection Capacity Analysis Summary Existing Conditions Intersection Time Period V/C1 #1 Fresh Pond Parkway/Mount Auburn Street Weekday Morning Weekday Evening 0.87 0.87 42 38 D D #2 Fresh Pond Parkway/Greenough Boulevard/Memorial Drive Weekday Morning Weekday Evening 0.82 0.89 25 42 C D #3 Eliot Bridge/Greenough Boulevard Weekday Morning Weekday Evening >1.20 1.06 >120 >120 F F #4 Eliot Bridge/Soldiers Field Road Weekday Morning Weekday Evening 0.95 0.90 >120 57 F E #5 JFK Street/Mount Auburn Street Weekday Morning Weekday Evening 0.59 0.53 24 24 C C #6 JFK Street/Memorial Drive Weekday Morning Weekday Evening 1.18 1.15 >120 >120 F F #7a N. Harvard Street/JFK Street/ Weekday Morning Weekday Evening 0.75 0.76 34 36 C D Weekday Morning Weekday Evening 0.61 21 C 0.75 44 D #8 Western Avenue/ North Harvard Street Weekday Morning Weekday Evening 0.65 0.68 32 37 C D #9a Western Avenue/Soldiers Field Road EB Weekday Morning Weekday Evening 0.76 0.74 29 49 C D #9b Western Avenue/Soldiers Field Road WB Weekday Morning Weekday Evening 0.79 0.92 61 30 E C #10 Western Avenue/Memorial Drive Weekday Morning Weekday Evening 1.05 1.00 81 66 F E #11a Cambridge Street/I-90 Ramps/Double Tree Hotel Weekday Morning Weekday Evening 0.72 0.75 82 41 F D #11b Cambridge Street/River Street/ Soldiers Field Road EB Weekday Morning Weekday Evening 0.70 0.76 42 35 D C #11c Cambridge Street/River Street/ Soldiers Field Road WB Weekday Morning Weekday Evening 0.76 0.91 39 70 D E #12 River Street/Memorial Drive Weekday Morning Weekday Evening 1.16 0.94 >120 48 F D #13 BU Bridge/Memorial Drive4 Weekday Morning Weekday Evening 0.97 0.72 >120 29 F C Soldiers Field Road EB #7b N. Harvard Street/JFK Street/ Soldiers Field Road EB Source: Note: 1 2 3 4 Delay2 LOS3 VHB, Inc. using Synchro 7 (Build 763) software. Shaded cells denote LOS E/F conditions. V/C – Volume-to-capacity ratio. Delay – Control delay per vehicle, expressed in seconds. LOS – Level-of-Service. Capacity analysis provided for signalized intersection of BU Bridge at Memorial Drive rotary only. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 6 Table 1 Signalized Intersection Capacity Analysis Summary (continued) Existing Conditions Intersection Time Period V/C1 Delay2 LOS3 #14a BU Bridge/Commonwealth Avenue Weekday Morning Weekday Evening >1.20 1.05 >120 41 F D #14b Commonwealth Avenue/Carlton Street Weekday Morning Weekday Evening 1.05 1.16 >120 93 F F #14c Mountfort Street/Carlton Street Weekday Morning Weekday Evening 0.63 0.68 24 23 C C #15 Massachusetts Avenue/Prospect Street Weekday Morning Weekday Evening 0.75 0.71 25 19 C B #16 Massachusetts Avenue/Sidney Street/ Columbia Street Weekday Morning Weekday Evening 0.95 0.71 56 40 E D #17a Massachusetts Avenue/ Memorial Drive WB Ramps Weekday Morning Weekday Evening 0.34 0.62 9 17 A B #17b Massachusetts Avenue/ Memorial Drive EB Ramps Weekday Morning Weekday Evening 0.54 0.67 9 10 A A #18 Beacon Street/Commonwealth Avenue/ Brookline Avenue (Kenmore Square) Weekday Morning Weekday Evening >1.20 >1.20 >120 >120 F F #19 Charlesgate West/Beacon Street Weekday Morning Weekday Evening 0.70 0.92 94 >120 F F #20a Charlesgate West/ Commonwealth Avenue WB Weekday Morning Weekday Evening 0.22 0.26 7 12 A B #20b Charlesgate West/ Commonwealth Avenue EB Weekday Morning Weekday Evening 0.40 0.44 7 15 A B #21 Charlesgate East/Beacon Street Weekday Morning Weekday Evening 0.37 0.50 12 17 B B #22a Charlesgate East/ Commonwealth Avenue WB Weekday Morning Weekday Evening 0.36 0.47 15 21 B C #22b Charlesgate East/ Commonwealth Avenue EB Weekday Morning Weekday Evening 0.49 0.56 15 20 B B #23 Bowker Overpass/Boylston Street Weekday Morning Weekday Evening >1.20 0.90 115 66 F E #24 Massachusetts Avenue/Beacon Street Weekday Morning Weekday Evening 0.74 1.03 28 71 C E #25 Massachusetts Avenue/Boylston Street Weekday Morning Weekday Evening 0.60 0.71 22 28 C C #26 Dartmouth Street/Stuart Street Weekday Morning Weekday Evening 0.48 0.54 12 13 B B #27 Clarendon Street/Beacon Street Weekday Morning Weekday Evening 0.33 0.37 8 9 A A Source: Note: 1 2 3 VHB, Inc. using Synchro 7 (Build 763) software. Shaded cells denote LOS E/F conditions. V/C – Volume-to-capacity ratio. Delay – Control delay per vehicle, expressed in seconds. LOS – Level-of-Service. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 7 Table 1 Signalized Intersection Capacity Analysis Summary (continued) Existing Conditions Intersection Time Period V/C1 #28 Berkeley Street/Beacon Street Weekday Morning Weekday Evening 0.72 0.95 19 28 B C #29 Arlington Street/Beacon Street Weekday Morning Weekday Evening 0.83 0.87 23 29 C C #30 Arlington Street/Boylston Street Weekday Morning Weekday Evening 0.77 0.76 23 22 C C #31 Charles Street/Beacon Street Weekday Morning Weekday Evening 0.76 0.96 22 40 C D #34a Charles Street/Cambridge Street EB/ Storrow Drive EB off-ramp Weekday Morning Weekday Evening 0.91 0.88 47 60 D E #34b Charles Street/Cambridge Street WB/ Storrow Drive WB on-ramp Weekday Morning Weekday Evening 0.60 0.75 19 18 B B #35a Nashua Street/O’Brien Highway/ Storrow Drive WB on-ramp (Leverett Circle) Weekday Morning Weekday Evening 1.07 >1.20 >120 >120 F F #35b O’Brien Highway/Martha Road/I-93 Ramps/ Storrow Drive EB off-ramp (Leverett Circle) Weekday Morning Weekday Evening 1.08 1.06 98 118 F F #35c Nashua Street/I-93 off-ramps (Leverett Circle) Weekday Morning Weekday Evening 0.53 0.70 29 33 C C #36 O’Brien Highway/Land Boulevard Weekday Morning Weekday Evening >1.20 >1.20 >120 >120 F F #37a McGrath Highway NB/Washington Street Weekday Morning Weekday Evening 0.59 0.85 52 >120 D F #37b McGrath Highway SB/Washington Street Weekday Morning Weekday Evening 0.66 0.57 >120 100 F F #38a Sullivan Square/Cambridge Street/ Maffa Way Weekday Morning Weekday Evening 1.11 1.03 92 85 F F #39a Rutherford Avenue NB/Gilmore Bridge/ Austin Street Weekday Morning Weekday Evening 0.66 0.83 41 >120 D F #39b Rutherford Avenue SB/Gilmore Bridge/ Austin Street Weekday Morning Weekday Evening 1.00 0.87 86 >120 F F #40 Charlestown Bridge/Commercial Street / Causeway Street Weekday Morning Weekday Evening 1.08 1.08 >120 >120 F F #41 Causeway Street/Merrimac Street/ Lomansey Way Weekday Morning Weekday Evening 1.17 0.86 >120 88 F F #42 Staniford Street/Cambridge Street Weekday Morning Weekday Evening 0.82 0.70 29 36 C D Source: Note: 1 2 3 VHB, Inc. using Synchro 7 (Build 763) software. Shaded cells denote LOS E/F conditions. V/C – Volume-to-capacity ratio. Delay – Control delay per vehicle, expressed in seconds. LOS – Level-of-Service. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Delay2 LOS3 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 8 Table 2 Unsignalized Intersection Capacity Analysis Summary Baseline Conditions Location Period Movement #32 Longfellow Bridge/ Memorial Drive Weekday Morning Weekday Evening SB-R SB-R 235 50 0.80 0.16 46 16 E C #33 Main Street/Memorial Drive Weekday Morning Weekday Evening NB-R NB-R 235 315 0.54 >1.20 20 >120 C F #34c Cambridge Street WB/ Storrow Drive WB off-ramp Weekday Morning Weekday Evening SB-T SB-T 350 310 0.86 0.52 62 23 F C #38b Sullivan Square/Rutherford Avenue Weekday Morning Weekday Evening NB-R NB-R 505 875 0.82 >1.20 49 >120 E F #38c Sullivan Square/Main Street Weekday Morning Weekday Evening WB-R WB-R 490 935 1.15 >1.20 >120 >120 F F #38d Sullivan Square/Alford Street Weekday Morning Weekday Evening SB-T SB-T 905 785 >1.20 >1.20 >120 >120 F F Source: Note: 1 2 3 4 L T R Neg Dem1 v/c2 Delay3 LOS4 VHB, Inc. using Synchro 7 (Build 763) software. Shaded cells denote LOS E/F conditions. Dem - Demand in vehicles per hour for unsignalized intersections; the demand applies to only the most critical lane group V/C – Volume-to-capacity ratio for the critical movement. Delay – Control delay of critical approach only, typically the left-turn movement, expressed in seconds. LOS – Level-of-Service of the critical movement. Left-turn movement Thru movement Right-turn movement negligible Accident Data Based on MassDOT’s available data for the four most recent years (2005 through 2008), VHB compiled the accident history at the 42 study locations. Table 3 summarizes this information. The most recent MassDOT average crash rates for signalized and unsignalized intersections for District 4 (the MassDOT district designations for Boston, Cambridge, and Somerville) are 0.78 and 0.59, respectively. As shown in Table 3, the following eight study area intersections exceed the MassDOT District 4 average crash rate values: JFK Street at Mount Auburn Street JFK Street at Memorial Drive Western Avenue at N. Harvard Street Western Avenue at Memorial Drive River Street at Memorial Drive Charlesgate West at Beacon Street Charlesgate East at Beacon Street Massachusetts Avenue at Boylston Street These locations will need to be paid particular attention throughout the ABP due to their existing crash history. It should be noted that the crash rate could not be calculated for intersections closely spaced (such as Western Avenue and Soldiers Field Road EB and WB ramps) since the crashes were combined for these locations due to limits in accuracy in the data reporting. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 9 Table 3 Vehicular Crash Summary (2005 - 2008) #1 Fresh Pond Pkwy at Mount Auburn St Yes 0.78 0.70 No #2 Fresh Pond Pkwy at Greenough Blvd/ Memorial Dr Yes 0.78 0.51 No #3 Eliot Bridge at Greenough Blvd Yes 0.78 0.21 No #4 Eliot Bridge at Soldiers Field Rd Yes 0.78 0.11 No #5 JFK St at Mount Auburn St Yes 0.78 1.19 Yes #6 JFK St at Memorial Dr Yes 0.78 1.07 Yes #7 N. Harvard St/ JFK St at Soldiers Field Rd n/a n/a n/a n/a #8 Western Ave at N. Harvard St Yes 0.78 0.95 Yes #9 Western Ave at Soldiers Field Rd n/a n/a n/a n/a #10 Western Ave at Memorial Dr Yes 0.78 1.16 Yes #11 SFR at Cambridge St/ River St n/a n/a n/a n/a 12 15 17 13 57 10 13 8 9 40 3 7 4 2 16 0 1 0 8 9 3 8 4 8 23 16 10 14 16 56 14 21 40 39 114 6 7 7 6 26 2 4 9 2 17 13 11 16 21 61 9 21 23 10 63 Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not Reported Total 22 3 19 0 2 6 4 0 1 57 14 0 15 0 0 6 4 0 1 40 6 0 5 0 0 3 2 0 0 16 2 0 1 0 0 2 4 0 0 9 4 0 8 0 0 6 2 0 3 23 22 2 18 1 1 7 4 1 0 56 25 1 19 1 0 6 52 1 9 114 8 3 6 0 2 5 0 0 2 26 4 0 9 0 0 1 2 0 1 17 14 2 25 0 2 9 3 0 6 61 21 1 18 0 0 18 2 0 3 63 Crash Severity Fatal injury Non-fatal injury Property damage only (none injured) Unknown/Not reported Total 0 18 37 2 57 0 6 29 5 40 0 6 10 0 16 0 2 7 0 9 0 4 10 9 23 0 15 37 4 56 0 31 76 7 114 0 6 14 6 26 0 7 9 1 17 0 17 37 7 61 0 12 50 1 63 Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total 8 9 2 24 14 57 11 4 0 16 9 40 4 1 1 4 6 16 2 0 0 5 2 9 4 1 0 11 7 23 8 7 3 25 13 56 20 9 4 50 31 114 6 5 0 13 2 26 2 0 1 9 5 17 12 2 1 31 15 61 16 3 1 33 10 63 Pavement Conditions Dry Wet Snow Ice Other Unknown/ Not reported Total 42 14 1 0 0 0 57 28 9 2 1 0 0 40 12 4 0 0 0 0 16 4 5 0 0 0 0 9 18 4 0 0 0 1 23 38 14 2 1 1 0 56 52 56 1 2 3 0 114 15 8 2 0 0 1 26 14 2 1 0 0 0 17 51 6 3 0 0 1 61 46 15 1 0 1 0 63 Total Non-Motorists (Pedestrians/Bikes) 0 1 0 0 2 4 1 1 0 3 2 Signalized? MassHighway Average Crash Rate Calculated Crash Rate Exceeds Average? Year 2005 2006 2007 2008 Total Source: MassDOT vehicle crash data. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 10 Table 3 Vehicular Crash Summary (2005 - 2008) #12 River St at Memorial Dr Yes 0.78 1.48 Yes #13 BU Bridge (Rotary) at Memorial Dr n/a n/a n/a n/a #14a BU Bridge at Comm Ave Yes 0.78 0.47 No #14b Carlton St at Comm Ave Yes 0.78 0.19 No #15 Massachusetts Ave at Prospect St Yes 0.78 0.74 No #16 Massachusetts Ave at Sidney St/ Columbia St Yes 0.78 0.54 No #17 Massachusetts Ave at Memorial Dr n/a n/a n/a n/a #18 Kenmore Sq Yes 0.78 0.42 No #19 Charlesgate West at Beacon St Yes 0.78 1.55 Yes #20 Charlesgate West at Comm Ave n/a n/a n/a n/a #21 Charlesgate East at Beacon St Yes 0.78 1.39 Yes Year 2005 2006 2007 2008 Total 17 23 22 25 87 1 6 9 10 26 10 17 12 7 46 2 6 2 2 12 2 6 7 11 26 2 1 1 9 13 14 18 15 23 70 9 5 5 11 30 12 9 16 10 47 8 9 8 13 38 5 12 10 11 38 Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not Reported Total 27 2 33 0 0 12 5 3 5 87 9 1 4 0 0 7 2 0 3 26 14 2 13 0 0 9 3 0 5 46 3 1 1 0 0 2 0 0 5 12 6 0 3 0 0 11 6 0 0 26 4 1 5 0 0 2 0 1 0 13 13 0 29 0 1 7 12 2 6 70 7 1 2 0 0 9 2 1 8 30 24 0 2 0 0 15 0 0 6 47 21 0 5 0 0 4 0 0 8 38 18 0 4 1 1 7 1 1 5 38 Crash Severity Fatal injury Non-fatal injury Property damage only (none injured) Unknown/Not reported Total 0 28 51 8 87 0 3 20 3 26 0 13 28 5 46 0 5 5 2 12 1 5 11 9 26 0 4 7 2 13 0 26 33 11 70 0 2 22 6 30 0 8 33 6 47 0 13 24 1 38 0 14 18 6 38 Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total 21 8 0 33 25 87 4 6 1 13 2 26 8 5 1 23 9 46 3 1 0 5 3 12 5 4 0 10 7 26 2 1 0 9 1 13 14 10 1 30 15 70 3 0 0 21 6 30 6 6 2 21 12 47 9 4 1 14 10 38 7 2 0 20 9 38 Pavement Conditions Dry Wet Snow Ice Other Unknown/ Not reported Total 61 22 1 0 0 3 87 23 3 0 0 0 0 26 31 13 1 0 0 1 46 10 2 0 0 0 0 12 22 3 0 1 0 0 26 10 3 0 0 0 0 13 50 16 1 0 1 2 70 23 3 0 0 0 4 30 41 6 0 0 0 0 47 30 6 1 0 0 1 38 30 7 0 0 0 1 38 Total Non-Motorists (Pedestrians/Bikes) 2 1 2 0 6 1 1 0 0 0 1 Signalized? MassHighway Average Crash Rate Calculated Crash Rate Exceeds Average? Source: MassDOT vehicle crash data. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 11 Table 3 Vehicular Crash Summary (2005 - 2008) Signalized? MassHighway Average Crash Rate Calculated Crash Rate Exceeds Average? Year 2005 2006 2007 2008 Total Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not Reported Total Crash Severity Fatal injury Non-fatal injury Property damage only (none injured) Unknown/Not reported Total Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total Pavement Conditions Dry Wet Snow Ice Other Unknown/ Not reported Total Total Non-Motorists (Pedestrians/Bikes) #22 Charlesgate East at Comm Ave n/a n/a n/a n/a #23 Bowker Overpass at Boylston St Yes 0.78 0.27 No #24 Massachusetts Ave at Beacon St Yes 0.78 0.67 No #25 Massachusetts Ave at Boylston St Yes 0.78 1.02 Yes #26 Dartmouth St at Stuart St Yes 0.78 0.54 No #27 Clarendon St at Beacon St Yes 0.78 0.57 No #28 Berkeley St at Beacon St Yes 0.78 0.43 No #29 Arlington St at Beacon St Yes 0.78 0.27 No #30 Arlington St at Boylston St. Yes 0.78 0.62 No #31 Charles St at Beacon St Yes 0.78 0.76 No #32/33 Longfellow Bridge/Main St at Memorial Dr n/a n/a n/a n/a 20 11 14 15 60 3 7 3 5 18 8 12 10 3 33 13 10 13 6 42 6 7 5 2 20 0 7 1 3 11 2 9 4 3 18 3 3 4 5 15 4 8 7 4 23 2 15 16 7 40 5 2 3 6 16 27 1 10 0 1 11 1 1 8 60 2 1 9 0 0 4 1 0 1 18 7 0 13 0 3 4 1 0 5 33 10 0 10 0 3 8 5 1 5 42 5 0 2 0 0 8 0 0 5 20 4 0 1 0 2 1 0 0 3 11 8 1 2 0 0 5 0 0 2 18 2 0 5 0 0 6 0 0 2 15 6 1 5 0 0 6 0 1 4 23 8 0 7 0 1 14 1 1 8 40 3 0 4 0 0 0 9 0 0 16 0 17 37 6 60 0 6 11 1 18 0 9 19 5 33 0 13 19 10 42 0 1 13 6 20 0 5 4 2 11 0 3 13 2 18 0 4 7 4 15 0 1 16 6 23 0 5 26 9 40 1 9 5 1 16 6 6 2 24 22 60 2 4 1 7 4 18 3 5 1 11 13 33 9 3 1 23 6 42 5 2 1 10 2 20 0 1 0 7 3 11 4 0 1 9 4 18 1 2 1 7 4 15 4 1 1 9 8 23 2 5 3 13 17 40 4 1 1 6 4 16 52 5 1 0 1 1 60 14 2 0 1 0 1 18 25 7 0 1 0 0 33 33 6 1 0 1 1 42 16 3 1 0 0 0 20 9 1 0 0 1 0 11 11 7 0 0 0 0 18 8 5 1 0 0 1 15 19 4 0 0 0 0 23 25 9 3 0 1 2 40 14 2 0 0 0 0 5 1 0 0 1 0 1 0 0 0 0 2 Source: MassDOT vehicle crash data. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Date: June 11, 2010 Revised: October 7, 2010 Project No.: 10989 12 Table 3 Vehicular Crash Summary (2005 - 2008) #37 McGrath Hwy at Washington St n/a n/a n/a n/a #38 Sullivan Sq (Rotary) n/a n/a n/a n/a #39 Rutherford Ave at Gilmore Bridge/ Austin St n/a n/a n/a n/a #40 Charlestown Bridge at Commercial St/ Causeway St Yes 0.78 0.59 No #41 Causeway St/ Merrimac St/ Lomansey Way Yes 0.78 0.41 No #42 Staniford St at Cambridge St Yes 0.78 0.45 No # 34 Charles Circle n/a n/a n/a n/a #35 Leverett Circle n/a n/a n/a n/a #36 O'Brien Hwy at Land Blvd Yes 0.78 0.59 No Year 2005 2006 2007 2008 Total 8 32 16 19 75 4 36 26 8 74 10 8 18 16 52 16 16 20 18 70 20 26 25 10 81 2 5 3 9 19 12 13 5 5 35 5 5 4 1 15 4 4 2 6 16 Collision Type Angle Head-on Rear-end Rear-to-rear Sideswipe, opposite direction Sideswipe, same direction Single-vehicle crash Unknown Not Reported Total 16 1 17 2 3 23 5 1 7 75 12 2 25 2 1 14 14 0 4 74 19 0 19 1 1 6 4 0 2 52 21 0 13 0 0 13 16 0 7 70 20 0 20 1 0 23 5 1 11 81 3 0 3 0 1 4 2 0 6 19 6 0 13 0 3 3 2 0 8 35 2 0 8 0 0 0 2 0 3 15 3 0 5 0 0 6 0 0 2 16 Crash Severity Fatal injury Non-fatal injury Property damage only (none injured) Unknown/Not reported Total 0 22 50 3 75 0 21 43 10 74 0 14 37 1 52 0 19 42 9 70 0 15 49 17 81 0 4 13 2 19 0 10 19 6 35 1 6 6 2 15 0 4 9 3 16 Time of day Weekday, 7:00 AM - 9:00 AM Weekday, 4:00 PM - 6:00 PM Saturday, 11:00 AM - 2:00 PM Weekday, other time Weekend, other time Total 19 8 1 40 7 75 9 10 2 43 10 74 6 7 0 26 13 52 8 5 5 36 16 70 15 10 2 40 14 81 6 4 0 5 4 19 4 2 1 20 8 35 5 1 1 6 2 15 2 0 0 12 2 16 Pavement Conditions Dry Wet Snow Ice Other Unknown/ Not reported Total 56 16 1 0 1 1 75 55 12 0 2 2 3 74 41 8 2 0 0 1 52 37 29 2 0 0 2 70 64 9 0 2 2 4 81 13 5 0 0 0 1 19 30 4 0 0 0 1 35 11 2 1 0 0 1 15 14 2 0 0 0 0 16 Total Non-Motorists (Pedestrians/Bikes) 1 3 1 1 0 0 0 0 0 Signalized? MassHighway Average Crash Rate Calculated Crash Rate Exceeds Average? Source: MassDOT vehicle crash data. Mawatr\ts\10989.01\doc\memos\Existing Conditions and Model Documentation_final061110 Subarea-figures.indd p1 03/15/10 Legend External TAZs Vanasse Hangen Brustlin, Inc. Figure 1 Subarea Model Study Area Traffic Analysis Zones (TAZs) and Roadways Subarea-figures.indd p2 03/15/10 Vanasse Hangen Brustlin, Inc. Figure 2 Subarea Model Intersection Count Locations \\mawatr\TS\10989.01\graphics\FIGURES\Study Area Intersections.indd p1 03/15/10 Study Area Boundary S o m e r v i l l e STUDY AREA INTERSECTIONS Western Avenue/Soldiers Field Road ond Parkway Fresh P 1 10 Western Avenue/Memorial Drive 11 Cambridge Street/River Street/Soldiers Field Road 12 River Street/Memorial Drive Mount Auburn St 2 W a t e r t o w n r tB 3 St 16 Massachusetts Avenue/Sidney Street/Columbia Street h ug no e e r G 18 Beacon Street/Commonwealth Avenue/Brookline Avenue 8 22 23 Bowker Overpass/ Boylston Street Charlesgate East/ Commonwealth Avenue 9 ld R Fie A l l s t o n 10 ve Western A 11 33 17 41 Ca Me rrim ac S t 42 23 22 25 n St lsto Boy Av e 20 BU Bridg e Com ne oo kli Br 28 St rles 18 21 24 31 B o s t o n 30 26 t rt S Stua 37 McGrath Highway/Washington Street 38 Sullivan Square 39 Rutherford Avenue/Gilmore Bridge/Austin Street 40 Charlestown Bridge/Commercial Street/Causeway Street 41 Causeway Street/Merrimac Street/Lomasney Way 42 Staniford Street/Cambridge Street 0 1100 2200 Feet mm erc ial St Cha Bea 34 Charles Street/Cambridge Street 36 O’Brien Highway/Land Boulevard /Gilmore Bridge Co ay ew s u Leverett Circle Cambridge St 29 St on ngt Arli t yS kele Ber St don ren St con 33 Main Street/Memorial Drive 35 Leverett Circle 34 Cla B r o o k l i n e onwea lth Ave e h Av ealt w n mo 27 St uth tmo 30 Arlington Street/ Boylston Street 19 Comm Dr row Stor on St c Bea Dar 14 Charlesgate 29 Arlington Street/ Beacon Street ve sA sett chu 28 Berkeley Street/ Beacon Street r Rive rles a h C ssa ve Dri rial o m Me 13 Clarendon Street/ Beacon Street 32 Longfellow Bridge/Memorial Drive LongFellow Bridge 40 r ie ld So Massachusetts Avenue/ Beacon Street Charles Street/ Beacon Street 32 Main St 12 25 Massachusetts Avenue/ Boylston Street 31 16 r t er S Riv 26 Dartmouth Street/ Stuart Street 27 Boston Inner Harbor 35 Ma 24 rfo rd Av e s 21 Charlesgate East/ Beacon Street 15 d 19 Charlesgate West/ Beacon Street ve Western A Ru 36 7 Ha rv ar d 15 Massachusetts Avenue/Prospect Street d ar ev l u Bo No rth 14 BU Bridge/Commonwealth Avenue 20 Charlesgate West/ Commonwealth Avenue C a m b r i d g e t tin S Aus the Br ien Hi gh wa y 6 13 BU Bridge/Memorial Drive 17 Massachusetts Avenue/Memorial Drive O’ 5 4 lio E 39 Staniford St 9 Av e North Harvard Street/Western Avenue on 8 gt North Harvard Street/JFK Street/Soldiers Field Road in 7 nt JFK Street/Memorial Drive Hu 6 37 Washington St St JFK Street/Mount Auburn Street bia 5 um Eliot Bridge/ Soldiers Field Road Col 4 Square ct St Eliot Bridge/ Greenough Boulevard spe 3 38 Sullivan e St bridg Cam Pro Fresh Pond Parkway/Greenough Boulevard/Memorial Drive St 2 JF K Fresh Pond Parkway/Mount Auburn Street y Highwa McGrath 1 Vanasse Hangen Brustlin, Inc. Figure 3 Study Area Intersections ATTACHMENTS Capacity Analysis Results • Existing Conditions Weekday Morning • Existing Conditions Weekday Evening Crash Data \\Mawatr\ts\10989.01\docs\memos\Existing Conditions Memo Attachments\Attachments.doc Capacity Analysis Results Existing Conditions Weekday Morning \\Mawatr\ts\10989.01\docs\memos\Existing Conditions Memo Attachments\Attachments.doc 10989.00: DCR Bridge Program 110: Mt Auburn St & Fresh Pond Pkwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR 0 1900 12 300 1900 12 2% 625 1900 10 0 1900 11 285 1900 11 -2% 35 1900 11 0 1900 12 1845 1900 12 -4% 25 1900 12 425 1900 10 1210 1900 11 3% 140 1900 11 0 2 25 No 0 0 25 0 0 25 No 0 0 25 0 0 25 No 300 2 25 75 1 25 0.88 0% 0 Perm 4 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag 30 843 19.2 0.88 7% 0.88 0% 0.78 0% 710 custom 4 14 1 31.0 31.0 49.0 27.4% 43.4% 4.0 5.0 -6.0 -3.0 3.0 5.0 Lag 0 Perm 341 30 502 11.4 0.78 15% 0.78 0% 410 0 0.92 0% 30 840 19.1 0.92 0% 0.92 0% 0.85 0% 0 2032 0 500 Prot 5 4 4 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag 3 0.78 53.6 0.0 53.6 232 #353 763 0.69 33.3 0.0 33.3 242 307 0.54 40.1 0.0 40.1 136 158 422 46.0 46.0 40.7% 5.0 1.0 -2.0 4.0 Lead Yes 1.04 65.5 0.0 65.5 ~582 #679 760 436 0 0 0 0.78 1023 0 0 0 0.69 758 0 0 0 0.54 1962 0 0 0 1.04 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 0.0 0.0% -1.0 3.0 36.0 36.0 31.9% 4.0 2.0 -3.0 3.0 0.53 36.0 0.0 36.0 156 196 300 940 0 0 0 0.53 ø1 ø2 1 2 18.0 18.0 16% 4.0 4.0 14.0 18.0 16% 4.0 2.0 Lead Yes Lag Yes 0 0 25 Yes 30 684 15.5 0.85 0% 0.85 0% 1589 0 123 82.0 72.6% 0.0 0.0% -3.0 5.0 -1.0 3.0 0.69 12.5 0.0 12.5 322 353 604 2313 0 0 0 0.69 Intersection Summary Area Type: Other Cycle Length: 113 Actuated Cycle Length: 113 Offset: 0 (0%), Referenced to phase 1:NWT, Start of Green Natural Cycle: 115 Control Type: Pretimed Description: NO DATA ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 110: Mt Auburn St & Fresh Pond Pkwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 110: Mt Auburn St & Fresh Pond Pkwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Grade (%) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) Description: NO DATA c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR 0 1900 12 300 1900 12 2% 3.0 1.00 1.00 1.00 1758 1.00 1758 0.88 341 0 341 7% 625 1900 10 0 1900 11 285 1900 11 -2% 3.0 0.95 0.98 1.00 3058 1.00 3058 0.78 365 0 410 15% 35 1900 11 0 1900 12 1845 1900 12 -4% 4.0 0.91 1.00 1.00 5280 1.00 5280 0.92 2005 0 2032 0% 25 1900 12 425 1900 10 1210 1900 11 3% 5.0 0.95 0.98 1.00 3384 1.00 3384 0.85 1424 8 1581 0% 140 1900 11 0.88 0 0 0 0% Perm 4 4 22.0 28.0 0.25 9.0 436 c0.19 0.78 39.7 1.00 13.1 52.7 D 45.4 D 5.0 0.88 0.85 1.00 2626 1.00 2626 0.88 710 0 710 0% custom 14 1 41.0 38.0 0.34 883 0.27 0.80 34.1 1.00 7.7 41.8 D 42.3 0.87 113.0 89.5% 15 0.78 0 0 0 0% Perm 4 3 3.0 0.97 1.00 0.95 3219 0.95 3219 0.85 500 0 500 0% Prot 5 22.0 28.0 0.25 9.0 758 0.13 40.0 42.0 0.37 6.0 1962 c0.38 30.0 33.0 0.29 6.0 940 0.16 0.54 36.9 1.00 2.8 39.7 D 39.7 D 1.04 35.5 1.00 30.2 65.7 E 65.7 E 0.53 33.5 1.00 2.2 35.7 D 0.78 45 0 0 0% 0.92 0 0 0 0% 0.92 27 0 0 0% 0.85 165 0 0 0% 123 4 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 76.0 76.0 0.67 2276 c0.47 0.69 11.4 1.00 1.8 13.1 B 18.5 B D 12.0 E HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 511: Memorial Drive & Greenough Blvd Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 355 1900 11 140 1 25 430 1900 14 175 1 25 Yes 1345 1900 11 85 1900 16 210 1 25 Yes 525 1900 16 0 2 25 1945 1900 14 30 486 11.0 1 0.89 1% 399 25 616 16.8 2 0.89 1% 0.82 0% 1640 3 483 Prot 3 20.0 20.0 19.0% 4.0 1.0 -1.0 4.0 20.0 20.0 19.0% 4.0 1.0 -1.0 4.0 0.87 63.5 0.0 63.5 136 #214 406 140 460 0 0 0 0.87 0.59 7.0 0.0 7.0 0 47 50.0 50.0 47.6% 4.0 1.0 -1.0 4.0 Lag Yes 0.83 30.6 0.0 30.6 347 355 536 175 821 0 0 0 0.59 2 1977 0 0 0 0.83 30 594 13.5 13 0.82 0% 13 0.98 0% 104 pt+ov 23 536 Prot 1 0.10 2.1 0.0 2.1 2 17 35.0 35.0 33.3% 4.0 1.0 -1.0 4.0 Lead Yes 0.51 32.7 0.0 32.7 153 205 210 1071 0 0 0 0.10 1055 0 0 0 0.51 70.0 66.7% -1.0 4.0 0.98 0% 1985 12 85.0 81.0% -1.0 4.0 0.74 8.6 0.0 8.6 305 384 514 2674 0 0 0 0.74 Intersection Summary Area Type: CBD Cycle Length: 105 Actuated Cycle Length: 105 Offset: 0 (0%), Referenced to phase 1:SBTL, Start of Green Natural Cycle: 105 Control Type: Pretimed # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 511: Memorial Drive & Greenough Blvd \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 511: Memorial Drive & Greenough Blvd Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 355 1900 11 4.0 0.97 1.00 1.00 1.00 0.95 3016 0.95 3016 0.89 399 0 399 1 1% 1345 1900 11 4.0 0.91 1.00 1.00 1.00 1.00 4513 1.00 4513 0.82 1640 0 1640 85 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1647 1.00 1647 0.82 104 36 68 13 0% pt+ov 23 525 1900 16 4.0 0.97 1.00 1.00 1.00 0.95 3572 0.95 3572 0.98 536 0 536 13 0% Prot 1 1945 1900 14 4.0 0.95 1.00 1.00 1.00 1.00 3466 1.00 3466 0.98 1985 0 1985 3 430 1900 14 4.0 0.88 1.00 1.00 0.85 1.00 2702 1.00 2702 0.89 483 409 74 2 1% Prot 3 15.0 16.0 0.15 5.0 460 c0.13 15.0 16.0 0.15 5.0 412 0.03 45.0 46.0 0.44 5.0 1977 c0.36 65.0 66.0 0.63 80.0 81.0 0.77 1035 0.04 30.0 31.0 0.30 5.0 1055 0.15 0.87 43.5 1.00 19.3 62.8 E 50.2 D 0.18 38.8 1.00 0.9 39.7 D 0.83 26.0 1.00 4.2 30.2 C 28.9 C 0.07 7.6 1.00 0.1 7.7 A 0.51 30.7 1.00 1.7 32.4 C 0% 2 25.0 0.82 105.0 78.9% 15 0% 12 2674 c0.57 0.74 6.4 1.00 1.9 8.3 A 13.5 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH C 12.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 510: Eliot Bridge & Greenough Blvd Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 385 1900 12 80 2 25 1175 1900 12 0 1 25 Yes 255 1900 11 685 1900 16 200 1 25 Yes 2020 1900 13 0 2 25 280 1900 10 30 948 21.5 3 0.88 0% 1106 30 556 12.6 24 0.88 0% 50% 667 Free 30 616 14.0 0.91 1% 0.91 1% 0.84 0% 0.84 0% 280 753 pt+ov 23 2405 Prot 1 333 1.38 210.1 0.0 210.1 ~598 #823 44.0 58.0 62.4% 3.0 2.0 -1.0 4.0 Lead Yes 1.27 148.7 18.0 166.8 ~930 #954 13.0 21.0 22.6% 3.0 2.0 -1.0 4.0 Lag Yes 1.14 132.9 0.0 132.9 ~232 #360 536 200 546 0 0 0 1.38 1891 58 0 0 1.31 292 0 0 0 1.14 3 2 2 Free 13.0 14.0 15.1% 3.0 2.0 -1.0 4.0 1.53 268.5 0.0 268.5 ~262 #336 868 80 723 0 0 0 1.53 0.0 0.0% 0.0 4.0 0.54 1.7 0.0 1.7 0 0 1226 0 0 0 0.54 13.0 21.0 22.6% 3.0 2.0 -1.0 4.0 Lag Yes 0.49 37.5 0.0 37.5 78 119 476 568 0 0 0 0.49 35.0 37.6% -1.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 93 Actuated Cycle Length: 93 Offset: 0 (0%), Referenced to phase 1:SBL, Start of Green Natural Cycle: 140 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 510: Eliot Bridge & Greenough Blvd \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 510: Eliot Bridge & Greenough Blvd Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 385 1900 12 4.0 0.94 0.92 1.00 0.91 0.98 3964 0.98 3964 0.88 438 297 809 3 0% 1175 1900 12 4.0 0.86 0.98 1.00 0.85 1.00 1226 1.00 1226 0.88 1335 0 667 24 0% Free 255 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3110 1.00 3110 0.91 280 0 280 685 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1631 1.00 1631 0.91 753 2 751 2020 1900 13 4.0 0.97 1.00 1.00 1.00 0.95 3257 0.95 3257 0.84 2405 0 2405 280 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1596 1.00 1596 0.84 333 0 333 1% 1% pt+ov 23 0% Prot 1 0% 30.0 31.0 0.33 544 c0.46 53.0 54.0 0.58 5.0 1891 c0.74 16.0 17.0 0.18 5.0 292 0.21 1.38 31.0 1.00 182.5 213.5 F 1.27 19.5 1.00 126.6 146.1 F 1.14 38.0 1.00 96.1 134.1 F 144.7 F 3 9.0 10.0 0.11 5.0 426 c0.20 1.90 41.5 1.00 413.1 454.6 F 284.2 F 2 Free 93.0 93.0 1.00 1226 0.54 0.54 0.0 1.00 1.7 1.7 A 16.0 17.0 0.18 5.0 568 0.09 0.49 34.1 1.00 3.0 37.2 D 165.7 F 193.2 1.40 93.0 117.8% 15 2 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH F 12.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 503: Eliot Bridge & Soldiers Field Road Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBT EBR WBL WBT NBL NBR 2365 1900 11 0 1900 10 180 2 25 Yes 770 1900 10 255 1 25 0 1900 11 470 1900 14 0 2 25 0 1900 14 0 0 25 Yes 30 389 8.8 0.92 30 270 6.1 0.92 0.92 0 511 0 30 425 9.7 0.92 0.92 0.92 2571 0 2 837 Prot 1 2 1 3 15.0 20.0 30.0 30.0% 4.0 1.0 -1.0 4.0 Lag Yes Min 1.50 252.9 0.0 252.9 ~550 #690 345 15.0 20.0 30.0 30.0% 4.0 1.0 -1.0 4.0 Lead Yes Max 0.65 28.6 0.0 28.6 133 194 0.0 4.0 15.0 20.0 40.0 40.0% 4.0 1.0 -1.0 4.0 309 None 0.64 32.7 0.0 32.7 125 175 190 1718 0 0 0 1.50 0.0 0.0% 0.0 4.0 3 0.0 0.0% 255 1291 0 0 0 0.65 0.0 0.0% 0.0 4.0 1406 0 0 0 0.36 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 84.5 Natural Cycle: 90 Control Type: Semi Act-Uncoord ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 503: Eliot Bridge & Soldiers Field Road \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 503: Eliot Bridge & Soldiers Field Road Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBT EBR WBL WBT NBL NBR 2365 1900 11 4.0 0.86 1.00 1.00 5575 1.00 5575 0.92 2571 0 2571 0 1900 10 0 1900 11 470 1900 14 4.0 0.97 1.00 0.95 3296 0.95 3296 0.92 511 0 511 0 1900 14 2 770 1900 10 4.0 0.94 1.00 0.95 4192 0.95 4192 0.92 837 0 837 Prot 1 25.0 26.0 0.31 5.0 4.0 1717 c0.46 25.0 26.0 0.31 5.0 4.0 1291 c0.20 19.4 20.4 0.24 5.0 4.0 797 c0.16 1.50 29.2 1.00 226.9 256.1 F 256.1 F 0.65 25.2 1.00 2.5 27.8 C 0.64 28.7 1.00 2.0 30.7 C 30.7 C 0.92 0 0 0 0.92 0 0 0 3 27.8 C 178.0 0.95 84.4 79.2% 15 0.92 0 0 0 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH F 12.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 477: Mt. Auburn Street & JFK Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 95 1900 No 510 1900 0 1900 No 0 1900 0 1900 0 1900 No 0 1900 510 1900 90 1900 No 0 1900 0 1900 0 1900 No 0.92 2% 0.83 8% 30 505 11.5 0.83 8% 0.83 8% 0.92 2% 30 402 9.1 0.92 2% 0.92 2% 0 0 722 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.92 6% 0 Perm 30 202 4.6 0.92 6% 0.92 6% 0.92 2% 30 1211 27.5 0.92 2% 657 0 0 0 1 1 45.0 45.0 50.0% 3.0 4.0 -2.0 5.0 Lead 45.0 45.0 50.0% 3.0 4.0 3.0 10.0 Lead 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.56 23.7 1.2 24.9 150 205 122 1131 1183 0 306 0 0.75 45.0 45.0 50.0% 3.0 4.0 3.0 10.0 Lag 0.63 25.5 1.4 26.9 233 269 425 322 1144 0 232 0 0.79 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 90 Control Type: Pretimed Splits and Phases: 477: Mt. Auburn Street & JFK Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 477: Mt. Auburn Street & JFK Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 95 1900 510 1900 10.0 0.95 1.00 0.99 3041 0.99 3041 0.92 554 0 657 6% 0 1900 0 1900 0 1900 0 1900 0 1900 90 1900 0 1900 0 1900 0 1900 0.92 0 0 0 6% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.83 0 0 0 8% 510 1900 10.0 0.95 0.98 1.00 2941 1.00 2941 0.83 614 0 722 8% 0.83 108 0 0 8% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 103 0 0 6% Perm 1 2 38.0 35.0 0.39 7.0 1183 38.0 35.0 0.39 7.0 1144 c0.25 1 0.22 0.56 21.4 1.00 1.9 23.3 C 23.3 C 0.0 A 24.3 0.59 90.0 65.5% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.63 22.3 1.03 2.2 25.1 C 25.1 C 0.0 A C 20.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 108: Memorial Drive & JFK Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 5 1900 10 695 1900 10 230 1900 10 Yes 0 1900 10 580 1900 10 165 1900 10 Yes 120 1900 10 650 1900 10 190 1900 10 Yes 90 1900 10 465 1900 10 10 1900 10 Yes 30 1766 40.1 63 0.89 1% 0 Perm 30 1458 33.1 0.89 1% 112 0.89 1% 112 0.88 1% 1045 0 0 Perm 1 1 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 0.88 1% 63 0.88 1% 215 0.89 5% 847 0 0 pm+pt 3 34 3 1 1 1 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 1.39 219.2 0.0 219.2 ~662 #788 1686 30 600 13.6 0.0 0.0% -1.0 3.0 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 751 0 0 0 1.39 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 0.99 74.6 0.0 74.6 ~421 #533 1378 852 0 0 0 0.99 0.0 0.0% -1.0 3.0 10.0 15.0 30.0 21.9% 3.0 2.0 -2.0 3.0 Lead Yes Max ø2 ø4 2 4 1.0 16.0 16.0 12% 2.0 0.0 4.0 10.0 36.0 26% 4.0 2.0 Lag Yes None Lag Yes Max 30 729 16.6 0.89 5% 205 0.89 5% 205 0.94 6% 1078 0 0 pm+pt 5 45 5 34 34 66.0 48.2% 0.0 0.0% -2.0 3.0 -1.0 3.0 8.0 14.0 14.0 10.2% 4.0 2.0 -3.0 3.0 0.94 6% 215 0.94 6% 602 0 45 45 50.0 36.5% 0.0 0.0% -3.0 3.0 -1.0 3.0 Max 1.09 85.5 0.0 85.5 ~387 #514 520 0.86 54.4 0.0 54.4 234 #343 649 989 0 0 0 1.09 701 0 0 0 0.86 Intersection Summary Area Type: CBD Cycle Length: 137 Actuated Cycle Length: 130.6 Natural Cycle: 150 Control Type: Semi Act-Uncoord ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 108: Memorial Drive & JFK Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 108: Memorial Drive & JFK Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 5 1900 10 695 1900 10 3.0 0.95 0.97 1.00 0.96 1.00 2801 0.89 2495 0.89 781 23 1022 230 1900 10 0 1900 10 165 1900 10 120 1900 10 90 1900 10 0.88 188 0 0 63 1% 0.89 135 0 0 215 5% pm+pt 3 34 0.89 213 0 0 205 5% 0.94 96 0 0 205 6% pm+pt 5 45 465 1900 10 3.0 0.95 1.00 1.00 1.00 0.99 2808 0.65 1827 0.94 495 1 601 10 1900 10 0.88 0 0 0 112 1% Perm 650 1900 10 3.0 0.95 0.97 1.00 0.97 0.99 2694 0.61 1641 0.89 730 15 1063 190 1900 10 0.89 258 0 0 112 1% 580 1900 10 3.0 0.95 0.98 1.00 0.97 1.00 2854 1.00 2854 0.88 659 18 829 0.89 6 0 0 63 1% Perm 1% 1 1% 1 1 1 35.1 38.1 0.29 6.0 4.0 724 35.1 38.1 0.29 6.0 4.0 828 0.29 c0.41 1.41 46.6 1.00 193.6 240.2 F 240.2 F 1.00 46.6 1.00 31.4 78.0 E 78.0 E 128.2 1.18 131.3 94.9% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 5% 34 6% 0.94 11 0 0 215 6% 45 55.2 59.2 0.45 38.1 44.1 0.34 957 c0.23 c0.27 1.11 36.1 1.00 64.3 100.3 F 100.3 F 696 c0.07 0.22 0.86 40.8 1.00 13.5 54.3 D 54.3 D F 22.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5171: Soldiers Field Road EB & North Harvard Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 380 1900 13 0 1 25 15 1900 16 85 1900 16 0 0 25 Yes 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 0 1900 13 0 0 25 375 1900 13 35 1900 13 125 1 25 No 395 1900 10 0 1 25 345 1900 10 0 1900 10 0 0 25 Yes 30 595 13.5 0.87 0% 36% 280 Split 4 30 519 11.8 30 381 8.7 0.87 0% 40 0.87 0% 0.92 2% 0.92 2% 0.92 2% 0.89 4% 0.89 4% 272 0 0 0 0 0 421 4 4 2 8.0 21.0 27.0 19.3% 5.0 2.0 -3.0 4.0 Lag Yes Max 0.80 57.5 0.3 57.7 188 #309 8.0 21.0 27.0 19.3% 5.0 2.0 -3.0 4.0 Lag Yes Max 0.77 51.6 0.4 52.0 170 #282 515 4.0 28.0 38.0 27.1% 4.0 4.0 -4.0 4.0 Lag Yes Max 0.77 42.6 0.1 42.7 253 #369 301 349 0 3 0 0.81 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 439 355 0 5 0 0.78 550 0 3 0 0.77 ø3 ø5 1 3 5 4.0 9.0 15.0 11% 4.0 1.0 1.0 20.0 35.0 25% 2.0 1.0 8.0 17.0 25.0 18% 4.0 1.0 Lead Yes Max Lead Yes None Max 30 76 1.7 252 0.89 4% 252 0.95 1% 39 Perm 416 pm+pt 15 125 15 2 4 ø1 2 2 4.0 28.0 38.0 27.1% 4.0 4.0 -4.0 4.0 Lag Yes Max 0.20 29.1 0.0 29.1 19 47 125 194 0 0 0 0.20 0.95 1% 0.95 1% 363 0 125 125 40.0 28.6% 78.0 55.7% 0.0 0.0% -1.0 4.0 -1.0 4.0 0.0 4.0 0.66 25.2 0.0 25.2 92 217 0.33 0.7 0.0 0.7 1 1 1 628 0 0 0 0.66 1114 0 0 0 0.33 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 105 Natural Cycle: 95 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5171: Soldiers Field Road EB & North Harvard Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5171: Soldiers Field Road EB & North Harvard Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 380 1900 13 4.0 0.95 1.00 1.00 1.00 0.95 1595 0.95 1595 0.87 437 0 280 15 1900 16 4.0 0.95 0.94 1.00 0.95 0.97 1591 0.97 1591 0.87 17 13 259 85 1900 16 0 1900 12 0 1900 12 0 1900 12 0 1900 13 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.89 0 0 0 0% 2% 2% 2% 4% 4% 395 1900 10 4.0 1.00 1.00 0.97 1.00 0.95 1456 0.22 340 0.95 416 0 416 252 1% pm+pt 15 125 65.0 67.0 0.64 345 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1580 1.00 1580 0.95 363 0 363 0% Split 4 35 1900 13 4.0 1.00 0.46 1.00 0.85 1.00 662 1.00 662 0.89 39 0 39 252 4% Perm 0 1900 10 0.87 98 0 0 40 0% 375 1900 13 4.0 1.00 1.00 1.00 1.00 1.00 1699 1.00 1699 0.89 421 0 421 1% 1% 4 2 20.0 23.0 0.22 7.0 2.0 349 c0.18 20.0 23.0 0.22 7.0 2.0 349 0.16 30.0 34.0 0.32 8.0 4.0 550 c0.25 0.80 38.8 1.00 17.5 56.3 E 0.74 38.2 1.00 13.3 51.5 D 54.0 D 0.77 31.9 1.00 9.8 41.7 D 40.5 D 0.0 A 33.8 0.75 105.0 71.9% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 2 30.0 34.0 0.32 8.0 4.0 214 0.06 0.18 25.5 1.00 1.9 27.4 C 600 c0.24 0.20 0.69 15.5 1.48 5.6 28.6 C 0.95 0 0 0 125 70.0 71.0 0.68 1068 0.23 0.34 7.1 0.01 0.7 0.8 A 15.7 B C 12.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5172: Soldiers Field Road WB & Larz Anderson Bridge Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 1900 11 0 1900 12 Yes 110 1900 16 5 1900 16 235 1900 16 No 30 1900 12 725 1900 10 0 1900 10 Yes 0 1900 12 630 1900 11 65 1900 11 Yes 30 590 13.4 30 536 12.2 0.92 2% 0.92 2% 0.92 2% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 -1.0 3.0 6 0.97 0% 0 Split 5 0.97 0% 118 30 76 1.7 27 0.97 0% 124 0.96 2% 242 Perm 0 pm+pt 4 24 4 5 5 5 5 5 8.0 17.0 25.0 17.9% 4.0 1.0 -2.0 3.0 8.0 17.0 25.0 17.9% 4.0 1.0 -2.0 3.0 8.0 17.0 25.0 17.9% 4.0 1.0 -2.0 3.0 Max 510 Max 0.30 37.6 0.0 37.6 67 121 456 Max 0.78 58.2 0.0 58.2 155 #279 387 0 6 0 0.31 309 0 0 0 0.78 8.0 21.0 27.0 19.3% 5.0 2.0 -4.0 3.0 Lag Yes Max ø1 ø2 ø3 1 2 3 4.0 9.0 15.0 11% 4.0 1.0 4.0 28.0 38.0 27% 4.0 4.0 1.0 20.0 35.0 25% 2.0 1.0 Lead Yes Max Lag Yes Max Lead Yes None 30 600 13.6 0.96 2% 0.96 2% 0.92 1% 0.92 1% 124 0.92 1% 786 0 0 756 0 24 12 12 12 24 65.0 46.4% 0.0 0.0% 0.0 0.0% 53.0 37.9% 0.0 0.0% -2.0 6.0 -1.0 3.0 -1.0 3.0 1.0 6.0 -1.0 3.0 0.55 3.0 0.0 3.0 6 30 1 0.56 23.0 0.2 23.3 188 248 520 1421 0 0 0 0.55 1360 0 148 0 0.62 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 105 Natural Cycle: 95 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5172: Soldiers Field Road WB & Larz Anderson Bridge \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5172: Soldiers Field Road WB & Larz Anderson Bridge Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 1900 11 0 1900 12 110 1900 16 0 1900 12 0.96 0 0 0 0.92 0 0 0 2% 2% 2% 0.97 113 0 0 6 0% Split 5 630 1900 11 6.0 0.95 0.99 1.00 0.99 1.00 3037 1.00 3037 0.92 685 5 751 65 1900 11 0.92 0 0 0 725 1900 10 6.0 0.95 1.00 1.00 1.00 1.00 2960 0.92 2717 0.96 755 0 786 0 1900 10 0.92 0 0 0 235 1900 16 3.0 1.00 0.92 1.00 0.85 1.00 1513 1.00 1513 0.97 242 0 242 27 0% Perm 30 1900 12 0.92 0 0 0 5 1900 16 3.0 1.00 1.00 1.00 1.00 0.95 1849 0.95 1849 0.97 5 0 118 2% 2% 1% 1% 0% 5 20.0 22.0 0.21 5.0 2.0 387 0.06 0.30 35.0 1.00 2.0 37.1 D 49.1 D 0.0 A 20.8 0.61 105.0 65.0% 15 5 20.0 22.0 0.21 5.0 2.0 317 c0.16 0.76 39.1 1.00 15.9 55.0 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.96 31 0 0 124 2% pm+pt 4 24 24 0.92 71 0 0 124 1% 12 12 45.0 44.0 0.42 50.0 54.0 0.51 1448 c0.11 0.17 0.54 17.2 0.14 0.9 3.3 A 3.3 A 1273 c0.25 0.59 23.5 1.00 2.0 25.6 C 25.6 C C 15.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 188: Western Avenue & North Harvard Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 60 1900 12 0 0 25 375 1900 12 5 1900 12 0 0 25 Yes 65 1900 11 0 0 25 415 1900 11 30 1900 16 100 1 25 Yes 215 1900 12 0 1 25 290 1900 11 25 1900 11 0 0 25 Yes 0 1900 10 100 1 25 200 1900 10 105 1900 10 0 0 25 Yes 30 461 10.5 9 0.92 4% 0 Perm 30 180 4.1 0.92 4% 13 0.92 4% 13 0.94 2% 478 0 0 Perm 1 1 1 8.0 13.0 50.0 40.3% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.94 2% 9 0.94 2% 49 0.93 5% 542 0 231 D.P+P 3 4 3 1 1 1 1 8.0 13.0 50.0 40.3% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.50 30.1 0.0 30.1 156 212 381 30 186 4.2 0.0 0.0% 0.0 4.0 8.0 13.0 50.0 40.3% 3.0 2.0 -1.0 4.0 Lead Yes Max 956 0 0 0 0.50 1 8.0 13.0 50.0 40.3% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.56 31.1 0.0 31.1 181 242 100 968 0 0 0 0.56 0.0 0.0% 0.0 4.0 4.0 8.0 12.0 9.7% 3.0 1.0 0.0 4.0 Lead Yes Max 0.74 42.0 0.0 42.0 125 #228 313 0 0 0 0.74 ø2 30 429 9.8 0.93 5% 76 0.93 5% 76 0.94 4% 339 0 0 Perm 34 0.94 4% 49 0.94 4% 325 0 4 4 4 34 4 0.49 27.0 0.0 27.0 196 290 106 8.0 12.0 44.0 35.5% 3.0 1.0 0.0 4.0 Lag Yes Max 0.65 38.8 0.0 38.8 212 324 349 695 0 0 0 0.49 499 0 0 0 0.65 56.0 45.2% 0.0 0.0% 0.0 4.0 0.0 4.0 8.0 12.0 44.0 35.5% 3.0 1.0 0.0 4.0 Lag Yes Max 2 0.0 0.0% 1.0 18.0 18.0 15% 2.0 0.0 0.0 4.0 Lag Yes None Intersection Summary Area Type: CBD Cycle Length: 124 Actuated Cycle Length: 116.8 Natural Cycle: 80 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 188: Western Avenue & North Harvard Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 188: Western Avenue & North Harvard Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 60 1900 12 375 1900 12 4.0 0.95 1.00 1.00 1.00 0.99 3095 0.77 2412 0.92 408 1 477 5 1900 12 65 1900 11 30 1900 16 290 1900 11 4.0 1.00 1.00 1.00 0.99 1.00 1548 1.00 1548 0.93 312 2 337 0 1900 10 0.93 27 0 0 76 5% 0.94 0 0 0 76 4% Perm 200 1900 10 4.0 1.00 0.97 1.00 0.95 1.00 1410 1.00 1410 0.94 213 15 310 105 1900 10 0.94 69 0 0 13 2% Perm 215 1900 12 4.0 1.00 1.00 0.99 1.00 0.95 1529 0.38 614 0.93 231 0 231 49 5% D.P+P 3 4 48.2 48.2 0.41 4.0 2.0 314 c0.05 c0.25 0.74 29.1 1.00 14.2 43.3 D 25 1900 11 0.92 5 0 0 13 4% 415 1900 11 4.0 0.95 1.00 1.00 0.99 0.99 3024 0.80 2433 0.94 441 4 538 0.92 65 0 0 9 4% Perm 4% 1 2% 0.94 32 0 0 9 2% 1 1 1 45.3 46.3 0.39 5.0 2.0 950 45.3 46.3 0.39 5.0 2.0 959 0.20 0.50 26.9 1.00 1.9 28.8 C 28.8 C c0.22 0.56 27.7 1.00 2.4 30.1 C 30.1 C 32.1 0.65 117.5 76.3% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 5% 34 4% 0.94 112 0 0 49 4% 4 4 52.2 52.2 0.44 688 0.22 40.2 40.2 0.34 4.0 2.0 482 0.22 0.49 23.2 1.00 2.5 25.7 C 32.8 C 0.64 32.6 1.00 6.5 39.1 D 39.1 D C 23.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5191: Western Avenue & Soldiers Field Road EB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 13 0 1900 13 435 1900 13 Yes 905 1900 12 Yes 565 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 11 820 1900 11 30 1900 11 Yes 0.84 2% 30 494 11.2 0.84 2% 0.94 0% 0.95 0% 30 441 10.0 0.95 0% 0.95 0% 0 0 0 0 895 0 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.84 2% 0.92 1% 518 custom 2 2 984 pm+pt 1 12 1 10.0 22.0 32.0 32.0% 4.0 3.0 -3.0 4.0 Lag Yes None 0.71 29.9 0.0 29.9 121 158 10.0 21.0 36.0 36.0% 4.0 2.0 -2.0 4.0 Lead Yes C-Max 0.49 1.1 0.0 1.1 1 m0 414 833 0 0 0 0.62 2008 0 0 0 0.49 30 100 2.3 0.92 1% 0.92 1% 0.94 0% 30 898 20.4 0.94 0% 614 0 0 0 12 3 12 3 68.0 68.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -2.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.59 3.6 0.0 3.6 18 m33 20 1118 0 0 0 0.55 818 10.0 18.0 32.0 32.0% 4.0 2.0 -2.0 4.0 0.0 0.0% 0.0 4.0 None 1.02 71.8 0.0 71.8 ~310 #445 361 878 0 0 0 1.02 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 1:WBTL, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5191: Western Avenue & Soldiers Field Road EB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5191: Western Avenue & Soldiers Field Road EB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 13 0 1900 13 565 1900 11 4.0 1.00 1.00 1.00 1637 1.00 1637 0.92 614 0 614 1% 0 1900 12 0 1900 12 0 1900 12 0 1900 11 0.92 0 0 0 1% 0.94 0 0 0 0% 0.94 0 0 0 0% 0.94 0 0 0 0% 0.95 0 0 0 0% 820 1900 11 4.0 0.95 0.99 1.00 3124 1.00 3124 0.95 863 3 892 0% 30 1900 11 0.84 0 0 0 2% 905 1900 12 4.0 0.97 1.00 0.95 3120 0.95 3120 0.92 984 13 971 1% pm+pt 1 12 55.0 59.0 0.59 6.0 2.0 1966 0.18 0.13 0.49 11.9 0.11 0.0 1.3 A 0 1900 11 0.84 0 0 0 2% 435 1900 13 4.0 0.88 0.85 1.00 2592 1.00 2592 0.84 518 114 404 2% custom 2 20.7 23.7 0.24 7.0 2.0 614 c0.16 0.66 34.5 1.00 2.0 36.4 D 36.4 D 28.6 0.76 100.0 97.3% 15 12 3 61.0 63.0 0.63 1031 c0.38 26.0 28.0 0.28 6.0 2.0 875 c0.29 0.60 11.0 0.31 0.1 3.4 A 2.1 A 1.02 36.0 1.00 35.4 71.4 E 71.4 E HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A 0.95 32 0 0 0% C 12.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5192: Western Avenue & Soldiers Field Road WB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 11 1355 1900 11 115 1900 11 Yes 115 1900 11 Yes 185 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0.92 2% 30 100 2.3 0.92 2% 0.92 2% 0.90 1% 30 474 10.8 0.90 1% 0.90 1% 0.94 0% 0.92 2% 0 0 0 0 1634 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 2.0 6.0 20 30 1151 26.2 0.94 0% 0.94 0% 0.92 2% 30 456 10.4 0.92 2% 319 0 0 0 1 0 Split 2 1 2 2 10.0 21.0 36.0 36.0% 4.0 2.0 0.0 6.0 Lead Yes C-Max 1.07 66.4 13.0 79.4 ~397 m#421 394 10.0 22.0 32.0 32.0% 4.0 3.0 -3.0 4.0 Lag Yes None 10.0 22.0 32.0 32.0% 4.0 3.0 -1.0 6.0 Lag Yes None 0.42 21.3 0.0 21.3 54 91 1071 1524 0 43 0 1.10 0.0 0.0% 0.0 4.0 2 ø3 3 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 10.0 18.0 32.0 32% 4.0 2.0 None 376 891 0 1 0 0.36 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 1:WBTL, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5192: Western Avenue & Soldiers Field Road WB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5192: Western Avenue & Soldiers Field Road WB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 11 115 1900 11 115 1900 11 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 2% 0.92 0 0 0 2% 0.90 0 0 0 1% 0.90 128 0 0 1% 0.94 122 0 0 0% Split 2 185 1900 11 6.0 0.95 1.00 0.98 3082 0.98 3082 0.94 197 96 223 0% 0 1900 11 0.92 0 0 0 2% 1355 1900 11 6.0 0.91 0.99 1.00 4416 1.00 4416 0.90 1506 9 1625 1% 0.94 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 0.0 A 60.7 0.79 100.0 97.3% 15 2 34.3 34.3 0.34 6.0 2.0 1515 c0.37 20.7 21.7 0.22 7.0 2.0 669 c0.07 1.07 32.9 0.97 34.1 66.0 E 66.0 E 0.33 33.1 1.00 0.1 33.2 C 33.2 C HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A E 44.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 941: Western Avenue & Memorial Drive Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 105 1900 10 0 0 25 740 1900 12 60 1900 10 150 1 25 Yes 430 1900 12 0 1 25 665 1900 10 0 1900 12 0 0 25 Yes 0 1900 10 0 0 25 940 1900 10 300 1900 10 0 0 25 Yes 30 474 10.8 30 345 7.8 0.92 2% 0.92 2% 0.92 2% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 7 0.90 5% 55 0.90 5% 41 0.91 0% 67 custom 4 8 0.90 5% 0 Split 4 939 4 4 8 473 pm+pt 1 6 1 5.0 10.0 29.0 29.0% 4.0 1.0 -1.0 4.0 5.0 10.0 29.0 29.0% 4.0 1.0 -1.0 4.0 5.0 10.0 13.0 13.0% 4.0 1.0 -1.0 4.0 Lag C-Max 394 35 1030 20.1 C-Max 0.85 44.4 0.0 44.4 209 #266 265 1105 0 0 0 0.85 ø7 35 1840 35.8 0.91 0% 0.91 0% 0.86 3% 0.86 3% 41 0.86 3% 731 0 0 1442 0 6 2 6 2 10.0 15.0 25.0 25.0% 4.0 1.0 -1.0 4.0 Lag 10.0 16.0 71.0 71.0% 4.0 2.0 -2.0 4.0 10.0 16.0 46.0 46.0% 4.0 2.0 -2.0 4.0 Lead C-Max 0.20 15.7 0.0 15.7 6 49 Max 1.15 126.5 0.0 126.5 ~312 #511 Max 0.68 14.2 0.0 14.2 253 386 950 Max 1.19 123.8 0.0 123.8 ~582 #668 1760 150 327 0 0 0 0.20 410 0 0 0 1.15 1069 0 0 0 0.68 1207 0 0 0 1.19 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 7 0.0 0.0% 1.0 15.0 16.0 16% 3.0 0.0 0.0 4.0 Lead None Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 83 (83%), Referenced to phase 4:WBTL and 8:WBR, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 941: Western Avenue & Memorial Drive \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 941: Western Avenue & Memorial Drive Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT 0 1900 12 0 1900 12 0 1900 12 105 1900 10 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 2% 2% 2% 0.90 117 0 0 7 5% Split 4 740 1900 12 4.0 0.91 1.00 1.00 1.00 0.99 4418 0.99 4418 0.90 822 0 939 0.0 A 81.4 1.05 100.0 95.1% 15 WBR NBL NBT NBR SBL SBT SBR 60 1900 10 4.0 1.00 1.00 1.00 0.85 1.00 1292 1.00 1292 0.90 67 43 24 55 5% 5% custom 4 8 430 1900 12 4.0 1.00 1.00 1.00 1.00 0.95 1624 0.09 149 0.91 473 0 473 41 0% pm+pt 1 6 66.0 67.0 0.67 5.0 2.0 410 c0.24 0.53 1.15 34.8 1.00 93.5 128.3 F 665 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1596 1.00 1596 0.91 731 0 731 0 1900 12 0 1900 10 300 1900 10 0.91 0 0 0 0.86 0 0 0 940 1900 10 4.0 0.95 0.99 1.00 0.96 1.00 2809 1.00 2809 0.86 1093 27 1415 0% 0% 3% 3% 24.0 25.0 0.25 5.0 2.0 1105 c0.21 18.6 19.6 0.20 5.0 2.0 253 0.02 0.85 35.7 1.00 8.2 43.9 D 43.2 D 0.09 32.9 1.00 0.7 33.7 C HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 6 2 65.0 67.0 0.67 6.0 2.0 1069 0.46 40.0 42.0 0.42 6.0 2.0 1180 c0.50 0.68 10.0 1.00 3.6 13.6 B 58.6 E 1.20 29.0 1.00 98.1 127.1 F 127.1 F 0.86 349 0 0 41 3% F 8.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5161: Cambridge Street & I-90 On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT WBT WBR NBL NBT NBR NEL NER 10 1900 760 1900 375 1900 130 1900 No 15 1900 5 1900 30 1900 No 10 1900 1240 1900 35 279 5.4 35 170 3.3 0.83 1% 0.97 1% 2 0.97 1% 0 Split 3 928 521 0 3 3 3 8.0 13.0 25.0 17.9% 4.0 1.0 -2.0 3.0 Lead Yes Max 8.0 13.0 25.0 17.9% 4.0 1.0 -2.0 3.0 Lead Yes Max 1.28 182.0 0.0 182.0 ~391 #427 199 2 0.83 1% 726 0 0 0 1.28 30 125 2.8 0.83 0% 0.83 0% 8 0.83 0% 30 548 12.5 2 0.94 3% 60 0 446 45 0 Split 2 45 2 2 1 5 1 8.0 13.0 19.0 13.6% 4.0 1.0 -2.0 3.0 Lag Yes None 0.41 10.4 2.5 12.9 52 48 90 8.0 13.0 19.0 13.6% 4.0 1.0 -2.0 3.0 Lag Yes None 0.35 63.4 0.0 63.4 51 92 45 8.0 13.0 35.0 25.0% 4.0 1.0 -2.0 3.0 Lead Yes C-Max 0.69 36.4 66.4 102.9 315 449 468 1276 609 0 0 0.78 173 0 0 0 0.35 61.0 43.6% 0.0 0.0% -5.0 3.0 -1.0 3.0 2 0.0 0.0% -1.0 3.0 646 0 251 0 1.13 8 0.94 3% 33% 884 custom 15 15 15 68.0 48.6% ø4 ø5 4 5 8.0 16.0 28.0 20% 3.0 5.0 8.0 13.0 33.0 24% 4.0 1.0 Lag Yes None None -2.0 3.0 0.74 35.4 98.4 133.8 354 445 1192 0 463 0 1.21 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 95 (68%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5161: Cambridge Street & I-90 On-Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5161: Cambridge Street & I-90 On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT WBT WBR NBL NBT NBR NEL NER 10 1900 760 1900 3.0 0.91 1.00 1.00 1.00 1.00 4619 1.00 4619 0.83 916 0 928 375 1900 3.0 0.95 1.00 1.00 0.96 1.00 3082 1.00 3082 0.97 387 0 521 130 1900 15 1900 30 1900 0.83 18 0 0 1% 1% 0.97 134 0 0 2 1% 5 1900 3.0 1.00 0.98 1.00 0.92 0.99 1518 0.99 1518 0.83 6 0 60 10 1900 3.0 1.00 0.98 1.00 0.85 1.00 1392 1.00 1392 0.94 11 0 446 2 3% 3 45 20.0 22.0 0.16 5.0 2.0 726 c0.20 56.0 61.0 0.44 1343 c0.17 14.0 16.0 0.11 5.0 2.0 173 c0.04 1240 1900 3.0 0.91 1.00 1.00 0.85 1.00 2568 1.00 2568 0.94 1319 0 884 8 3% custom 15 15 63.0 65.0 0.46 1.28 59.0 1.00 135.7 194.7 F 194.7 F 0.39 26.8 0.32 0.1 8.8 A 8.8 A 0.35 57.2 1.00 0.4 57.6 E 57.6 E 0.83 12 0 0 2 1% Split 3 82.2 0.72 140.0 74.2% 15 0% Split 2 0% 2 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.83 36 0 0 8 0% 1 5 58.0 62.0 0.44 5.0 2.0 646 0.16 0.16 0.69 30.5 1.00 3.4 34.0 C 33.5 C 1192 c0.34 0.74 30.6 1.00 2.7 33.3 C F 12.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5162: Cambridge Street & Soldiers Field Road EB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 1580 1900 11 450 1900 11 Yes 10 1900 11 380 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 500 1900 11 210 1900 11 125 1900 10 Yes 0.94 2% 35 170 3.3 0.94 2% 0.94 2% 0.87 0% 35 86 1.7 0.87 0% 0.87 0% 0.92 2% 30 306 7.0 0.92 2% 0.92 2% 0.91 3% 30 266 6.0 0.91 3% 0 1681 479 Perm 0 pm+pt 5 15 5 448 0 0 0 0 231 15 549 Split 4 4 137 Prot 4 15 4 4 4 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 1.08 117.6 0.0 117.6 ~287 #405 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 0.84 81.8 0.0 81.8 206 #349 186 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 0.40 11.5 0.0 11.5 0 62 507 0 0 0 1.08 275 0 0 0 0.84 339 0 0 0 0.40 123 123 123 123 0.0 0.0% 79.0 56.4% 79.0 56.4% 0.0 4.0 -1.0 4.0 -1.0 4.0 8.0 13.0 33.0 23.6% 4.0 1.0 -1.0 4.0 68.0 48.6% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 None 0.71 20.9 148.7 169.5 375 m357 90 0.50 4.7 14.8 19.5 97 m45 2370 1104 0 0 1.33 958 462 0 0 0.97 0.34 0.5 0.0 0.5 2 m2 6 1314 0 0 0 0.34 226 ø1 ø2 ø3 1 2 3 8.0 13.0 35.0 25% 4.0 1.0 8.0 13.0 19.0 14% 4.0 1.0 8.0 13.0 25.0 18% 4.0 1.0 Lead Yes C-Max Lag Yes None Lead Yes Max 0.91 3% Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 95 (68%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5162: Cambridge Street & Soldiers Field Road EB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5162: Cambridge Street & Soldiers Field Road EB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 1580 1900 11 4.0 0.91 1.00 1.00 4424 1.00 4424 0.94 1681 0 1681 2% 450 1900 11 4.0 1.00 0.85 1.00 1378 1.00 1378 0.94 479 220 259 2% Perm 10 1900 11 380 1900 11 4.0 0.95 1.00 1.00 3137 0.95 2999 0.87 437 0 448 0% 0 1900 11 0 1900 12 0 1900 12 0 1900 12 0.87 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 500 1900 11 4.0 0.97 1.00 0.95 2958 0.95 2958 0.91 549 0 549 3% Split 4 210 1900 11 4.0 1.00 1.00 1.00 1605 1.00 1605 0.91 231 0 231 3% 4 125 1900 10 4.0 1.00 0.85 1.00 1317 1.00 1317 0.91 137 114 23 3% Prot 4 20.0 24.0 0.17 8.0 2.0 507 c0.19 20.0 24.0 0.17 8.0 2.0 275 0.14 20.0 24.0 0.17 8.0 2.0 226 0.02 1.08 58.0 1.00 64.2 122.2 F 0.84 56.1 1.00 18.9 75.0 E 99.4 F 0.10 48.9 1.00 0.1 49.0 D 0.94 0 0 0 2% 123 74.0 75.0 0.54 2370 c0.38 0.71 24.3 0.82 0.3 20.3 C 26.4 C 123 74.0 75.0 0.54 738 0.19 0.35 18.6 2.58 0.0 48.0 D 42.1 0.70 140.0 65.2% 15 0.87 11 0 0 0% pm+pt 5 15 15 58.0 60.0 0.43 1314 c0.07 0.08 0.34 26.8 0.02 0.0 0.5 A 0.5 A HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A D 12.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5163: Cambridge Street & Soldiers Field Road WB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 160 1900 11 1920 1900 11 0 1900 11 No 0 1900 12 0 1900 12 0 1900 12 No 390 1900 11 140 1900 10 60 1900 10 No 0 1900 12 0 1900 12 0 1900 12 No 0.98 2% 35 86 1.7 0.98 2% 0.98 2% 0.92 2% 35 455 8.9 0.92 2% 0.92 2% 0.92 2% 2122 0 0 0 0 0 30 304 6.9 0.89 0% 0.89 0% 0.92 2% 30 1151 26.2 0.92 2% 329 0 0 0 0 Split 1234 1234 0.89 0% 24% 333 Split 5 1234 1234 5 5 8.0 13.0 33.0 23.6% 4.0 1.0 1.0 6.0 8.0 13.0 33.0 23.6% 4.0 1.0 1.0 6.0 107.0 76.4% 107.0 76.4% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 4.0 -1.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.65 1.1 0.3 1.3 12 m12 6 None 1.16 151.2 0.0 151.2 ~375 #572 375 3242 0 409 0 0.75 288 0 0 0 1.16 5 None 1.18 159.5 260.7 420.2 ~376 #571 224 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 ø1 ø2 ø3 ø4 1 2 3 4 8.0 13.0 35.0 25% 4.0 1.0 8.0 13.0 19.0 14% 4.0 1.0 8.0 13.0 25.0 18% 4.0 1.0 8.0 16.0 28.0 20% 3.0 5.0 Lead Yes C-Max Lag Yes None Lead Yes Max Lag Yes None 1071 279 0 93 0 1.77 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 95 (68%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5163: Cambridge Street & Soldiers Field Road WB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 5163: Cambridge Street & Soldiers Field Road WB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 160 1900 11 1920 1900 11 4.0 0.91 1.00 1.00 4407 1.00 4407 0.98 1959 0 2122 2% 0 1900 11 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 140 1900 10 6.0 0.95 0.97 0.98 1447 0.98 1447 0.89 157 0 329 0% 60 1900 10 0.98 0 0 0 2% 390 1900 11 6.0 0.95 1.00 0.95 1492 0.95 1492 0.89 438 0 333 0% Split 5 0.89 67 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 28.0 27.0 0.19 5.0 4.0 288 0.22 28.0 27.0 0.19 5.0 4.0 279 c0.23 1.16 56.5 1.00 102.1 158.6 F 1.18 56.5 1.00 111.4 167.9 F 163.2 F 0.98 163 0 0 2% Split 1234 1234 99.0 100.0 0.71 3148 c0.48 0.67 11.0 0.05 0.3 0.8 A 0.8 A 0.0 A 39.4 0.76 140.0 71.3% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 5 0.0 A D 10.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 937: River Street & Memorial Drive Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 160 1900 12 960 1900 12 860 1900 12 No 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 12 935 1900 11 125 1900 10 Yes 95 1900 10 950 1900 10 0 1900 12 Yes 35 455 8.9 11 0.96 0% 0.96 0% 35 484 9.4 11 0.96 0% 35 1616 31.5 0.92 2% 0.92 2% 0.98 1% 0.98 1% 12 0.98 1% 12 0.80 0% 0 0 0 0 1082 0 1167 4 896 Prot 4 4 4 4 6 10.0 10.0 21.0 21.0 60.0 60.0 42.9% 42.9% 4.0 4.0 1.0 1.0 -2.0 -2.0 3.0 3.0 Lag Lag Yes Yes Max Max 0.89 1.51 47.7 270.1 11.3 0.0 59.0 270.1 591 ~1166 m660 m#1411 375 10.0 22.0 48.0 34.3% 4.0 2.0 -3.0 3.0 Lag Yes C-Max 0.80 38.9 0.0 38.9 437 531 1536 10.0 21.0 60.0 42.9% 4.0 1.0 -2.0 3.0 Lag Yes Max 1313 146 0 0 1.00 35 1030 20.1 0.92 2% 0 Split 4 6 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 -1.0 3.0 -1.0 3.0 404 592 0 0 0 1.51 1352 0 0 0 0.80 ø3 0.0 0.0% -1.0 3.0 0.80 0% 0.80 0% 0 pm+pt 5 2 5 1307 0 5.0 10.0 15.0 10.7% 4.0 1.0 -2.0 3.0 Lead Yes Max 10.0 22.0 63.0 45.0% 4.0 2.0 -3.0 3.0 2 3 2 C-Max 1.26 150.9 0.0 150.9 ~698 #667 950 0.0 0.0% 1.0 16.0 17.0 12% 2.0 0.0 -1.0 3.0 Lead Yes None 1040 0 0 0 1.26 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 53 (38%), Referenced to phase 2:SBTL and 6:NBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 937: River Street & Memorial Drive \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 937: River Street & Memorial Drive Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 160 1900 12 960 1900 12 3.0 0.95 1.00 1.00 1.00 0.99 3226 0.99 3226 0.96 1000 0 1167 0 1900 12 0 1900 12 0 1900 12 0 1900 12 125 1900 10 95 1900 10 0.92 0 0 0 0.92 0 0 0 0.98 0 0 0 2% 2% 2% 1% 1% 0.98 128 0 0 12 1% 0.80 119 0 0 12 0% pm+pt 5 2 950 1900 10 3.0 0.95 1.00 1.00 1.00 1.00 3019 0.56 1684 0.80 1188 0 1307 0 1900 12 0.92 0 0 0 935 1900 11 3.0 0.95 0.99 1.00 0.98 1.00 3039 1.00 3039 0.98 954 6 1076 0% 0% 4 860 1900 12 3.0 1.00 1.00 1.00 0.85 1.00 1454 1.00 1454 0.96 896 0 896 11 0% Prot 4 55.0 57.0 0.41 5.0 2.0 1313 0.36 55.0 57.0 0.41 5.0 2.0 592 c0.62 59.0 62.0 0.44 6.0 2.0 1346 c0.35 0.89 38.6 1.04 7.1 47.3 D 149.0 F 1.51 41.5 1.05 237.6 281.3 F 0.80 33.6 1.00 5.0 38.7 D 38.7 D 0.96 167 0 0 11 0% Split 4 0% 6 0.0 A 122.4 1.16 140.0 110.2% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.80 0 0 0 2 74.0 77.0 0.55 6.0 2.0 1050 c0.12 0.57 1.24 31.5 1.00 118.3 149.8 F 149.8 F F 9.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 294: Memorial Dr. on-ramp & BU Bridge Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 Yes 100 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 1130 1900 835 1900 Yes 0 1900 0 1900 0 1900 Yes 30 98 2.2 30 613 13.9 30 129 2.9 30 61 1.4 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 200 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0 111 0 0 0 0 0 2184 0 0 0 0 0.0 0.0% 0.0 4.0 3 1 3 1 8.0 12.0 17.0 22.7% 3.0 0.6 0.0 3.6 8.0 12.0 40.0 53.3% 3.0 0.6 0.0 3.6 Lead Yes C-Max 1.39 199.9 116.1 316.0 ~686 #826 49 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 Max 0.12 24.0 0.0 24.0 23 44 18 533 918 0 0 0 0.12 ø2 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 10.0 17.0 18.0 24% 2.0 0.0 Lag Yes None 1 1570 246 0 0 1.65 Intersection Summary Area Type: CBD Cycle Length: 75 Actuated Cycle Length: 75 Offset: 0 (0%), Referenced to phase 1:NBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 294: Memorial Dr. on-ramp & BU Bridge \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 294: Memorial Dr. on-ramp & BU Bridge Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 1130 1900 3.6 0.95 0.94 1.00 0.94 1.00 2866 1.00 2866 0.90 1256 181 2003 835 1900 0.90 0 0 0 100 1900 3.6 0.95 1.00 1.00 1.00 1.00 3249 1.00 3249 0.90 111 0 111 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0% 0% 0% 0% 0% 0% 0% 0% 0.90 928 0 0 200 0% 0% 0% 0% 3 1 21.2 21.2 0.28 3.6 2.0 918 c0.03 35.6 35.6 0.47 3.6 2.0 1360 c0.70 0.12 20.0 1.00 0.3 20.2 C 20.2 C 1.47 19.7 1.00 216.7 236.4 F 236.4 F 0.0 A 226.0 0.97 75.0 81.1% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A F 18.2 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 315: Commonwealth Avenue & BU Bridge Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 10 300 1 25 1430 1900 12 320 1900 13 170 1 25 Yes 0 1900 10 0 0 25 815 1900 10 1235 1900 16 200 1 25 No 0 1900 16 0 0 25 730 1900 16 5 1900 16 0 0 25 No 5 1900 10 0 0 25 910 1900 12 420 1900 11 175 1 25 Yes 30 1330 30.2 0.86 0% 0.86 0% 0 1663 30 354 8.0 503 0.86 0% 372 Perm 0.89 0% 0.89 0% 0 916 2 0.0 0.0% 0.0 4.0 2 2 8.0 24.0 57.0 57.0% 4.0 1.0 -1.0 4.0 8.0 24.0 57.0 57.0% 4.0 1.0 -1.0 4.0 8.0 24.0 57.0 57.0% 4.0 1.0 -1.0 4.0 C-Max 0.67 18.9 0.0 18.9 269 299 1250 2474 0 21 0 0.68 0.0 4.0 C-Max 0.77 30.1 0.0 30.1 169 282 170 486 0 0 0 0.77 646 0.89 0% 1388 custom 2 28 2 2 0.0 0.0% 30 198 4.5 C-Max 0.40 17.9 0.0 17.9 136 m127 274 2309 0 0 0 0.40 0.73 0% 101 0.73 0% 101 0.91 0% 0 1007 0 0 Perm 7 0.0 0.0% -1.0 4.0 0.0 4.0 200 1103 78 0 0 1.35 8.0 17.0 29.0 29.0% 3.0 4.0 -3.0 4.0 Lead None 2.08 515.6 0.0 515.6 ~1019 #969 118 483 0 0 0 2.08 0.0 0.0% 0.0 4.0 0.91 0% 1005 53 0.91 0% 3 462 Prot 3 3 3 3 3 8.0 25.0 43.0 43.0% 3.0 4.0 -3.0 4.0 8.0 25.0 43.0 43.0% 3.0 4.0 -3.0 4.0 8.0 25.0 43.0 43.0% 3.0 4.0 -3.0 4.0 7 71.0 71.0% 1.26 143.3 42.7 186.0 ~1114 m#946 30 1048 23.8 0.73 0% 28 ø8 8 4.0 8.0 14.0 14% 3.0 1.0 Lag None None 0.83 33.8 0.0 33.8 300 387 968 1204 0 0 0 0.83 None 0.84 40.7 0.0 40.7 261 #443 None 175 550 0 0 0 0.84 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 11 (11%), Referenced to phase 2:EBWB, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 315: Commonwealth Avenue & BU Bridge \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 315: Commonwealth Avenue & BU Bridge Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT 0 1900 10 815 1900 10 4.0 0.91 1.00 1.00 1.00 1.00 4357 1.00 4357 0.89 916 0 916 0% 0% 320 1900 13 4.0 1.00 0.60 1.00 0.85 1.00 897 1.00 897 0.86 372 10 362 503 0% Perm 0 1900 10 0.86 0 0 0 1430 1900 12 4.0 0.91 1.00 1.00 1.00 1.00 4668 1.00 4668 0.86 1663 0 1663 2 52.0 53.0 0.53 5.0 2.0 2474 0.36 0.67 17.2 1.00 1.5 18.6 B 20.6 C 2 52.0 53.0 0.53 5.0 2.0 475 0.40 0.76 18.5 1.00 11.0 29.5 C 127.2 1.55 100.0 145.4% 15 0.89 0 0 0 0% WBR NBL NBT NBR SBL SBT SBR 1235 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1647 1.00 1647 0.89 1388 0 1388 646 0% 0% custom 2 28 0 1900 16 5 1900 16 5 1900 10 0.73 0 0 0 730 1900 16 4.0 1.00 1.00 1.00 1.00 1.00 1932 1.00 1932 0.73 1000 0 1007 0% 0% 0.73 7 0 0 101 0% 0.91 5 0 0 101 0% Perm 910 1900 12 4.0 0.95 1.00 1.00 1.00 1.00 3248 0.95 3086 0.91 1000 0 1005 420 1900 11 4.0 1.00 1.00 1.00 0.85 1.00 1405 1.00 1405 0.91 462 2 460 53 0% Prot 3 7 0% 3 3 52.0 53.0 0.53 5.0 2.0 2309 0.21 0.40 14.0 1.25 0.3 17.7 B 109.0 F 66.0 64.0 0.64 1054 c0.84 1.32 18.0 1.29 146.0 169.3 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 22.0 25.0 0.25 7.0 4.0 483 c0.52 36.0 39.0 0.39 7.0 4.0 1204 0.33 0.83 27.6 1.00 4.4 31.9 C 33.5 C 2.08 37.5 0.70 494.5 520.8 F 520.8 F 36.0 39.0 0.39 7.0 4.0 548 0.33 0.84 27.7 1.00 9.3 37.0 D F 12.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1329: Commonwealth Avenue & University Road Outbound Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 705 1900 11 735 1900 12 Yes 0 1900 11 490 1900 11 35 1900 11 Yes 1180 1900 14 410 1900 13 30 1900 13 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0.93 2% 30 51 1.2 0.93 2% 0.93 2% 0.84 8% 30 553 12.6 0.84 8% 0.84 8% 0.95 1% 30 323 7.3 0.95 1% 0.95 1% 0.92 2% 30 391 8.9 0.92 2% 0.92 2% 0 758 790 custom 2 36 0 625 0 464 0 0 0 0 6 1242 Split 3 6 3 3 2.0 9.0 26.0 26.0% 4.0 3.0 -3.0 4.0 Lag 20.0 28.0 55.0 55.0% 4.0 4.0 -4.0 4.0 20.0 28.0 55.0 55.0% 4.0 4.0 -4.0 4.0 2 0.0 0.0% 0.0 4.0 8.0 15.0 45.0 45.0% 4.0 3.0 -3.0 4.0 36 81.0 81.0% 0.0 0.0% -3.0 5.0 0.0 4.0 C-Max 0.60 18.8 0.2 19.0 84 141 1 0.60 9.8 12.9 22.7 243 324 1262 96 0 0 0.65 1311 506 0 0 0.98 0.0 0.0% 0.0 4.0 3 ø5 5 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 1.0 13.0 19.0 19% 3.0 0.0 Lead C-Max 0.54 32.0 0.0 32.0 121 146 473 None 1.42 220.1 98.3 318.4 ~1073 #1325 1166 0 1 0 0.54 875 0 117 0 1.64 None 0.52 18.9 0.0 18.9 187 278 243 None 311 886 0 0 0 0.52 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 23 (23%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1329: Commonwealth Avenue & University Road Outbound \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1329: Commonwealth Avenue & University Road Outbound Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group EBL EBT 0 1900 11 705 1900 11 4.0 0.95 1.00 1.00 3079 1.00 3079 0.93 758 0 758 2% 0.93 0 0 0 2% Charles River Base Model - Existing Conditions Weekday Morning EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 735 1900 12 5.0 1.00 0.85 1.00 1425 1.00 1425 0.93 790 174 616 2% custom 2 36 0 1900 11 490 1900 11 4.0 0.91 0.99 1.00 4136 1.00 4136 0.84 583 7 618 8% 35 1900 11 410 1900 13 4.0 1.00 0.99 1.00 1731 1.00 1731 0.95 432 2 462 1% 30 1900 13 0 1900 12 0 1900 12 0 1900 12 0.95 32 0 0 1% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 6 1180 1900 14 4.0 1.00 1.00 0.95 1716 0.95 1716 0.95 1242 0 1242 1% Split 3 25.0 28.0 0.28 7.0 0.2 1158 0.15 47.0 51.0 0.51 8.0 4.0 875 c0.72 47.0 51.0 0.51 8.0 4.0 883 0.27 0.53 30.5 1.00 1.8 32.2 C 32.2 C 1.42 24.5 1.00 195.5 220.0 F 0.52 16.4 1.00 0.7 17.1 B 164.8 F 38.0 41.0 0.41 7.0 4.0 1262 c0.25 0.60 23.1 0.74 1.6 18.5 B 111.8 F 79.0 78.0 0.78 1112 0.43 0.55 4.3 47.08 0.5 201.2 F 122.3 1.05 100.0 101.0% 15 0.84 0 0 0 8% 0.84 42 0 0 8% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 3 0.0 A F 8.0 G HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 8000: Lenox Street & Mountfort Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBT WBR WBR2 NBL NBT SEL 45 1900 12 0 1900 10 50 1 25 555 1900 12 5 1900 11 0 0 25 490 1900 16 650 1900 11 0 0 25 30 307 7.0 0.92 0% 30 228 5.2 0.89 5% 538 730 ø2 Yes 30 280 6.4 0.88 8% 0.88 8% 0.88 8% 0.92 0% 631 custom 5 1 0 0 Perm 51 5 1 5.0 11.0 18.0 19.6% 4.0 2.0 -2.0 4.0 Lead 8.0 13.0 55.0 59.8% 4.0 1.0 -1.0 4.0 Lead Max 0.21 36.8 0.0 36.8 26 59 200 Max 0.72 10.3 0.0 10.3 75 198 241 0 0 0 0.21 0.0 0.0% 0.0 4.0 3 6 3 3 3 6 8.0 18.0 22.0 23.9% 3.0 1.0 0.0 4.0 8.0 18.0 22.0 23.9% 3.0 1.0 0.0 4.0 8.0 16.0 52.0 56.5% 4.0 1.0 -1.0 4.0 Lag 1.0 15.0 15.0 16% 4.0 0.0 Max 0.75 42.2 0.0 42.2 156 214 227 C-Max 0.48 15.4 0.0 15.4 132 176 148 C-Max 720 0 0 0 0.75 1514 0 0 0 0.48 Max 50 878 0 0 0 0.72 2 Lag Intersection Summary Area Type: CBD Cycle Length: 92 Actuated Cycle Length: 92 Offset: 49 (53%), Referenced to phase 2:Ped and 6:SEL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Splits and Phases: 8000: Lenox Street & Mountfort Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 8000: Lenox Street & Mountfort Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group WBT Charles River Base Model - Existing Conditions Weekday Morning WBR WBR2 NBL NBT SEL 0 1900 10 4.0 1.00 0.85 1.00 1256 1.00 1256 0.88 0 181 450 8% custom 5 1 555 1900 12 5 1900 11 0.88 631 0 0 8% 0.92 5 0 0 0% Perm 490 1900 16 4.0 0.95 1.00 1.00 3680 1.00 3680 0.92 533 0 538 0% 650 1900 11 4.0 0.97 1.00 0.95 2901 0.95 2901 0.89 730 0 730 5% 3 6 18.0 18.0 0.20 4.0 2.0 720 47.0 48.0 0.52 5.0 2.0 1514 c0.25 45 1900 12 4.0 1.00 1.00 1.00 1583 1.00 1583 0.88 51 0 51 8% 3 12.0 14.0 0.15 6.0 2.0 241 0.03 50.0 51.0 0.55 5.0 2.0 696 c0.36 0.21 34.2 1.00 2.0 36.2 D 20.1 C 0.65 14.2 1.00 4.6 18.8 B 0.15 0.75 34.9 1.00 7.0 41.8 D 41.8 D 24.2 0.63 92.0 60.1% 15 0.48 14.1 1.00 1.1 15.2 B 15.2 B HCM Level of Service C Sum of lost time (s) ICU Level of Service 8.0 B \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 239: Mass Ave. & Prospect Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 25 430 1900 40 1900 100 1 25 No 5 1900 0 0 25 230 1900 65 1900 100 1 25 No 5 1900 0 0 25 525 1900 220 1900 0 1 25 No 5 1900 0 0 25 470 1900 35 1900 0 0 25 No 30 527 12.0 30 304 6.9 30 127 2.9 0.93 11% 0.93 11% 0.93 11% 0.86 19% 0.86 19% 0.86 19% 0.93 10% 0.93 10% 0 462 43 Prot 1 0 Perm 273 76 Prot 1 0 Perm 570 1 0.0 0.0% 0.0 4.0 41.0 41.0 45.6% 3.0 7.0 -5.0 5.0 Lead Yes 0.75 32.4 0.0 32.4 220 #344 447 41.0 41.0 45.6% 3.0 7.0 -5.0 5.0 Lead Yes 0.08 17.4 0.0 17.4 15 36 616 0 0 0 0.75 1 1 41.0 41.0 45.6% 3.0 7.0 0.0 10.0 Lead Yes 100 524 0 0 0 0.08 41.0 41.0 45.6% 3.0 7.0 -5.0 5.0 Lead Yes 0.48 23.6 2.8 26.4 113 175 224 568 192 0 0 0.73 41.0 41.0 45.6% 3.0 7.0 -5.0 5.0 Lead Yes 0.16 18.4 0.0 18.4 27 54 100 488 0 0 0 0.16 2 2 49.0 49.0 54.4% 3.0 7.0 0.0 10.0 Lag Yes 30 354 8.0 540 0.93 10% 237 Prot 2 49.0 49.0 54.4% 3.0 7.0 -5.0 5.0 Lag Yes 0.75 26.5 49.1 75.6 251 390 47 49.0 49.0 54.4% 3.0 7.0 0.0 10.0 Lag Yes 0.41 20.4 1.2 21.6 90 153 756 234 0 0 1.09 572 168 0 0 0.59 0.89 6% 0.89 6% 0.89 6% 0 Perm 573 0 2 2 49.0 49.0 54.4% 3.0 7.0 0.0 10.0 Lag Yes 49.0 49.0 54.4% 3.0 7.0 -5.0 5.0 Lag Yes 0.74 25.5 0.0 25.5 249 377 274 0.0 0.0% 0.0 4.0 776 0 0 0 0.74 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:NBSB and 6:, Start of Green Natural Cycle: 90 Control Type: Pretimed # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 239: Mass Ave. & Prospect Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 239: Mass Ave. & Prospect Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 40 1900 5.0 1.00 1.00 1.00 0.85 1.00 1309 1.00 1309 0.93 43 0 43 5 1900 230 1900 5.0 1.00 1.00 1.00 1.00 1.00 1435 0.99 1419 0.86 267 0 273 65 1900 5.0 1.00 1.00 1.00 0.85 1.00 1221 1.00 1221 0.86 76 0 76 5 1900 525 1900 5.0 1.00 1.00 1.00 1.00 1.00 1554 0.99 1546 0.93 565 0 570 470 1900 5.0 1.00 1.00 1.00 0.99 1.00 1598 0.99 1588 0.89 528 0 573 35 1900 11% 11% 11% Prot 1 19% Perm 19% 19% Prot 1 10% Perm 220 1900 10.0 1.00 1.00 1.00 0.85 1.00 1321 1.00 1321 0.93 237 0 237 540 10% Prot 2 5 1900 0.93 0 0 0 430 1900 5.0 1.00 1.00 1.00 1.00 1.00 1541 1.00 1541 0.93 462 0 462 6% 6% 1 0.86 6 0 0 1 1 31.0 36.0 0.40 10.0 616 c0.30 31.0 36.0 0.40 10.0 524 0.03 0.75 23.1 1.00 8.2 31.3 C 30.1 C 0.08 16.7 1.00 0.3 17.1 B 25.1 0.75 90.0 104.5% 15 0.93 5 0 0 10% 2 2 31.0 36.0 0.40 10.0 568 0.19 0.48 20.1 1.00 2.9 23.0 C 21.9 C 31.0 36.0 0.40 10.0 488 0.06 0.16 17.3 1.00 0.7 18.0 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.89 6 0 0 6% Perm 0.89 39 0 0 2 2 39.0 44.0 0.49 10.0 756 c0.37 0.75 18.6 1.00 6.9 25.5 C 23.8 C 39.0 39.0 0.43 10.0 572 0.18 0.41 17.6 1.00 2.2 19.8 B 39.0 44.0 0.49 10.0 776 0.36 0.74 18.4 1.00 6.2 24.6 C 24.6 C C 10.0 G HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 227: Mass Ave. & Sidney St Ext. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 285 1900 130 1 100 440 1900 75 1900 0 0 25 No 155 1900 115 1 215 335 1900 115 1900 0 0 25 No 0 1900 0 0 25 0 1900 10 1900 0 1 25 No 250 1900 0 0 25 125 1900 185 1900 0 1 25 No 30 627 14.3 0.92 0.92 0.92 310 Prot 5 560 0 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 1.17 134.2 551.8 686.0 ~215 m#371 21.0 40.0 44.4% 4.0 1.0 0.0 5.0 Lag Yes 0.88 49.4 0.0 49.4 338 #503 547 0.92 130 266 0 137 0 2.40 2 638 0 0 0 0.88 0.0 0.0% 0.0 4.0 30 673 15.3 0.92 0.92 0.92 30 277 6.3 0.92 168 Prot 1 489 0 0 0 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.63 46.8 0.0 46.8 90 #168 21.0 40.0 44.4% 4.0 1.0 0.0 5.0 Lag Yes 0.78 34.6 0.0 34.6 239 #398 593 115 266 0 0 0 0.63 6 627 0 0 0 0.78 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 30 170 3.9 0.92 0.92 0.92 11 custom 1 1 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.05 32.2 0.0 32.2 5 20 0 Split 8 408 21.0 30.0 33.3% 4.0 1.0 0.0 5.0 21.0 30.0 33.3% 4.0 1.0 0.0 5.0 197 242 0 0 0 0.05 8 0.90 53.2 589.2 642.4 215 m211 90 451 275 0 0 2.32 0.92 201 Over 5 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.84 27.6 116.0 143.6 75 m78 238 77 0 0 1.25 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 74 (82%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 227: Mass Ave. & Sidney St Ext. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 227: Mass Ave. & Sidney St Ext. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 285 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 310 0 310 Prot 5 440 1900 5.0 1.00 0.98 1.00 1640 1.00 1640 0.92 478 0 560 75 1900 335 1900 5.0 1.00 0.96 1.00 1612 1.00 1612 0.92 364 0 489 115 1900 0 1900 0 1900 0.92 125 0 0 0.92 0 0 0 0.92 0 0 0 125 1900 5.0 1.00 1.00 0.97 1622 0.97 1622 0.92 136 0 408 8 185 1900 5.0 1.00 0.85 1.00 1425 1.00 1425 0.92 201 0 201 Over 5 15.0 15.0 0.17 5.0 266 c0.19 35.0 35.0 0.39 5.0 638 c0.34 15.0 15.0 0.17 5.0 266 0.11 35.0 35.0 0.39 5.0 627 0.30 10 1900 5.0 1.00 0.86 1.00 1450 1.00 1450 0.92 11 0 11 custom 1 1 15.0 15.0 0.17 5.0 242 0.01 250 1900 2 155 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 168 0 168 Prot 1 25.0 25.0 0.28 5.0 451 c0.25 15.0 15.0 0.17 5.0 238 0.14 1.17 37.5 0.84 102.2 133.7 F 0.88 25.5 1.38 13.1 48.2 D 78.7 E 0.63 34.9 1.00 10.9 45.8 D 0.78 24.1 1.00 9.3 33.4 C 36.6 D 0.90 31.4 1.58 3.2 52.8 D 43.4 D 0.84 36.4 0.57 3.5 24.1 C 0.92 82 0 0 55.5 0.95 90.0 80.1% 15 6 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.05 31.5 1.00 0.4 31.8 C 31.8 C 0.92 272 0 0 Split 8 E 15.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 308: Memorial Dr WB On-ramp & Mass Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 0 1900 115 1900 Yes 95 1900 490 1900 0 1900 Yes 0 1900 490 1900 15 1900 Yes 0.92 30 711 16.2 0.92 0.92 0.92 30 476 10.8 0.92 0.92 0.92 30 127 2.9 0.92 0.92 0.92 30 432 9.8 0.92 0.92 0 0 0 0 0 125 custom 4 533 0 0 549 0 4 103 pm+pt 1 6 1 6.0 15.0 21.0 24.1% 4.0 1.0 0.0 5.0 Lag Yes None 0.19 0.6 0.0 0.6 0 0 790 0 0 0 0.16 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 631 6 2 6 2 10.0 15.0 18.0 20.7% 4.0 1.0 0.0 5.0 Lead Yes Max 0.17 1.8 1.3 3.2 4 m6 10.0 15.0 45.0 51.7% 4.0 1.0 0.0 5.0 Max 0.24 1.6 0.6 2.2 11 13 47 22.0 27.0 27.0 31.0% 4.0 1.0 0.0 5.0 Lag Yes Max 0.46 15.5 0.0 15.5 77 116 352 613 363 0 0 0.41 2184 1217 0 0 0.55 1198 0 0 0 0.46 396 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 ø3 3 0.0 0.0% 4.0 21.0 21.0 24% 2.0 0.0 0.0 4.0 Lead Yes None Intersection Summary Area Type: CBD Cycle Length: 87 Actuated Cycle Length: 58.4 Natural Cycle: 80 Control Type: Semi Act-Uncoord m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 308: Memorial Dr WB On-ramp & Mass Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 308: Memorial Dr WB On-ramp & Mass Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 490 1900 5.0 0.95 1.00 1.00 3171 1.00 3171 0.92 533 2 547 15 1900 0.92 0 0 0 490 1900 5.0 0.95 1.00 1.00 3185 1.00 3185 0.92 533 0 533 0 1900 0.92 0 0 0 95 1900 5.0 1.00 1.00 0.95 1593 0.33 556 0.92 103 0 103 pm+pt 1 6 40.0 40.0 0.69 5.0 0.2 613 0.04 0.08 0.17 3.5 0.38 0.5 1.8 A 0 1900 0.92 0 0 0 115 1900 5.0 1.00 0.86 1.00 1450 1.00 1450 0.92 125 107 18 custom 4 8.3 8.3 0.14 5.0 2.0 206 c0.01 0.09 21.7 1.00 0.1 21.8 C 0.0 A 21.8 C 9.1 0.34 58.3 60.9% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 6 2 40.0 40.0 0.69 5.0 0.2 2185 c0.17 22.0 22.0 0.38 5.0 0.2 1197 c0.17 0.24 3.4 0.37 0.2 1.5 A 1.5 A 0.46 13.7 1.00 1.3 14.9 B 14.9 B 0.92 16 0 0 A 15.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 304: Memorial Dr EB Off-ramp & Mass Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 395 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 585 1900 395 1900 Yes 0 1900 490 1900 0 1900 Yes 30 698 15.9 1.00 0% 1.00 0% 0 0 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 30 425 9.7 150 0.86 9% 459 custom 4 30 2105 47.8 1.00 0% 1.00 0% 1.00 0% 0.86 14% 150 0.86 0% 1.00 0% 0.88 11% 1.00 0% 0 0 0 0 1139 0 0 557 0 6 2 4 6 2 6.0 15.0 21.0 24.1% 4.0 1.0 0.0 5.0 Lag Yes None 0.60 3.4 0.0 3.4 0 0 10.0 15.0 45.0 51.7% 4.0 1.0 0.0 5.0 Max 0.61 5.6 0.0 5.6 71 105 2025 22.0 27.0 27.0 31.0% 4.0 1.0 0.0 5.0 Lag Yes Max 0.50 4.0 0.0 4.0 8 12 47 1871 0 0 0 0.61 1104 19 0 0 0.51 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 618 345 858 0 0 0 0.53 ø3 1 3 10.0 15.0 18.0 21% 4.0 1.0 4.0 21.0 21.0 24% 2.0 0.0 Lead Yes Max Lead Yes None 30 127 2.9 1.00 0% 0.0 0.0% ø1 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 87 Actuated Cycle Length: 58.4 Natural Cycle: 80 Control Type: Semi Act-Uncoord Splits and Phases: 304: Memorial Dr EB Off-ramp & Mass Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 304: Memorial Dr EB Off-ramp & Mass Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 0% 0% 0% 0% 0% 0% 14% 0.86 459 0 0 150 0% 490 1900 5.0 0.95 1.00 1.00 1.00 1.00 2927 1.00 2927 0.88 557 0 557 0 1900 1.00 0 0 0 585 1900 5.0 0.95 0.95 1.00 0.94 1.00 2673 1.00 2673 0.86 680 79 1060 395 1900 1.00 0 0 0 395 1900 5.0 1.00 1.00 1.00 0.86 1.00 1357 1.00 1357 0.86 459 394 65 150 9% custom 4 0% 11% 0% 6 2 8.3 8.3 0.14 5.0 2.0 193 c0.05 40.0 40.0 0.69 5.0 0.2 1834 c0.40 22.0 22.0 0.38 5.0 0.2 1105 0.19 0.34 22.5 1.00 0.4 22.9 C 0.58 4.8 1.00 1.3 6.1 A 6.1 A 0.50 14.0 0.17 1.5 3.9 A 3.9 A 22.9 C 0.0 A 9.1 0.54 58.3 60.9% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 1.00 0 0 0 A 10.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 11: Commonwealth Ave & Beacon St Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBT EBR EBR2 NBR2 SBR2 NER NER2 SWL2 SWL SWT SWR SWR2 395 1900 35 1900 40 1 25 15 1900 300 1900 20 1900 900 1900 0 0 25 30 1900 40 1900 380 1900 0 0 25 735 1900 485 1900 0 0 25 25 1900 Yes Yes Yes Yes Yes Yes 25 249 6.8 0.90 6% 439 25 73 2.0 170 0.90 6% 174 0.90 6% 25 56 Perm 0 2 26.0 28.0 28.0% 4.0 5.0 -1.0 8.0 Lag 0.72 44.8 0.0 44.8 138 194 169 613 0 0 0 0.72 ø7 2 26.0 28.0 28.0% 4.0 5.0 -1.0 8.0 Lag 98 0.94 11% 25 64 0.75 0% 98 0.86 1% 170 0.86 1% 25 98 0.93 6% 170 0.93 6% 319 27 1082 custom custom custom 8 2 1 0 0 custom 452 Prot 4 4 20.0 42.0 42.0% 3.0 4.0 -1.0 6.0 64 0.93 6% 18 59.0 59.0% 59.0 59.0% 0.0 0.0% -1.0 7.0 -1.0 7.0 0.0 4.0 26.0 28.0 28.0% 4.0 5.0 0.0 9.0 Lag 24.0 30.0 30.0% 4.0 4.0 -1.0 7.0 Lead 0.31 30.8 0.0 30.8 21 59 0.04 0.1 0.0 0.1 0 0 1.85 415.0 0.0 415.0 ~605 #704 2.05 505.9 0.0 505.9 ~372 #670 0.64 11.1 0.0 11.1 135 216 1 0.63 13.0 0.0 13.0 116 215 40 183 0 0 0 0.31 606 0 0 0 0.53 650 0 0 0 0.04 585 0 0 0 1.85 221 0 0 0 2.05 1462 0 0 0 0.64 651 0 0 0 0.63 0.0 4.0 0.0 0.0% 0.0 4.0 0.93 6% 27% 408 Prot 18 931 14.0 29.0 29.0% 3.0 1.0 -1.0 3.0 Lag Yes 0.53 24.9 0.0 24.9 66 115 0.0 0.0% 20.0 42.0 42.0% 3.0 4.0 -1.0 6.0 0.93 6% 0 7 13.0 13.0 13% 2.0 0.0 Lead Yes Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 28 (28%), Referenced to phase 1:SWT, Start of Green Natural Cycle: 130 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Commonwealth Ave & Beacon St \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 11: Commonwealth Ave & Beacon St Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBT EBR EBR2 395 1900 8.0 0.95 1.00 1.00 1.00 1.00 3065 1.00 3065 0.90 439 0 439 35 1900 8.0 1.00 0.62 1.00 0.85 1.00 847 1.00 847 0.90 39 14 42 170 6% 15 1900 6% 0.90 17 0 0 174 6% 25 Perm 2 19.0 20.0 0.20 9.0 613 c0.14 0.72 37.3 1.00 7.0 44.4 D 43.6 D 2 19.0 20.0 0.20 9.0 169 NBR2 SBR2 NER NER2 SWL2 SWL SWT SWR SWR2 300 20 900 1900 1900 1900 3.0 9.0 7.0 0.88 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1.00 0.85 0.86 0.85 1.00 1.00 1.00 2045 1479 2533 1.00 1.00 1.00 2045 1479 2533 0.94 0.75 0.86 319 27 1047 75 22 2 244 5 1080 98 64 98 11% 0% 1% 25 custom custom custom 8 2 1 30 1900 40 1900 0.93 43 0 0 98 6% 735 1900 7.0 0.91 0.98 1.00 0.98 1.00 2813 1.00 2813 0.93 790 0 931 6% 485 1900 7.0 0.91 1.00 1.00 0.85 1.00 1248 1.00 1248 0.93 522 3 405 64 6% 25 1900 0.86 35 0 0 170 1% 25 380 1900 6.0 1.00 1.00 0.39 1.00 0.95 604 0.95 604 0.93 409 4 448 170 6% 18 Prot 18 51.0 49.0 0.49 51.0 49.0 0.49 1378 0.33 612 0.32 0.68 19.4 0.53 2.2 12.6 B 142.7 F 0.66 19.3 0.53 4.6 14.7 B custom Prot 4 0.93 27 0 0 6% 4 0.05 0.25 33.7 1.00 3.5 37.2 D 202.6 1.66 100.0 Err% 15 25.0 26.0 0.26 4.0 532 0.12 19.0 19.0 0.19 9.0 281 0.00 22.0 23.0 0.23 8.0 583 c0.43 0.46 31.1 1.00 2.8 33.9 C 0.02 32.9 1.00 0.1 33.0 C 1.85 38.5 1.00 390.0 428.5 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 35.0 36.0 0.36 7.0 217 0.74 2.07 32.0 1.06 492.1 526.1 F F 21.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 152: Beacon St & Storrow Dr Off Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 130 1900 12 0 0 25 Yes 440 1900 12 0 1900 12 0 0 25 Yes 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 0 1900 10 0 0 25 280 1900 10 830 1900 10 200 1 25 Yes 0.92 2% 25 643 17.5 0.92 2% 0.92 2% 0.95 10% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 25 365 10.0 0.95 10% 0.95 10% 0 Split 3 600 0 21.0 47.0 47.0% 3.0 1.0 0.0 4.0 21.0 47.0 47.0% 3.0 1.0 0.0 4.0 563 0.92 2% 25 261 7.1 0.92 2% 0.92 2% 0.97 1% 25 152 4.1 0.97 1% 0 0 0 0 289 3 0.32 0.4 0.0 0.4 0 0 285 1858 0 0 0 0.32 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 181 0.97 1% 1 856 Prot 1 22.0 33.0 33.0% 3.0 1.0 0.0 4.0 Lead 22.0 33.0 33.0% 3.0 1.0 0.0 4.0 Lead 0.33 29.2 0.0 29.2 75 113 72 1.15 97.6 0.0 97.6 ~400 #638 871 0 0 0 0.33 ø2 2 20.0 20.0 20% 3.0 0.0 Lag Yes 200 746 0 0 0 1.15 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 91 (91%), Referenced to phase 1:SBT, Start of Green Natural Cycle: 90 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 152: Beacon St & Storrow Dr Off Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 152: Beacon St & Storrow Dr Off Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 130 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 10 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.95 137 0 0 10% Split 3 440 1900 12 4.0 0.91 1.00 0.99 4196 0.99 4196 0.95 463 54 546 10% 0.95 0 0 0 10% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.97 0 0 0 1% 280 1900 10 4.0 0.95 1.00 1.00 3002 1.00 3002 0.97 289 0 289 1% 0.0 A 94.1 0.70 100.0 76.3% 15 3 1 830 1900 10 4.0 1.00 0.85 1.00 1343 1.00 1343 0.97 856 356 500 1% Prot 1 43.0 43.0 0.43 4.0 1804 c0.13 29.0 29.0 0.29 4.0 871 0.10 29.0 29.0 0.29 4.0 389 c0.37 0.30 18.7 0.00 0.4 0.4 A 0.4 A 0.33 27.9 1.00 1.0 28.9 C 143.1 F 1.28 35.5 1.00 146.2 181.7 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A F 28.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1401: Commonwealth Ave WB & Charlesgate West Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 90 1900 Yes 335 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 370 1900 40 1900 Yes 0.92 2% 25 608 16.6 0.92 2% 0.92 2% 0.84 4% 0.92 2% 0.91 3% 25 261 7.1 0.91 3% 0.91 3% 0 0 0 0 Perm 0 0 451 0 25 336 9.2 0.84 4% 0.84 4% 0.92 2% 25 138 3.8 0.92 2% 506 0 0 0 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 1 46.0 61.0 61.0% 3.0 1.0 0.0 4.0 Lead Yes 528 46.0 61.0 61.0% 3.0 1.0 0.0 4.0 Lead Yes 0.20 1.9 0.0 1.9 8 13 256 2579 0 0 0 0.20 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 58 39.0 39.0 39.0% 3.0 1.0 0.0 4.0 Lag Yes 0.29 10.8 0.0 10.8 35 47 181 0.0 0.0% 0.0 4.0 1575 0 0 0 0.29 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 30 (30%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 85 Control Type: Pretimed Splits and Phases: 1401: Commonwealth Ave WB & Charlesgate West \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1401: Commonwealth Ave WB & Charlesgate West Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 90 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.84 107 0 0 4% Perm 0.84 0 0 0 4% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.91 0 0 0 3% 370 1900 4.0 0.91 0.99 1.00 4466 1.00 4466 0.91 407 13 438 3% 40 1900 0.92 0 0 0 2% 335 1900 4.0 0.91 1.00 0.99 4442 0.99 4442 0.84 399 46 460 4% 1 2 57.0 57.0 0.57 4.0 2532 35.0 35.0 0.35 4.0 1563 c0.10 0.91 44 0 0 3% 1 0.10 0.18 10.3 0.21 0.2 2.3 A 2.3 A 0.0 A 6.5 0.22 100.0 40.0% 15 0.28 23.4 0.46 0.4 11.2 B 11.2 B 0.0 A HCM Level of Service A Sum of lost time (s) ICU Level of Service 8.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1391: Commonwealth Ave EB & Charlesgate West Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 1345 1900 90 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 135 1900 Yes 325 1900 0 1900 Yes 0.95 3% 25 574 15.7 0.95 3% 0.95 3% 0.92 2% 25 344 9.4 0.92 2% 0.92 2% 0.92 2% 25 431 11.8 0.92 2% 0.92 2% 0.93 3% 0 1511 0 0 0 0 0 0 0 0 Perm 1 0.0 0.0% 0.0 4.0 44.0 62.0 62.0% 3.0 1.0 0.0 4.0 Lead Yes 0.46 6.6 0.0 6.6 86 47 494 25 138 3.8 0.93 3% 0.93 3% 494 0 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 264 3293 0 0 0 0.46 351 2 29.0 38.0 38.0% 3.0 1.0 0.0 4.0 Lag Yes 29.0 38.0 38.0% 3.0 1.0 0.0 4.0 Lag Yes 0.32 8.5 0.7 9.2 21 30 58 0.0 0.0% 0.0 4.0 1547 702 0 0 0.58 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 26 (26%), Referenced to phase 1:EBT, Start of Green Natural Cycle: 75 Control Type: Pretimed Splits and Phases: 1391: Commonwealth Ave EB & Charlesgate West \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1391: Commonwealth Ave EB & Charlesgate West Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 1345 1900 4.0 0.86 0.99 1.00 5657 1.00 5657 0.95 1416 10 1501 3% 90 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 135 1900 0 1900 0.95 95 0 0 3% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.93 145 0 0 3% Perm 325 1900 4.0 0.91 1.00 0.99 4467 0.99 4467 0.93 349 27 467 3% 0.95 0 0 0 3% 1 0.93 0 0 0 3% 2 2 58.0 58.0 0.58 4.0 3281 c0.27 34.0 34.0 0.34 4.0 1519 0.46 12.0 0.52 0.4 6.7 A 6.7 A 0.0 A 7.3 0.40 100.0 46.7% 15 0.10 0.31 24.3 0.36 0.5 9.2 A 9.2 A 0.0 A HCM Level of Service A Sum of lost time (s) ICU Level of Service 8.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 314: Beacon St & Storrow Dr EB On Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 555 1900 110 1900 Yes 15 1900 Yes 525 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0.92 2% 25 365 10.0 0.92 2% 0.92 2% 0.94 8% 25 603 16.4 0.94 8% 0.94 8% 0.91 1% 0.92 2% 0 0 0 0 707 0 25 214 5.8 0.91 1% 0.91 1% 0.92 2% 25 142 3.9 0.92 2% 16 Split 2 577 0 0 0 0 24.0 63.0 63.0% 3.0 1.0 0.0 4.0 Lag 24.0 63.0 63.0% 3.0 1.0 0.0 4.0 Lag 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.51 16.9 0.0 16.9 57 78 523 0.02 0.7 0.0 0.7 0 m0 0.30 4.6 0.0 4.6 35 46 134 1378 0 0 0 0.51 955 0 0 0 0.02 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 285 25.0 37.0 37.0% 3.0 2.0 0.0 5.0 Lead 0.0 0.0% 0.0 4.0 2 62 1898 0 0 0 0.30 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 34 (34%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 50 Control Type: Pretimed m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 314: Beacon St & Storrow Dr EB On Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 314: Beacon St & Storrow Dr EB On Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 110 1900 0 1900 0 1900 0.92 0 0 0 2% 0.94 0 0 0 8% 525 1900 4.0 0.95 1.00 1.00 3217 1.00 3217 0.91 577 0 577 1% 0 1900 0.92 0 0 0 2% 0.91 0 0 0 1% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 15 1900 4.0 1.00 1.00 0.95 1608 0.95 1608 0.91 16 7 9 1% Split 2 0 1900 0.92 0 0 0 2% 555 1900 5.0 0.91 0.98 1.00 4215 1.00 4215 0.94 590 30 677 8% 32.0 32.0 0.32 5.0 1349 c0.16 59.0 59.0 0.59 4.0 949 0.01 59.0 59.0 0.59 4.0 1898 c0.18 0.50 27.5 0.61 1.0 17.8 B 17.8 B 0.01 8.5 0.18 0.0 1.6 A 0.30 10.2 0.41 0.4 4.6 A 4.5 A 0.0 A 11.7 0.37 100.0 59.6% 15 0.94 117 0 0 8% 2 0.0 A HCM Level of Service B Sum of lost time (s) ICU Level of Service 9.0 B \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 140: Commonwealth Ave WB & Charlesgate East Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 315 1900 50 1900 Yes 110 1900 Yes 615 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0.92 2% 25 336 9.2 0.92 2% 0.92 2% 0.94 3% 30 779 17.7 0.94 3% 0.94 3% 0.90 2% 0.92 2% 0 0 0 0 388 0 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 256 19.0 27.0 27.0% 3.0 1.0 0.0 4.0 Lead Yes 0.37 29.7 0.0 29.7 69 100 699 1043 0 0 0 0.37 0.0 0.0% 0.0 4.0 25 123 3.4 0.90 2% 0.90 2% 0.92 2% 25 192 5.2 0.92 2% 0 Split 2 805 0 0 0 0 18.0 73.0 73.0% 3.0 0.0 0.0 3.0 Lag Yes 18.0 73.0 73.0% 3.0 0.0 0.0 3.0 Lag Yes 0.36 6.2 1.2 7.3 91 128 43 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2 112 2226 1120 0 0 0.73 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 35 (35%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 40 Control Type: Pretimed Splits and Phases: 140: Commonwealth Ave WB & Charlesgate East \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 140: Commonwealth Ave WB & Charlesgate East Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 50 1900 110 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.94 0 0 0 3% 0.94 53 0 0 3% 0.90 122 0 0 2% Split 2 615 1900 3.0 0.95 1.00 0.99 3161 0.99 3161 0.90 683 14 791 2% 0 1900 0.92 0 0 0 2% 315 1900 4.0 0.91 0.98 1.00 4439 1.00 4439 0.94 335 22 366 3% 0.90 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 0.0 A 14.7 0.36 100.0 41.6% 15 2 23.0 23.0 0.23 4.0 1021 c0.08 70.0 70.0 0.70 3.0 2213 c0.25 0.36 32.3 0.95 1.0 31.7 C 31.7 C 0.36 6.0 1.01 0.4 6.5 A 6.5 A 0.0 A HCM Level of Service B Sum of lost time (s) ICU Level of Service 7.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 139: Commonwealth Ave EB & Charlesgate East Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT NBT NBR NEL NER 540 1900 Yes 940 1900 40 1900 35 1900 Yes 145 1900 155 1900 25 344 9.4 0.96 2% 30 280 6.4 0.85 6% 0.85 6% 25 411 11.2 0.82 3% 0.82 3% 1170 88 0 366 0 1 3 34.0 55.0 55.0% 3.0 1.0 0.0 4.0 Lead Yes 0.53 8.2 0.2 8.4 48 62 264 16.0 17.0 17.0% 3.0 1.0 0.0 4.0 0.39 33.3 0.1 33.4 30 m64 200 20.0 28.0 28.0% 3.0 1.0 0.0 4.0 Lag Yes 0.53 36.3 0.0 36.3 105 135 331 2215 160 286 0 0.61 228 0 7 0 0.40 696 0 0 0 0.53 0.96 2% 34% 371 Perm 1 34.0 55.0 55.0% 3.0 1.0 0.0 4.0 Lead Yes 0.42 1.8 0.9 2.7 0 0 880 121 274 0 0.61 2 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 37 (37%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 70 Control Type: Pretimed m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 139: Commonwealth Ave EB & Charlesgate East \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 139: Commonwealth Ave EB & Charlesgate East Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT NBT NBR NEL NER 540 1900 4.0 0.86 1.00 0.95 1370 0.95 1370 0.96 562 182 189 2% Perm 940 1900 4.0 0.86 1.00 0.99 4290 0.99 4290 0.96 979 26 1144 2% 40 1900 4.0 1.00 0.94 1.00 1512 1.00 1512 0.85 47 31 57 6% 35 1900 145 1900 4.0 0.97 0.92 0.98 2901 0.98 2901 0.82 177 0 366 3% 155 1900 1 3 2 51.0 51.0 0.51 4.0 2188 13.0 13.0 0.13 4.0 197 c0.04 24.0 24.0 0.24 4.0 696 c0.13 0.29 39.3 1.13 3.2 47.8 D 47.8 D 0.53 33.1 1.00 2.8 35.9 D 35.9 D 1 51.0 51.0 0.51 4.0 699 0.14 0.27 13.9 0.26 0.9 4.5 A 0.27 0.52 16.4 0.47 0.8 8.5 A 7.6 A 14.5 0.49 100.0 53.4% 15 0.85 41 0 0 6% 0.82 189 0 0 3% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH B 12.0 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9007: Boylston St & Bowker Overpass Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBR NBL NBT SBT SBR 160 1900 0 2 25 995 1900 50 1 25 No 0 1900 0 0 25 885 1900 925 1900 1310 1900 250 2 25 No 25 651 17.8 0.97 1% 954 25 792 21.6 0.77 1% 0.77 1% 0.88 1% 25 429 11.7 0.88 1% 0 1006 56 1292 Prot 56 56 56 208 1 1 58.0 58.0% 58.0 58.0% 0.0 0.0% 2.0 4.0 2.0 4.0 0.0 4.0 0.12 11.6 0.0 11.6 31 42 712 1685 0 0 0 0.12 1.66 326.7 0.0 326.7 ~1205 #1173 50 777 0 0 0 1.66 8.0 20.0 42.0 42.0% 4.0 1.0 -1.0 4.0 C-Min 0.82 34.9 8.3 43.2 300 372 349 C-Min 0.78 32.8 0.0 32.8 277 358 571 1222 189 0 0 0.97 1222 0 0 0 0.78 ø6 5 6 8.0 17.0 28.0 28% 2.0 0.0 8.0 25.0 30.0 30% 3.0 1.0 Lead Yes Ped Lag Yes Ped 0.97 1% 1351 custom 1 16 6 1 16 8.0 20.0 42.0 42.0% 4.0 1.0 -1.0 4.0 ø5 72.0 72.0% -1.0 4.0 0.78 15.2 0.0 15.2 297 405 250 1722 0 0 0 0.78 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 8 (8%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 9007: Boylston St & Bowker Overpass \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 9007: Boylston St & Bowker Overpass Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBR NBL NBT SBT SBR 160 1900 4.0 0.97 1.00 0.95 3120 0.95 3120 0.77 208 0 208 1% 0 1900 885 1900 4.0 0.95 1.00 1.00 3217 1.00 3217 0.88 1006 0 1006 1% 925 1900 4.0 0.95 1.00 1.00 3217 1.00 3217 0.97 954 0 954 1% 56 995 1900 4.0 1.00 0.85 1.00 1439 1.00 1439 0.77 1292 0 1292 1% Prot 56 1 1 54.0 52.0 0.52 54.0 52.0 0.52 1622 0.07 748 c0.90 37.0 38.0 0.38 5.0 2.0 1222 c0.31 37.0 38.0 0.38 5.0 2.0 1222 0.30 1310 1900 4.0 0.88 0.85 1.00 2533 1.00 2533 0.97 1351 0 1351 1% custom 16 6 67.0 65.0 0.65 0.13 12.3 1.00 0.0 12.4 B 309.1 F 1.73 24.0 1.00 332.9 356.9 F 0.82 28.0 1.00 6.4 34.3 C 34.3 C 0.78 27.3 1.00 5.0 32.3 C 23.0 C 0.88 0 0 0 1% 114.6 1.32 100.0 103.5% 15 1646 0.53 0.82 13.1 1.00 3.3 16.4 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH F 8.0 G HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 88: Beacon St & Massachusetts Ave Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Bus Blockages (#/hr) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 Yes 90 1900 10 350 1900 10 70 1900 16 No 115 1900 10 735 1900 10 0 1900 10 Yes 0 1900 10 735 1900 10 150 1900 10 Yes 30 603 13.7 30 296 6.7 0.92 2% 0 0.92 2% 0 0.92 2% 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 29.0 33.0 523 120 0.80 6% 0 10 30 313 7.1 0.80 3% 0 120 0.80 3% 0 10 60 0.88 12% 0 0 Split 5 638 0 5 5 8.0 27.0 30.0 30.0% 3.0 1.0 -1.0 3.0 Lag Yes Min 8.0 27.0 30.0 30.0% 3.0 1.0 -1.0 3.0 Lag Yes Min 0.70 39.8 0.0 39.8 135 147 216 5 1077 0 0 0 0.59 0.0 0.0% -1.0 3.0 30 342 7.8 0.88 5% 5 10 0.92 2% 0 0.92 11% 0 0.89 6% 0 60 0.89 2% 0 0 pm+pt 6 1 6 966 0 0 995 0 8.0 16.0 20.0 20.0% 3.0 1.0 -1.0 3.0 Max 1 1 1 1 8.0 22.0 50.0 50.0% 3.0 1.0 -1.0 3.0 Lead Yes C-Max 0.74 20.2 0.0 20.2 156 232 233 8.0 22.0 50.0 50.0% 3.0 1.0 -1.0 3.0 Lead Yes C-Max 0.76 25.7 0.0 25.7 257 334 262 1314 0 0 0 0.74 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 0.0 0.0% -1.0 3.0 1312 0 0 0 0.76 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 64 (64%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Splits and Phases: 88: Beacon St & Massachusetts Ave \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 88: Beacon St & Massachusetts Ave Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Bus Blockages (#/hr) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 90 1900 10 70 1900 16 115 1900 10 0 1900 10 0.92 0 0 0 2% 0 0.88 131 0 0 60 12% 0 0.92 0 0 0 2% 0 0.80 88 0 0 120 3% 0 10 0.92 0 0 0 2% 0 0.80 112 0 0 120 6% 0 10 Split 5 735 1900 10 3.0 0.95 0.98 1.00 0.97 1.00 2753 1.00 2753 0.89 826 17 978 150 1900 10 0.92 0 0 0 735 1900 10 3.0 0.95 1.00 1.00 1.00 0.99 2603 0.62 1614 0.88 835 0 966 0 1900 10 0.92 0 0 0 350 1900 10 3.0 0.91 0.98 1.00 0.98 0.99 3993 0.99 3993 0.80 438 0 638 5% 5 10 2% 0 11% 0 6% 0 3% 0 5 21.7 22.7 0.23 4.0 3.0 906 c0.16 0.70 35.6 1.00 2.5 38.1 D 38.1 D 0.0 A 28.2 0.74 100.0 84.0% 15 pm+pt 6 1 1 1 66.3 68.3 0.68 4.0 3.0 1313 c0.16 0.35 0.74 10.1 2.04 3.3 23.9 C 23.9 C 46.0 47.0 0.47 4.0 3.0 1294 c0.36 0.76 21.8 1.00 4.1 25.9 C 25.9 C HCM Level of Service C Sum of lost time (s) ICU Level of Service 9.0 E \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.89 169 0 0 60 2% 0 HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 92: Boylston Street & Mass Ave Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 1900 0 0 25 430 1900 110 1900 0 0 25 Yes 0 1900 0 0 25 55 1900 105 1900 100 0 25 Yes 20 1900 0 0 25 665 1900 90 1900 0 0 25 Yes 180 1900 150 0 25 500 1900 50 1900 0 0 25 Yes 0.95 6% 0 Perm 30 435 9.9 0.95 6% 0.95 6% 0.84 7% 580 0 0 Perm 3 3 3 30 453 10.3 0.84 7% 65 30 239 5.4 0.92 8% 0.92 8% 0.87 7% 843 0 207 D.P+P 4 1 4 0.84 7% 0.92 8% 125 Perm 0 Perm 1 1 1 3 1 3 3 3 3 3 3 4.0 26.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 4.0 26.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 4.0 26.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 4.0 26.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 4.0 26.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 4.0 20.0 45.0 45.0% 3.0 1.0 0.0 4.0 4.0 20.0 45.0 45.0% 3.0 1.0 0.0 4.0 Min Min 0.84 48.9 0.0 48.9 183 244 355 Min Min 0.17 30.5 0.0 30.5 32 62 373 Min 0.30 7.5 0.0 7.5 0 36 C-Max C-Max 0.53 15.7 0.3 16.0 139 200 159 0.0 0.0% 0.0 4.0 757 0 0 0 0.77 415 0 0 0 0.16 100 446 0 0 0 0.28 1585 239 0 0 0.63 0.0 0.0% 0.0 4.0 4.0 11.0 25.0 25.0% 3.0 1.0 0.0 4.0 Lag Min 0.46 14.6 0.0 14.6 38 137 150 525 0 0 0 0.39 30 340 7.7 0.87 7% 0.87 7% 632 0 14 14 70.0 70.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.31 8.1 0.4 8.4 52 130 260 2047 829 117 0 0.52 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 70 (70%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Splits and Phases: 92: Boylston Street & Mass Ave \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 92: Boylston Street & Mass Ave Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 1900 430 1900 4.0 0.95 0.97 1.00 2970 0.95 2827 0.95 453 23 557 6% 110 1900 0 1900 665 1900 4.0 0.91 0.98 1.00 4242 0.76 3222 0.92 723 14 829 8% 90 1900 180 1900 4.0 1.00 1.00 0.95 1518 0.28 446 0.87 207 0 207 7% D.P+P 4 1 64.3 64.3 0.64 4.0 3.0 454 c0.07 0.22 0.46 7.7 1.84 0.6 14.8 B 500 1900 4.0 0.95 0.99 1.00 2995 1.00 2995 0.87 575 7 625 7% 50 1900 0.84 0 0 0 7% Perm 105 1900 4.0 1.00 0.85 1.00 1358 1.00 1358 0.84 125 95 30 7% Perm 20 1900 0.95 116 0 0 6% 55 1900 4.0 1.00 1.00 1.00 1598 1.00 1598 0.84 65 0 65 7% 0.95 11 0 0 6% Perm 3 0.92 22 0 0 8% Perm 3 3 3 23.7 23.7 0.24 4.0 3.0 670 23.7 23.7 0.24 4.0 3.0 379 0.04 c0.20 0.83 36.3 1.10 8.4 48.4 D 48.4 D 0.17 30.3 1.00 0.2 30.6 C 30.1 C 22.1 0.60 100.0 64.8% 15 1 3 23.7 23.7 0.24 4.0 3.0 322 0.02 0.09 29.8 1.00 0.1 29.9 C HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.92 98 0 0 8% 1 48.7 48.7 0.49 4.0 3.0 1569 c0.26 0.53 17.7 0.78 1.2 14.9 B 14.9 B 0.87 57 0 0 7% 14 68.3 68.3 0.68 2046 0.21 0.31 6.3 1.19 0.1 7.6 A 9.4 A C 12.0 C HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 20: Stuart Street & Dartmouth Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 620 1900 16 3502 0.950 3502 No 755 1900 14 4882 385 1900 16 1615 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 415 1900 11 3079 35 1900 11 1364 0 1900 12 0 0 1900 12 0 0 1900 12 0 4882 1615 No 0 0 0 Yes 0 3079 626 Yes 51 0 0 0 Yes 25 634 17.3 25 590 16.1 0.91 2% 0.93 2% 0.81 2% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.90 2% 681 custom 812 475 Prot 1 0 0 0 0 461 1 1 1 2 5 2 8.0 18.0 53.0 53.0% 3.0 1.0 0.0 4.0 Lead 8.0 18.0 53.0 53.0% 3.0 1.0 0.0 4.0 Lead 8.0 14.0 14.0 14.0% 3.0 1.0 0.0 4.0 Lag C-Max 49.0 0.49 0.34 13.8 0.0 13.8 B 11.2 B 126 152 554 C-Max 49.0 0.49 0.60 20.6 0.0 20.6 C 2392 0 0 0 0.34 791 0 0 0 0.60 15 86.0 86.0% 0.0 4.0 82.0 0.82 0.24 1.4 0.0 1.4 A 20 29 2872 0 0 0 0.24 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 225 273 510 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 44 (44%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 11.3 Intersection Capacity Utilization 40.1% Analysis Period (min) 15 Splits and Phases: 25 416 11.3 Max 43.0 0.43 0.35 12.3 0.0 12.3 B 12.0 B 63 116 336 1324 0 0 0 0.35 ø5 25 395 10.8 781 0.69 3% 51 custom 0.92 0% 0.92 0% 0.92 0% 0 0 0 5 25 25 47.0 47.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 8.0 16.0 33.0 33% 3.0 1.0 Max 43.0 0.43 0.17 8.9 0.0 8.9 A 7 20 315 298 0 0 0 0.17 Intersection LOS: B ICU Level of Service A 20: Stuart Street & Dartmouth Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 20: Stuart Street & Dartmouth Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT 620 1900 16 4.0 0.97 1.00 1.00 1.00 0.95 3502 0.95 3502 0.91 681 0 681 755 1900 14 4.0 0.91 1.00 1.00 1.00 1.00 4882 1.00 4882 0.93 812 0 812 385 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1615 1.00 1615 0.81 475 0 475 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 415 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3079 1.00 3079 0.90 461 0 461 2% custom 2% 0% 0% 0% 0% 1 2% Prot 1 49.0 49.0 0.49 4.0 2.0 2392 0.17 49.0 49.0 0.49 4.0 2.0 791 c0.29 0.34 15.6 0.86 0.4 13.7 B 11.0 B 0.60 18.4 0.91 3.3 20.0 C 15 82.0 82.0 0.82 2872 0.19 0.24 2.0 0.60 0.2 1.4 A 0.0 A 11.8 0.48 100.0 40.1% 15 NBR SBL SBT SBR 35 1900 11 4.0 1.00 0.46 1.00 0.85 1.00 626 1.00 626 0.69 51 29 22 781 2% 3% custom 2 5 25 39.0 43.0 39.0 43.0 0.39 0.43 4.0 2.0 1324 269 c0.03 0.11 0.04 0.35 0.08 21.5 16.8 0.60 1.47 0.7 0.6 13.6 25.3 B C 14.8 B 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0% 0% 0% HCM Level of Service B Sum of lost time (s) ICU Level of Service 8.0 A \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB 0.0 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 336: Beacon Street & Clarendon Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 340 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 330 1900 13 3317 20 1900 12 0 0 0 0 Yes 0 Yes 410 1900 11 4113 0.978 3993 0 Yes 0 0 0 Yes 0 3317 0 Yes 258 25 620 16.9 25 603 16.4 0.92 0% 0.92 0% 0.92 0% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 523 30 0.93 1% 0 0 Perm 7 25 272 7.4 25 309 8.4 0.93 6% 0 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.93 0% 10 0.93 2% 807 0 0 0 0 0 377 0 1 5 1 1 1 5 8.0 18.0 46.0 46.0% 3.0 1.0 0.0 4.0 Lead 8.0 18.0 46.0 46.0% 3.0 1.0 0.0 4.0 Lead 8.0 19.0 38.0 38.0% 3.0 1.0 0.0 4.0 C-Max C-Max 54.8 0.55 0.35 0.3 0.0 0.3 A 0.3 A 0 m0 540 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2305 0 3 0 0.35 ø2 2 0.0 0.0% 7.0 16.0 16.0 16% 2.0 1.0 0.0 4.0 Lag 229 Max 34.0 0.34 0.33 25.1 0.1 25.2 C 25.2 C 91 130 192 None 1132 0 145 0 0.38 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 45 (45%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.35 Intersection Signal Delay: 8.3 Intersection LOS: A Intersection Capacity Utilization 40.1% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 336: Beacon Street & Clarendon Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 336: Beacon Street & Clarendon Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 340 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0% 0% 0% 0.93 366 0 0 30 1% 0 Perm 330 1900 13 4.0 0.95 1.00 1.00 0.99 1.00 3318 1.00 3318 0.93 355 5 372 20 1900 12 0.92 0 0 0 410 1900 11 4.0 0.91 1.00 0.97 1.00 0.98 3992 0.98 3992 0.93 441 123 684 6% 0 0% 0% 0% 0% 0% 0% 1 5 52.4 52.4 0.52 4.0 2.0 2092 34.0 34.0 0.34 4.0 2.0 1128 c0.11 0.93 22 0 0 10 2% 1 0.17 0.33 13.7 0.00 0.3 0.3 A 0.3 A 0.0 A 8.3 0.33 100.0 40.1% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB 0.33 24.5 1.00 0.8 25.3 C 25.3 C 0.0 A A 13.6 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 283: Beacon Street & Berkeley Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 675 1900 11 3912 305 1900 12 0 75 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 0 0 Yes 0 3912 0 No 0 No 920 1900 13 3129 0.996 3124 0 Yes 0 0 0 Yes 25 620 16.9 25 672 18.3 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 5% 0 40 0.92 0% 0 10 0.92 8% 0 0 0 0 0 1066 0 0 Perm 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 540 8.0 20.0 39.0 39.0% 3.0 1.0 0.0 4.0 Lead 25 274 7.5 0.92 1% 0 0.92 0% 0.92 0% 0.92 0% 0.92 0% 1082 0 0 0 0 5 1 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 30 (30%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay: 19.5 Intersection Capacity Utilization 60.5% Analysis Period (min) 15 Splits and Phases: 25 309 8.4 0.0 0.0% 0.0 4.0 C-Max 47.8 0.48 0.57 17.0 0.0 17.0 B 17.0 B 230 299 592 1870 0 0 0 0.57 5 5 5 8.0 20.0 45.0 45.0% 3.0 1.0 0.0 4.0 8.0 20.0 45.0 45.0% 3.0 1.0 0.0 4.0 ø2 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 7.0 16.0 16.0 16% 2.0 1.0 Lag Max Max 41.0 0.41 0.84 21.4 0.5 22.0 C 22.0 C 126 220 229 None 194 1281 36 0 0 0.87 Intersection LOS: B ICU Level of Service B 283: Beacon Street & Berkeley Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 283: Beacon Street & Berkeley Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 12 305 1900 12 75 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0% 0% 0% 0.92 82 0 0 10 8% 0 Perm 0.92 0 0 0 0% 0.92 332 0 0 40 0% 0 920 1900 13 4.0 0.95 1.00 1.00 1.00 1.00 3125 1.00 3125 0.92 1000 0 1082 0 1900 12 0.92 0 0 0 675 1900 11 4.0 0.91 0.97 1.00 0.95 1.00 3913 1.00 3913 0.92 734 0 1066 1% 0 0% 0% 0% 0% 5% 0 1 5 5 45.4 45.4 0.45 4.0 2.0 1777 c0.27 0.60 20.5 0.79 1.2 17.5 B 17.5 B 0.0 A 19.2 0.72 100.0 60.5% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB 41.0 41.0 0.41 4.0 2.0 1281 0.35 0.84 26.6 0.55 6.0 20.8 C 20.8 C 0.0 A B 13.6 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 71: Beacon Street & Arlington Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 450 1900 10 2770 280 1900 10 1209 0 1900 12 0 0 1900 12 0 0 1900 12 0 55 1900 12 0 0 1900 15 0 0 0 No 2770 1209 No 0 0 0 No 0 0 1060 1900 15 3393 0.997 3393 485 1900 15 1455 0 640 1900 16 1563 0.950 1563 No 0.92 0% 25 672 18.3 0.92 0% 0.92 0% 0.91 6% 0 0.76 1% 0 0.92 0% 25 305 8.3 0.92 0% 0.92 0% 0.78 0% 0.92 0% 25 292 8.0 0.90 0% 0 0 0 703 custom 368 Perm 0 0 0 0 custom 0 1300 25 889 24.2 0.92 4% 0 489 3 36 36 0.0 0.0% 0.0 0.0% 0.0 0.0% 78.0 78.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 79.2 0.79 0.57 7.7 0.0 7.7 A 178 272 592 1253 0 0 0 0.56 3 3 3 8.0 34.0 42.0 42.0% 3.0 1.0 0.0 4.0 8.0 34.0 42.0 42.0% 3.0 1.0 0.0 4.0 None 34.6 0.35 0.51 27.4 0.0 27.4 C 24.6 C 121 168 809 None 34.6 0.35 0.88 53.2 0.0 53.2 D 1053 0 0 0 0.46 459 0 0 0 0.80 56 6 0.0 0.0% 0.0 0.0% 0.0 0.0% 58.0 58.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 1.0 4.0 0.0 4.0 206 253 225 1455 No 0.95 0% 10% 460 custom 5 6 6 6 6 7.0 22.0 22.0 22.0% 2.0 1.0 1.0 4.0 Lead 8.0 12.0 36.0 36.0% 3.0 1.0 0.0 4.0 Lag None 57.4 0.57 0.67 17.7 0.0 17.7 B 24.2 C 321 405 212 C-Max 39.8 0.40 0.79 42.7 0.0 42.7 D 1946 0 0 0 0.67 579 0 0 0 0.79 318 #546 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 80 (80%), Referenced to phase 6:WBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 24.4 Intersection LOS: C Intersection Capacity Utilization 86.1% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 71: Beacon Street & Arlington Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 71: Beacon Street & Arlington Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 12 55 1900 12 0 1900 15 0.92 0 0 0 0% 280 1900 10 4.0 1.00 0.85 1.00 1209 1.00 1209 0.76 368 0 368 1% 0 Perm 0 1900 12 0.92 0 0 0 0% 450 1900 10 4.0 0.95 1.00 1.00 2770 1.00 2770 0.92 489 0 489 4% 0 0 1900 12 0.92 0 0 0 0% 640 1900 16 4.0 1.00 1.00 0.95 1563 0.95 1563 0.91 703 0 703 6% 0 custom 0.92 0 0 0 0% 0.92 0 0 0 0% 0.92 0 0 0 0% 0.78 71 0 0 0% 0.92 0 0 0 0% 1060 1900 15 4.0 0.91 0.99 1.00 3394 1.00 3394 0.90 1178 0 1300 0% 485 1900 15 4.0 0.91 0.85 1.00 1455 1.00 1455 0.95 511 0 460 0% custom 3 36 77.8 77.8 0.78 1216 0.45 0.58 4.5 1.00 0.4 4.9 A 0.0 A 22.9 0.83 100.0 86.1% 15 34.6 34.6 0.35 4.0 2.0 958 0.18 0.51 26.0 1.00 0.2 26.2 C 22.0 C 3 34.6 34.6 0.35 4.0 2.0 418 c0.30 0.88 30.8 1.00 18.5 49.2 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB 56 0.0 A 5 6 54.4 52.4 0.52 3.0 2.0 1914 c0.10 0.29 0.68 17.6 1.00 0.8 18.4 B 23.7 C custom 6 39.2 39.2 0.39 4.0 2.0 570 c0.32 0.81 27.0 1.00 11.6 38.7 D C 12.0 E HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 75: Boylston Street & Arlington Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 595 1900 3094 150 1900 1384 0 1900 0 0 1900 0 0 1900 0 0 1900 0 0 1900 0 0 1900 0 3094 1134 No 0 0 0 Yes 0 0 0 Yes 955 1900 3030 0.993 3030 0 1900 0 0 700 1900 1449 0.950 1449 No 25 684 18.7 0.92 0% 0.97 5% 0 613 25 436 11.9 155 0.71 5% 211 Perm 25 329 9.0 0.0 4.0 0 Yes 25 297 8.1 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0 0 0 0 0 0 0.95 2% 23% 567 Perm 1 0.0 0.0% ø2 0.94 2% 0.92 0% 1186 0 5 1 1 1 5 5 5 8.0 12.0 31.0 31.0% 3.0 1.0 0.0 4.0 Lead 8.0 12.0 31.0 31.0% 3.0 1.0 0.0 4.0 Lead 8.0 12.0 51.0 51.0% 3.0 1.0 0.0 4.0 8.0 12.0 51.0 51.0% 3.0 1.0 0.0 4.0 C-Max 30.6 0.31 0.65 23.3 0.0 23.3 C 24.4 C 219 280 604 C-Max 30.6 0.31 0.61 27.6 0.0 27.6 C Max 47.0 0.47 0.83 27.2 0.1 27.2 C 135 153 171 #540 946 0 0 0 0.65 347 0 0 0 0.61 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2 0.0 0.0% 7.0 18.0 18.0 18% 2.0 1.0 0.0 4.0 Lag 356 249 681 2 0 0 0.84 Max 47.0 0.47 0.83 21.2 0.0 21.3 C 23.2 C 178 240 217 None 1424 4 0 0 0.84 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 34 (34%), Referenced to phase 1:EBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.83 Intersection Signal Delay: 23.6 Intersection LOS: C Intersection Capacity Utilization 59.6% ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 75: Boylston Street & Arlington Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 75: Boylston Street & Arlington Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 955 1900 4.0 0.91 1.00 1.00 1.00 0.99 3029 0.99 3029 0.94 1016 0 1186 0 1900 0.92 0 0 0 700 1900 4.0 0.91 1.00 1.00 1.00 0.95 1449 0.95 1449 0.95 737 0 567 0% 5% 150 1900 4.0 1.00 0.84 1.00 0.85 1.00 1157 1.00 1157 0.71 211 0 211 155 5% Perm 0 1900 0.92 0 0 0 595 1900 4.0 0.95 1.00 1.00 1.00 1.00 3094 1.00 3094 0.97 613 0 613 0% 0% 0% 0% 0% 0% 2% Perm 2% 0% 1 30.0 30.0 0.30 4.0 2.0 928 c0.20 0.66 30.6 0.64 3.1 22.7 C 23.4 C 0.92 0 0 0 5 1 30.0 30.0 0.30 4.0 2.0 347 5 47.0 47.0 0.47 4.0 2.0 681 0.18 0.61 30.0 0.63 6.5 25.4 C 0.39 0.83 23.1 0.67 10.3 25.8 C 0.0 A 22.7 0.77 100.0 59.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_AM.syn Jim Danila, VHB 0.0 A 47.0 47.0 0.47 4.0 2.0 1424 0.39 0.83 23.1 0.67 5.2 20.7 C 22.4 C C 23.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 4: Beacon Street & Charles Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 No 0 1900 325 1900 0 1900 No 560 1900 No 0 1900 970 1900 No 35 1900 0 1900 335 1900 No 0.92 30 286 6.5 0.92 0.92 0.92 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 206 30 282 6.4 0.92 0 0.92 0.92 0 0 1 1 609 custom 6 15 6 10.0 25.0 25.0 31.3% 3.0 2.0 0.0 5.0 Lead 10.0 15.0 15.0 18.8% 3.0 1.0 0.0 4.0 Lag 353 0.0 0.0% 0.0 4.0 C-Max 0.38 25.3 0.0 25.3 78 119 202 Max 0.29 5.9 0.0 5.9 60 85 938 0 0 0 0.38 2113 0 0 0 0.29 30 318 7.2 0.92 0 0.0 0.0% 0.0 4.0 30 323 7.3 0.92 ø2 0.92 0.92 0 1054 custom 6 1 6 38 Prot 5 5 364 custom 5 6 5 10.0 15.0 15.0 18.8% 3.0 1.0 0.0 4.0 Lag 10.0 16.0 16.0 20.0% 3.0 1.0 0.0 4.0 Lead 10.0 16.0 16.0 20.0% 3.0 1.0 0.0 4.0 Lead 4.0 24.0 24.0 30% 3.0 1.0 Max 0.82 26.5 0.0 26.5 272 #423 Max 0.18 32.1 0.0 32.1 17 44 Max 0.45 23.0 0.0 23.0 79 122 None 238 0 0.0 0.0% 0.0 4.0 0.92 0 2 Lag 243 1279 0 0 0 0.82 215 0 0 0 0.18 804 0 0 0 0.45 Intersection Summary Area Type: CBD Cycle Length: 80 Actuated Cycle Length: 80 Offset: 5 (6%), Referenced to phase 1:NBWB, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 4: Beacon Street & Charles Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 4: Beacon Street & Charles Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 970 1900 4.0 0.88 0.85 1.00 2508 1.00 2508 0.92 1054 0 1054 35 1900 4.0 1.00 1.00 0.95 1433 0.95 1433 0.92 38 0 38 0 Prot 5 0 1900 0.92 0 0 0 560 1900 4.0 0.97 1.00 0.95 2935 0.95 2935 0.92 609 0 609 0 custom 6 15 47.0 47.0 0.59 4.0 2.0 2018 0.04 0.17 0.30 8.6 1.00 0.4 9.0 A 0 1900 0.92 0 0 0 325 1900 5.0 0.95 1.00 1.00 3026 1.00 3026 0.92 353 0 353 0 335 1900 4.0 0.88 0.85 1.00 2383 1.00 2383 0.92 364 0 364 0 custom 5 6 23.0 23.0 0.29 4.0 2.0 804 c0.07 0.08 0.45 23.3 1.00 1.8 25.2 C 0.92 0 0 0 1 24.0 24.0 0.30 5.0 0.2 908 0.12 0.39 22.2 1.00 1.3 23.4 C 23.4 C 0.0 A 22.4 0.76 80.0 51.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.92 0 0 0 custom 6 1 35.0 35.0 0.44 4.0 2.0 1223 c0.12 0.30 0.86 20.3 1.00 8.1 28.4 C 21.3 C 0.92 0 0 0 12.0 12.0 0.15 4.0 2.0 215 0.03 0.18 29.7 1.00 1.8 31.5 C 25.8 C C 28.0 A HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 313: Longfellow Bridge & Memorial Dr WB Off-ramp Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBR NBR2 SWL SWR 0 465 Free 0% 0.87 534 135 0 200 235 0.92 0 0.84 280 0 Stop 0% 0.92 0 100 12.0 4.0 8 235 0.92 0 0 Stop 0% 0.92 0 100 12.0 4.0 8 0 0.87 155 925 Free 0% 0.94 984 1796 712 1084 1796 6.5 5.5 4.0 100 175 445 0.92 0 Raised 1 634 1084 4.1 634 4.1 2.2 100 586 2.2 100 866 0.0 EB 2 333 0 155 1700 0.20 0 0.0 0.84 280 Raised 1 1084 EB 1 356 0 0 1700 0.21 0 0.0 0.94 213 WB 1 656 0 0 1700 0.39 0 0.0 0.0 7.5 59.4% 15 WB 2 541 0 213 1700 0.32 0 0.0 1484 712 772 1484 7.5 6.5 3.5 100 58 NB 1 280 0 280 519 0.54 79 19.7 C 19.7 C 3.3 46 519 698 698 6.9 3.3 20 351 SW 1 280 0 280 351 0.80 168 45.6 E 45.6 E ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 445 6.9 1825 1190 634 1825 6.5 5.5 4.0 100 166 B HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR SBL2 SBL SBT SEL2 SEL SER 370 1900 805 1900 115 1900 No 45 1900 No 225 1900 170 1900 230 1900 295 1900 175 1900 30 227 5.2 30 255 5.8 0.93 1% 0.93 1% 148 11 0.93 1% 0 Split 1 1388 0 30 308 7.0 0.88 6% 0.88 6% 0.88 6% 0.84 3% 0.84 3% 98 0.84 3% 307 Split 6 193 0 6 274 Split 5 559 1 0 Split 6 1 1 6 6 6 5 5 7.0 22.0 56.0 56.0% 3.0 1.0 0.0 4.0 7.0 22.0 56.0 56.0% 3.0 1.0 0.0 4.0 6.0 16.0 16.0 16.0% 3.0 1.0 0.0 4.0 Lag 6.0 16.0 16.0 16.0% 3.0 1.0 0.0 4.0 Lag 6.0 16.0 16.0 16.0% 3.0 1.0 0.0 4.0 Lag 7.0 24.0 28.0 28.0% 4.0 2.0 0.0 6.0 Lead 7.0 24.0 28.0 28.0% 4.0 2.0 0.0 6.0 Lead C-Max C-Max 0.87 28.8 3.8 32.6 393 #507 147 None None 0.86 67.9 0.0 67.9 94 #161 None 0.99 110.0 0.0 110.0 120 #253 175 None 0.80 56.1 0.0 56.1 166 #258 None 0.94 64.3 0.0 64.3 180 #249 228 357 0 0 0 0.86 194 0 0 0 0.99 347 0 0 0 0.79 604 0 0 0 0.93 0.0 0.0% 0.0 4.0 1589 0 136 0 0.96 5 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 72 (72%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR SBL2 SBL SBT SEL2 SEL SER 370 1900 115 1900 45 1900 0.88 51 0 0 170 1900 4.0 1.00 1.00 1.00 1.00 1.00 1613 1.00 1613 0.88 193 0 193 230 1900 6.0 1.00 1.00 1.00 1.00 0.95 1577 0.95 1577 0.84 274 0 274 295 1900 6.0 0.97 0.93 1.00 0.94 0.97 2742 0.97 2742 0.84 351 0 559 1% 1% 0.93 124 0 0 148 11 1% 225 1900 4.0 0.97 1.00 1.00 1.00 0.95 2973 0.95 2973 0.88 256 0 307 175 1900 0.93 398 0 0 805 1900 4.0 0.95 0.97 1.00 0.99 0.99 3032 0.99 3032 0.93 866 0 1388 6% 6% 6% 3% 3% Split 1 1 Split 6 Split 6 6 Split 5 5 52.4 52.4 0.52 4.0 3.0 1589 c0.46 12.0 12.0 0.12 4.0 3.0 357 0.10 12.0 12.0 0.12 4.0 3.0 194 c0.12 21.6 21.6 0.22 6.0 2.0 341 0.17 21.6 21.6 0.22 6.0 2.0 592 c0.20 0.87 20.9 1.00 7.0 27.9 C 27.9 C 0.86 43.2 1.03 18.2 62.6 E 0.99 44.0 1.02 62.8 107.8 F 80.0 F 0.80 37.2 1.00 12.1 49.3 D 0.94 38.6 1.00 23.6 62.3 E 58.0 E 46.7 0.91 100.0 78.5% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.84 208 0 0 98 3% D 14.0 D HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 27: Cambridge Street & Charles Street On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBT WBR WBR2 NBL2 NBL NBT 310 1900 335 1900 135 1900 No 320 1900 No 60 1900 265 1900 30 273 6.2 30 200 4.5 1 401 Prot 1 121 27 0.87 6% 10% 139 Prot 1 1 1 1 2 2 2 7.0 11.0 51.0 51.0% 3.0 1.0 0.0 4.0 Lead 7.0 11.0 51.0 51.0% 3.0 1.0 0.0 4.0 Lead 7.0 11.0 51.0 51.0% 3.0 1.0 0.0 4.0 Lead 7.0 24.0 49.0 49.0% 4.0 2.0 0.0 6.0 Lag 7.0 24.0 49.0 49.0% 4.0 2.0 0.0 6.0 Lag 7.0 24.0 49.0 49.0% 4.0 2.0 0.0 6.0 Lag C-Min 0.36 12.0 0.0 12.0 102 196 193 C-Min 0.54 16.1 0.0 16.1 152 305 C-Min 0.17 10.5 0.0 10.5 36 82 None 0.74 33.2 8.2 41.4 212 m245 None 0.07 21.5 0.0 21.5 16 m1 None 0.21 27.4 0.1 27.5 50 m23 120 1002 0 0 0 0.36 749 0 0 0 0.54 809 0 0 0 0.17 698 319 0 0 0.88 1355 0 0 0 0.05 2007 924 0 0 0.25 0.87 6% 356 121 27 0.87 6% 2 0.96 0% 0.96 0% 0.96 0% 333 Split 2 62 Split 2 276 2 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 79 (79%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 27: Cambridge Street & Charles Street On-Ramp \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 27: Cambridge Street & Charles Street On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBT WBR WBR2 NBL2 NBL NBT 310 1900 4.0 1.00 1.00 1.00 1.00 1.00 1613 1.00 1613 0.87 356 0 356 135 1900 4.0 0.95 1.00 1.00 0.85 1.00 1303 1.00 1303 0.87 155 0 139 121 27 6% Prot 1 320 1900 6.0 1.00 1.00 1.00 1.00 0.95 1624 0.95 1624 0.96 333 0 333 60 1900 6.0 0.97 1.00 1.00 1.00 0.95 3152 0.95 3152 0.96 62 0 62 2 265 1900 6.0 0.91 1.00 1.00 1.00 1.00 4668 1.00 4668 0.96 276 0 276 0% Split 2 0% Split 2 0% 1 335 1900 4.0 0.88 1.00 1.00 0.85 1.00 1207 1.00 1207 0.87 385 0 401 121 27 6% Prot 1 62.1 62.1 0.62 4.0 3.0 1002 0.22 62.1 62.1 0.62 4.0 3.0 750 c0.33 62.1 62.1 0.62 4.0 3.0 809 0.11 27.9 27.9 0.28 6.0 3.0 453 c0.20 27.9 27.9 0.28 6.0 3.0 879 0.02 27.9 27.9 0.28 6.0 3.0 1302 0.06 0.36 9.2 1.00 1.0 10.2 B 11.4 B 0.53 10.8 1.00 2.7 13.5 B 0.17 8.0 1.00 0.5 8.5 A 0.74 32.7 0.89 3.1 32.1 C 0.07 26.5 0.91 0.0 24.2 C 0.21 27.6 1.04 0.0 28.7 C 30.0 C 6% 19.3 0.60 100.0 46.8% 15 2 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH B 10.0 A HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 176: Cambridge Street & Storrow Drive WB Off-ramp/ Parking Lot Exit Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 Free 0% 0.92 0 0 85 0 0 0 0.86 0 0.92 0 0.92 0 0.95 0 350 Stop 0% 0.95 368 575 0.86 99 0 Stop 0% 0.92 0 0 0.92 0 545 Free 0% 0.86 634 0.92 0 0.95 605 4 None None 634 0 699 831 0 831 831 317 634 4.1 0 4.2 699 7.5 831 6.5 0 6.9 831 7.5 831 6.5 317 6.9 2.2 100 945 2.2 94 1607 3.5 0 0 4.0 100 285 3.3 100 1084 3.5 100 251 4.0 0 287 3.3 11 682 WB 1 99 99 0 1607 0.06 5 7.4 A 1.0 WB 2 317 0 0 1700 0.19 0 0.0 WB 3 317 0 0 1700 0.19 0 0.0 24.6 63.0% 15 SB 1 246 0 0 287 0.86 184 62.0 F 42.3 E SB 2 728 0 605 820 0.89 294 35.6 E ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH B HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1: Nashua Street & Storrow Dr WB on-ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBL2 WBL WBR NBL SER SER2 NWT 25 1900 700 1900 240 1900 Yes 525 1900 930 1900 820 1900 Yes 490 1900 0.92 30 263 6.0 0.92 0 Perm 788 30 200 4.5 0.92 0.92 261 Perm 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 2 1011 891 custom custom 79 3 3 2 2 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 0.75 26.6 21.7 48.3 186 302 183 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 0.49 14.8 2.2 17.0 84 178 1051 279 73 0 1.02 534 156 0 0 0.69 0.92 571 2 2 2 0.92 79 39.0 39.0% 0.0 6.0 0.56 0.3 9.0 9.3 0 m0 120 1020 410 0 0 0.94 1 1 10.0 24.0 30.0 30.0% 4.0 2.0 0.0 6.0 10.0 24.0 30.0 30.0% 4.0 2.0 0.0 6.0 8.0 19.0 21.0 21.0% 3.0 4.0 0.0 7.0 Lead Yes None 1.20 146.5 580.3 726.9 ~217 #324 59 602 0 54 0 1.84 646 0 0 0 1.38 ø7 ø9 5 6 7 9 10.0 15.0 21.0 21% 4.0 1.0 20.0 26.0 40.0 40% 4.0 2.0 10.0 16.0 30.0 30% 4.0 2.0 2.0 8.0 9.0 9% 4.0 2.0 Lead Yes None Lag Yes C-Min None Max 533 3 None 1.38 199.8 0.0 199.8 ~553 #793 ø6 30 139 3.2 0.92 3 None 1.68 340.9 74.4 415.3 ~538 #676 ø5 446 246 0 0 2.67 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 40 (40%), Referenced to phase 2:WBL and 6:, Start of Green Natural Cycle: 145 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Nashua Street & Storrow Dr WB on-ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1: Nashua Street & Storrow Dr WB on-ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBL2 WBL WBR NBL 25 1900 700 1900 6.0 0.97 1.00 0.95 3090 0.95 3090 0.92 761 0 788 240 1900 6.0 1.00 0.85 1.00 1425 1.00 1425 0.92 261 50 212 Perm 525 1900 6.0 0.97 1.00 0.95 3090 0.95 3090 0.92 571 0 571 0.92 27 0 0 Perm 2 2 34.0 34.0 0.34 6.0 3.0 1051 0.26 0.75 29.2 0.75 4.4 26.3 C 24.4 C 2 34.0 34.0 0.34 6.0 3.0 485 0.15 0.44 25.6 0.64 2.5 18.9 B 195.5 1.07 100.0 70.5% 15 SER2 NWT 930 820 1900 1900 6.0 6.0 0.88 1.00 0.85 0.85 1.00 1.00 2508 1425 1.00 1.00 2508 1425 0.92 0.92 1011 891 0 304 1011 587 custom custom 79 3 3 490 1900 7.0 0.95 1.00 1.00 3185 1.00 3185 0.92 533 0 533 33.0 33.0 0.33 1020 c0.18 0.56 27.5 0.00 0.1 0.1 A 0.1 A SER 1 24.0 24.0 0.24 6.0 3.0 602 0.40 24.0 24.0 0.24 6.0 3.0 342 c0.41 14.0 14.0 0.14 7.0 3.0 446 c0.17 1.68 38.0 1.00 313.0 351.0 F 1.72 38.0 1.00 334.5 372.5 F 1.20 43.0 1.00 107.9 150.9 F 150.9 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH F 19.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 2: Charles Street Ext. & Nashua Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBR EBR2 NBT SBT SBR SWL SWT 1045 1900 385 1900 Yes 525 1900 645 1900 310 1900 60 1900 45 1900 0.92 30 252 5.7 0.92 30 200 4.5 0.92 0.92 0 571 1038 0 7 39 39 39 0.92 0% 1554 custom 6 6 6 20.0 26.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 1.09 81.3 235.0 316.3 ~500 #643 1425 465 0 0 1.62 7 0.0 0.0% 0.0 4.0 10.0 16.0 30.0 30.0% 4.0 2.0 0.0 6.0 39.0 39.0% 0.0 0.0% 0.0 6.0 0.0 4.0 None 1.42 234.6 258.6 493.2 ~493 #700 172 1.04 34.1 136.6 170.7 ~117 m5 120 402 116 0 0 2.00 1000 235 0 0 1.36 0.92 14% 56 Split 5 ø1 ø2 ø3 ø9 1 2 3 9 8.0 19.0 21.0 21% 3.0 4.0 20.0 31.0 40.0 40% 4.0 2.0 10.0 24.0 30.0 30% 4.0 2.0 2.0 8.0 9.0 9% 4.0 2.0 Lead Yes None Lag Yes C-Min None Max 30 277 6.3 0.92 58 5 5 5 10.0 15.0 21.0 21.0% 4.0 1.0 0.0 5.0 Lead Yes None 0.35 57.7 0.0 57.7 40 m84 10.0 15.0 21.0 21.0% 4.0 1.0 0.0 5.0 Lead Yes None 0.34 57.5 0.0 57.5 42 m86 197 242 0 0 0 0.23 253 0 0 0 0.23 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 40 (40%), Referenced to phase 2:WBL and 6:, Start of Green Natural Cycle: 145 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2: Charles Street Ext. & Nashua Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 2: Charles Street Ext. & Nashua Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBR EBR2 NBT SBT SBR SWL SWT 1045 1900 6.0 0.76 0.85 1.00 3249 1.00 3249 0.92 1136 50 1504 custom 6 6 41.3 41.3 0.41 6.0 3.0 1342 c0.46 385 1900 525 1900 6.0 1.00 1.00 1.00 1676 1.00 1676 0.92 571 0 571 645 1900 6.0 0.95 0.95 1.00 3030 1.00 3030 0.92 701 0 1038 310 1900 45 1900 5.0 0.95 1.00 0.99 1580 0.99 1580 0.92 49 0 58 7 39 39 33.0 33.0 0.33 60 1900 5.0 0.95 1.00 0.95 1513 0.95 1513 0.92 65 0 56 Split 5 8.7 8.7 0.09 5.0 3.0 132 c0.04 8.7 8.7 0.09 5.0 3.0 137 0.04 0.42 43.3 1.25 2.2 56.2 E 0.42 43.3 1.25 2.1 56.3 E 56.2 E 1.12 29.4 1.00 64.6 94.0 F 0.92 418 0 0 24.0 24.0 0.24 6.0 3.0 402 c0.34 1000 c0.34 1.42 38.0 1.00 203.3 241.3 F 241.3 F 1.04 33.5 0.28 20.7 30.2 C 30.2 C 98.1 1.08 100.0 90.4% 15 0.92 337 0 0 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 5 F 17.0 E HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 3: Nashua Street & Ramp N-LC Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBL WBT NBL2 NBL NBR NWL2 NWL NWR 95 1900 400 1900 5 1900 Yes 90 1900 245 1900 5 1900 475 1900 245 1900 Yes 0.92 30 207 4.7 0.92 103 custom 1 1 1 435 20.0 25.0 29.0 29.0% 4.0 1.0 0.0 5.0 Lead Yes C-Min 0.17 23.7 0.0 23.7 41 96 20.0 25.0 29.0 29.0% 4.0 1.0 0.0 5.0 Lead Yes C-Min 0.35 24.5 0.0 24.5 98 171 127 616 0 0 0 0.17 1231 0 70 0 0.37 0.92 0 custom 1 2 2 1 2 10.0 21.0 35.0 35.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 30 383 8.7 0.92 0.92 0.92 33% 191 178 0 custom custom 2 2 3 2 3 2 2 3 10.0 21.0 35.0 35.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 0.65 47.3 0.0 47.3 114 172 303 10.0 21.0 35.0 35.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 0.68 50.8 0.0 50.8 113 175 442 0 0 0 0.43 393 0 0 0 0.45 30 294 6.7 0.92 0.92 521 266 custom 3 13 13 3 13 10.0 29.0 36.0 36.0% 4.0 3.0 0.0 7.0 10.0 29.0 36.0 36.0% 4.0 3.0 0.0 7.0 Ped Ped 0.70 39.8 3.1 42.9 159 200 214 0.25 1.5 0.0 1.5 0 28 896 0 266 0 0.83 1061 0 0 0 0.25 65.0 65.0% 0.0 5.0 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 66 (66%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Splits and Phases: 3: Nashua Street & Ramp N-LC \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 3: Nashua Street & Ramp N-LC Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBL WBT NBL2 NBL 95 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 103 0 103 custom 1 1 38.6 38.6 0.39 5.0 3.0 615 0.06 400 1900 5.0 0.95 1.00 1.00 3185 1.00 3185 0.92 435 0 435 5 1900 90 1900 6.0 1.00 0.93 0.97 1520 0.97 1520 0.92 98 1 190 0.17 20.2 1.00 0.6 20.7 C 0.92 5 0 0 custom 1 2 2 38.6 38.6 0.39 5.0 3.0 1229 c0.14 0.35 21.8 1.00 0.8 22.6 C 22.3 C 2 19.2 19.2 0.19 6.0 3.0 292 0.13 0.65 37.3 1.00 5.1 42.4 D 43.6 D 29.3 0.53 100.0 58.3% 15 NBR NWL2 NWL NWR 245 5 1900 1900 6.0 0.95 0.85 1.00 1354 1.00 1354 0.92 0.92 266 5 0 0 178 0 custom custom 2 3 2 3 19.2 19.2 0.19 6.0 3.0 260 c0.13 475 1900 7.0 0.97 1.00 0.95 3090 0.95 3090 0.92 516 0 521 245 1900 5.0 1.00 0.85 1.00 1425 1.00 1425 0.92 266 99 167 custom 13 13 69.8 62.8 0.63 0.68 37.6 1.00 7.3 44.8 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 3 24.2 24.2 0.24 7.0 3.0 748 c0.17 0.70 34.6 1.00 2.8 37.4 D 27.4 C 895 0.12 0.19 7.8 1.00 0.1 7.9 A C 18.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 901: Land Boulevard & Craigie Dam Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 125 1900 11 610 1 25 395 1900 11 255 1900 11 0 1 25 No 425 1900 11 0 0 25 730 1900 11 85 1900 11 0 0 25 No 250 1900 11 0 1 25 695 1900 11 225 1900 11 0 1 25 No 140 1900 11 175 1 250 1215 1900 11 360 1900 15 375 1 130 No 0.92 136 Split 4 30 988 22.5 0.92 429 4 0.92 0.92 277 Prot 4 0 Split 5 30 713 16.2 0.92 0.92 0.92 1347 0 272 Prot 3 5 30 270 6.1 0.92 755 23 0.92 0.92 245 Prot 23 152 Prot 1 30 820 18.6 0.92 1321 ø2 0.92 391 Free 6 2 Free 17.0 17.0 14.2% 4.0 1.0 -1.0 4.0 Lag Yes 0.81 86.8 0.0 86.8 105 #215 610 167 0 0 0 0.81 17.0 17.0 14.2% 4.0 1.0 -1.0 4.0 Lag Yes 1.28 191.7 0.0 191.7 ~222 #328 908 17.0 17.0 14.2% 4.0 1.0 -1.0 4.0 Lag Yes 1.86 441.5 129.7 571.3 ~326 #499 334 0 0 0 1.28 149 0 20 0 2.15 26.0 50.0 41.7% 4.0 1.0 -1.0 4.0 26.0 50.0 41.7% 4.0 1.0 -1.0 4.0 1.17 121.5 182.5 304.0 ~655 #793 633 1149 0 297 0 1.58 0.0 0.0% 0.0 4.0 13.0 17.0 14.2% 4.0 1.0 -1.0 4.0 Lead Yes 1.63 339.0 0.0 339.0 ~307 #482 167 0 0 0 1.63 0.84 42.1 13.4 55.4 288 #373 190 0.61 36.0 3.6 39.7 164 256 13.0 14.0 11.7% 4.0 1.0 -1.0 4.0 Lead Yes 1.19 185.7 0.0 185.7 ~142 #279 898 138 0 0 0.99 402 87 0 0 0.78 175 128 0 0 0 1.19 39.0 32.5% 39.0 32.5% -1.0 4.0 -1.0 4.0 26.0 36.0 30.0% 4.0 1.0 -1.0 4.0 0.0 0.0% 13.0 22.0 18% 4.0 1.0 0.0 4.0 Lag Yes 1.12 106.4 12.6 119.0 ~431 #527 740 1180 0 30 0 1.15 0.25 0.4 0.0 0.4 0 0 375 1567 0 0 0 0.25 Intersection Summary Area Type: CBD Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 2:NBT, Start of Green Natural Cycle: 125 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 901: Land Boulevard & Craigie Dam \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 901: Land Boulevard & Craigie Dam Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 125 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 136 0 136 Split 4 395 1900 11 4.0 0.95 1.00 1.00 3079 1.00 3079 0.92 429 0 429 425 1900 11 730 1900 11 4.0 0.95 0.99 0.98 2996 0.98 2996 0.92 793 0 1347 85 1900 11 140 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 152 0 152 Prot 1 360 1900 15 4.0 1.00 0.85 1.00 1567 1.00 1567 0.92 391 0 391 Free 23 225 1900 11 4.0 1.00 0.85 1.00 1378 1.00 1378 0.92 245 0 245 Prot 23 1215 1900 11 4.0 0.91 1.00 1.00 4424 1.00 4424 0.92 1321 0 1321 5 250 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 272 0 272 Prot 3 695 1900 11 4.0 0.95 1.00 1.00 3079 1.00 3079 0.92 755 0 755 4 255 1900 11 4.0 1.00 0.85 1.00 1378 1.00 1378 0.92 277 0 277 Prot 4 12.0 13.0 0.11 5.0 167 0.09 12.0 13.0 0.11 5.0 334 0.14 12.0 13.0 0.11 5.0 149 c0.20 45.0 46.0 0.38 5.0 1148 c0.45 12.0 13.0 0.11 5.0 167 c0.18 34.0 35.0 0.29 34.0 35.0 0.29 898 0.25 402 0.18 9.0 10.0 0.08 5.0 128 0.10 31.0 32.0 0.27 5.0 1180 c0.30 0.81 52.3 1.00 33.7 86.0 F 1.28 53.5 1.00 148.9 202.4 F 269.9 F 1.86 53.5 1.00 411.2 464.7 F 1.17 37.0 1.00 87.5 124.5 F 124.5 F 1.63 53.5 0.87 307.2 353.8 F 0.84 39.9 0.82 8.9 41.5 D 107.1 F 0.61 36.6 0.79 6.4 35.3 D 1.19 55.0 1.00 138.6 193.6 F 1.12 44.0 1.00 65.5 109.5 F 93.5 F 132.5 1.30 120.0 106.1% 15 0.92 462 0 0 Split 5 0.92 92 0 0 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 6 Free 120.0 120.0 1.00 1567 0.25 0.25 0.0 1.00 0.4 0.4 A F 16.0 G HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 30: Washington St & McGrath Hwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 465 1900 14 270 1900 12 0 1900 12 Yes 0 1800 14 965 1800 14 80 1800 14 No 20 1900 12 180 1900 12 415 1900 12 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0.92 5% 30 86 2.0 0.89 10% 0.89 10% 0.90 5% 30 905 20.6 0.90 5% 0.90 5% 0.87 9% 30 410 9.3 0.87 9% 0.87 9% 0.92 2% 30 602 13.7 0.92 2% 0.92 2% 303 0 0 1161 0 23 Split 5 684 0 0 0 0 10.0 20.0 15.0% 3.0 2.0 0.0 5.0 10.0 20.0 15.0% 3.0 2.0 0.0 5.0 505 Split 123 123 57.0 42.9% 57.0 42.9% 0.0 0.0% 0.0 0.0% 0.0 5.0 0.0 5.0 1.0 5.0 1.0 5.0 0.36 2.7 0.0 2.7 14 m16 1391 0 0 0 0.36 4 0.16 1.4 0.0 1.4 2 m2 6 22.0 56.0 42.1% 4.0 2.0 -1.0 5.0 Lag Yes 0.61 34.8 0.1 34.8 293 344 825 1843 0 0 0 0.16 1893 0 61 0 0.63 0.0 0.0% 1.0 5.0 0.06 53.3 0.0 53.3 9 22 362 0 0 0 0.06 5 1.05 77.2 0.0 77.2 ~186 #287 330 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 1.0 5.0 0.0 4.0 0.0 4.0 0.0 4.0 ø1 ø2 ø3 1 2 3 11.0 11.0 8% 4.0 1.0 21.0 31.0 23% 4.0 2.0 10.0 15.0 11% 3.0 2.0 Lead Yes Lag Yes Lead Yes 522 649 0 0 0 1.05 Intersection Summary Area Type: Other Cycle Length: 133 Actuated Cycle Length: 133 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 100 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 30: Washington St & McGrath Hwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 30: Washington St & McGrath Hwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 465 1900 14 5.0 0.97 1.00 0.95 3557 0.95 3557 0.92 505 0 505 5% Split 123 270 1900 12 5.0 0.91 1.00 1.00 4715 1.00 4715 0.89 303 0 303 10% 0 1900 12 0 1800 14 80 1800 14 180 1900 12 5.0 0.95 0.90 1.00 2965 1.00 2965 0.87 207 315 369 9% 0 1900 12 0 1900 12 0 1900 12 0.90 0 0 0 5% 0.87 477 0 0 9% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 123 4 20 1900 12 5.0 0.97 1.00 0.95 3213 0.95 3213 0.87 23 0 23 9% Split 5 415 1900 12 0.89 0 0 0 10% 965 1800 14 5.0 0.91 0.99 1.00 4935 1.00 4935 0.90 1072 0 1161 5% 52.0 46.0 0.35 52.0 46.0 0.35 1230 c0.14 1631 0.06 50.0 51.0 0.38 6.0 1892 c0.24 15.0 15.0 0.11 5.0 362 0.01 15.0 15.0 0.11 5.0 334 c0.12 0.41 33.2 0.07 0.9 3.3 A 0.19 30.4 0.05 0.2 1.6 A 2.7 A 0.61 33.1 1.00 1.5 34.6 C 34.6 C 0.06 52.7 1.00 0.3 53.1 D 1.10 59.0 1.00 80.5 139.5 F 136.7 F Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group 51.9 0.59 133.0 80.9% 15 0.90 89 0 0 5% HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 5 0.0 A D 20.0 D HCM Signalized Intersection Capacity Analysis 3/9/2010 10989.00: DCR Bridge Program 31: Washington St & McGrath Hwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1800 12 700 1800 12 25 1800 12 Yes 450 1900 12 535 1900 12 0 1900 12 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 35 1750 14 125 1750 14 395 1750 14 Yes 0.92 7% 30 598 13.6 0.92 7% 0.89 7% 0.94 5% 30 86 2.0 0.88 6% 0.88 6% 0.92 2% 30 216 4.9 0.92 2% 0.92 2% 0.73 6% 30 692 15.7 0.88 5% 0.88 5% 0 789 0 479 Split 45 608 0 0 0 0 0 Perm 639 0 12 45 3 0.0 0.0% 42.0 31.6% 0.0 0.0% 76.0 57.1% 76.0 57.1% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 1.0 5.0 0.0 5.0 1.0 5.0 -1.0 5.0 -1.0 5.0 1.0 5.0 0.0 4.0 0.0 4.0 0.0 4.0 0.42 39.7 0.0 39.7 136 164 518 0.52 3.9 0.0 3.9 44 88 1890 0 35 0 0.43 918 0 0 0 0.52 0.33 0.5 0.0 0.5 0 0 6 1818 0 0 0 0.33 136 3 10.0 15.0 11.3% 3.0 2.0 0.0 5.0 Lead Yes 10.0 15.0 11.3% 3.0 2.0 0.0 5.0 Lead Yes 2.35dr 541.3 0.0 541.3 ~429 #537 612 0.0 0.0% ø1 ø2 ø4 ø5 1 2 4 5 11.0 11.0 8% 4.0 1.0 21.0 31.0 23% 4.0 2.0 22.0 56.0 42% 4.0 2.0 10.0 20.0 15% 3.0 2.0 Lead Yes Lag Yes Lag Yes 1.0 5.0 301 0 0 0 2.12 Intersection Summary Area Type: Other Cycle Length: 133 Actuated Cycle Length: 133 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 100 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 31: Washington St & McGrath Hwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 31: Washington St & McGrath Hwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1800 12 700 1800 12 5.0 0.81 0.99 1.00 6777 1.00 6777 0.92 761 4 785 7% 25 1800 12 450 1900 12 5.0 1.00 1.00 0.95 1719 0.95 1719 0.94 479 0 479 5% Split 45 535 1900 12 5.0 0.95 1.00 1.00 3406 1.00 3406 0.88 608 0 608 6% 0 1900 12 0 1900 12 0 1900 12 0 1900 12 35 1750 14 395 1750 14 0.88 0 0 0 6% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.73 48 0 0 6% Perm 125 1750 14 5.0 0.95 0.89 1.00 3008 1.00 3008 0.88 142 75 564 5% 0.92 0 0 0 7% 12 0.89 28 0 0 7% 45 0.88 449 0 0 5% 3 3 36.0 36.0 0.27 71.0 72.0 0.54 71.0 72.0 0.54 1834 c0.12 931 c0.28 1844 0.18 0.43 40.0 1.00 0.7 40.7 D 40.7 D 0.51 19.4 0.11 1.6 3.7 A 0.33 17.0 0.00 0.4 0.4 A 1.9 A Intersection Summary HCM Average Control Delay 203.6 HCM Level of Service HCM Volume to Capacity ratio 0.66 Actuated Cycle Length (s) 133.0 Sum of lost time (s) Intersection Capacity Utilization 80.9% ICU Level of Service Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. c Critical Lane Group \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 10.0 10.0 0.08 5.0 226 0.19 2.35dr 61.5 1.00 686.2 747.7 F 747.7 F 0.0 A F 15.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 8: Sullivan Square & Cambridge Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBL NBT NBR SBL SBT SBR SEL2 SEL SER 0 1900 0 0 25 0 1900 0 0 25 0 1900 0 0 25 0 1900 860 1900 0 2 25 No 330 1900 0 2 25 570 1900 0 1900 0 0 25 Yes 0 1900 1560 1900 0 3 25 220 1900 400 1 25 Yes 30 269 6.1 0.92 2% 0.92 2% 0.88 11% 30 559 12.7 0.88 11% 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 189 0.88 11% 0.95 6% 977 347 custom custom 6 5 6 5 6 5 4.0 20.0 47.0 33.6% 3.0 3.0 -2.0 4.0 Lag Yes None 1.24 160.2 0.0 160.2 ~626 #747 4.0 20.0 20.0 14.3% 3.0 3.0 -2.0 4.0 Lead Yes None 0.92 89.9 0.0 89.9 163 m#227 787 0 0 0 1.24 377 0 0 0 0.92 479 30 455 10.3 0.95 6% 0.95 6% 600 0 56 56 56 0.94 5% 0% 0 Perm 1 1 30 733 16.7 0.94 5% ø9 0.94 5% 1660 234 custom 1 1 1 1 1 1 9 4.0 20.0 59.0 42.1% 3.0 2.0 0.0 5.0 4.0 20.0 59.0 42.1% 3.0 2.0 -1.0 4.0 4.0 20.0 59.0 42.1% 3.0 2.0 -1.0 4.0 4.0 11.0 14.0 10% 6.0 1.0 C-Min C-Min 1.08 81.1 0.0 81.1 ~923 #1068 653 C-Min 0.27 5.7 0.0 5.7 23 71 None 0.39 26.9 0.0 26.9 191 m225 375 1533 0 0 0 0.39 1542 0 0 0 1.08 67.0 47.9% 0.0 0.0% -2.0 4.0 0.0 4.0 400 852 0 0 0 0.27 Intersection Summary Area Type: Other Cycle Length: 140 Actuated Cycle Length: 140 Offset: 73 (52%), Referenced to phase 1:SEL, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 8: Sullivan Square & Cambridge Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 8: Sullivan Square & Cambridge Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBL NBT NBR 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.88 0 0 0 11% 0.88 0 0 0 11% SBL SBT SBR SEL2 SEL SER 860 330 1900 1900 4.0 4.0 0.88 0.97 0.85 1.00 1.00 0.95 2561 3303 1.00 0.95 2561 3303 0.88 0.95 977 347 0 0 977 347 11% 6% custom custom 6 5 6 5 41.0 14.0 43.0 16.0 0.31 0.11 6.0 6.0 3.0 3.0 787 377 c0.38 c0.11 570 1900 4.0 0.95 1.00 1.00 3406 1.00 3406 0.95 600 0 600 6% 0 1900 0 1900 0.95 0 0 0 6% 0.94 0 0 0 5% Perm 1560 1900 4.0 0.91 1.00 0.95 3129 0.95 3129 0.94 1660 0 1660 5% 220 1900 4.0 1.00 0.85 1.00 1538 1.00 1538 0.94 234 94 140 5% custom 1 1 68.0 69.0 0.49 5.0 3.0 758 0.09 1.24 48.5 1.00 119.3 167.8 F 0.0 A 0.92 61.4 0.99 27.0 87.5 F 167.8 F 91.9 1.11 140.0 119.3% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 56 56 61.0 63.0 0.45 1533 0.18 1 1 68.0 69.0 0.49 5.0 3.0 1542 c0.53 0.39 25.7 1.01 0.2 26.1 C 48.6 D 1.08 35.5 1.00 46.6 82.1 F 74.5 E 1 0.18 19.8 1.00 0.5 20.3 C F 12.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 6: Main Street & Sullivan Square Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 0 Yield 0% 0.96 0 490 860 Free 0% 0.91 945 1060 0 0.91 1165 0.92 0 0 Free 0% 0.92 0 0.96 510 None None 429 1527 1055 2110 1527 6.8 1055 6.9 2110 4.1 3.5 100 108 3.3 0 222 2.2 100 256 WB 1 255 0 255 222 1.15 302 152.6 F 152.6 F WB 2 255 0 255 222 1.15 302 152.6 F NB 1 630 0 0 1700 0.37 0 0.0 NB 2 1480 0 1165 1700 0.87 0 0.0 0.0 29.7 81.7% 15 ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH D HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5: Sullivan Square & Rutherford Avenue Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Morning EBT EBR WBL WBT NBL NBR 1415 Free 0% 0.92 1538 0 0 0.92 0 0 Yield 0% 0.90 0 505 0.92 0 0 Free 0% 0.92 0 0.90 561 1538 1538 769 1538 4.1 1538 6.8 769 6.9 2.2 100 428 3.5 100 106 3.3 0 344 None None 269 EB 1 769 0 0 1700 0.45 0 0.0 0.0 EB 2 769 0 0 1700 0.45 0 0.0 NB 1 281 0 281 344 0.82 176 48.7 E 48.7 E 13.0 63.4% 15 NB 2 281 0 281 344 0.82 176 48.7 E ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH B HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9: Sullivan Square & Alford Street SB Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Morning WBL WBR NBT NBR SBL SBT 825 Free 0% 0.95 868 0 0 Stop 0% 0.92 0 0 0 0.92 0 0.92 0 905 Stop 0% 0.92 984 0 1737 0 1737 1737 0 4.2 1737 6.5 0 6.2 1737 7.2 1737 6.6 2.3 45 1585 4.0 100 39 3.3 100 1085 3.6 100 38 4.1 0 39 SB 1 492 0 0 39 12.74 Err Err F Err F SB 2 492 0 0 39 12.74 Err Err F 0.95 0 None 1022 WB 1 434 434 0 1585 0.55 88 10.0 A 10.0 WB 2 434 434 0 1585 0.55 88 10.0 A 5315.4 109.6% 15 ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH H HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 162: Austin St. & Rutherford Avenue Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 380 1900 290 1900 0 1900 Yes 0 1900 455 1900 5 1900 Yes 380 1900 20 1900 75 1900 Yes 0 1900 0 1900 0 1900 Yes 0.83 3% 0.91 3% 0 0.93 7% 14% 352 custom 3 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 1.04 49.9 0.0 49.9 ~36 m#41 339 0 0 0 1.04 30 100 2.3 0.93 7% 0.93 7% 0.83 3% 30 615 14.0 0.83 3% 369 0 0 554 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 2 1.04 50.5 0.0 50.5 ~40 m#43 20 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 0.35 16.2 0.0 16.2 98 123 535 354 0 0 0 1.04 1565 0 0 0 0.35 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 0.0% 0.0 4.0 0.80 4% 36% 304 custom 1 1 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.92 68.8 661.2 730.0 169 #270 330 0 289 0 7.41 30 341 7.8 0.80 4% 0.80 4% 0.91 3% 30 332 7.5 0.91 3% 290 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 1 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.85 54.3 667.0 721.3 145 #234 261 252 341 0 282 0 4.92 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of Green Natural Cycle: 70 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 162: Austin St. & Rutherford Avenue \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 162: Austin St. & Rutherford Avenue Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 380 1900 4.0 0.95 1.00 0.95 1603 0.95 1603 0.93 409 0 352 7% custom 3 3 17.0 18.0 0.21 5.0 339 0.22 290 1900 4.0 0.95 1.00 0.99 1674 0.99 1674 0.93 312 0 369 7% 0 1900 0 1900 5 1900 20 1900 4.0 0.95 0.95 0.97 1604 0.97 1604 0.80 25 20 270 4% 0 1900 0 1900 0 1900 0.83 0 0 0 3% 380 1900 4.0 0.95 1.00 0.95 1649 0.95 1649 0.80 475 0 304 4% custom 1 1 16.0 17.0 0.20 5.0 330 c0.18 75 1900 0.93 0 0 0 7% 455 1900 4.0 0.95 1.00 1.00 3499 1.00 3499 0.83 548 1 553 3% 0.80 94 0 0 4% 0.91 0 0 0 3% 0.91 0 0 0 3% 0.91 0 0 0 3% 0.92 33.3 1.00 33.0 66.4 E 0.84 32.7 1.00 22.6 55.3 E 60.9 E 1.04 33.5 0.21 35.7 42.8 D 3 2 17.0 18.0 0.21 5.0 354 c0.22 37.0 38.0 0.45 5.0 1564 c0.16 1.04 33.5 0.21 36.4 43.5 D 43.1 D 0.35 15.4 1.00 0.6 16.1 B 16.1 B 40.8 0.66 85.0 54.2% 15 0.83 6 0 0 3% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 1 16.0 17.0 0.20 5.0 321 0.17 0.0 A D 12.0 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 161: Charlestown Avenue & Rutherford Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 25 660 1900 250 1900 250 1 25 Yes 45 1900 0 0 25 790 1900 0 1900 0 0 25 No 0 1900 0 0 25 0 1900 0 1900 0 0 25 Yes 10 1900 0 0 25 20 1900 915 1900 0 1 25 Yes 0.93 7% 30 505 11.5 0.93 7% 0 710 3 0.0 0.0% 0.0 4.0 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 0.99 67.5 23.0 90.5 200 #319 425 714 0 49 0 1.07 30 100 2.3 0.83 3% 0.83 3% 0.93 7% 0.83 3% 269 custom 3 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 0 Split 2 1006 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 0.64 14.2 0.0 14.2 265 m298 20 0.51 7.6 0.0 7.6 0 61 250 532 0 0 0 0.51 0.80 4% 30 305 6.9 0.80 4% 0.80 4% 0.91 3% 0 0 0 0 0 Split 1 33 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.05 27.8 0.1 27.9 7 20 282 2 1562 0 0 0 0.64 225 30 362 8.2 0.91 3% 0.91 3% 1005 custom 1 13 690 0 345 0 0.10 43.0 50.6% -1.0 4.0 1.33 182.0 0.0 182.0 ~694 #930 754 0 0 0 1.33 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of Green Natural Cycle: 70 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 161: Charlestown Avenue & Rutherford Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 161: Charlestown Avenue & Rutherford Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT 0 1900 660 1900 4.0 0.95 1.00 1.00 3374 1.00 3374 0.93 710 0 710 7% 250 1900 4.0 1.00 0.85 1.00 1509 1.00 1509 0.93 269 212 57 7% custom 3 3 17.0 18.0 0.21 5.0 320 0.04 45 1900 790 1900 4.0 0.95 1.00 1.00 3495 1.00 3495 0.83 952 0 1006 3% 0 1900 0 1900 0 1900 0 1900 10 1900 0.83 0 0 0 3% 0.80 0 0 0 4% 0.80 0 0 0 4% 0.80 0 0 0 4% 0.91 11 0 0 3% Split 1 20 1900 4.0 0.95 1.00 0.98 3447 0.98 3447 0.91 22 0 33 3% 0.93 0 0 0 7% 3 17.0 18.0 0.21 5.0 714 0.21 0.99 33.4 1.00 32.4 65.8 E 55.6 E 0.18 27.4 1.00 1.2 28.7 C 86.1 1.00 85.0 86.5% 15 0.83 54 0 0 3% Split 2 2 915 1900 4.0 1.00 0.85 1.00 1568 1.00 1568 0.91 1005 34 971 3% custom 1 13 37.0 38.0 0.45 5.0 1562 c0.29 16.0 17.0 0.20 5.0 689 0.01 0.64 18.2 0.68 1.6 14.0 B 14.0 B 0.05 27.5 1.00 0.1 27.6 C 184.6 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.0 A SBR 38.0 39.0 0.46 719 c0.62 1.35 23.0 1.00 166.8 189.8 F F 8.0 E HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 400: North Washington Street & Causeway Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWR 80 1900 460 1900 60 1900 Yes 325 1900 1005 1900 590 1900 Yes 230 1900 160 1900 120 1900 Yes 100 1900 130 1900 250 1900 Yes 30 240 5.5 10 0.90 2% 0 Perm 30 214 4.9 0.90 2% 105 0.90 2% 105 0.90 2% 667 0 361 pm+pt 1 6 24.0 62.0 41.3% 3.0 3.0 -2.0 4.0 Lead 2 2 22.0 32.0 21.3% 3.0 3.0 -2.0 4.0 Lag 22.0 32.0 21.3% 3.0 3.0 -2.0 4.0 Lag 0.0 0.0% 0.0 4.0 0.90 2% 1117 30 1674 38.0 7 0.90 2% 125 0.90 2% 656 Perm 0.90 2% 160 0.90 2% 160 0.90 2% 256 Split 4 311 0 6 22.0 94.0 62.7% 3.0 3.0 -2.0 4.0 22.0 31.0 20.7% 3.0 3.0 -2.0 4.0 22.0 31.0 20.7% 3.0 3.0 -2.0 4.0 6 22.0 94.0 62.7% 3.0 3.0 -2.0 4.0 30 711 16.2 4 0.0 0.0% 0.0 4.0 0.90 2% 125 0.90 2% 0 Split 8 533 0 22.0 25.0 16.7% 3.0 3.0 -2.0 4.0 22.0 25.0 16.7% 3.0 3.0 -2.0 4.0 8 1.84 420.0 0.0 420.0 ~519 #650 160 0.55 27.9 0.0 27.9 219 324 0.58 20.0 0.0 20.0 340 404 134 0.61 4.0 0.0 4.0 11 68 0.89 91.3 0.0 91.3 248 #413 1.20 166.7 0.0 166.7 ~350 #549 1594 1.13 122.7 0.0 122.7 ~246 #370 631 363 0 0 0 1.84 661 0 0 0 0.55 1911 0 0 0 0.58 1079 0 0 0 0.61 287 0 0 0 0.89 260 0 0 0 1.20 471 0 0 0 1.13 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 110 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 400: North Washington Street & Causeway Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 400: North Washington Street & Causeway Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWR 80 1900 460 1900 4.0 0.95 0.95 1.00 0.98 0.99 2957 0.64 1914 0.90 511 6 661 60 1900 325 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.12 210 0.90 361 0 361 105 2% pm+pt 1 6 88.0 90.0 0.60 6.0 661 0.21 0.12 0.55 25.8 1.00 3.2 29.0 C 1005 1900 4.0 0.95 1.00 1.00 1.00 1.00 3185 1.00 3185 0.90 1117 0 1117 590 1900 4.0 1.00 0.97 1.00 0.85 1.00 1380 1.00 1380 0.90 656 251 405 7 2% Perm 230 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.95 1593 0.90 256 0 256 125 2% Split 4 160 1900 4.0 1.00 0.86 1.00 0.94 1.00 1344 1.00 1344 0.90 178 18 293 120 1900 100 1900 250 1900 0.90 133 0 0 160 2% 0.90 111 0 0 160 2% Split 8 130 1900 4.0 0.95 0.84 1.00 0.92 0.99 2427 0.99 2427 0.90 144 131 402 25.0 27.0 0.18 6.0 287 0.16 25.0 27.0 0.18 6.0 242 c0.22 19.0 21.0 0.14 6.0 340 c0.17 0.89 60.1 1.00 31.4 91.5 F 1.21 61.5 1.00 126.7 188.2 F 144.6 F 1.18 64.5 1.00 108.4 172.9 F 172.9 F 0.90 89 0 0 10 2% Perm 2% 0.90 67 0 0 105 2% 2 2 26.0 28.0 0.19 6.0 357 c0.35 1.85 61.0 1.00 394.2 455.2 F 455.2 F 134.0 1.08 150.0 103.9% 15 2% 6 88.0 90.0 0.60 6.0 1911 c0.35 0.58 18.5 1.00 1.3 19.8 B 21.1 C 6 88.0 90.0 0.60 6.0 828 0.29 0.49 17.0 1.00 2.1 19.0 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 2% 4 2% 0.90 278 0 0 125 2% 8 F 16.0 G HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 410: Merrimac Street & Staniford Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning WBU WBL WBR WBR2 NBU NBL NBR NBR2 SEU SEL2 SEL SER SWL2 SWL SWR 5 1900 160 1900 115 1900 40 1900 Yes 5 1900 75 1900 175 1900 190 1900 Yes 5 1900 165 1900 250 1900 285 1900 Yes 50 1900 405 1900 245 1900 Yes 0.82 3% 30 628 14.3 170 0.82 3% 0.83 4% 95 0.83 4% 30 562 12.8 260 0.83 4% 170 0.83 4% 260 0.91 7% 30 1674 38.0 170 0.91 7% 0 Prot 1 205 Prot 1 343 Perm 0 Perm 4 4 4.0 10.0 22.0 24.4% 3.0 3.0 -2.0 4.0 Lag Yes None 0 Perm 5 5 1160 0.82 3% 95 0.82 0.89 3% 9% 10% 201 145 44 0 custom custom custom 5 2 2 4 5 2 2 4 8.0 14.0 20.0 22.2% 3.0 3.0 0.0 6.0 Lead 8.0 14.0 20.0 22.2% 3.0 3.0 -2.0 4.0 Lead 8.0 14.0 28.0 31.1% 3.0 3.0 -2.0 4.0 Lag 8.0 14.0 28.0 31.1% 3.0 3.0 0.0 6.0 Lag Min Min 3.00 956.1 0.0 956.1 ~200 #302 548 C-Min 0.25 17.4 0.0 17.4 54 101 C-Min 0.08 6.1 0.0 6.1 0 18 67 0 0 0 3.00 576 0 0 0 0.25 541 0 0 0 0.08 4.0 10.0 22.0 24.4% 3.0 3.0 0.0 6.0 Lag Yes None 30 276 6.3 1160 0.89 9% 90 4 4 95 0.89 9% 260 0.89 9% 197 213 Over custom 4 45 4 45 4.0 10.0 22.0 24.4% 3.0 3.0 -2.0 4.0 Lag Yes None 1.67 392.0 0.0 392.0 ~71 m#136 196 4.0 10.0 22.0 24.4% 3.0 3.0 -2.0 4.0 Lag Yes None 0.74 54.3 0.0 54.3 83 m#169 54 0 0 0 1.67 267 0 0 0 0.74 301 6 1 1 6 8.0 14.0 20.0 22.2% 3.0 3.0 0.0 6.0 Lead 8.0 14.0 20.0 22.2% 3.0 3.0 -2.0 4.0 Lead 8.0 14.0 28.0 31.1% 3.0 3.0 -2.0 4.0 Lag 8.0 14.0 28.0 31.1% 3.0 3.0 -2.0 4.0 Lag None 0.42 4.0 0.0 4.0 1 m17 None 0.64 38.6 0.0 38.6 87 122 C-Max 0.39 12.9 0.0 12.9 106 138 482 C-Max 0.48 4.1 0.0 4.1 42 37 505 0 0 0 0.42 332 0 0 0 0.62 764 0 0 0 0.39 722 0 0 0 0.48 -2.0 4.0 260 0.91 7% 269 custom 4 6 6 42.0 46.7% 500 4 4.0 10.0 22.0 24.4% 3.0 3.0 -2.0 4.0 Lag Yes None 1.69 354.0 0.0 354.0 ~217 #315 1594 295 0 0 0 1.69 ø3 3 14 14 42.0 46.7% 4.0 20.0 20.0 22% 2.0 0.0 -2.0 4.0 Lead Yes None 0.48 4.8 0.0 4.8 0 40 567 0 0 0 0.47 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 70 (78%), Referenced to phase 2:WBR and 6:SEL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 410: Merrimac Street & Staniford Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 410: Merrimac Street & Staniford Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group WBU WBL 5 1900 160 1900 4.0 1.00 1.00 0.91 1.00 0.95 1428 0.25 376 0.82 195 0 201 170 3% 0.82 6 0 0 3% Perm 5 WBR Charles River Base Model - Existing Conditions Weekday Morning NBU NBL NBR NBR2 SEU SEL2 SEL SER SWL2 SWL SWR 115 40 5 1900 1900 1900 4.0 6.0 0.88 0.95 1.00 0.92 1.00 1.00 0.85 0.85 1.00 1.00 1242 1240 1.00 1.00 1242 1240 0.82 0.82 0.89 140 49 6 1 25 0 144 19 0 1160 95 3% 3% 9% custom custom custom 5 2 2 4 14.0 39.7 39.7 16.0 41.7 39.7 0.18 0.46 0.44 6.0 6.0 6.0 2.0 2.0 2.0 67 575 547 0.12 c0.53 0.02 3.00 0.25 0.04 37.0 14.7 14.3 1.00 1.00 1.00 938.6 1.0 0.1 975.6 15.7 14.4 F B B 510.3 F 75 1900 4.0 1.00 1.00 0.65 1.00 0.95 970 0.26 268 0.89 84 0 90 1160 9% 175 190 1900 1900 4.0 4.0 1.00 1.00 1.00 0.68 1.00 1.00 0.85 0.85 1.00 1.00 1333 904 1.00 1.00 1333 904 0.89 0.89 197 213 0 123 197 90 95 260 9% 9% Over custom 4 45 16.0 36.0 18.0 38.0 0.20 0.42 6.0 2.0 267 382 0.15 0.10 0.74 0.24 33.8 16.7 1.11 0.60 8.1 0.1 45.6 10.1 D B 5 1900 165 1900 4.0 1.00 1.00 1.00 1.00 0.95 1562 0.95 1562 0.83 199 0 205 95 4% Prot 1 250 1900 4.0 1.00 1.00 1.00 1.00 0.95 1562 0.95 1562 0.83 301 0 301 260 4% 285 1900 4.0 1.00 0.89 1.00 0.85 1.00 1238 1.00 1238 0.83 343 175 168 170 4% Perm 50 1900 405 1900 4.0 0.97 1.00 0.60 1.00 0.95 1753 0.80 1477 0.91 445 0 500 170 7% 245 1900 4.0 1.00 0.70 1.00 0.85 1.00 945 1.00 945 0.91 269 149 120 260 7% custom 178.8 1.17 90.0 69.8% 15 WBR2 4 16.0 18.0 0.20 6.0 2.0 54 0.34 1.67 36.0 1.08 362.6 401.3 F 94.5 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 0.83 6 0 0 4% Prot 1 0.91 55 0 0 260 7% Perm 6 16.3 18.3 0.20 6.0 2.0 318 0.13 42.0 44.0 0.49 6.0 2.0 764 c0.19 0.64 32.9 0.92 3.2 33.3 C 0.39 14.6 0.76 1.4 12.5 B 19.3 B 4 6 42.0 44.0 0.49 6.0 2.0 605 0.14 0.28 13.6 1.15 1.1 16.8 B 4 16.0 18.0 0.20 6.0 2.0 295 c0.34 1.69 36.0 1.00 326.9 362.9 F 241.5 F 14 38.3 40.3 0.45 423 0.13 0.28 15.7 1.00 0.1 15.9 B F 8.0 C HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 121: Cambridge Street & Staniford Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 250 1900 10 180 1 25 630 1900 11 0 1900 11 0 0 25 No 0 1900 12 0 0 25 420 1900 12 145 1900 12 0 1 25 No 0 1900 12 0 0 25 0 1900 12 20 1900 12 0 1 25 Yes 200 1900 10 0 1 25 0 1900 12 300 1900 12 0 1 25 No 30 379 8.6 30 261 5.9 30 236 5.4 0.93 3% 0.93 3% 68 0.93 3% 0.96 7% 0.96 7% 269 Prot 4 677 0 0 438 2 6 151 pt+ov 36 4 2 6 36 8.0 22.0 26.0 28.9% 3.0 1.0 0.0 4.0 Lag Yes Ped 0.82 54.0 0.0 54.0 144 #258 8.0 12.0 25.0 27.8% 3.0 1.0 0.0 4.0 Lag Yes C-Max 0.68 32.1 0.0 32.1 188 #281 299 8.0 22.0 37.0 41.1% 3.0 1.0 0.0 4.0 180 360 0 0 0 0.75 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 1001 0 0 0 0.68 10 0.96 7% 0.64 4% 0.64 4% 0 0 64.0 71.1% 0.0 0.0% 0.0 0.0% 0.0 5.0 0.0 4.0 0.0 4.0 C-Max 0.37 13.6 0.6 14.2 83 m106 181 0.16 8.0 0.8 8.8 49 m68 1179 404 0 0 0.57 919 535 0 0 0.39 30 816 18.5 1 0.64 4% 0.90 7% 0.90 7% 31 custom 1 222 Prot 3 0 1 3 3 5.0 9.0 12.0 13.3% 3.0 1.0 0.0 4.0 Lead Yes None 0.06 0.2 0.0 0.2 0 0 8.0 23.0 27.0 30.0% 4.0 1.0 0.0 5.0 Lead Yes Ped 0.64 23.6 0.0 23.6 109 m100 8.0 23.0 27.0 30.0% 4.0 1.0 0.0 5.0 Lead Yes Ped 1.00 44.2 0.0 44.2 ~196 m162 156 0.0 0.0% 0.0 4.0 1 0.90 7% 333 custom 3 736 573 0 0 0 0.05 346 0 0 0 0.64 332 0 0 0 1.00 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 30 (33%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 121: Cambridge Street & Staniford Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 121: Cambridge Street & Staniford Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Morning EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 250 1900 10 4.0 1.00 1.00 1.00 1.00 0.95 1472 0.95 1472 0.93 269 0 269 630 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3049 1.00 3049 0.93 677 0 677 0 1900 11 0 1900 12 0 1900 12 0.64 0 0 0 0.64 0 0 0 20 1900 12 4.0 1.00 1.00 1.00 0.86 1.00 1422 1.00 1422 0.64 31 30 1 200 1900 10 5.0 1.00 1.00 1.00 1.00 0.95 1417 0.95 1417 0.90 222 0 222 0 1900 12 0.96 0 0 0 145 1900 12 5.0 1.00 1.00 1.00 0.85 1.00 1358 1.00 1358 0.96 151 0 151 0 1900 12 0.93 0 0 0 420 1900 12 4.0 0.95 1.00 1.00 1.00 1.00 3036 1.00 3036 0.96 438 0 438 300 1900 12 5.0 1.00 1.00 1.00 0.85 1.00 1358 1.00 1358 0.90 333 0 333 3% Prot 4 3% 68 3% 7% 7% 4% 4% 6 7% Prot 3 7% 2 1 4% custom 1 20.1 20.1 0.22 4.0 2.0 329 c0.18 27.9 27.9 0.31 4.0 2.0 945 c0.22 34.9 34.9 0.39 4.0 2.0 1177 c0.14 60.9 56.9 0.63 859 0.11 3.0 3.0 0.03 4.0 2.0 47 0.00 22.0 22.0 0.24 5.0 2.0 346 0.16 22.0 22.0 0.24 5.0 2.0 332 c0.25 0.82 33.2 1.00 13.8 47.0 D 0.72 27.5 1.00 4.6 32.2 C 36.4 D 0.37 19.7 0.63 0.7 13.2 B 12.1 B 0.18 6.8 1.34 0.0 9.2 A 0.02 42.1 1.00 0.1 42.1 D 0.64 30.5 0.73 0.3 22.4 C 1.00 34.0 0.73 15.5 40.5 D 28.9 0.82 90.0 50.6% 15 10 7% pt+ov 36 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_AM.syn VHB:NLH 42.1 D 0.90 0 0 0 1 7% custom 3 33.2 C C 17.0 A HCM Signalized Intersection Capacity Analysis 3/8/2010 Capacity Analysis Results Existing Conditions Weekday Evening \\Mawatr\ts\10989.01\docs\memos\Existing Conditions Memo Attachments\Attachments.doc 10989.00: DCR Bridge Program 110: Mt Auburn St & Fresh Pond Pkwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR 5 1900 12 325 1900 12 2% 570 1900 10 0 1900 11 270 1900 11 -2% 45 1900 11 0 1900 12 1420 1900 12 -4% 20 1900 12 950 1900 10 1290 1900 11 3% 145 1900 11 0 2 25 No 0 0 25 0 0 25 No 0 0 25 0 0 25 No 300 2 25 75 1 25 30 843 19.2 30 0.91 0% 30 0.96 0% 626 custom 4 14 1 31.0 31.0 49.0 27.4% 43.4% 4.0 5.0 -6.0 -3.0 3.0 5.0 Lag 0 Perm 0.91 0% 0.91 7% 0 Perm 362 4 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag 30 502 11.4 30 840 19.1 0.95 0% 0.95 0% 0.95 0% 0.99 0% 0.99 0% 25 0.99 0% 328 0 0 1516 0 960 Prot 5 1449 0 3 0.84 58.4 0.0 58.4 251 #407 763 0.61 30.8 0.0 30.8 203 271 0.44 38.2 0.0 38.2 106 151 422 46.0 46.0 40.7% 5.0 1.0 -2.0 4.0 Lead Yes 0.77 34.6 0.0 34.6 351 411 760 433 0 0 0 0.84 1023 0 0 0 0.61 741 0 0 0 0.44 1962 0 0 0 0.77 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 1 2 18.0 18.0 16% 4.0 4.0 14.0 18.0 16% 4.0 2.0 Lead Yes Lag Yes 30 687 15.6 0.96 0% 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag ø2 0 0 25 Yes 0.96 18% 4 4 31.0 31.0 27.4% 4.0 5.0 -6.0 3.0 Lag ø1 0.0 0.0% -1.0 3.0 36.0 36.0 31.9% 4.0 2.0 -3.0 3.0 1.02 74.8 0.0 74.8 ~382 #509 300 940 0 0 0 1.02 123 82.0 72.6% 0.0 0.0% -3.0 5.0 -1.0 3.0 0.63 11.3 0.0 11.3 273 336 607 2306 0 0 0 0.63 Intersection Summary Area Type: Other Cycle Length: 113 Actuated Cycle Length: 113 Offset: 0 (0%), Referenced to phase 1:NWT, Start of Green Natural Cycle: 115 Control Type: Pretimed Description: NO DATA ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 110: Mt Auburn St & Fresh Pond Pkwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 110: Mt Auburn St & Fresh Pond Pkwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Grade (%) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) Description: NO DATA c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR SEL SET SER NWL NWT NWR 5 1900 12 325 1900 12 2% 3.0 1.00 1.00 1.00 1.00 1.00 1758 0.99 1748 0.91 357 0 362 570 1900 10 0 1900 11 270 1900 11 -2% 3.0 0.95 1.00 1.00 0.98 1.00 2988 1.00 2988 0.96 281 0 328 45 1900 11 0 1900 12 20 1900 12 950 1900 10 0.95 0 0 0 0.95 21 0 0 3.0 0.97 1.00 1.00 1.00 0.95 3219 0.95 3219 0.99 960 0 960 1290 1900 11 3% 5.0 0.95 1.00 1.00 0.98 1.00 3372 1.00 3372 0.99 1303 8 1441 145 1900 11 0.96 47 0 0 1420 1900 12 -4% 4.0 0.91 1.00 1.00 1.00 1.00 5280 1.00 5280 0.95 1495 0 1516 18% 0% 0% 0% 0% 0.91 5 0 0 0% Perm 7% 4 4 22.0 28.0 0.25 9.0 433 c0.21 0.84 40.3 1.00 17.2 57.5 E 44.8 D 5.0 0.88 1.00 1.00 0.85 1.00 2626 1.00 2626 0.91 626 0 626 30 0% custom 14 1 41.0 38.0 0.34 883 0.24 0.71 32.7 1.00 4.8 37.5 D 37.8 0.87 113.0 91.5% 15 0.96 0 0 0 30 0% Perm 4 3 0% Prot 5 22.0 28.0 0.25 9.0 740 0.11 40.0 42.0 0.37 6.0 1962 c0.29 30.0 33.0 0.29 6.0 940 c0.30 0.44 35.9 1.00 1.9 37.8 D 37.8 D 0.77 31.3 1.00 3.0 34.3 C 34.3 C 1.02 40.0 1.00 34.8 74.8 E 0% 0.99 146 0 0 25 0% 123 4 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 76.0 76.0 0.67 2268 0.43 0.64 10.6 1.00 1.4 12.0 B 37.0 D D 10.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 511: Memorial Drive & Greenough Blvd Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBT NBR SBL SBT 360 1900 11 140 1 25 420 1900 14 175 1 25 Yes 1965 1900 11 55 1900 16 210 1 25 Yes 455 1900 16 0 2 25 1535 1900 14 30 486 11.0 1 0.91 0% 25 616 16.8 30 594 13.5 0.91 0% 0.93 0% 0.93 0% 0.92 0% 0.92 0% 2113 59 pt+ov 23 495 Prot 1 1668 3 462 Prot 3 20.0 20.0 19.0% 4.0 1.0 -1.0 4.0 20.0 20.0 19.0% 4.0 1.0 -1.0 4.0 0.85 61.9 0.0 61.9 135 #214 406 140 464 0 0 0 0.85 0.57 6.9 0.0 6.9 0 48 50.0 50.0 47.6% 4.0 1.0 -1.0 4.0 Lag Yes 1.07 71.1 0.0 71.1 ~578 #674 536 396 175 807 0 0 0 0.57 2 1977 0 0 0 1.07 0.06 2.2 0.0 2.2 0 15 35.0 35.0 33.3% 4.0 1.0 -1.0 4.0 Lead Yes 0.47 32.1 0.0 32.1 139 189 210 1057 0 0 0 0.06 1055 0 0 0 0.47 70.0 66.7% -1.0 4.0 12 85.0 81.0% -1.0 4.0 0.62 6.5 0.0 6.5 212 262 514 2674 0 0 0 0.62 Intersection Summary Area Type: CBD Cycle Length: 105 Actuated Cycle Length: 105 Offset: 0 (0%), Referenced to phase 1:SBTL, Start of Green Natural Cycle: 105 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 511: Memorial Drive & Greenough Blvd \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 511: Memorial Drive & Greenough Blvd Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBT NBR SBL SBT 360 1900 11 4.0 0.97 1.00 1.00 1.00 0.95 3046 0.95 3046 0.91 396 0 396 1 0% 420 1900 14 4.0 0.88 1.00 1.00 0.85 1.00 2729 1.00 2729 0.91 462 392 70 1965 1900 11 4.0 0.91 1.00 1.00 1.00 1.00 4513 1.00 4513 0.93 2113 0 2113 55 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1647 1.00 1647 0.93 59 22 37 455 1900 16 4.0 0.97 1.00 1.00 1.00 0.95 3572 0.95 3572 0.92 495 0 495 1535 1900 14 4.0 0.95 1.00 1.00 1.00 1.00 3466 1.00 3466 0.92 1668 0 1668 0% 0% pt+ov 23 0% Prot 1 0% 3 0% Prot 3 15.0 16.0 0.15 5.0 464 c0.13 15.0 16.0 0.15 5.0 416 0.03 45.0 46.0 0.44 5.0 1977 c0.47 65.0 66.0 0.63 80.0 81.0 0.77 1035 0.02 30.0 31.0 0.30 5.0 1055 0.14 0.85 43.4 1.00 17.8 61.1 E 49.5 D 0.17 38.7 1.00 0.9 39.6 D 1.07 29.5 1.00 41.5 71.0 E 69.3 E 0.04 7.4 1.00 0.1 7.5 A 0.47 30.3 1.00 1.5 31.8 C 2 42.2 0.89 105.0 78.0% 15 12 2674 c0.48 0.62 5.3 1.00 1.1 6.4 A 12.2 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH D 12.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 510: Eliot Bridge & Greenough Blvd Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBT NBR SBL SBT 410 1900 12 80 2 25 1805 1900 12 0 1 25 Yes 215 1900 11 325 1900 16 200 1 25 Yes 1625 1900 13 0 2 25 270 1900 10 30 948 21.5 1 0.90 0% 1459 30 556 12.6 2 0.90 0% 50% 1003 Free 30 616 14.0 0.88 1% 0.88 1% 0.93 0% 0.93 0% 244 369 pt+ov 23 1747 Prot 1 290 0.66 32.1 0.0 32.1 176 268 44.0 58.0 62.4% 3.0 2.0 -1.0 4.0 Lead Yes 0.92 27.7 5.2 32.9 445 #645 13.0 21.0 22.6% 3.0 2.0 -1.0 4.0 Lag Yes 0.99 91.2 0.0 91.2 172 #337 536 200 556 0 0 0 0.66 1891 114 0 0 0.98 292 0 0 0 0.99 3 2 2 Free 13.0 14.0 15.1% 3.0 2.0 -1.0 4.0 1.73dr 325.7 0.0 325.7 ~356 #448 868 80 876 0 0 0 1.67 0.0 0.0% 0.0 4.0 0.81 6.2 0.0 6.2 0 0 1234 0 0 0 0.81 13.0 21.0 22.6% 3.0 2.0 -1.0 4.0 Lag Yes 0.43 36.4 0.0 36.4 67 102 476 568 0 0 0 0.43 35.0 37.6% -1.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 93 Actuated Cycle Length: 93 Offset: 0 (0%), Referenced to phase 1:SBL, Start of Green Natural Cycle: 80 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 510: Eliot Bridge & Greenough Blvd \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 510: Eliot Bridge & Greenough Blvd Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBT NBR SBL SBT 410 1900 12 4.0 0.94 0.98 1.00 0.90 0.98 4173 0.98 4173 0.90 456 427 1032 1 0% 1805 1900 12 4.0 0.86 0.99 1.00 0.85 1.00 1234 1.00 1234 0.90 2006 0 1003 2 0% Free 215 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3110 1.00 3110 0.88 244 0 244 325 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1631 1.00 1631 0.88 369 12 357 1625 1900 13 4.0 0.97 1.00 1.00 1.00 0.95 3257 0.95 3257 0.93 1747 0 1747 270 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1596 1.00 1596 0.93 290 0 290 1% 1% pt+ov 23 0% Prot 1 0% 16.0 17.0 0.18 5.0 568 0.08 30.0 31.0 0.33 544 0.22 53.0 54.0 0.58 5.0 1891 c0.54 16.0 17.0 0.18 5.0 292 0.18 0.43 33.7 1.00 2.4 36.1 D 33.9 C 0.66 26.5 1.00 6.1 32.5 C 0.92 17.6 1.00 9.1 26.8 C 0.99 37.9 1.00 51.0 88.9 F 35.6 D 3 9.0 10.0 0.11 5.0 449 c0.25 1.73dr 41.5 1.00 591.7 633.2 F 377.7 F 2 Free 93.0 93.0 1.00 1234 c0.81 0.81 0.0 1.00 5.9 5.9 A 2 Intersection Summary HCM Average Control Delay 200.1 HCM Level of Service HCM Volume to Capacity ratio 1.06 Actuated Cycle Length (s) 93.0 Sum of lost time (s) Intersection Capacity Utilization 91.1% ICU Level of Service Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. c Critical Lane Group \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH F 8.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 503: Eliot Bridge & Soldiers Field Road Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBT EBR WBL WBT NBL NBR 1440 1900 11 0 1900 10 180 2 25 Yes 1345 1900 10 255 1 25 0 1900 11 415 1900 14 0 2 25 0 1900 14 0 0 25 Yes 30 389 8.8 0.92 30 270 6.1 0.92 0.92 0 451 0 30 425 9.7 0.92 0.92 0.92 1565 0 2 1462 Prot 1 2 1 3 15.0 20.0 30.0 30.0% 4.0 1.0 -1.0 4.0 Lag Yes Min 0.89 35.7 0.0 35.7 220 #325 345 15.0 20.0 30.0 30.0% 4.0 1.0 -1.0 4.0 Lead Yes Max 1.11 90.0 0.0 90.0 ~307 #437 0.0 4.0 15.0 20.0 40.0 40.0% 4.0 1.0 -1.0 4.0 309 None 0.60 32.3 0.0 32.3 108 154 190 1751 0 0 0 0.89 0.0 0.0% 0.0 4.0 3 0.0 0.0% 255 1316 0 0 0 1.11 0.0 0.0% 0.0 4.0 1433 0 0 0 0.31 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 82.9 Natural Cycle: 80 Control Type: Semi Act-Uncoord ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 503: Eliot Bridge & Soldiers Field Road \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 503: Eliot Bridge & Soldiers Field Road Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBT EBR WBL WBT NBL NBR 1440 1900 11 4.0 0.86 1.00 1.00 5575 1.00 5575 0.92 1565 0 1565 0 1900 10 0 1900 11 415 1900 14 4.0 0.97 1.00 0.95 3296 0.95 3296 0.92 451 0 451 0 1900 14 2 1345 1900 10 4.0 0.94 1.00 0.95 4192 0.95 4192 0.92 1462 0 1462 Prot 1 25.0 26.0 0.31 5.0 4.0 1751 c0.28 25.0 26.0 0.31 5.0 4.0 1316 c0.35 17.8 18.8 0.23 5.0 4.0 748 c0.14 0.89 27.1 1.00 6.4 33.5 C 33.5 C 1.11 28.4 1.00 61.1 89.5 F 0.60 28.7 1.00 1.6 30.3 C 30.3 C 0.92 0 0 0 0.92 0 0 0 3 89.5 F 56.6 0.90 82.8 74.8% 15 0.92 0 0 0 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH E 12.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 477: Mt. Auburn Street & JFK Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 155 1900 No 285 1900 0 1900 No 0 1900 0 1900 0 1900 No 0 1900 690 1900 65 1900 No 0 1900 0 1900 0 1900 No 0.92 0.91 30 505 11.5 0.91 0.91 0.92 30 402 9.1 0.92 0.92 0 0 829 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.95 0 Perm 30 175 4.0 0.95 0.95 0.92 30 1211 27.5 0.92 463 0 0 0 1 1 45.0 45.0 50.0% 3.0 4.0 -2.0 5.0 Lead 45.0 45.0 50.0% 3.0 4.0 3.0 10.0 Lead 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.38 20.9 0.3 21.2 97 137 95 1131 1218 0 294 0 0.50 45.0 45.0 50.0% 3.0 4.0 3.0 10.0 Lag 0.68 26.0 1.9 27.9 272 334 425 322 1223 0 238 0 0.84 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 90 Control Type: Pretimed Splits and Phases: 477: Mt. Auburn Street & JFK Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 477: Mt. Auburn Street & JFK Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 155 1900 285 1900 10.0 0.95 1.00 0.98 3130 0.98 3130 0.95 300 0 463 0 1900 0 1900 0 1900 0 1900 0 1900 65 1900 0 1900 0 1900 0 1900 0.95 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.91 0 0 0 690 1900 10.0 0.95 0.99 1.00 3144 1.00 3144 0.91 758 0 829 0.91 71 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.95 163 0 0 Perm 1 2 38.0 35.0 0.39 7.0 1217 38.0 35.0 0.39 7.0 1223 c0.26 1 0.15 0.38 19.7 1.00 0.9 20.6 C 20.6 C 0.0 A 23.8 0.53 90.0 65.0% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.68 22.8 1.03 2.1 25.6 C 25.6 C 0.0 A C 20.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 108: Memorial Drive & JFK Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 5 1900 10 530 1900 10 200 1900 10 Yes 10 1900 10 640 1900 10 140 1900 10 Yes 165 1900 10 750 1900 10 140 1900 10 Yes 100 1900 10 545 1900 10 10 1900 10 Yes 30 1761 40.0 46 0.84 0% 0 Perm 30 1448 32.9 0.84 0% 128 0.84 0% 128 0.96 0% 875 0 0 Perm 1 1 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 0.96 0% 46 0.96 0% 311 0.95 2% 823 0 0 pm+pt 3 34 3 1 1 1 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 1.14 119.7 0.0 119.7 ~484 #552 1681 30 600 13.6 0.0 0.0% -1.0 3.0 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 765 0 0 0 1.14 1 2.0 8.0 41.0 29.9% 4.0 2.0 -3.0 3.0 Lead Yes Max 1.15 123.1 0.0 123.1 ~464 #598 1368 717 0 0 0 1.15 0.0 0.0% -1.0 3.0 10.0 15.0 30.0 21.9% 3.0 2.0 -2.0 3.0 Lead Yes Max ø2 ø4 2 4 1.0 16.0 16.0 12% 2.0 0.0 4.0 10.0 36.0 26% 4.0 2.0 Lag Yes None Lag Yes Max 30 729 16.6 0.95 2% 327 0.95 2% 327 0.88 2% 1110 0 0 pm+pt 5 45 5 34 34 66.0 48.2% 0.0 0.0% -2.0 3.0 -1.0 3.0 8.0 14.0 14.0 10.2% 4.0 2.0 -3.0 3.0 0.88 2% 311 0.88 2% 744 0 45 45 50.0 36.5% 0.0 0.0% -3.0 3.0 -1.0 3.0 Max 1.16 111.5 0.0 111.5 ~460 #600 520 1.05 90.3 0.0 90.3 ~354 #391 649 958 0 0 0 1.16 708 0 0 0 1.05 Intersection Summary Area Type: CBD Cycle Length: 137 Actuated Cycle Length: 130.6 Natural Cycle: 150 Control Type: Semi Act-Uncoord ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 108: Memorial Drive & JFK Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 108: Memorial Drive & JFK Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 5 1900 10 530 1900 10 3.0 0.95 0.96 1.00 0.96 1.00 2795 0.90 2530 0.84 631 28 847 200 1900 10 10 1900 10 140 1900 10 165 1900 10 100 1900 10 0.96 146 0 0 46 0% 0.95 174 0 0 311 2% pm+pt 3 34 0.95 147 0 0 327 2% 0.88 114 0 0 327 2% pm+pt 5 45 545 1900 10 3.0 0.95 1.00 0.99 1.00 0.99 2915 0.62 1819 0.88 619 1 743 10 1900 10 0.96 10 0 0 128 0% Perm 750 1900 10 3.0 0.95 0.97 1.00 0.98 0.99 2792 0.52 1461 0.95 789 9 1101 140 1900 10 0.84 238 0 0 128 0% 640 1900 10 3.0 0.95 0.99 1.00 0.97 1.00 2918 0.83 2414 0.96 667 13 810 0.84 6 0 0 46 0% Perm 0% 1 0% 1 1 1 35.1 38.1 0.29 6.0 4.0 734 35.1 38.1 0.29 6.0 4.0 700 0.33 1.15 46.6 1.00 84.5 131.1 F 131.1 F c0.34 1.16 46.6 1.00 86.4 133.0 F 133.0 F 122.8 1.15 131.3 98.3% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 2% 34 2% 0.88 11 0 0 311 2% 45 55.2 59.2 0.45 38.1 44.1 0.34 933 c0.24 c0.29 1.18 36.1 1.00 92.2 128.3 F 128.3 F 703 c0.09 0.27 1.06 43.6 1.00 50.1 93.7 F 93.7 F F 22.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5171: Soldiers Field Road EB & North Harvard Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 290 1900 13 0 1 25 10 1900 16 95 1900 16 0 0 25 Yes 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 0 1900 13 0 0 25 490 1900 13 60 1900 13 125 1 25 No 385 1900 10 0 1 25 390 1900 10 0 1900 10 0 0 25 Yes 30 595 13.5 0.86 0% 30% 236 Split 4 30 519 11.8 30 381 8.7 0.86 0% 48 0.86 0% 0.92 2% 0.92 2% 0.92 2% 0.95 1% 0.95 1% 223 0 0 0 0 0 516 4 4 2 8.0 21.0 27.0 21.6% 5.0 2.0 -3.0 4.0 Lag Yes Max 0.68 48.5 0.1 48.6 153 231 8.0 21.0 27.0 21.6% 5.0 2.0 -3.0 4.0 Lag Yes Max 0.64 40.7 0.1 40.8 122 197 515 4.0 28.0 38.0 30.4% 4.0 4.0 -4.0 4.0 Lag Yes Max 0.91 56.3 0.3 56.6 330 #531 301 349 0 3 0 0.68 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 439 350 0 3 0 0.64 567 0 2 0 0.91 ø3 ø5 1 3 5 4.0 9.0 15.0 12% 4.0 1.0 1.0 20.0 20.0 16% 2.0 1.0 8.0 17.0 25.0 20% 4.0 1.0 Lead Yes Max Lead Yes None Max 30 76 1.7 301 0.95 1% 301 1.00 0% 63 Perm 385 pm+pt 15 125 15 2 4 ø1 2 2 4.0 28.0 38.0 30.4% 4.0 4.0 -4.0 4.0 Lag Yes Max 0.32 32.7 0.0 32.7 32 71 125 194 0 0 0 0.32 1.00 0% 1.00 0% 390 0 125 125 40.0 32.0% 78.0 62.4% 0.0 0.0% -1.0 4.0 -1.0 4.0 0.0 4.0 0.66 33.1 0.0 33.1 144 238 0.35 0.8 0.0 0.8 1 1 1 586 0 0 0 0.66 1125 0 0 0 0.35 Intersection Summary Area Type: CBD Cycle Length: 125 Actuated Cycle Length: 105 Natural Cycle: 135 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5171: Soldiers Field Road EB & North Harvard Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5171: Soldiers Field Road EB & North Harvard Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 290 1900 13 4.0 0.95 1.00 1.00 1.00 0.95 1595 0.95 1595 0.86 337 0 236 10 1900 16 4.0 0.95 0.90 1.00 0.93 0.98 1506 0.98 1506 0.86 12 27 196 95 1900 16 0 1900 12 0 1900 12 0 1900 12 0 1900 13 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.95 0 0 0 0% 2% 2% 2% 1% 1% 385 1900 10 4.0 1.00 1.00 1.00 1.00 0.95 1516 0.13 206 1.00 385 0 385 301 0% pm+pt 15 125 65.0 67.0 0.64 390 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1596 1.00 1596 1.00 390 0 390 0% Split 4 60 1900 13 4.0 1.00 0.43 1.00 0.85 1.00 644 1.00 644 0.95 63 0 63 301 1% Perm 0 1900 10 0.86 110 0 0 48 0% 490 1900 13 4.0 1.00 1.00 1.00 1.00 1.00 1750 1.00 1750 0.95 516 0 516 0% 0% 4 2 20.0 23.0 0.22 7.0 2.0 349 c0.15 20.0 23.0 0.22 7.0 2.0 330 0.13 30.0 34.0 0.32 8.0 4.0 567 c0.29 0.68 37.6 1.00 10.1 47.7 D 0.60 36.8 1.00 7.7 44.5 D 46.1 D 0.91 34.0 1.00 21.1 55.1 E 52.4 D 0.0 A 36.0 0.76 105.0 75.7% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 2 30.0 34.0 0.32 8.0 4.0 209 0.10 0.30 26.6 1.00 3.7 30.3 C 581 c0.23 0.20 0.66 20.6 1.46 4.9 35.0 D 1.00 0 0 0 125 70.0 71.0 0.68 1079 0.24 0.36 7.3 0.01 0.8 0.8 A 17.8 B D 12.0 D HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5172: Soldiers Field Road WB & Larz Anderson Bridge Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 1900 11 0 1900 12 Yes 85 1900 16 15 1900 16 320 1900 16 No 45 1900 12 735 1900 10 0 1900 10 Yes 0 1900 12 690 1900 11 65 1900 11 Yes 30 590 13.4 30 536 12.2 0.92 2% 0.92 2% 0.92 2% 0.86 1% 0.86 1% 0 0 0 0 Split 5 116 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 -1.0 3.0 30 76 1.7 41 0.86 1% 236 0.97 1% 372 Perm 0 pm+pt 4 24 4 5 5 5 5 5 8.0 17.0 25.0 20.0% 4.0 1.0 -2.0 3.0 8.0 17.0 25.0 20.0% 4.0 1.0 -2.0 3.0 8.0 17.0 25.0 20.0% 4.0 1.0 -2.0 3.0 Max 510 Max 0.30 37.6 0.0 37.6 66 113 456 Max 1.26 178.1 0.0 178.1 ~315 #467 386 0 6 0 0.31 295 0 0 0 1.26 8.0 21.0 27.0 21.6% 5.0 2.0 -4.0 3.0 Lag Yes Max ø1 ø2 ø3 1 2 3 4.0 9.0 15.0 12% 4.0 1.0 4.0 28.0 38.0 30% 4.0 4.0 1.0 20.0 20.0 16% 2.0 1.0 Lead Yes Max Lag Yes Max Lead Yes None 30 600 13.6 0.97 1% 0.97 1% 0.93 0% 0.93 0% 236 0.93 0% 804 0 0 812 0 24 12 12 12 24 65.0 52.0% 0.0 0.0% 0.0 0.0% 53.0 42.4% 0.0 0.0% -2.0 6.0 -1.0 3.0 -1.0 3.0 1.0 6.0 -1.0 3.0 0.58 2.5 0.0 2.5 6 m21 1 0.59 23.8 1.0 24.7 207 270 520 1395 0 0 0 0.58 1368 0 293 0 0.76 Intersection Summary Area Type: CBD Cycle Length: 125 Actuated Cycle Length: 105 Natural Cycle: 135 Control Type: Semi Act-Uncoord ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5172: Soldiers Field Road WB & Larz Anderson Bridge \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5172: Soldiers Field Road WB & Larz Anderson Bridge Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 0 1900 11 0 1900 12 85 1900 16 0 1900 12 0.86 99 0 0 0.97 0 0 0 0.93 0 0 0 690 1900 11 6.0 0.95 0.98 1.00 0.99 1.00 3053 1.00 3053 0.93 742 5 807 65 1900 11 0.92 0 0 0 735 1900 10 6.0 0.95 1.00 0.99 1.00 1.00 2979 0.87 2614 0.97 758 0 804 0 1900 10 0.92 0 0 0 2% 2% 2% 1% Split 5 320 1900 16 3.0 1.00 0.88 1.00 0.85 1.00 1439 1.00 1439 0.86 372 0 372 41 1% Perm 45 1900 12 0.92 0 0 0 15 1900 16 3.0 1.00 1.00 1.00 1.00 0.96 1840 0.96 1840 0.86 17 0 116 1% 1% 0% 0% 1% 5 20.0 22.0 0.21 5.0 2.0 386 0.06 0.30 35.0 1.00 2.0 37.0 D 139.3 F 0.0 A 43.5 0.75 105.0 71.6% 15 5 20.0 22.0 0.21 5.0 2.0 302 c0.26 1.23 41.5 1.00 129.8 171.3 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.97 46 0 0 236 1% pm+pt 4 24 24 0.93 70 0 0 236 0% 12 12 45.0 44.0 0.42 50.0 54.0 0.51 1421 c0.12 0.17 0.57 17.5 0.10 0.9 2.7 A 2.7 A 1279 c0.26 0.63 24.1 1.00 2.4 26.5 C 26.5 C D 15.0 C HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 188: Western Avenue & North Harvard Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 100 1900 12 0 0 25 335 1900 12 25 1900 12 0 0 25 Yes 45 1900 11 0 0 25 475 1900 11 5 1900 16 100 1 25 Yes 160 1900 12 0 1 25 225 1900 11 30 1900 11 0 0 25 Yes 0 1900 10 100 1 25 250 1900 10 125 1900 10 0 0 25 Yes 30 461 10.5 22 0.96 0% 0 Perm 30 180 4.1 0.96 0% 13 0.96 0% 13 0.93 0% 479 0 0 Perm 1 1 1 8.0 13.0 55.0 44.4% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.93 0% 22 0.93 0% 55 0.96 2% 564 0 167 D.P+P 3 4 3 1 1 1 1 8.0 13.0 55.0 44.4% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.50 26.9 0.0 26.9 148 204 381 30 186 4.2 0.0 0.0% 0.0 4.0 8.0 13.0 55.0 44.4% 3.0 2.0 -1.0 4.0 Lead Yes Max 953 0 0 0 0.50 1 8.0 13.0 55.0 44.4% 3.0 2.0 -1.0 4.0 Lead Yes Max 0.47 26.0 0.0 26.0 173 228 100 1194 0 0 0 0.47 0.0 0.0% 0.0 4.0 4.0 8.0 12.0 9.7% 3.0 1.0 0.0 4.0 Lead Yes Max 0.76 51.1 0.0 51.1 92 #164 219 0 0 0 0.76 ø2 30 429 9.8 0.96 2% 43 0.96 2% 43 0.92 2% 265 0 0 Perm 34 0.92 2% 55 0.92 2% 408 0 4 4 4 34 4 0.41 28.2 0.0 28.2 153 232 106 8.0 12.0 39.0 31.5% 3.0 1.0 0.0 4.0 Lag Yes Max 0.92 65.8 0.0 65.8 312 #523 349 644 0 0 0 0.41 445 0 0 0 0.92 51.0 41.1% 0.0 0.0% 0.0 4.0 0.0 4.0 8.0 12.0 39.0 31.5% 3.0 1.0 0.0 4.0 Lag Yes Max 2 0.0 0.0% 1.0 18.0 18.0 15% 2.0 0.0 0.0 4.0 Lag Yes None Intersection Summary Area Type: CBD Cycle Length: 124 Actuated Cycle Length: 116.8 Natural Cycle: 90 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 188: Western Avenue & North Harvard Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 188: Western Avenue & North Harvard Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 100 1900 12 335 1900 12 4.0 0.95 1.00 1.00 0.99 0.99 3175 0.67 2163 0.96 349 3 476 25 1900 12 45 1900 11 5 1900 16 225 1900 11 4.0 1.00 0.99 1.00 0.98 1.00 1584 1.00 1584 0.96 234 4 261 0 1900 10 0.96 31 0 0 43 2% 0.92 0 0 0 43 2% Perm 250 1900 10 4.0 1.00 0.96 1.00 0.95 1.00 1432 1.00 1432 0.92 272 14 394 125 1900 10 0.93 48 0 0 13 0% Perm 160 1900 12 4.0 1.00 1.00 0.99 1.00 0.95 1583 0.22 373 0.96 167 0 167 55 2% D.P+P 3 4 43.2 43.2 0.37 4.0 2.0 220 c0.05 0.23 0.76 29.8 1.00 21.5 51.3 D 30 1900 11 0.96 26 0 0 13 0% 475 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3120 0.87 2718 0.93 511 1 563 0.96 104 0 0 22 0% Perm 0% 1 0% 0.93 5 0 0 22 0% 1 1 1 50.3 51.3 0.44 5.0 2.0 944 50.3 51.3 0.44 5.0 2.0 1187 c0.22 0.50 23.9 1.00 1.9 25.8 C 25.8 C 0.21 0.47 23.5 1.00 1.4 24.9 C 24.9 C 36.9 0.68 117.5 78.4% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 2% 34 2% 0.92 136 0 0 55 2% 4 4 47.2 47.2 0.40 636 0.17 35.2 35.2 0.30 4.0 2.0 429 c0.28 0.41 25.2 1.00 2.0 27.1 C 36.5 D 0.92 39.8 1.00 27.1 66.9 E 66.9 E D 23.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 5191: Western Avenue & Soldiers Field Road EB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 13 0 1900 13 560 1900 13 Yes 960 1900 12 Yes 505 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 11 585 1900 11 25 1900 11 Yes 0.88 0% 30 494 11.2 0.88 0% 0.92 2% 0.83 0% 30 441 10.0 0.83 0% 0.83 0% 0 0 0 0 735 0 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.88 0% 0.92 0% 636 custom 2 2 1043 pm+pt 1 12 1 10.0 22.0 23.0 25.6% 4.0 3.0 -3.0 4.0 Lag Yes None 0.88 37.8 0.0 37.8 136 #231 10.0 21.0 46.0 51.1% 4.0 2.0 -2.0 4.0 Lead Yes C-Max 0.46 0.3 0.0 0.3 1 m1 414 725 0 0 0 0.88 2280 0 0 0 0.46 30 100 2.3 0.92 0% 0.92 0% 0.92 2% 30 898 20.4 0.92 2% 549 0 0 0 12 3 12 3 69.0 76.7% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -2.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.46 0.6 0.0 0.6 2 m2 20 1194 0 0 0 0.46 818 10.0 18.0 21.0 23.3% 4.0 2.0 -2.0 4.0 0.0 0.0% 0.0 4.0 None 1.24 154.9 0.0 154.9 ~276 #346 361 593 0 0 0 1.24 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 1:WBTL, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5191: Western Avenue & Soldiers Field Road EB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5191: Western Avenue & Soldiers Field Road EB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 13 0 1900 13 505 1900 11 4.0 1.00 1.00 1.00 1653 1.00 1653 0.92 549 0 549 0% 0 1900 12 0 1900 12 0 1900 12 0 1900 11 0.92 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.83 0 0 0 0% 585 1900 11 4.0 0.95 0.99 1.00 3121 1.00 3121 0.83 705 3 732 0% 25 1900 11 0.88 0 0 0 0% 960 1900 12 4.0 0.97 1.00 0.95 3152 0.95 3152 0.92 1043 4 1039 0% pm+pt 1 12 56.0 60.0 0.67 6.0 2.0 2241 0.22 0.11 0.46 7.2 0.01 0.0 0.1 A 0 1900 11 0.88 0 0 0 0% 560 1900 13 4.0 0.88 0.85 1.00 2643 1.00 2643 0.88 636 167 469 0% custom 2 16.0 19.0 0.21 7.0 2.0 558 c0.18 0.84 34.0 1.00 10.5 44.6 D 44.6 D 49.0 0.74 90.0 105.4% 15 12 3 62.0 64.0 0.71 1175 c0.33 15.0 17.0 0.19 6.0 2.0 590 c0.23 0.47 5.6 0.02 0.0 0.1 A 0.1 A 1.24 36.5 1.00 122.1 158.6 F 158.6 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A 0.83 30 0 0 0% D 12.0 G HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5192: Western Avenue & Soldiers Field Road WB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 11 1430 1900 11 265 1900 11 Yes 35 1900 11 Yes 440 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0.92 2% 30 100 2.3 0.92 2% 0.92 2% 0.91 0% 30 474 10.8 0.91 0% 0.91 0% 0.91 0% 0.92 2% 0 0 0 0 1862 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 2.0 6.0 20 30 1151 26.2 0.91 0% 0.91 0% 0.92 2% 30 456 10.4 0.92 2% 522 0 0 0 1 0 Split 2 1 2 2 10.0 21.0 46.0 51.1% 4.0 2.0 0.0 6.0 Lead Yes C-Max 0.94 24.9 7.9 32.8 369 m330 394 10.0 22.0 23.0 25.6% 4.0 3.0 -3.0 4.0 Lag Yes None 10.0 22.0 23.0 25.6% 4.0 3.0 -1.0 6.0 Lag Yes None 0.87 52.2 0.0 52.2 150 #241 1071 1990 128 0 0 1.00 0.0 0.0% 0.0 4.0 2 ø3 3 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 10.0 18.0 21.0 23% 4.0 2.0 None 376 597 0 0 0 0.87 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 1:WBTL, Start of Green, Master Intersection Natural Cycle: 90 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5192: Western Avenue & Soldiers Field Road WB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5192: Western Avenue & Soldiers Field Road WB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 11 265 1900 11 35 1900 11 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 2% 0.92 0 0 0 2% 0.91 0 0 0 0% 0.91 291 0 0 0% 0.91 38 0 0 0% Split 2 440 1900 11 6.0 0.95 1.00 1.00 3129 1.00 3129 0.91 484 6 516 0% 0 1900 11 0.92 0 0 0 2% 1430 1900 11 6.0 0.91 0.98 1.00 4407 1.00 4407 0.91 1571 30 1832 0% 0.91 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 0.0 A 29.9 0.92 90.0 105.4% 15 2 40.0 40.0 0.44 6.0 2.0 1959 c0.42 16.0 17.0 0.19 7.0 2.0 591 c0.16 0.94 23.8 0.91 3.0 24.7 C 24.7 C 0.87 35.4 1.00 13.0 48.4 D 48.4 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A C 33.0 G HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 941: Western Avenue & Memorial Drive Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 115 1900 10 0 0 25 945 1900 12 65 1900 10 150 1 25 Yes 525 1900 12 0 1 25 775 1900 10 0 1900 12 0 0 25 Yes 0 1900 10 0 0 25 600 1900 10 225 1900 10 0 0 25 Yes 30 474 10.8 30 345 7.8 0.92 2% 0.92 2% 0.92 2% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 9 0.95 2% 30 1030 23.4 49 0.95 2% 49 0.84 1% 68 custom 4 8 0.95 2% 0 Split 4 1116 4 4 8 625 pm+pt 1 6 1 5.0 10.0 29.0 32.2% 4.0 1.0 -1.0 4.0 5.0 10.0 29.0 32.2% 4.0 1.0 -1.0 4.0 5.0 10.0 13.0 14.4% 4.0 1.0 -1.0 4.0 Lag C-Max 394 C-Max 0.88 40.8 0.0 40.8 221 #300 265 1265 0 0 0 0.88 ø7 30 1839 41.8 0.84 1% 0.84 1% 0.88 3% 0.88 3% 49 0.88 3% 923 0 0 938 0 6 2 6 2 10.0 15.0 32.0 35.6% 4.0 1.0 -1.0 4.0 Lag 10.0 16.0 61.0 67.8% 4.0 2.0 -2.0 4.0 10.0 16.0 29.0 32.2% 4.0 2.0 -2.0 4.0 Lead C-Max 0.21 16.5 0.0 16.5 7 48 Max 1.09 91.9 0.0 91.9 ~358 #502 Max 0.92 31.3 0.0 31.3 417 #646 950 Max 1.15 112.4 0.0 112.4 ~321 #429 1759 150 322 0 0 0 0.21 575 0 0 0 1.09 1001 0 0 0 0.92 814 0 0 0 1.15 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 7 0.0 0.0% 1.0 15.0 16.0 18% 3.0 0.0 0.0 4.0 Lead None Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 4:WBTL and 8:WBR, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 941: Western Avenue & Memorial Drive \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 941: Western Avenue & Memorial Drive Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT 0 1900 12 0 1900 12 0 1900 12 115 1900 10 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 2% 2% 2% 0.95 121 0 0 9 2% Split 4 945 1900 12 4.0 0.91 1.00 1.00 1.00 0.99 4552 0.99 4552 0.95 995 0 1116 0.0 A 65.8 1.00 90.0 92.7% 15 WBR NBL NBT NBR SBL SBT SBR 65 1900 10 4.0 1.00 1.00 1.00 0.85 1.00 1330 1.00 1330 0.95 68 42 26 49 2% 2% custom 4 8 525 1900 12 4.0 1.00 1.00 1.00 1.00 0.95 1608 0.14 233 0.84 625 0 625 49 1% pm+pt 1 6 56.0 57.0 0.63 5.0 2.0 575 c0.34 0.35 1.09 26.3 1.00 63.3 89.6 F 775 1900 10 4.0 1.00 1.00 1.00 1.00 1.00 1580 1.00 1580 0.84 923 0 923 0 1900 12 0 1900 10 225 1900 10 0.84 0 0 0 0.88 0 0 0 600 1900 10 4.0 0.95 0.98 1.00 0.96 1.00 2774 1.00 2774 0.88 682 43 895 1% 1% 3% 3% 24.0 25.0 0.28 5.0 2.0 1264 c0.25 16.2 17.2 0.19 5.0 2.0 254 0.02 0.88 31.1 1.00 9.1 40.2 D 39.7 D 0.10 30.0 1.00 0.8 30.8 C 6 2 55.0 57.0 0.63 6.0 2.0 1001 0.58 23.0 25.0 0.28 6.0 2.0 771 c0.32 0.92 14.5 1.00 14.9 29.5 C 53.8 D 1.16 32.5 1.00 86.3 118.8 F 118.8 F HCM Level of Service E Sum of lost time (s) ICU Level of Service 8.0 F \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.88 256 0 0 49 3% HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5161: Cambridge Street & I-90 On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT WBT WBR NBL NBT NBR NEL NER 5 1900 795 1900 525 1900 315 1900 No 10 1900 20 1900 35 1900 No 5 1900 1265 1900 30 279 6.3 30 170 3.9 0.94 1% 0.94 1% 0.91 0% 0.91 0% 0.86 0% 0.86 0% 2 0.86 0% 0.94 1% 0 Split 3 851 923 0 76 0 449 3 45 0 Split 2 3 3 45 2 2 1 5 1 8.0 13.0 29.0 20.7% 4.0 1.0 -2.0 3.0 Lead Yes Max 8.0 13.0 29.0 20.7% 4.0 1.0 -2.0 3.0 Lead Yes Max 0.99 85.3 0.0 85.3 286 #384 199 8.0 13.0 14.0 10.0% 4.0 1.0 -2.0 3.0 Lag Yes None 0.60 10.9 2.0 12.9 55 124 90 8.0 13.0 14.0 10.0% 4.0 1.0 -2.0 3.0 Lag Yes None 0.62 84.7 0.0 84.7 68 #126 45 8.0 13.0 24.0 17.1% 4.0 1.0 -2.0 3.0 Lead Yes C-Max 0.67 34.7 138.8 173.5 310 440 468 1534 438 0 0 0.84 122 0 0 0 0.62 858 0 0 0 0.99 30 125 2.8 73.0 52.1% 0.0 0.0% -5.0 3.0 -1.0 3.0 ø4 ø5 4 5 8.0 16.0 28.0 20% 3.0 5.0 8.0 13.0 45.0 32% 4.0 1.0 Lag Yes None None 30 548 12.5 2 0.0 0.0% -1.0 3.0 670 0 324 0 1.30 2 0.94 1% 33% 902 custom 15 15 15 69.0 49.3% -2.0 3.0 0.73 34.2 186.9 221.1 357 446 1235 0 596 0 1.41 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 75 (54%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5161: Cambridge Street & I-90 On-Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5161: Cambridge Street & I-90 On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT WBT WBR NBL NBT NBR NEL NER 5 1900 795 1900 3.0 0.91 1.00 1.00 1.00 1.00 4621 1.00 4621 0.94 846 0 851 525 1900 3.0 0.95 1.00 1.00 0.94 1.00 3066 1.00 3066 0.91 577 0 923 315 1900 10 1900 35 1900 0.91 346 0 0 0.86 12 0 0 20 1900 3.0 1.00 0.99 1.00 0.93 0.99 1557 0.99 1557 0.86 23 0 76 5 1900 3.0 1.00 0.99 1.00 0.85 1.00 1422 1.00 1422 0.94 5 0 449 1% 0% 0% 3 45 0% Split 2 24.0 26.0 0.19 5.0 2.0 858 c0.18 68.0 73.0 0.52 1599 c0.30 9.0 11.0 0.08 5.0 2.0 122 c0.05 1265 1900 3.0 0.91 1.00 1.00 0.85 1.00 2619 1.00 2619 0.94 1346 0 902 2 1% custom 15 15 64.0 66.0 0.47 0.99 56.9 1.00 28.8 85.7 F 85.7 F 0.58 22.9 0.37 0.3 8.8 A 8.8 A 0.62 62.5 1.00 6.9 69.4 E 69.4 E 0.94 5 0 0 1% Split 3 40.8 0.75 140.0 73.8% 15 0% 2 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.86 41 0 0 2 0% 1% 1 5 59.0 63.0 0.45 5.0 2.0 670 0.10 0.22 0.67 30.9 1.00 2.9 33.8 C 32.8 C 1235 c0.34 0.73 29.8 1.00 2.4 32.2 C D 12.0 D HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5162: Cambridge Street & Soldiers Field Road EB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 1570 1900 11 525 1900 11 Yes 10 1900 11 760 1900 11 0 1900 11 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 440 1900 11 225 1900 11 80 1900 10 Yes 0.99 1% 30 170 3.9 0.99 1% 0.99 1% 0.92 0% 30 86 2.0 0.92 0% 0.92 0% 0.92 2% 30 306 7.0 0.92 2% 0.92 2% 0.92 1% 30 266 6.0 0.92 1% 0 1586 530 Perm 0 pm+pt 5 15 5 837 0 0 0 0 245 15 478 Split 4 4 87 Prot 4 15 4 4 4 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 0.92 81.7 0.0 81.7 223 #326 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 0.87 85.7 0.0 85.7 220 #374 186 8.0 16.0 28.0 20.0% 3.0 5.0 -4.0 4.0 Lag Yes None 0.29 12.3 0.1 12.4 0 50 517 0 0 0 0.92 281 0 0 0 0.87 302 0 23 0 0.31 123 123 123 123 0.0 0.0% 67.0 47.9% 67.0 47.9% 0.0 4.0 -1.0 4.0 -1.0 4.0 8.0 13.0 45.0 32.1% 4.0 1.0 -1.0 4.0 69.0 49.3% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 None 0.79 26.0 193.6 219.6 379 m403 90 0.60 9.2 19.6 28.8 143 m194 2011 901 0 0 1.43 884 352 0 0 1.00 0.62 1.4 0.3 1.7 0 m0 6 1347 0 120 0 0.68 226 ø1 ø2 ø3 1 2 3 8.0 13.0 24.0 17% 4.0 1.0 8.0 13.0 14.0 10% 4.0 1.0 8.0 13.0 29.0 21% 4.0 1.0 Lead Yes C-Max Lag Yes None Lead Yes Max 0.92 1% Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 75 (54%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 5162: Cambridge Street & Soldiers Field Road EB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5162: Cambridge Street & Soldiers Field Road EB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 1570 1900 11 4.0 0.91 1.00 1.00 4468 1.00 4468 0.99 1586 0 1586 1% 525 1900 11 4.0 1.00 0.85 1.00 1391 1.00 1391 0.99 530 258 272 1% Perm 10 1900 11 760 1900 11 4.0 0.95 1.00 1.00 3139 0.95 2999 0.92 826 0 837 0% 0 1900 11 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 440 1900 11 4.0 0.97 1.00 0.95 3016 0.95 3016 0.92 478 0 478 1% Split 4 225 1900 11 4.0 1.00 1.00 1.00 1637 1.00 1637 0.92 245 0 245 1% 4 80 1900 10 4.0 1.00 0.85 1.00 1343 1.00 1343 0.92 87 72 15 1% Prot 4 20.0 24.0 0.17 8.0 2.0 517 c0.16 20.0 24.0 0.17 8.0 2.0 281 0.15 20.0 24.0 0.17 8.0 2.0 230 0.01 0.92 57.1 1.00 22.1 79.2 E 0.87 56.5 1.00 23.7 80.2 F 76.2 E 0.06 48.6 1.00 0.0 48.6 D 0.99 0 0 0 1% 123 62.0 63.0 0.45 2011 c0.35 0.79 32.8 0.73 1.1 25.0 C 31.8 C 123 62.0 63.0 0.45 626 0.20 0.43 26.3 1.97 0.1 52.0 D 34.6 0.76 140.0 82.9% 15 0.92 11 0 0 0% pm+pt 5 15 15 59.0 61.0 0.44 1348 c0.18 0.09 0.62 30.6 0.04 0.1 1.4 A 1.4 A HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A C 12.0 E HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5163: Cambridge Street & Soldiers Field Road WB Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 415 1900 11 1595 1900 11 0 1900 11 No 0 1900 12 0 1900 12 0 1900 12 No 770 1900 11 60 1900 10 130 1900 10 No 0 1900 12 0 1900 12 0 1900 12 No 0.96 1% 30 86 2.0 0.96 1% 0.96 1% 0.25 0% 30 455 10.3 0.25 0% 0.25 0% 0.25 0% 2093 0 0 0 0 0 30 304 6.9 0.91 0% 0.91 0% 0.25 0% 30 1151 26.2 0.25 0% 522 0 0 0 0 Split 1234 1234 0.91 0% 37% 533 Split 5 1234 1234 5 5 8.0 13.0 45.0 32.1% 4.0 1.0 1.0 6.0 8.0 13.0 45.0 32.1% 4.0 1.0 1.0 6.0 95.0 67.9% 95.0 67.9% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 4.0 -1.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.73 1.7 0.1 1.8 5 17 6 None 1.28 184.9 18.2 203.1 ~647 #885 375 2875 0 133 0 0.76 416 0 13 0 1.32 5 None 1.33 204.1 20.2 224.2 ~647 #886 224 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 ø1 ø2 ø3 ø4 1 2 3 4 8.0 13.0 24.0 17% 4.0 1.0 8.0 13.0 14.0 10% 4.0 1.0 8.0 13.0 29.0 21% 4.0 1.0 8.0 16.0 28.0 20% 3.0 5.0 Lead Yes C-Max Lag Yes None Lead Yes Max Lag Yes None 1071 393 0 13 0 1.37 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 75 (54%), Referenced to phase 1:NEL, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 5163: Cambridge Street & Soldiers Field Road WB \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 5163: Cambridge Street & Soldiers Field Road WB Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 415 1900 11 1595 1900 11 4.0 0.91 1.00 0.99 4422 0.99 4422 0.96 1661 0 2093 1% 0 1900 11 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.25 0 0 0 0% 0.25 0 0 0 0% 0.25 0 0 0 0% 60 1900 10 6.0 0.95 0.96 0.97 1412 0.97 1412 0.91 66 0 522 0% 130 1900 10 0.96 0 0 0 1% 770 1900 11 6.0 0.95 1.00 0.95 1492 0.95 1492 0.91 846 0 533 0% Split 5 0.91 143 0 0 0% 0.25 0 0 0 0% 0.25 0 0 0 0% 0.25 0 0 0 0% 40.0 39.0 0.28 5.0 4.0 416 0.36 40.0 39.0 0.28 5.0 4.0 393 c0.37 1.28 50.5 1.00 143.9 194.4 F 1.33 50.5 1.00 164.4 214.9 F 204.5 F 0.96 432 0 0 1% Split 1234 1234 87.0 88.0 0.63 2780 c0.47 0.75 18.3 0.04 0.6 1.4 A 1.4 A 0.0 A 69.5 0.91 140.0 81.8% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 5 0.0 A E 10.0 D HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 937: River Street & Memorial Drive Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 195 1900 12 1020 1900 12 510 1900 12 No 0 1900 12 0 1900 12 0 1900 12 Yes 0 1900 12 1105 1900 11 70 1900 10 Yes 75 1900 10 640 1900 10 0 1900 12 Yes 30 455 10.3 16 0.97 0% 0.97 0% 30 484 11.0 22 0.97 0% 30 1616 36.7 30 1030 23.4 0.92 2% 0.92 2% 0.92 2% 0.90 0% 0.90 0% 18 0.90 0% 18 0.93 0% 0 0 0 0 1306 0 0 Split 4 1253 4 526 Prot 4 4 4 4 6 10.0 21.0 67.0 47.9% 4.0 1.0 -2.0 3.0 Lag Yes Max 10.0 21.0 67.0 47.9% 4.0 1.0 -2.0 3.0 Lag Yes Max 0.85 27.1 4.8 31.9 508 m515 375 10.0 21.0 67.0 47.9% 4.0 1.0 -2.0 3.0 Lag Yes Max 0.79 28.2 3.6 31.7 336 m476 10.0 22.0 42.0 30.0% 4.0 2.0 -3.0 3.0 Lag Yes C-Max 1.05 80.2 0.0 80.2 ~680 #821 1536 1473 164 0 0 0.96 665 74 0 0 0.89 6 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 -1.0 3.0 -1.0 3.0 404 1244 0 0 0 1.05 ø3 0.0 0.0% -1.0 3.0 0.93 0% 0.93 0% 0 pm+pt 5 2 5 769 0 5.0 10.0 14.0 10.0% 4.0 1.0 -2.0 3.0 Lead Yes Max 10.0 22.0 56.0 40.0% 4.0 2.0 -3.0 3.0 2 3 2 C-Max 0.85 37.4 0.0 37.4 241 300 950 0.0 0.0% 1.0 16.0 17.0 12% 2.0 0.0 -1.0 3.0 Lead Yes None 905 0 0 0 0.85 Intersection Summary Area Type: CBD Cycle Length: 140 Actuated Cycle Length: 140 Offset: 43 (31%), Referenced to phase 2:SBTL and 6:NBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 937: River Street & Memorial Drive \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 937: River Street & Memorial Drive Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 195 1900 12 1020 1900 12 3.0 0.95 1.00 1.00 1.00 0.99 3223 0.99 3223 0.97 1052 0 1253 0 1900 12 0 1900 12 0 1900 12 0 1900 12 70 1900 10 75 1900 10 0.92 0 0 0 0.92 0 0 0 0.90 0 0 0 2% 2% 2% 0% 0% 0.90 78 0 0 18 0% 0.93 81 0 0 18 0% pm+pt 5 2 640 1900 10 3.0 0.95 1.00 1.00 1.00 0.99 3017 0.52 1586 0.93 688 0 769 0 1900 12 0.92 0 0 0 1105 1900 11 3.0 0.95 1.00 1.00 0.99 1.00 3102 1.00 3102 0.90 1228 3 1303 0% 0% 4 510 1900 12 3.0 1.00 1.00 1.00 0.85 1.00 1454 1.00 1454 0.97 526 0 526 22 0% Prot 4 62.0 64.0 0.46 5.0 2.0 1473 c0.39 62.0 64.0 0.46 5.0 2.0 665 0.36 53.0 56.0 0.40 6.0 2.0 1241 c0.42 0.85 33.8 0.67 4.0 26.7 C 26.9 C 0.79 32.3 0.67 5.9 27.4 C 1.05 42.0 1.00 39.7 81.7 F 81.7 F 0.97 201 0 0 16 0% Split 4 0% 6 0.0 A 48.0 0.94 140.0 106.2% 15 2 67.0 70.0 0.50 6.0 2.0 916 c0.07 0.35 0.84 30.2 1.00 9.1 39.3 D 39.3 D HCM Level of Service D Sum of lost time (s) ICU Level of Service 9.0 G \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.93 0 0 0 HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 294: Memorial Dr on-ramp & BU Bridge Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 Yes 135 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 855 1900 555 1900 Yes 0 1900 0 1900 0 1900 Yes 30 98 2.2 30 614 14.0 30 129 2.9 30 61 1.4 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0.90 3% 150 0.90 0% 0.90 0% 0.90 0% 0.90 0% 0 150 0 0 0 0 0 1567 0 0 0 0 0.0 0.0% 0.0 4.0 3 1 3 1 7.0 12.0 17.0 18.9% 4.0 1.0 0.0 5.0 8.0 20.0 55.0 61.1% 4.0 1.0 0.0 5.0 Lead Yes C-Max 0.91 24.1 199.8 223.9 340 #538 49 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 Max 0.22 33.5 0.0 33.5 41 71 18 534 693 0 0 0 0.22 ø2 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 10.0 18.0 18.0 20% 3.0 0.0 Lag Yes None 1 1727 644 0 0 1.45 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 1:NBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 294: Memorial Dr on-ramp & BU Bridge \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 294: Memorial Dr on-ramp & BU Bridge Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 855 1900 5.0 0.95 0.96 1.00 0.94 1.00 2892 1.00 2892 0.90 950 122 1445 555 1900 0.90 0 0 0 135 1900 5.0 0.95 1.00 1.00 1.00 1.00 3249 1.00 3249 0.90 150 0 150 0.90 0 0 0 0.90 0 0 0 0.90 0 0 0 0% 0% 0% 0% 0% 0% 0% 3% 0.90 617 0 0 150 0% 0% 0% 0% 3 1 19.2 19.2 0.21 5.0 2.0 693 c0.05 48.8 48.8 0.54 5.0 2.0 1568 c0.50 0.22 29.2 1.00 0.7 29.9 C 29.9 C 0.92 18.8 1.00 10.4 29.2 C 29.2 C 0.0 A 29.3 0.72 90.0 63.0% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A C 22.0 B HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 315: Commonwealth Avenue & BU Bridge On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 10 300 1 25 1030 1900 12 365 1900 13 170 1 25 Yes 0 1900 10 0 0 25 1345 1900 10 1030 1900 16 200 1 25 No 0 1900 16 0 0 25 380 1900 16 0 1900 16 0 0 25 No 25 1900 10 0 0 25 1255 1900 12 590 1900 11 175 1 25 Yes 30 1330 30.2 0.82 0% 0.82 0% 0 1256 30 354 8.0 419 0.82 0% 946 0.94 0% 0.94 0% 445 Perm 0 1431 2 0.0 0.0% 0.0 4.0 0.85 0% 0.85 0% 125 0.85 0% 125 0.89 0% 1096 custom 2 28 0 447 0 0 Perm 2 2 8.0 24.0 52.0 47.3% 4.0 1.0 -1.0 4.0 8.0 24.0 52.0 47.3% 4.0 1.0 -1.0 4.0 8.0 24.0 52.0 47.3% 4.0 1.0 -1.0 4.0 C-Max 0.62 25.5 0.0 25.6 245 257 1250 2037 0 12 0 0.62 0.0 4.0 C-Max 1.09 101.8 0.0 101.8 ~350 #475 C-Max 0.75 22.0 2.5 24.6 224 m193 274 170 408 0 0 0 1.09 30 1048 23.8 0.94 0% 2 2 0.0 0.0% 30 198 4.5 1901 336 0 0 0.91 7 81.0 73.6% 0.0 0.0% -1.0 4.0 0.0 4.0 0.95 21.4 138.6 160.0 525 m362 200 1153 321 0 0 1.32 8.0 17.0 29.0 26.4% 3.0 4.0 -3.0 4.0 Lead None 1.02 70.1 0.0 70.1 ~326 #484 118 440 0 0 0 1.02 0.0 0.0% 0.0 4.0 0.89 0% 1438 74 0.89 0% 3 663 Prot 3 3 3 3 3 8.0 25.0 58.0 52.7% 3.0 4.0 -3.0 4.0 8.0 25.0 58.0 52.7% 3.0 4.0 -3.0 4.0 8.0 25.0 58.0 52.7% 3.0 4.0 -3.0 4.0 7 28 ø8 8 4.0 8.0 29.0 26% 3.0 1.0 Lag None None 1.01 54.2 0.0 54.2 ~527 #685 968 1428 0 0 0 1.01 None 0.95 51.9 0.0 51.9 427 #672 None 175 696 0 0 0 0.95 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 104 (95%), Referenced to phase 2:EBWB, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 315: Commonwealth Avenue & BU Bridge On-Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 315: Commonwealth Avenue & BU Bridge On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 10 1345 1900 10 4.0 0.91 1.00 1.00 1.00 1.00 4357 1.00 4357 0.94 1431 0 1431 1030 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1647 1.00 1647 0.94 1096 0 1096 0 1900 16 0 1900 16 25 1900 10 0.85 0 0 0 380 1900 16 4.0 1.00 1.00 1.00 1.00 1.00 1938 1.00 1938 0.85 447 0 447 0% 0% custom 2 28 0% 0% 0.85 0 0 0 125 0% 0.89 28 0 0 125 0% Perm 1255 1900 12 4.0 0.95 1.00 1.00 1.00 1.00 3246 0.89 2907 0.89 1410 0 1438 0% 365 1900 13 4.0 1.00 0.61 1.00 0.85 1.00 916 1.00 916 0.82 445 8 437 419 0% Perm 0 1900 10 0.82 0 0 0 1030 1900 12 4.0 0.91 1.00 1.00 1.00 1.00 4668 1.00 4668 0.82 1256 0 1256 590 1900 11 4.0 1.00 1.00 1.00 0.85 1.00 1405 1.00 1405 0.89 663 6 657 74 0% Prot 3 2 47.0 48.0 0.44 5.0 2.0 2037 0.27 0.62 23.9 1.00 1.4 25.3 C 45.7 D 2 47.0 48.0 0.44 5.0 2.0 400 c0.48 1.09 31.0 1.00 72.3 103.3 F 41.1 1.05 110.0 99.8% 15 0.94 0 0 0 946 0% 0% 7 0% 3 3 47.0 48.0 0.44 5.0 2.0 1901 0.33 0.75 26.0 0.83 0.3 21.8 C 24.0 C 76.0 74.0 0.67 1108 0.67 0.99 17.6 1.20 5.9 26.9 C 22.0 25.0 0.23 7.0 4.0 440 0.23 51.0 54.0 0.49 7.0 4.0 1427 c0.49 1.01 28.0 1.00 25.7 53.7 D 52.5 D 1.02 42.5 0.47 46.4 66.5 E 66.5 E HCM Level of Service D Sum of lost time (s) ICU Level of Service 8.0 F \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 51.0 54.0 0.49 7.0 4.0 690 0.47 0.95 26.8 1.00 23.2 50.0 D HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 1329: Commonwealth Avenue & University Road Outbound Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 11 675 1900 11 380 1900 12 Yes 0 1900 11 940 1900 11 50 1900 11 Yes 1165 1900 14 250 1900 13 85 1900 13 Yes 0 1900 12 0 1900 12 0 1900 16 Yes 0.96 1% 30 76 1.7 0.96 1% 0.96 1% 0.95 2% 30 553 12.6 0.95 2% 0.95 2% 0.94 1% 30 319 7.3 0.94 1% 0.94 1% 0.92 2% 30 393 8.9 0.92 2% 0.92 2% 0 703 396 custom 2 36 0 1042 0 356 0 0 0 0 6 1239 Split 3 6 3 3 2.0 9.0 17.0 15.5% 4.0 3.0 -3.0 4.0 Lag 20.0 28.0 73.0 66.4% 4.0 4.0 -4.0 4.0 20.0 28.0 73.0 66.4% 4.0 4.0 -4.0 4.0 2 0.0 0.0% 0.0 4.0 8.0 15.0 37.0 33.6% 4.0 3.0 -3.0 4.0 36 90.0 81.8% 0.0 0.0% -3.0 5.0 0.0 4.0 C-Max 0.75 24.9 0.0 24.9 73 m133 1 0.31 2.2 1.4 3.6 0 m0 933 2 0 0 0.76 1268 652 0 0 0.64 0.0 0.0% 0.0 4.0 3 ø5 5 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 1.0 13.0 20.0 18% 3.0 0.0 Lead C-Max 1.30 180.2 12.5 192.7 ~346 #439 473 None 1.15 99.8 70.0 169.7 ~1044 #1301 803 0 17 0 1.33 1076 0 130 0 1.31 None 0.33 7.1 0.0 7.1 56 m97 239 None 313 1067 0 0 0 0.33 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 13 (12%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1329: Commonwealth Avenue & University Road Outbound \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 1329: Commonwealth Avenue & University Road Outbound Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group EBL EBT 0 1900 11 675 1900 11 4.0 0.95 1.00 1.00 3110 1.00 3110 0.96 703 0 703 1% 0.96 0 0 0 1% Charles River Base Model - Existing Conditions Weekday Evening EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 380 1900 12 5.0 1.00 0.85 1.00 1439 1.00 1439 0.96 396 79 317 1% custom 2 36 0 1900 11 940 1900 11 4.0 0.91 0.99 1.00 4390 1.00 4390 0.95 989 5 1037 2% 50 1900 11 250 1900 13 4.0 1.00 0.96 1.00 1683 1.00 1683 0.94 266 11 345 1% 85 1900 13 0 1900 12 0 1900 12 0 1900 16 0.94 90 0 0 1% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 6 1165 1900 14 4.0 1.00 1.00 0.95 1716 0.95 1716 0.94 1239 0 1239 1% Split 3 17.0 20.0 0.18 7.0 0.2 798 c0.24 65.0 69.0 0.63 8.0 4.0 1076 c0.72 65.0 69.0 0.63 8.0 4.0 1056 0.20 1.30 45.0 1.00 144.0 189.0 F 189.0 F 1.15 20.5 0.99 77.5 97.7 F 0.33 9.6 0.71 0.2 7.1 A 77.5 E 30.0 33.0 0.30 7.0 4.0 933 c0.23 0.75 34.8 0.58 4.4 24.6 C 26.0 C 89.0 88.0 0.80 1151 0.22 0.28 2.8 10.03 0.1 28.4 C 93.4 1.16 110.0 99.8% 15 0.95 0 0 0 2% 0.95 53 0 0 2% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 3 0.0 A F 12.0 F HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 8000: Lenox Street & Mountfort Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBT WBR WBR2 NBT SEL 25 1900 12 0 1900 10 50 1 25 745 1900 12 365 1900 16 630 1900 11 0 0 25 30 228 5.2 0.97 3% ø2 Yes 30 280 6.4 0.96 3% 0.96 3% 0.96 3% 30 307 7.0 0.89 0% 776 custom 5 1 0 410 649 3 6 26 2 5 1 3 6 5.0 11.0 20.0 18.2% 4.0 2.0 -2.0 4.0 Lead 8.0 13.0 75.0 68.2% 4.0 1.0 -1.0 4.0 Lead 8.0 18.0 20.0 18.2% 3.0 1.0 0.0 4.0 8.0 16.0 70.0 63.6% 4.0 1.0 -1.0 4.0 Lag 1.0 15.0 15.0 14% 4.0 0.0 Max 0.11 42.2 0.0 42.2 16 43 200 C-Max 0.77 11.7 0.0 11.7 147 333 Max 0.76 55.6 0.0 55.6 148 201 227 C-Max 0.37 6.8 0.0 6.8 62 m64 148 Max 536 0 0 0 0.76 1775 0 0 0 0.37 241 0 0 0 0.11 0.0 0.0% 0.0 4.0 50 1004 0 0 0 0.77 Lag Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 58 (53%), Referenced to phase 1:WBR and 6:SEL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 8000: Lenox Street & Mountfort Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 8000: Lenox Street & Mountfort Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group WBT Charles River Base Model - Existing Conditions Weekday Evening WBR WBR2 NBT SEL 0 1900 10 4.0 1.00 0.85 1.00 1317 1.00 1317 0.96 0 154 622 3% custom 5 1 745 1900 12 365 1900 16 4.0 0.95 1.00 1.00 3682 1.00 3682 0.89 410 0 410 0% 630 1900 11 4.0 0.97 1.00 0.95 2958 0.95 2958 0.97 649 0 649 3% 3 6 25 1900 12 4.0 1.00 1.00 1.00 1660 1.00 1660 0.96 26 0 26 3% 0.96 776 0 0 3% 14.0 16.0 0.15 6.0 2.0 241 0.02 70.0 71.0 0.65 5.0 2.0 850 c0.47 16.0 16.0 0.15 4.0 2.0 536 c0.11 65.0 66.0 0.60 5.0 2.0 1775 c0.22 0.11 40.8 1.00 0.9 41.7 D 19.4 B 0.73 13.1 1.00 5.5 18.6 B 0.76 45.2 1.00 10.0 55.2 E 55.2 E 0.37 11.3 0.57 0.3 6.7 A 6.7 A 22.8 0.68 110.0 69.1% 15 HCM Level of Service C Sum of lost time (s) ICU Level of Service 8.0 C \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 239: Mass Ave. & Prospect Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 25 330 1900 55 1900 100 1 25 No 0 1900 0 0 25 315 1900 125 1900 100 1 25 No 0 1900 0 0 25 650 1900 175 1900 0 1 25 No 0 1900 0 0 25 465 1900 55 1900 0 0 25 No 30 527 12.0 30 304 6.9 30 127 2.9 0.93 5% 0.93 5% 0.93 5% 0.95 5% 0.95 5% 0.95 5% 0.96 4% 0.96 4% 0 355 59 Prot 1 0 332 132 Prot 1 0 677 1 0.0 0.0% 0.0 4.0 35.0 35.0 38.9% 3.0 7.0 -5.0 5.0 Lead Yes 0.65 32.4 0.0 32.4 170 267 447 35.0 35.0 38.9% 3.0 7.0 -5.0 5.0 Lead Yes 0.13 21.9 0.0 21.9 23 52 543 0 0 0 0.65 1 0.0 0.0% 0.0 4.0 100 461 0 0 0 0.13 35.0 35.0 38.9% 3.0 7.0 -5.0 5.0 Lead Yes 0.61 32.9 11.4 44.4 171 262 224 543 183 0 0 0.92 35.0 35.0 38.9% 3.0 7.0 -5.0 5.0 Lead Yes 0.29 25.9 0.0 25.9 62 113 100 461 0 0 0 0.29 2 0.0 0.0% 0.0 4.0 30 354 8.0 540 0.96 4% 182 Prot 2 55.0 55.0 61.1% 3.0 7.0 -5.0 5.0 Lag Yes 0.74 10.3 23.9 34.3 143 m161 47 55.0 55.0 61.1% 3.0 7.0 -5.0 5.0 Lag Yes 0.23 1.3 0.0 1.3 4 m6 913 252 0 0 1.02 777 0 0 0 0.23 0.96 2% 0.96 2% 0.96 2% 0 541 0 2 0.0 0.0% 0.0 4.0 55.0 55.0 61.1% 3.0 7.0 -5.0 5.0 Lag Yes 0.59 16.5 0.0 16.5 190 291 274 0.0 0.0% 0.0 4.0 918 0 0 0 0.59 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 0 (0%), Referenced to phase 2:NBSB and 6:, Start of Green Natural Cycle: 90 Control Type: Pretimed m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 239: Mass Ave. & Prospect Street \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 239: Mass Ave. & Prospect Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 55 1900 5.0 1.00 1.00 1.00 0.85 1.00 1384 1.00 1384 0.93 59 0 59 0 1900 125 1900 5.0 1.00 1.00 1.00 0.85 1.00 1384 1.00 1384 0.95 132 0 132 0.96 0 0 0 465 1900 5.0 1.00 1.00 1.00 0.99 1.00 1653 1.00 1653 0.96 484 0 541 5% 5% 5% 5% 4% 2% 2% 2% 1 5% Prot 1 4% 1 5% Prot 1 2 175 1900 5.0 1.00 1.00 1.00 0.85 1.00 1398 1.00 1398 0.96 182 0 182 540 4% Prot 2 55 1900 0.96 0 0 0 650 1900 5.0 1.00 1.00 1.00 1.00 1.00 1644 1.00 1644 0.96 677 0 677 0 1900 0.95 0 0 0 315 1900 5.0 1.00 1.00 1.00 1.00 1.00 1629 1.00 1629 0.95 332 0 332 0 1900 0.93 0 0 0 330 1900 5.0 1.00 1.00 1.00 1.00 1.00 1629 1.00 1629 0.93 355 0 355 25.0 30.0 0.33 10.0 543 c0.22 25.0 30.0 0.33 10.0 461 0.04 25.0 30.0 0.33 10.0 543 0.20 25.0 30.0 0.33 10.0 461 0.10 45.0 50.0 0.56 10.0 913 c0.41 45.0 50.0 0.56 10.0 777 0.13 45.0 50.0 0.56 10.0 918 0.33 0.65 25.6 1.00 6.0 31.6 C 30.2 C 0.13 20.9 1.00 0.6 21.5 C 0.61 25.1 1.08 5.1 32.1 C 30.2 C 0.29 22.1 1.07 1.6 25.3 C 0.74 15.1 0.44 3.4 10.0 A 8.1 A 0.23 10.2 0.09 0.4 1.3 A 0.59 13.2 1.00 2.8 16.0 B 16.0 B 18.5 0.71 90.0 65.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.96 57 0 0 2 B 10.0 C HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 227: Mass Ave. & Sidney St Ext. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 105 1900 130 1 100 270 1900 40 1900 0 0 25 No 140 1900 115 1 215 405 1900 100 1900 0 0 25 No 0 1900 0 0 25 0 1900 70 1900 0 1 25 No 60 1900 0 0 25 130 1900 170 1900 0 1 25 No 30 627 14.3 0.92 0.92 0.92 114 Prot 5 336 0 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.43 32.5 0.0 32.5 63 m109 21.0 40.0 44.4% 4.0 1.0 0.0 5.0 Lag Yes 0.53 34.5 0.0 34.5 176 261 547 0.92 130 266 0 0 0 0.43 2 640 0 0 0 0.53 0.0 0.0% 0.0 4.0 30 673 15.3 0.92 0.92 0.92 30 277 6.3 0.92 152 Prot 1 549 0 0 0 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.57 44.0 0.0 44.0 81 143 21.0 40.0 44.4% 4.0 1.0 0.0 5.0 Lag Yes 0.87 41.9 0.0 41.9 282 #475 593 115 266 0 0 0 0.57 6 632 0 0 0 0.87 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 30 170 3.9 0.92 0.92 0.92 76 custom 1 1 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.31 37.1 0.0 37.1 38 80 0 Split 8 206 21.0 30.0 33.3% 4.0 1.0 0.0 5.0 21.0 30.0 33.3% 4.0 1.0 0.0 5.0 197 242 0 0 0 0.31 8 0.45 39.4 160.0 199.5 102 m144 90 458 303 0 0 1.33 0.92 185 Over 5 20.0 20.0 22.2% 4.0 1.0 0.0 5.0 Lead Yes 0.78 60.1 63.8 123.9 110 m#146 238 71 0 0 1.11 Intersection Summary Area Type: CBD Cycle Length: 90 Actuated Cycle Length: 90 Offset: 74 (82%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 70 Control Type: Pretimed # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 227: Mass Ave. & Sidney St Ext. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 227: Mass Ave. & Sidney St Ext. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 105 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 114 0 114 Prot 5 270 1900 5.0 1.00 0.98 1.00 1644 1.00 1644 0.92 293 0 336 40 1900 405 1900 5.0 1.00 0.97 1.00 1627 1.00 1627 0.92 440 0 549 100 1900 0 1900 0 1900 0.92 109 0 0 0.92 0 0 0 0.92 0 0 0 130 1900 5.0 1.00 1.00 0.98 1650 0.98 1650 0.92 141 0 206 8 170 1900 5.0 1.00 0.85 1.00 1425 1.00 1425 0.92 185 0 185 Over 5 15.0 15.0 0.17 5.0 266 0.07 35.0 35.0 0.39 5.0 639 0.20 15.0 15.0 0.17 5.0 266 0.10 35.0 35.0 0.39 5.0 633 c0.34 70 1900 5.0 1.00 0.86 1.00 1450 1.00 1450 0.92 76 0 76 custom 1 1 15.0 15.0 0.17 5.0 242 0.05 60 1900 2 140 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 152 0 152 Prot 1 25.0 25.0 0.28 5.0 458 c0.12 15.0 15.0 0.17 5.0 238 c0.13 0.43 33.7 0.83 4.0 31.8 C 0.53 21.1 1.48 2.5 33.7 C 33.2 C 0.57 34.5 1.00 8.6 43.2 D 0.87 25.4 1.00 14.9 40.2 D 40.9 D 0.45 26.8 1.36 2.2 38.6 D 48.1 D 0.78 35.9 1.20 15.6 58.7 E 0.92 43 0 0 40.3 0.71 90.0 60.7% 15 6 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.31 33.0 1.00 3.4 36.3 D 36.3 D 0.92 65 0 0 Split 8 D 15.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 308: Memorial Dr WB On-ramp & Mass Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 0 1900 135 1900 Yes 125 1900 635 1900 0 1900 Yes 0 1900 750 1900 90 1900 Yes 30 711 16.2 30 476 10.8 0.92 2% 0.92 2% 0.92 2% 0.92 2% 0.92 2% 0 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 631 30 127 2.9 150 0.72 0% 150 0.86 0% 188 custom 4 30 432 9.8 0.86 14% 0.92 0% 0.92 2% 0.88 11% 150 0.88 1% 738 0 0 954 0 4 145 pm+pt 1 6 1 6.0 15.0 21.0 24.1% 4.0 1.0 0.0 5.0 Lag Yes None 0.31 1.3 0.0 1.3 0 0 746 0 0 0 0.25 6 2 6 2 10.0 15.0 18.0 20.7% 4.0 1.0 0.0 5.0 Lead Yes Max 0.30 5.9 2.9 8.8 5 m11 10.0 15.0 45.0 51.7% 4.0 1.0 0.0 5.0 Max 0.38 1.7 1.1 2.8 12 18 47 22.0 27.0 27.0 31.0% 4.0 1.0 0.0 5.0 Lag Yes Max 0.92 33.5 1.7 35.2 168 #278 352 479 240 0 0 0.61 1954 924 0 0 0.72 1042 0 27 0 0.94 396 ø3 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 3 0.0 0.0% 4.0 21.0 21.0 24% 2.0 0.0 0.0 4.0 Lead Yes None Intersection Summary Area Type: CBD Cycle Length: 87 Actuated Cycle Length: 58.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 308: Memorial Dr WB On-ramp & Mass Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 308: Memorial Dr WB On-ramp & Mass Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 750 1900 5.0 0.95 0.95 1.00 0.98 1.00 2769 1.00 2769 0.88 852 9 945 90 1900 0.92 0 0 0 635 1900 5.0 0.95 1.00 1.00 1.00 1.00 2850 1.00 2850 0.86 738 0 738 0 1900 0.92 0 0 0 2% 2% 2% 2% 2% 125 1900 5.0 1.00 1.00 1.00 1.00 0.95 1624 0.15 253 0.86 145 0 145 150 0% pm+pt 1 6 40.0 40.0 0.69 5.0 0.2 479 0.07 0.14 0.30 5.5 1.26 1.0 7.9 A 0 1900 0.92 0 0 0 135 1900 5.0 1.00 1.00 1.00 0.86 1.00 1479 1.00 1479 0.72 188 161 27 150 0% custom 4 14% 0% 2% 11% 8.3 8.3 0.14 5.0 2.0 211 c0.02 0.13 21.8 1.00 0.1 21.9 C 0.0 A 21.9 C 17.2 0.62 58.3 63.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 6 2 40.0 40.0 0.69 5.0 0.2 1955 c0.26 22.0 22.0 0.38 5.0 0.2 1045 c0.34 0.38 3.9 0.31 0.3 1.5 A 2.6 A 0.90 17.2 1.00 12.6 29.8 C 29.8 C 0.88 102 0 0 150 1% B 15.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 304: Memorial Dr EB Off-ramp & Mass Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 365 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 760 1900 475 1900 Yes 0 1900 750 1900 0 1900 Yes 30 698 15.9 1.00 0% 1.00 0% 0 0 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 30 425 9.7 150 0.86 9% 424 custom 4 30 2105 47.8 1.00 0% 1.00 0% 1.00 0% 0.86 14% 150 0.86 0% 1.00 0% 0.88 11% 1.00 0% 0 0 0 0 1436 0 0 852 0 6 2 4 6 2 6.0 15.0 21.0 24.1% 4.0 1.0 0.0 5.0 Lag Yes None 0.56 3.0 0.0 3.0 0 0 10.0 15.0 45.0 51.7% 4.0 1.0 0.0 5.0 Max 0.77 9.1 0.1 9.1 129 187 2025 22.0 27.0 27.0 31.0% 4.0 1.0 0.0 5.0 Lag Yes Max 0.77 6.7 3.6 10.3 15 m28 47 1864 0 20 0 0.78 1104 168 0 0 0.91 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 618 345 845 0 0 0 0.50 ø3 1 3 10.0 15.0 18.0 21% 4.0 1.0 4.0 21.0 21.0 24% 2.0 0.0 Lead Yes Max Lead Yes None 30 127 2.9 1.00 0% 0.0 0.0% ø1 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 87 Actuated Cycle Length: 58.4 Natural Cycle: 90 Control Type: Semi Act-Uncoord m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 304: Memorial Dr EB Off-ramp & Mass Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 304: Memorial Dr EB Off-ramp & Mass Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 1.00 0 0 0 0% 0% 0% 0% 0% 0% 14% 0.86 552 0 0 150 0% 750 1900 5.0 0.95 1.00 1.00 1.00 1.00 2927 1.00 2927 0.88 852 0 852 0 1900 1.00 0 0 0 760 1900 5.0 0.95 0.95 1.00 0.94 1.00 2681 1.00 2681 0.86 884 65 1371 475 1900 1.00 0 0 0 365 1900 5.0 1.00 1.00 1.00 0.86 1.00 1357 1.00 1357 0.86 424 364 60 150 9% custom 4 0% 11% 0% 6 2 8.3 8.3 0.14 5.0 2.0 193 c0.04 40.0 40.0 0.69 5.0 0.2 1839 c0.51 22.0 22.0 0.38 5.0 0.2 1105 0.29 0.31 22.4 1.00 0.3 22.8 C 0.75 5.9 1.00 2.8 8.7 A 8.7 A 0.77 15.9 0.22 2.1 5.6 A 5.6 A 22.8 C 0.0 A 9.9 0.67 58.3 63.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 1.00 0 0 0 A 10.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 11: Commonwealth Ave & Beacon Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBT EBR EBR2 NBR2 SBR2 NER NER2 SWL2 SWL SWT SWR SWR2 525 1900 30 1900 40 1 25 75 1900 575 1900 50 1900 635 1900 0 2 25 30 1900 60 1900 315 1900 0 1 25 1340 1900 620 1900 0 1 25 15 1900 Yes Yes Yes Yes Yes Yes 25 291 7.9 0.94 4% 559 25 73 2.0 470 0.94 4% 174 0.94 4% 25 112 Perm 0 2 26.0 36.0 32.7% 4.0 5.0 -1.0 8.0 Lag 0.70 42.8 0.0 42.8 188 252 211 795 0 0 0 0.70 ø7 2 26.0 36.0 32.7% 4.0 5.0 -1.0 8.0 Lag 98 0.87 5% 25 96 0.63 2% 98 0.91 1% 170 0.91 1% 25 98 0.96 2% 170 0.96 2% 661 79 731 custom custom custom 8 2 1 0 0 custom 390 Prot 4 4 20.0 41.0 37.3% 3.0 4.0 -1.0 6.0 170 0.96 2% 0 18 662 Prot 18 61.0 55.5% 61.0 55.5% 0.0 0.0% -1.0 7.0 -1.0 7.0 0.0 4.0 1396 26.0 36.0 32.7% 4.0 5.0 0.0 9.0 Lag 24.0 33.0 30.0% 4.0 4.0 -1.0 7.0 Lead 0.49 20.5 0.0 20.5 18 78 14.0 28.0 25.5% 3.0 1.0 -1.0 3.0 Lag Yes 1.22 150.7 0.0 150.7 ~307 #414 0.14 0.5 0.0 0.5 0 0 1.21 148.3 0.0 148.3 ~360 #493 2.00 491.7 0.0 491.7 ~431 #623 0.89 34.2 10.8 45.0 454 #575 1 0.94 50.6 9.3 59.9 428 #685 40 229 0 0 0 0.49 540 0 0 0 1.22 560 0 0 0 0.14 602 0 0 0 1.21 195 0 0 0 2.00 1564 170 0 0 1.00 701 38 0 0 1.00 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 20.0 41.0 37.3% 3.0 4.0 -1.0 6.0 98 0.96 2% 0.96 2% 7 13.0 13.0 12% 2.0 0.0 Lead Yes Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 81 (74%), Referenced to phase 1:SWT, Start of Green Natural Cycle: 110 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 11: Commonwealth Ave & Beacon Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 11: Commonwealth Ave & Beacon Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group EBT EBR EBR2 525 1900 8.0 0.95 1.00 1.00 1.00 1.00 3124 1.00 3124 0.94 559 0 559 30 1900 8.0 1.00 0.48 1.00 0.85 1.00 664 1.00 664 0.94 32 60 52 470 4% 75 1900 4% 0.94 80 0 0 174 4% 25 Perm 2 27.0 28.0 0.25 9.0 795 c0.18 0.70 37.2 1.00 5.2 42.4 D 41.6 D 2 27.0 28.0 0.25 9.0 169 Charles River Base Model - Existing Conditions Weekday Evening NBR2 SBR2 NER NER2 SWL2 SWL SWT SWR SWR2 575 50 635 1900 1900 1900 3.0 9.0 7.0 0.88 1.00 0.88 1.00 1.00 1.00 1.00 1.00 1.00 0.85 0.86 0.85 1.00 1.00 1.00 2162 1450 2533 1.00 1.00 1.00 2162 1450 2533 0.87 0.63 0.91 661 79 698 49 60 3 612 19 728 98 96 98 5% 2% 1% 25 custom custom custom 8 2 1 30 1900 60 1900 0.96 62 0 0 98 2% 1340 1900 7.0 0.95 1.00 1.00 1.00 1.00 3185 1.00 3185 0.96 1396 0 1396 2% 620 1900 7.0 1.00 1.00 1.00 0.85 1.00 1425 1.00 1425 0.96 646 1 661 98 2% 15 1900 0.91 33 0 0 170 1% 25 315 1900 6.0 1.00 1.00 0.37 1.00 0.95 594 0.95 594 0.96 328 6 384 170 2% 18 Prot 18 53.0 51.0 0.46 53.0 51.0 0.46 1477 0.44 661 0.46 0.95 28.2 1.00 13.6 41.7 D 124.0 F 1.00 29.5 1.00 35.0 64.5 E custom Prot 4 0.96 16 0 0 170 2% 4 0.08 0.31 33.2 1.00 4.7 37.9 D 121.7 1.38 110.0 Err% 15 24.0 25.0 0.23 4.0 491 0.28 27.0 27.0 0.25 9.0 356 0.01 25.0 26.0 0.24 8.0 599 c0.29 1.25 42.5 1.00 127.3 169.8 F 0.05 31.7 1.00 0.3 32.0 C 1.22 42.0 1.00 111.6 153.6 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 34.0 35.0 0.32 7.0 189 0.65 2.03 37.5 1.00 482.0 519.5 F F 21.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 152: Beacon Street & Storrow Dr Off ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 150 1900 12 0 0 25 Yes 675 1900 12 0 1900 12 0 0 25 Yes 0 1900 12 0 0 25 0 1900 12 0 1900 12 0 0 25 Yes 0 1900 10 0 0 25 220 1900 10 850 1900 10 200 1 25 Yes 0.92 2% 30 591 13.4 0.92 2% 0.92 2% 0.88 3% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 25 355 9.7 0.88 3% 0.88 3% 0 Split 3 937 0 25.0 51.0 46.4% 3.0 1.0 0.0 4.0 25.0 51.0 46.4% 3.0 1.0 0.0 4.0 511 0.92 2% 25 253 6.9 0.92 2% 0.92 2% 0.94 0% 25 234 6.4 0.94 0% 0 0 0 0 234 3 0.48 2.0 0.1 2.0 10 12 275 1951 159 0 0 0.52 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 173 0.94 0% 1 904 Prot 1 22.0 39.0 35.5% 3.0 1.0 0.0 4.0 Lead 22.0 39.0 35.5% 3.0 1.0 0.0 4.0 Lead 0.24 28.6 0.0 28.6 64 96 154 1.33 179.3 0.0 179.3 ~647 #893 965 0 0 0 0.24 ø2 2 20.0 20.0 18% 3.0 0.0 Lag Yes 200 680 0 0 0 1.33 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 37 (34%), Referenced to phase 1:SBT, Start of Green Natural Cycle: 90 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 152: Beacon Street & Storrow Dr Off ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 152: Beacon Street & Storrow Dr Off ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 150 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 10 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.88 170 0 0 3% Split 3 675 1900 12 4.0 0.91 1.00 0.99 4492 0.99 4492 0.88 767 32 905 3% 0.88 0 0 0 3% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.94 0 0 0 0% 220 1900 10 4.0 0.95 1.00 1.00 3032 1.00 3032 0.94 234 0 234 0% 0.0 A 127.1 0.92 110.0 83.0% 15 3 1 850 1900 10 4.0 1.00 0.85 1.00 1357 1.00 1357 0.94 904 248 656 0% Prot 1 47.0 47.0 0.43 4.0 1919 c0.20 35.0 35.0 0.32 4.0 965 0.08 35.0 35.0 0.32 4.0 432 c0.48 0.47 22.6 0.06 0.7 2.0 A 2.0 A 0.24 27.7 1.00 0.6 28.3 C 230.1 F 1.52 37.5 1.00 244.8 282.3 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A F 28.0 E HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1401: Commonwealth Ave WB & Charlesgate West Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 120 1900 Yes 580 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 340 1900 30 1900 Yes 0.92 2% 25 558 15.2 0.92 2% 0.92 2% 0.97 1% 0.92 2% 0.93 1% 25 253 6.9 0.93 1% 0.93 1% 0 0 0 0 Perm 0 0 398 0 25 334 9.1 0.97 1% 0.97 1% 0.92 2% 25 135 3.7 0.92 2% 722 0 0 0 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 1 46.0 66.0 60.0% 3.0 1.0 0.0 4.0 Lead Yes 478 46.0 66.0 60.0% 3.0 1.0 0.0 4.0 Lead Yes 0.28 7.5 0.1 7.6 43 55 254 2610 867 0 0 0.41 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 55 39.0 44.0 40.0% 3.0 1.0 0.0 4.0 Lag Yes 0.24 19.5 0.6 20.1 92 125 173 0.0 0.0% 0.0 4.0 1670 880 0 0 0.50 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 94 (85%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 85 Control Type: Pretimed Splits and Phases: 1401: Commonwealth Ave WB & Charlesgate West \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1401: Commonwealth Ave WB & Charlesgate West Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 120 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.97 124 0 0 1% Perm 0.97 0 0 0 1% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.93 0 0 0 1% 340 1900 4.0 0.91 0.99 1.00 4566 1.00 4566 0.93 366 9 389 1% 30 1900 0.92 0 0 0 2% 580 1900 4.0 0.91 1.00 0.99 4583 0.99 4583 0.97 598 29 693 1% 1 2 62.0 62.0 0.56 4.0 2583 40.0 40.0 0.36 4.0 1660 c0.09 0.93 32 0 0 1% 1 0.15 0.27 12.3 0.64 0.2 8.2 A 8.2 A 0.0 A 12.4 0.26 110.0 40.0% 15 0.23 24.3 0.81 0.3 20.1 C 20.1 C 0.0 A HCM Level of Service B Sum of lost time (s) ICU Level of Service 8.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1391: Commonwealth Ave EB & Charlesgate West Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 1510 1900 130 1900 Yes 0 1900 0 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 125 1900 Yes 335 1900 0 1900 Yes 0.94 1% 25 553 15.1 0.94 1% 0.94 1% 0.92 2% 25 343 9.4 0.92 2% 0.92 2% 0.92 2% 25 214 5.8 0.92 2% 0.92 2% 0.89 0% 0 1744 0 0 0 0 0 0 0 0 Perm 1 0.0 0.0% 0.0 4.0 44.0 66.0 60.0% 3.0 1.0 0.0 4.0 Lead Yes 0.54 15.5 0.0 15.5 208 240 473 25 135 3.7 0.89 0% 0.89 0% 516 0 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 263 3255 0 207 0 0.57 134 2 29.0 44.0 40.0% 3.0 1.0 0.0 4.0 Lag Yes 29.0 44.0 40.0% 3.0 1.0 0.0 4.0 Lag Yes 0.31 10.7 1.0 11.7 35 45 55 0.0 0.0% 0.0 4.0 1690 885 0 0 0.64 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 90 (82%), Referenced to phase 1:EBT, Start of Green Natural Cycle: 75 Control Type: Pretimed Splits and Phases: 1391: Commonwealth Ave EB & Charlesgate West \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1391: Commonwealth Ave EB & Charlesgate West Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 1510 1900 4.0 0.86 0.99 1.00 5755 1.00 5755 0.94 1606 12 1732 1% 130 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 125 1900 0 1900 0.94 138 0 0 1% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.89 140 0 0 0% Perm 335 1900 4.0 0.91 1.00 0.99 4606 0.99 4606 0.89 376 15 501 0% 0.94 0 0 0 1% 1 0.89 0 0 0 0% 2 2 62.0 62.0 0.56 4.0 3244 c0.30 40.0 40.0 0.36 4.0 1675 0.53 15.0 1.00 0.6 15.6 B 15.6 B 0.0 A 14.6 0.44 110.0 50.1% 15 0.11 0.30 25.0 0.43 0.5 11.1 B 11.1 B 0.0 A HCM Level of Service B Sum of lost time (s) ICU Level of Service 8.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 314: Beacon Street & Storrow Dr EB On Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 785 1900 175 1900 Yes 40 1900 Yes 680 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0.92 2% 30 355 8.1 0.92 2% 0.92 2% 0.91 2% 25 616 16.8 0.91 2% 0.91 2% 0.92 0% 0.92 2% 0 0 0 0 1055 0 25 184 5.0 0.92 0% 0.92 0% 0.92 2% 25 234 6.4 0.92 2% 43 Split 2 739 0 0 0 0 24.0 66.0 60.0% 3.0 1.0 0.0 4.0 Lag 24.0 66.0 60.0% 3.0 1.0 0.0 4.0 Lag 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.65 23.3 0.0 23.3 123 m132 536 0.05 0.7 0.0 0.7 0 m1 0.40 7.6 0.0 7.6 72 88 104 1611 0 0 0 0.65 933 0 0 0 0.05 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 275 25.0 44.0 40.0% 3.0 2.0 0.0 5.0 Lead 0.0 0.0% 0.0 4.0 2 154 1831 0 0 0 0.40 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 94 (85%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 50 Control Type: Pretimed m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 314: Beacon Street & Storrow Dr EB On Ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 314: Beacon Street & Storrow Dr EB On Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 175 1900 0 1900 0 1900 0.92 0 0 0 2% 0.91 0 0 0 2% 680 1900 4.0 0.95 1.00 1.00 3249 1.00 3249 0.92 739 0 739 0% 0 1900 0.92 0 0 0 2% 0.92 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 40 1900 4.0 1.00 1.00 0.95 1624 0.95 1624 0.92 43 18 25 0% Split 2 0 1900 0.92 0 0 0 2% 785 1900 5.0 0.91 0.97 1.00 4452 1.00 4452 0.91 863 32 1023 2% 39.0 39.0 0.35 5.0 1578 c0.23 62.0 62.0 0.56 4.0 915 0.02 62.0 62.0 0.56 4.0 1831 c0.23 0.65 29.7 0.79 0.8 24.3 C 24.3 C 0.03 10.6 0.16 0.1 1.7 A 0.40 13.6 0.51 0.6 7.5 A 7.2 A 0.0 A 17.0 0.50 110.0 78.4% 15 0.91 192 0 0 2% 2 0.0 A HCM Level of Service B Sum of lost time (s) ICU Level of Service 9.0 D \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 140: Commonwealth Ave WB & Charlesgate East Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 Yes 0 1900 490 1900 60 1900 Yes 210 1900 Yes 765 1900 0 1900 Yes 0 1900 0 1900 0 1900 Yes 0.92 2% 25 334 9.1 0.92 2% 0.92 2% 0.91 1% 30 793 18.0 0.91 1% 0.91 1% 0.97 0% 0.92 2% 0 0 0 0 604 0 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 254 29.0 48.0 43.6% 3.0 1.0 0.0 4.0 Lead Yes 0.33 22.5 0.0 22.5 101 132 713 1833 0 0 0 0.33 0.0 0.0% 0.0 4.0 25 149 4.1 0.97 0% 0.97 0% 0.92 2% 25 185 5.0 0.92 2% 0 Split 2 1005 0 0 0 0 28.0 62.0 56.4% 3.0 0.0 0.0 3.0 Lag Yes 28.0 62.0 56.4% 3.0 0.0 0.0 3.0 Lag Yes 0.58 19.6 3.5 23.0 263 323 69 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2 105 1746 626 0 0 0.90 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 95 (86%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 60 Control Type: Pretimed Splits and Phases: 140: Commonwealth Ave WB & Charlesgate East \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 140: Commonwealth Ave WB & Charlesgate East Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 60 1900 210 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.91 0 0 0 1% 0.91 66 0 0 1% 0.97 216 0 0 0% Split 2 765 1900 3.0 0.95 1.00 0.99 3214 0.99 3214 0.97 789 23 982 0% 0 1900 0.92 0 0 0 2% 490 1900 4.0 0.91 0.98 1.00 4546 1.00 4546 0.91 538 14 590 1% 0.97 0 0 0 0% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 1 0.0 A 21.4 0.47 110.0 49.4% 15 2 44.0 44.0 0.40 4.0 1818 c0.13 59.0 59.0 0.54 3.0 1724 c0.31 0.32 22.8 1.00 0.5 23.2 C 23.2 C 0.57 17.0 1.12 1.2 20.3 C 20.3 C 0.0 A HCM Level of Service C Sum of lost time (s) ICU Level of Service 7.0 A \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 139: Commonwealth Ave EB & Charlesgate East Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT NBT NBR NEL NER 660 1900 Yes 975 1900 70 1900 40 1900 Yes 245 1900 90 1900 25 343 9.4 0.91 1% 25 271 7.4 0.81 1% 0.81 1% 25 161 4.4 0.92 2% 0.92 2% 1361 135 0 364 0 1 3 34.0 58.0 52.7% 3.0 1.0 0.0 4.0 Lead Yes 0.63 11.4 0.7 12.1 272 327 263 16.0 17.0 15.5% 3.0 1.0 0.0 4.0 0.65 54.2 0.5 54.7 78 127 191 19.0 35.0 31.8% 3.0 1.0 0.0 4.0 Lag Yes 0.43 34.2 0.0 34.2 108 153 81 2160 121 419 0 0.78 209 0 6 0 0.67 849 0 0 0 0.43 0.91 1% 40% 435 Perm 1 34.0 58.0 52.7% 3.0 1.0 0.0 4.0 Lead Yes 0.51 5.8 13.8 19.6 183 294 858 106 402 0 0.95 2 0.0 0.0% 0.0 4.0 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 109 (99%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 70 Control Type: Pretimed Splits and Phases: 139: Commonwealth Ave EB & Charlesgate East \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 139: Commonwealth Ave EB & Charlesgate East Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT NBT NBR NEL NER 660 1900 4.0 0.86 1.00 0.95 1383 0.95 1383 0.91 725 179 256 1% Perm 975 1900 4.0 0.86 1.00 0.99 4322 0.99 4322 0.91 1071 40 1321 1% 70 1900 4.0 1.00 0.95 1.00 1610 1.00 1610 0.81 86 19 116 1% 40 1900 245 1900 4.0 0.97 0.96 0.96 3011 0.96 3011 0.92 266 0 364 2% 90 1900 1 3 2 54.0 54.0 0.49 4.0 2122 13.0 13.0 0.12 4.0 190 c0.07 31.0 31.0 0.28 4.0 849 c0.12 0.61 46.1 1.00 13.9 60.0 E 60.0 E 0.43 32.3 1.00 1.6 33.8 C 33.8 C 1 54.0 54.0 0.49 4.0 679 0.18 0.38 17.5 1.03 1.4 19.3 B 0.31 0.62 20.5 0.52 1.2 11.9 B 13.7 B 19.6 0.56 110.0 56.2% 15 0.81 49 0 0 1% 0.92 98 0 0 2% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH B 12.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9007: Boylston St & Bowker Overpass Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBR NBL NBT SBT SBR 790 1900 0 2 25 85 1900 50 1 25 No 0 1900 0 0 25 1335 1900 855 1900 1110 1900 250 2 25 No 25 464 12.7 0.92 1% 929 25 861 23.5 0.91 0% 0.91 0% 0.90 1% 25 442 12.1 0.90 1% 0 1483 56 93 Prot 56 56 56 868 1 1 70.0 63.6% 70.0 63.6% 0.0 0.0% 2.0 4.0 2.0 4.0 0.0 4.0 0.49 15.2 0.0 15.2 166 208 781 1823 0 0 0 0.48 0.11 10.6 0.0 10.6 27 49 50 841 0 0 0 0.11 8.0 20.0 40.0 36.4% 4.0 1.0 -1.0 4.0 C-Min 1.26 155.8 78.4 234.2 ~756 m204 362 C-Min 0.79 38.4 0.0 38.4 321 #440 384 1174 143 0 0 1.44 1174 0 0 0 0.79 ø6 5 6 8.0 17.0 30.0 27% 2.0 0.0 8.0 25.0 40.0 36% 3.0 1.0 Lead Yes Ped Lag Yes Ped 0.92 1% 1207 custom 1 16 6 1 16 8.0 20.0 40.0 36.4% 4.0 1.0 -1.0 4.0 ø5 80.0 72.7% -1.0 4.0 0.66 10.7 0.0 10.7 211 335 250 1814 0 0 0 0.67 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 2 (2%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 9007: Boylston St & Bowker Overpass \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 9007: Boylston St & Bowker Overpass Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBR NBL NBT SBT SBR 790 1900 4.0 0.97 1.00 0.95 3152 0.95 3152 0.91 868 0 868 0% 0 1900 1335 1900 4.0 0.95 1.00 1.00 3217 1.00 3217 0.90 1483 0 1483 1% 855 1900 4.0 0.95 1.00 1.00 3217 1.00 3217 0.92 929 0 929 1% 56 85 1900 4.0 1.00 0.85 1.00 1454 1.00 1454 0.91 93 0 93 0% Prot 56 1 1 61.9 59.9 0.54 61.9 59.9 0.54 1716 c0.28 792 0.06 39.1 40.1 0.36 5.0 2.0 1173 c0.46 39.1 40.1 0.36 5.0 2.0 1173 0.29 1110 1900 4.0 0.88 0.85 1.00 2533 1.00 2533 0.92 1207 0 1207 1% custom 16 6 78.3 76.3 0.69 0.51 15.7 1.00 0.1 15.8 B 15.5 B 0.12 12.2 1.00 0.0 12.2 B 1.26 35.0 1.24 119.6 162.8 F 162.8 F 0.79 31.2 1.00 5.5 36.7 D 22.1 C 0.90 0 0 0 1% 66.3 0.90 110.0 72.7% 15 1757 c0.48 0.69 9.9 1.00 0.9 10.8 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH E 12.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 88: Beacon St & Massachusetts Ave Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 Yes 90 1900 10 500 1900 10 145 1900 16 No 185 1900 10 980 1900 10 0 1900 10 No 0 1900 10 840 1900 10 275 1900 10 Yes 30 616 14.0 30 296 6.7 0.92 2% 0.92 2% 0.92 2% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 29.0 33.0 180 0.80 6% 30 308 7.0 0.80 3% 180 0.80 3% 90 0.88 12% 0 Split 5 918 0 5 5 8.0 27.0 37.0 33.6% 3.0 1.0 -1.0 3.0 Lag Yes Min 8.0 27.0 37.0 33.6% 3.0 1.0 -1.0 3.0 Lag Yes Min 0.82 43.4 0.0 43.4 216 228 216 536 5 1191 0 0 0 0.77 0.0 0.0% -1.0 3.0 30 342 7.8 0.88 5% 0.92 2% 0.92 11% 0.89 6% 90 0.89 2% 0 pm+pt 6 1 6 1324 0 0 1253 0 8.0 16.0 22.0 20.0% 3.0 1.0 -1.0 3.0 Max 1 1 1 1 8.0 22.0 51.0 46.4% 3.0 1.0 -1.0 3.0 Lead Yes C-Max 1.13 87.7 0.8 88.5 ~431 #630 228 8.0 22.0 51.0 46.4% 3.0 1.0 -1.0 3.0 Lead Yes C-Max 1.05 71.2 0.0 71.2 ~499 #624 262 1171 2 0 0 1.13 0.0 0.0% 0.0 0.0% -1.0 3.0 -1.0 3.0 0.0 0.0% -1.0 3.0 1190 0 0 0 1.05 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 18 (16%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 88: Beacon St & Massachusetts Ave \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 88: Beacon St & Massachusetts Ave Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 90 1900 10 145 1900 16 185 1900 10 0 1900 10 0.92 0 0 0 2% 0.88 210 0 0 90 12% pm+pt 6 1 0.92 0 0 0 2% 0.80 181 0 0 180 3% 0.92 0 0 0 2% 0.80 112 0 0 180 6% Split 5 840 1900 10 3.0 0.95 0.96 1.00 0.96 1.00 2662 1.00 2662 0.89 944 29 1224 275 1900 10 0.92 0 0 0 980 1900 10 3.0 0.95 1.00 1.00 1.00 0.99 2835 0.50 1432 0.88 1114 0 1324 0 1900 10 0.92 0 0 0 500 1900 10 3.0 0.91 0.95 1.00 0.97 0.99 3853 0.99 3853 0.80 625 0 918 5% 2% 11% 6% 3% 5 30.8 31.8 0.29 4.0 3.0 1114 c0.24 0.82 36.5 1.00 5.1 41.6 D 41.6 D 0.0 A 71.2 1.03 110.0 102.2% 15 1 1 67.2 69.2 0.63 4.0 3.0 1171 c0.22 c0.49 1.13 20.4 1.00 70.0 90.4 F 90.4 F 47.0 48.0 0.44 4.0 3.0 1162 0.46 1.05 31.0 1.00 41.7 72.7 E 72.7 E HCM Level of Service E Sum of lost time (s) ICU Level of Service 9.0 G \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.89 309 0 0 90 2% HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 92: Boylston St & Massachusetts Ave Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 1900 0 0 25 425 1900 130 1900 0 0 25 Yes 5 1900 0 0 25 125 1900 175 1900 100 0 25 Yes 40 1900 0 0 25 720 1900 85 1900 0 0 25 Yes 165 1900 150 0 25 595 1900 60 1900 0 0 25 Yes 0.78 2% 0 Perm 30 426 9.7 0.78 2% 0.78 2% 0.77 2% 725 0 0 Perm 3 3 3 30 493 11.2 0.77 2% 168 30 306 7.0 0.84 3% 0.84 3% 0.86 2% 1006 0 192 D.P+P 4 1 4 0.77 2% 0.84 3% 227 Perm 0 Perm 1 1 1 3 1 3 3 3 3 3 3 8.0 28.0 34.0 30.9% 3.0 1.0 0.0 4.0 Lead 8.0 28.0 34.0 30.9% 3.0 1.0 0.0 4.0 Lead 8.0 28.0 34.0 30.9% 3.0 1.0 0.0 4.0 Lead 8.0 28.0 34.0 30.9% 3.0 1.0 0.0 4.0 Lead 8.0 28.0 34.0 30.9% 3.0 1.0 0.0 4.0 Lead 8.0 27.0 49.0 44.5% 3.0 1.0 0.0 4.0 8.0 27.0 49.0 44.5% 3.0 1.0 0.0 4.0 None None 0.94 53.5 1.1 54.6 230 231 346 None None 0.41 37.0 0.0 37.0 97 133 413 None 0.42 6.8 0.0 6.8 0 31 C-Max C-Max 0.66 30.4 2.6 33.0 225 272 226 0.0 0.0% 0.0 4.0 821 2 20 0 0.91 431 0 0 0 0.39 100 554 0 0 0 0.41 1529 385 0 0 0.88 0.0 0.0% 0.0 4.0 6.0 11.0 27.0 24.5% 3.0 1.0 0.0 4.0 Lag None 0.47 15.0 0.0 15.0 24 m46 150 503 2 0 0 0.38 30 324 7.4 0.86 2% 0.86 2% 762 0 14 14 76.0 69.1% 0.0 0.0% 0.0 4.0 0.0 4.0 0.36 4.7 0.5 5.2 47 53 244 2101 818 0 0 0.59 Intersection Summary Area Type: CBD Cycle Length: 110 Actuated Cycle Length: 110 Offset: 45 (41%), Referenced to phase 1:NBSB, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 92: Boylston St & Massachusetts Ave \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 92: Boylston St & Massachusetts Ave Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 10 1900 425 1900 4.0 0.95 0.97 1.00 3072 0.95 2919 0.78 545 26 699 2% 130 1900 5 1900 720 1900 4.0 0.91 0.98 1.00 4453 0.69 3065 0.84 857 11 995 3% 85 1900 165 1900 4.0 1.00 1.00 0.95 1593 0.22 370 0.86 192 0 192 2% D.P+P 4 1 69.7 69.7 0.63 4.0 1.0 405 c0.07 0.23 0.47 9.2 1.70 0.2 15.9 B 595 1900 4.0 0.95 0.99 1.00 3141 1.00 3141 0.86 692 7 755 2% 60 1900 0.77 6 0 0 2% Perm 175 1900 4.0 1.00 0.85 1.00 1425 1.00 1425 0.77 227 169 58 2% Perm 40 1900 0.78 167 0 0 2% 125 1900 4.0 1.00 1.00 1.00 1673 0.94 1581 0.77 162 0 168 2% 0.78 13 0 0 2% Perm 3 0.84 48 0 0 3% Perm 3 3 3 28.3 28.3 0.26 4.0 1.0 751 28.3 28.3 0.26 4.0 1.0 407 c0.24 0.93 39.9 0.91 16.8 53.0 D 53.0 D 0.11 0.41 33.9 1.00 0.2 34.2 C 32.8 C 28.2 0.71 110.0 74.7% 15 1 3 28.3 28.3 0.26 4.0 1.0 367 0.04 0.16 31.6 1.00 0.1 31.7 C HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.84 101 0 0 3% 1 54.4 54.4 0.49 4.0 1.0 1516 c0.32 0.66 20.8 1.29 2.1 29.0 C 29.0 C 0.86 70 0 0 2% 14 73.7 73.7 0.67 2104 0.24 0.36 7.9 0.56 0.0 4.4 A 6.7 A C 12.0 D HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 20: Stuart Street & Dartmouth Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 735 1900 16 3536 0.950 3536 No 605 1900 14 4980 450 1900 16 1647 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 485 1900 11 3141 25 1900 11 1405 0 1900 12 0 0 1900 12 0 0 1900 12 0 4980 1647 No 0 0 0 Yes 0 3141 859 Yes 56 0 0 0 Yes 25 634 17.3 25 590 16.1 0.94 1% 0.83 0% 0.83 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 782 custom 729 542 Prot 1 0 0 0 0 527 1 1 1 2 5 2 8.0 18.0 55.0 55.0% 3.0 1.0 0.0 4.0 Lead 8.0 18.0 55.0 55.0% 3.0 1.0 0.0 4.0 Lead 8.0 14.0 14.0 14.0% 3.0 1.0 0.0 4.0 Lag C-Max 51.0 0.51 0.29 15.2 0.0 15.2 B 12.3 B 106 119 554 C-Max 51.0 0.51 0.65 24.4 0.0 24.4 C 2540 0 0 0 0.29 840 0 0 0 0.65 15 86.0 86.0% 0.0 4.0 82.0 0.82 0.27 1.2 0.0 1.2 A 19 27 2900 0 0 0 0.27 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 287 353 510 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 75 (75%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.65 Intersection Signal Delay: 12.4 Intersection Capacity Utilization 44.9% Analysis Period (min) 15 Splits and Phases: 25 416 11.3 Max 41.0 0.41 0.41 13.3 0.0 13.3 B 12.7 B 81 116 336 1288 0 0 0 0.41 ø5 25 395 10.8 240 0.45 0% 56 custom 0.92 0% 0.92 0% 0.92 0% 0 0 0 5 25 25 45.0 45.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 8.0 16.0 31.0 31% 3.0 1.0 Max 41.0 0.41 0.15 6.7 0.0 6.7 A 0 4 315 385 0 0 0 0.15 Intersection LOS: B ICU Level of Service A 20: Stuart Street & Dartmouth Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 20: Stuart Street & Dartmouth Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT 735 1900 16 4.0 0.97 1.00 1.00 1.00 0.95 3536 0.95 3536 0.94 782 0 782 605 1900 14 4.0 0.91 1.00 1.00 1.00 1.00 4980 1.00 4980 0.83 729 0 729 450 1900 16 4.0 1.00 1.00 1.00 0.85 1.00 1647 1.00 1647 0.83 542 0 542 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 485 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3141 1.00 3141 0.92 527 0 527 1% custom 0% 0% 0% 0% 0% 1 0% Prot 1 51.0 51.0 0.51 4.0 2.0 2540 0.15 51.0 51.0 0.51 4.0 2.0 840 c0.33 0.29 14.1 1.05 0.3 15.1 B 12.0 B 0.65 17.9 1.11 3.7 23.6 C 15 82.0 82.0 0.82 2900 0.22 0.27 2.1 0.47 0.2 1.2 A 0.0 A 12.7 0.54 100.0 44.9% 15 NBR SBL SBT SBR 25 1900 11 4.0 1.00 0.61 1.00 0.85 1.00 859 1.00 859 0.45 56 33 23 240 0% 0% custom 2 5 25 37.0 41.0 37.0 41.0 0.37 0.41 4.0 2.0 1288 352 c0.04 0.13 0.03 0.41 0.07 23.4 17.9 0.59 1.11 0.9 0.3 14.6 20.1 B C 15.1 B 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0% 0% 0% HCM Level of Service B Sum of lost time (s) ICU Level of Service 8.0 A \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB 0.0 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 336: Beacon Street & Clarendon Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 285 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 245 1900 13 3215 55 1900 12 0 0 0 0 Yes 0 Yes 600 1900 11 4222 0.984 4178 0 Yes 0 0 0 Yes 0 3215 0 Yes 165 25 620 16.9 25 603 16.4 0.92 0% 0.92 0% 0.92 0% 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 523 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 10 (10%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.39 Intersection Signal Delay: 8.4 Intersection Capacity Utilization 38.5% Analysis Period (min) 15 Splits and Phases: 15 0.92 1% 0 0 Perm 27 25 272 7.4 25 309 8.4 0.92 2% 0 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 35 0.92 0% 962 0 0 0 0 0 326 0 1 5 1 1 1 5 8.0 18.0 52.0 52.0% 3.0 1.0 0.0 4.0 Lead 8.0 18.0 52.0 52.0% 3.0 1.0 0.0 4.0 Lead 8.0 19.0 32.0 32.0% 3.0 1.0 0.0 4.0 C-Max C-Max 57.6 0.58 0.39 1.8 0.0 1.8 A 1.8 A 8 12 540 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2476 0 0 0 0.39 ø2 2 0.0 0.0% 7.0 16.0 16.0 16% 2.0 1.0 0.0 4.0 Lag 229 Max 28.0 0.28 0.35 27.6 0.0 27.6 C 27.6 C 79 119 192 None 920 0 0 0 0.35 Intersection LOS: A ICU Level of Service A 336: Beacon Street & Clarendon Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 336: Beacon Street & Clarendon Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 285 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0% 0% 0% 0.92 310 0 0 15 1% 0 Perm 245 1900 13 4.0 0.95 0.99 1.00 0.97 1.00 3216 1.00 3216 0.92 266 19 307 55 1900 12 0.92 0 0 0 600 1900 11 4.0 0.91 1.00 0.99 1.00 0.98 4179 0.98 4179 0.92 652 73 889 2% 0 0% 0% 0% 0% 0% 0% 1 5 55.8 55.8 0.56 4.0 2.0 2332 28.0 28.0 0.28 4.0 2.0 900 c0.10 0.92 60 0 0 35 0% 1 0.21 0.38 12.4 0.14 0.4 2.1 A 2.1 A 0.0 A 9.1 0.37 100.0 38.5% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB 0.34 28.7 1.00 1.0 29.7 C 29.7 C 0.0 A A 16.2 A HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 283: Beacon Street & Berkeley Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 780 1900 11 2954 475 1900 12 1308 1230 1900 13 3189 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 1900 12 0 0 0 0 Yes 0 2954 1308 No 105 1900 12 1433 0.950 1420 No 3189 0 Yes 0 0 0 Yes 25 620 16.9 25 672 18.3 25 309 8.4 0.94 0% 0.94 0% 0.94 0% 0.94 0% 0.94 1% 0 0.94 0% 0 5 0.94 2% 0 0 0 0 0 830 505 Perm 112 Perm 1 1 1 5 5 5 8.0 20.0 34.0 34.0% 3.0 1.0 0.0 4.0 Lead 8.0 20.0 34.0 34.0% 3.0 1.0 0.0 4.0 Lead 8.0 20.0 50.0 50.0% 3.0 1.0 0.0 4.0 8.0 20.0 50.0 50.0% 3.0 1.0 0.0 4.0 C-Max 39.6 0.40 0.71 25.5 0.0 25.5 C 36.4 D 276 m#358 592 C-Max 39.6 0.40 0.97 54.3 0.0 54.3 D Max 46.0 0.46 0.17 6.4 0.0 6.4 A 345 m#560 22 39 1 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 540 15 274 12.5 0.94 0% 0 0.94 0% 0.94 0% 0.94 0% 0.94 0% 1309 0 0 0 0 5 1170 0 0 0 0.71 518 0 0 0 0.97 ø2 2 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 7.0 16.0 16.0 16% 2.0 1.0 Lag 653 0 0 0 0.17 Max 46.0 0.46 0.89 19.7 0.0 19.7 B 18.6 B 240 #475 229 None 194 1467 0 0 0 0.89 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 8 (8%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.97 Intersection Signal Delay: 27.2 Intersection LOS: C Intersection Capacity Utilization 77.1% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 283: Beacon Street & Berkeley Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 283: Beacon Street & Berkeley Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0 1900 12 0.94 0 0 0 1230 1900 13 4.0 0.95 1.00 1.00 1.00 1.00 3189 1.00 3189 0.94 1309 0 1309 0 1900 12 0.94 0 0 0 0.94 0 0 0 0.94 0 0 0 0.94 0 0 0 0.94 0 0 0 0% 0% 0% 0% 1% 0 0% 0 Perm 105 1900 12 4.0 1.00 1.00 0.99 1.00 0.95 1420 0.95 1420 0.94 112 0 112 5 2% 0 Perm 0 1900 12 0.94 0 0 0 475 1900 12 4.0 1.00 1.00 1.00 0.85 1.00 1308 1.00 1308 0.94 505 0 505 0 1900 12 0.94 0 0 0 780 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 2954 1.00 2954 0.94 830 0 830 0% 0 0% 0% 0% 0% 1 37.8 37.8 0.38 4.0 2.0 494 5 46.0 46.0 0.46 4.0 2.0 653 c0.39 1.02 31.1 0.88 35.8 63.1 E 0.08 0.17 15.8 0.36 0.5 6.2 A 1 37.8 37.8 0.38 4.0 2.0 1117 0.28 0.74 26.9 0.82 2.5 24.5 C 39.1 D 0.0 A 28.1 0.95 100.0 77.1% 15 5 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB 46.0 46.0 0.46 4.0 2.0 1467 c0.41 0.89 24.7 0.44 7.9 18.7 B 17.7 B 0.0 A C 16.2 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 71: Beacon Street & Arlington Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR 0 1900 12 0 0 1900 12 0 0 1900 12 0 870 1900 10 2852 315 1900 10 1221 0 1900 12 0 0 1900 12 0 0 1900 12 0 55 1900 12 0 0 1900 15 0 0 0 No 2852 1221 No 0 0 0 No 0 0 735 1900 15 3376 0.996 3376 440 1900 15 1455 0 995 1900 16 1641 0.950 1641 No 0.92 0% 25 672 18.3 0.92 0% 0.92 0% 0.93 1% 0 0.80 0% 0 0.92 0% 25 305 8.3 0.92 0% 0.92 0% 0.63 0% 0.92 0% 25 292 8.0 0.90 0% 0 0 0 1070 custom 394 Perm 0 0 0 0 custom 0 966 25 889 24.2 0.86 1% 0 1012 3 36 36 0.0 0.0% 0.0 0.0% 0.0 0.0% 78.0 78.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 79.2 0.79 0.82 16.2 0.0 16.2 B 428 #863 592 1299 0 0 0 0.82 3 3 3 8.0 34.0 52.0 52.0% 3.0 1.0 0.0 4.0 8.0 34.0 52.0 52.0% 3.0 1.0 0.0 4.0 None 46.7 0.47 0.76 26.3 0.0 26.3 C 22.3 C 263 320 809 None 46.7 0.47 0.69 28.3 0.0 28.3 C 1369 0 0 0 0.74 586 0 0 0 0.67 56 56 0.0 0.0% 0.0 0.0% 0.0 0.0% 48.0 48.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 1.0 4.0 0.0 4.0 186 246 225 1455 No 0.92 0% 13% 416 custom 5 6 6 6 6 7.0 22.0 22.0 22.0% 2.0 1.0 1.0 4.0 Lead 8.0 12.0 26.0 26.0% 3.0 1.0 0.0 4.0 Lag None 45.3 0.45 0.63 23.6 0.0 23.6 C 44.6 D 258 331 212 C-Max 27.7 0.28 1.03 93.4 0.0 93.4 F 1530 0 0 0 0.63 403 0 0 0 1.03 ~374 #579 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 46 (46%), Referenced to phase 6:WBSB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay: 30.3 Intersection LOS: C Intersection Capacity Utilization 97.5% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 71: Beacon Street & Arlington Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 71: Beacon Street & Arlington Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR 0 1900 12 0 1900 12 0 1900 12 0 1900 12 55 1900 12 0 1900 15 0.92 0 0 0 0% 315 1900 10 4.0 1.00 0.85 1.00 1221 1.00 1221 0.80 394 0 394 0% 0 Perm 0 1900 12 0.92 0 0 0 0% 870 1900 10 4.0 0.95 1.00 1.00 2852 1.00 2852 0.86 1012 0 1012 1% 0 0 1900 12 0.92 0 0 0 0% 995 1900 16 4.0 1.00 1.00 0.95 1641 0.95 1641 0.93 1070 0 1070 1% 0 custom 0.92 0 0 0 0% 0.92 0 0 0 0% 0.92 0 0 0 0% 0.63 87 0 0 0% 0.92 0 0 0 0% 735 1900 15 4.0 0.91 0.99 1.00 3375 1.00 3375 0.90 817 0 966 0% 440 1900 15 4.0 0.91 0.85 1.00 1455 1.00 1455 0.92 478 0 416 0% custom 3 36 77.8 77.8 0.78 1277 c0.65 0.84 7.1 1.00 4.7 11.8 B 0.0 A 28.8 0.87 100.0 97.5% 15 46.7 46.7 0.47 4.0 2.0 1332 0.35 0.76 22.0 1.00 2.3 24.3 C 18.8 B 3 46.7 46.7 0.47 4.0 2.0 570 56 0.32 0.69 21.0 1.00 2.9 23.9 C 0.0 A HCM Level of Service C Sum of lost time (s) ICU Level of Service 8.0 F \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB 5 6 42.3 40.3 0.40 3.0 2.0 1495 c0.09 0.19 0.65 24.1 1.00 0.7 24.8 C 46.6 D custom 6 27.1 27.1 0.27 4.0 2.0 394 c0.29 1.06 36.5 1.00 60.8 97.3 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 75: Boylston Street & Arlington Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 690 1900 2875 230 1900 1439 0 1900 0 0 1900 0 0 1900 0 0 1900 0 0 1900 0 0 1900 0 2875 1204 No 0 0 0 Yes 0 0 0 Yes 700 1900 3075 0.988 3075 0 1900 0 0 650 1900 1478 0.950 1478 No 25 684 18.7 0.92 0% 0.97 13% 0 711 25 436 11.9 165 0.85 1% 271 Perm 25 329 9.0 0.0 4.0 0 Yes 25 297 8.1 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0.92 0% 0 0 0 0 0 0 0.88 0% 33% 495 Perm 1 0.0 0.0% ø2 0.90 0% 0.92 0% 1022 0 5 1 1 1 5 5 5 8.0 12.0 36.0 36.0% 3.0 1.0 0.0 4.0 Lead 8.0 12.0 36.0 36.0% 3.0 1.0 0.0 4.0 Lead 8.0 12.0 46.0 46.0% 3.0 1.0 0.0 4.0 8.0 12.0 46.0 46.0% 3.0 1.0 0.0 4.0 C-Max 35.6 0.36 0.69 19.5 0.0 19.5 B 20.1 C 255 317 604 C-Max 35.6 0.36 0.63 21.8 0.0 21.8 C Max 42.0 0.42 0.80 29.1 1.9 31.0 C 175 253 183 #281 1024 0 0 0 0.69 428 0 0 0 0.63 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 2 0.0 0.0% 7.0 18.0 18.0 18% 2.0 1.0 0.0 4.0 Lag 356 249 621 44 0 0 0.86 Max 42.0 0.42 0.79 23.2 1.4 24.5 C 26.6 C 187 251 217 None 1292 117 0 0 0.87 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 93 (93%), Referenced to phase 1:EBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 24.1 Intersection LOS: C Intersection Capacity Utilization 58.1% ICU Level of Service B Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 75: Boylston Street & Arlington Street \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB Queues 3/8/2010 10989.00: DCR Bridge Program 75: Boylston Street & Arlington Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Back Bay Traffic Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 0.92 0 0 0 700 1900 4.0 0.91 1.00 1.00 1.00 0.99 3075 0.99 3075 0.90 778 0 1022 0 1900 0.92 0 0 0 650 1900 4.0 0.91 1.00 1.00 1.00 0.95 1478 0.95 1478 0.88 739 0 495 0% 13% 230 1900 4.0 1.00 0.85 1.00 0.85 1.00 1222 1.00 1222 0.85 271 0 271 165 1% Perm 0 1900 0.92 0 0 0 690 1900 4.0 0.95 1.00 1.00 1.00 1.00 2875 1.00 2875 0.97 711 0 711 0% 0% 0% 0% 0% 0% 0% Perm 0% 0% 1 35.0 35.0 0.35 4.0 2.0 1006 c0.25 0.71 28.1 0.55 3.6 19.0 B 19.3 B 0.92 0 0 0 5 1 35.0 35.0 0.35 4.0 2.0 428 5 42.0 42.0 0.42 4.0 2.0 621 0.22 0.63 27.1 0.52 6.0 20.2 C c0.33 0.80 25.3 0.72 9.7 27.9 C 0.0 A 22.4 0.76 100.0 58.1% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\Mawatr\ts\10989.00\tech\synchro\Charles River Base Model\02_Back_Bay_PM.syn Jim Danila, VHB 0.0 A 42.0 42.0 0.42 4.0 2.0 1292 0.33 0.79 25.2 0.72 4.7 22.8 C 24.5 C C 23.0 B HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 4: Beacon Street & Charles Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Parking (#/hr) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 No 0 1900 515 1900 0 1900 No 1050 1900 No 0 1900 1215 1900 No 50 1900 0 1900 430 1900 No 0.92 30 286 6.5 0.92 0.92 0.92 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 206 30 282 6.4 0.92 0 0.92 0.92 0 0 1 1 1141 custom 6 15 6 10.0 22.0 23.0 28.8% 3.0 2.0 0.0 5.0 Lead 10.0 14.0 17.0 21.3% 3.0 1.0 0.0 4.0 Lag 560 0.0 0.0% 0.0 4.0 C-Max 0.65 32.1 0.0 32.1 140 #221 202 Max 0.54 8.2 0.0 8.2 147 201 863 0 0 0 0.65 2113 0 0 0 0.54 30 318 7.2 0.92 0 0.0 0.0% 0.0 4.0 30 323 7.3 0.92 ø2 0.92 0.92 0 1321 custom 6 1 6 54 Prot 5 5 467 custom 5 6 5 10.0 14.0 17.0 21.3% 3.0 1.0 0.0 4.0 Lag 10.0 14.0 16.0 20.0% 3.0 1.0 0.0 4.0 Lead 10.0 14.0 16.0 20.0% 3.0 1.0 0.0 4.0 Lead 4.0 24.0 24.0 30% 3.0 1.0 Max 1.03 58.6 0.0 58.6 ~453 #591 Max 0.25 33.5 0.0 33.5 24 58 Max 0.54 23.1 0.0 23.1 103 153 None 238 0 0.0 0.0% 0.0 4.0 0.92 0 2 Lag 243 1279 0 0 0 1.03 215 0 0 0 0.25 864 0 0 0 0.54 Intersection Summary Area Type: CBD Cycle Length: 80 Actuated Cycle Length: 80 Offset: 79 (99%), Referenced to phase 1:NBWB, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 4: Beacon Street & Charles Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 4: Beacon Street & Charles Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Parking (#/hr) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 0.92 0 0 0 1215 1900 4.0 0.88 0.85 1.00 2508 1.00 2508 0.92 1321 0 1321 50 1900 4.0 1.00 1.00 0.95 1433 0.95 1433 0.92 54 0 54 0 Prot 5 0 1900 0.92 0 0 0 1050 1900 4.0 0.97 1.00 0.95 2935 0.95 2935 0.92 1141 0 1141 0 custom 6 15 47.0 47.0 0.59 4.0 2.0 2018 c0.09 0.30 0.57 11.1 1.00 1.2 12.3 B 0 1900 0.92 0 0 0 515 1900 5.0 0.95 1.00 1.00 3026 1.00 3026 0.92 560 0 560 0 430 1900 4.0 0.88 0.85 1.00 2383 1.00 2383 0.92 467 0 467 0 custom 5 6 25.0 25.0 0.31 4.0 2.0 864 0.08 0.11 0.54 22.7 1.00 2.4 25.2 C 0.92 0 0 0 1 22.0 22.0 0.28 5.0 2.0 832 0.19 0.67 25.8 1.00 4.3 30.1 C 30.1 C 0.0 A 39.7 0.96 80.0 76.6% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.92 0 0 0 custom 6 1 35.0 35.0 0.44 4.0 2.0 1223 c0.18 0.35 1.08 22.5 1.00 50.3 72.8 E 44.7 D 0.92 0 0 0 12.0 12.0 0.15 4.0 2.0 215 0.04 0.25 30.0 1.00 2.8 32.8 C 26.0 C D 28.0 D HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 313: Longfellow Bridge & Memorial Dr WB Off-ramp Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBR NBR2 SWL SWR 0 1025 Free 0% 0.87 1178 300 0 150 315 0.92 0 0.84 375 0 Stop 0% 0.92 0 200 12.0 4.0 17 50 0.92 0 0 Stop 0% 0.92 0 200 12.0 4.0 17 0 0.87 345 570 Free 0% 0.94 606 2357 1551 806 2357 6.5 5.5 4.0 100 101 961 0.92 0 Raised 1 1378 806 4.1 1378 4.1 2.2 100 678 2.2 100 411 0.0 EB 2 738 0 345 1700 0.43 0 0.0 0.84 60 Raised 1 806 EB 1 785 0 0 1700 0.46 0 0.0 0.94 160 WB 1 404 0 0 1700 0.24 0 0.0 0.0 53.5 72.2% 15 WB 2 362 0 160 1700 0.21 0 0.0 1913 1551 363 1913 7.5 6.5 3.5 100 81 NB 1 375 0 375 217 1.73 634 386.2 F 386.2 F 3.3 0 217 583 583 6.9 3.3 84 380 SW 1 60 0 60 380 0.16 14 16.2 C 16.2 C ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 961 6.9 2264 886 1378 2264 6.5 5.5 4.0 100 113 C HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR SBL2 SBL SBT SEL2 SEL SER 190 1900 460 1900 50 1900 No 60 1900 No 155 1900 170 1900 580 1900 480 1900 280 1900 30 227 5.2 30 255 5.8 0.85 1% 0.85 1% 255 0.85 1% 0 Split 1 824 0 30 308 7.0 0.85 5% 0.85 5% 0.85 5% 0.96 1% 0.96 1% 0.96 1% 253 Split 6 200 0 6 604 Split 5 792 1 0 Split 6 1 1 6 6 6 5 5 7.0 22.0 45.0 45.0% 3.0 1.0 0.0 4.0 7.0 22.0 45.0 45.0% 3.0 1.0 0.0 4.0 6.0 16.0 17.0 17.0% 3.0 1.0 0.0 4.0 Lag 6.0 16.0 17.0 17.0% 3.0 1.0 0.0 4.0 Lag 6.0 16.0 17.0 17.0% 3.0 1.0 0.0 4.0 Lag 7.0 24.0 38.0 38.0% 4.0 2.0 0.0 6.0 Lead 7.0 24.0 38.0 38.0% 4.0 2.0 0.0 6.0 Lead C-Max C-Max 0.63 26.1 0.1 26.2 204 245 147 None None 0.65 51.4 0.0 51.4 78 114 None 0.94 94.8 0.0 94.8 126 #245 175 None 1.17 129.5 0.0 129.5 ~463 #673 None 0.82 39.9 0.0 39.9 238 #314 228 390 0 0 0 0.65 212 0 0 0 0.94 515 0 0 0 1.17 963 0 0 0 0.82 0.0 0.0% 0.0 4.0 1315 0 52 0 0.65 5 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 52 (52%), Referenced to phase 1:EBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 9008: Storrow Drive EB Off-Ramp & Storrow Drive On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR SBL2 SBL SBT SEL2 SEL SER 190 1900 460 1900 4.0 *1.00 0.97 1.00 0.99 0.99 3207 0.99 3207 0.85 541 0 824 50 1900 60 1900 0.85 71 0 0 170 1900 4.0 1.00 1.00 1.00 1.00 1.00 1629 1.00 1629 0.85 200 0 200 580 1900 6.0 1.00 1.00 1.00 1.00 0.95 1608 0.95 1608 0.96 604 0 604 480 1900 6.0 0.97 1.00 1.00 0.94 0.97 3008 0.97 3008 0.96 500 0 792 280 1900 0.85 59 0 0 255 1% 155 1900 4.0 0.97 1.00 1.00 1.00 0.95 3001 0.95 3001 0.85 182 0 253 5% Split 6 5% Split 6 5% 1% 1% 6 1% Split 5 41.0 41.0 0.41 4.0 3.0 1315 c0.26 13.0 13.0 0.13 4.0 3.0 390 0.08 13.0 13.0 0.13 4.0 3.0 212 c0.12 32.0 32.0 0.32 6.0 2.0 515 c0.38 32.0 32.0 0.32 6.0 2.0 963 0.26 0.63 23.4 1.00 2.3 25.7 C 25.7 C 0.65 41.3 1.04 3.7 46.6 D 0.94 43.1 1.03 45.7 90.3 F 65.9 E 1.17 34.0 1.00 96.8 130.8 F 0.82 31.4 1.00 5.5 36.9 D 77.5 E 0.85 224 0 0 1% Split 1 1% 1 59.6 0.88 100.0 79.9% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.96 292 0 0 5 E 14.0 D HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 27: Cambridge Street & Charles Street On-Ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBT WBR WBR2 NBL2 NBL NBT 365 1900 670 1900 205 1900 No 135 1900 No 285 1900 410 1900 30 273 6.2 30 200 4.5 1 719 Prot 1 169 107 0.96 2% 10% 193 Prot 1 1 1 1 2 2 2 7.0 22.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 7.0 22.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 7.0 22.0 30.0 30.0% 3.0 1.0 0.0 4.0 Lead 7.0 24.0 70.0 70.0% 4.0 2.0 0.0 6.0 Lag 7.0 24.0 70.0 70.0% 4.0 2.0 0.0 6.0 Lag 7.0 24.0 70.0 70.0% 4.0 2.0 0.0 6.0 Lag C-Min 0.32 3.4 0.0 3.4 16 55 193 C-Min 0.81 20.5 0.0 20.5 534 #775 C-Min 0.20 2.7 0.0 2.7 8 24 None 0.47 48.7 0.1 48.8 102 m162 None 0.51 20.0 0.0 20.0 41 m6 None 0.49 24.8 0.0 24.9 63 m36 120 1185 0 0 0 0.32 886 0 0 0 0.81 957 0 0 0 0.20 1039 212 0 0 0.18 2017 302 0 0 0.18 2988 483 0 0 0.18 0.96 2% 380 169 107 0.96 2% 0.92 0% 0.92 0% 0.92 0% 147 Split 2 310 Split 2 446 2 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 76 (76%), Referenced to phase 1:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 27: Cambridge Street & Charles Street On-Ramp \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 7/8/2010 10989.00: DCR Bridge Program 27: Cambridge Street & Charles Street On-Ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Confl. Bikes (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening WBT WBR WBR2 NBL2 NBL NBT 365 1900 4.0 1.00 1.00 1.00 1.00 1.00 1676 1.00 1676 0.96 380 0 380 205 1900 4.0 0.95 1.00 1.00 0.85 1.00 1354 1.00 1354 0.96 214 0 193 169 107 2% Prot 1 135 1900 6.0 1.00 1.00 1.00 1.00 0.95 1624 0.95 1624 0.92 147 0 147 285 1900 6.0 0.97 1.00 1.00 1.00 0.95 3152 0.95 3152 0.92 310 0 310 410 1900 6.0 0.91 1.00 1.00 1.00 1.00 4668 1.00 4668 0.92 446 0 446 0% Split 2 0% Split 2 0% 1 670 1900 4.0 0.88 1.00 1.00 0.85 1.00 1254 1.00 1254 0.96 698 0 719 169 107 2% Prot 1 70.7 70.7 0.71 4.0 3.0 1185 0.23 70.7 70.7 0.71 4.0 3.0 887 c0.57 70.7 70.7 0.71 4.0 3.0 957 0.14 19.3 19.3 0.19 6.0 3.0 313 0.09 19.3 19.3 0.19 6.0 3.0 608 c0.10 19.3 19.3 0.19 6.0 3.0 901 0.10 0.32 5.6 0.42 0.6 3.0 A 10.7 B 0.81 10.1 0.99 7.1 17.1 B 0.20 5.0 0.38 0.4 2.3 A 0.47 35.8 1.30 0.9 47.5 D 0.51 36.1 0.56 0.1 20.3 C 0.50 36.0 0.70 0.0 25.3 C 27.2 C 2% 17.5 0.75 100.0 75.5% 15 2 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\TS\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH B 10.0 D HCM Signalized Intersection Capacity Analysis 7/8/2010 10989.00: DCR Bridge Program 176: Cambridge Street & Storrow Drive Off-Ramp/ Parking Lot Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 0 Free 0% 0.92 0 0 55 0 0 0 0.97 0 0.92 0 0.92 0 0.96 0 310 Stop 0% 0.96 323 260 0.97 57 0 Stop 0% 0.92 0 0 0.92 0 445 Free 0% 0.97 459 0.92 0 0.96 271 4 None None 459 0 504 572 0 572 572 229 459 4.1 0 4.2 504 7.5 572 6.5 0 6.9 572 7.6 572 6.6 229 7.0 2.2 100 1099 2.2 96 1614 3.5 100 100 4.0 100 414 3.3 100 1084 3.5 100 390 4.0 22 411 3.3 65 770 WB 1 57 57 0 1614 0.04 3 7.3 A 0.8 WB 2 229 0 0 1700 0.13 0 0.0 WB 3 229 0 0 1700 0.13 0 0.0 9.4 38.2% 15 SB 1 215 0 0 411 0.52 73 23.0 C 16.9 C SB 2 378 0 271 1076 0.35 40 13.5 B ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH A HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 1: Nashua Street & Storrow Dr WB on-ramp Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBL2 WBL WBR NBL SER SER2 NWT 25 1900 1060 1900 355 1900 Yes 395 1900 1040 1900 610 1900 Yes 505 1900 0.92 30 263 6.0 0.92 0 Perm 1179 30 200 4.5 0.92 0.92 386 Perm 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 2 1130 663 custom custom 79 3 3 2 2 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 1.12 91.4 67.6 159.0 ~459 #569 183 20.0 31.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 0.67 15.6 4.6 20.2 87 m122 1051 127 81 0 1.28 572 122 0 0 0.86 0.92 429 2 2 2 0.92 79 39.0 39.0% 0.0 6.0 0.42 0.1 1.7 1.8 0 m0 120 1020 410 0 0 0.70 1 1 10.0 24.0 30.0 30.0% 4.0 2.0 0.0 6.0 10.0 24.0 30.0 30.0% 4.0 2.0 0.0 6.0 8.0 19.0 21.0 21.0% 3.0 4.0 0.0 7.0 Lead Yes None 1.23 160.0 565.0 725.0 ~228 #336 59 602 0 104 0 2.27 624 0 0 0 1.06 ø7 ø9 5 6 7 9 10.0 15.0 21.0 21% 4.0 1.0 20.0 26.0 40.0 40% 4.0 2.0 10.0 16.0 30.0 30% 4.0 2.0 2.0 8.0 9.0 9% 4.0 2.0 Lead Yes None Lag Yes C-Min None Max 549 3 None 1.06 71.7 0.0 71.7 ~274 #494 ø6 30 139 3.2 0.92 3 None 1.88 426.7 176.4 603.1 ~628 #769 ø5 446 245 0 0 2.73 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 90 (90%), Referenced to phase 2:WBL and 6:, Start of Green Natural Cycle: 145 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 1: Nashua Street & Storrow Dr WB on-ramp \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 1: Nashua Street & Storrow Dr WB on-ramp Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening WBL2 WBL WBR NBL 25 1900 1060 1900 6.0 0.97 1.00 0.95 3090 0.95 3090 0.92 1152 0 1179 355 1900 6.0 1.00 0.85 1.00 1425 1.00 1425 0.92 386 88 298 Perm 395 1900 6.0 0.97 1.00 0.95 3090 0.95 3090 0.92 429 0 429 0.92 27 0 0 Perm 2 2 34.0 34.0 0.34 6.0 3.0 1051 0.38 1.12 33.0 0.79 64.3 90.5 F 73.2 E 2 34.0 34.0 0.34 6.0 3.0 485 0.21 0.61 27.5 0.59 4.1 20.5 C 180.3 1.27 100.0 78.3% 15 SER2 NWT 1040 610 1900 1900 6.0 6.0 0.88 1.00 0.85 0.85 1.00 1.00 2508 1425 1.00 1.00 2508 1425 0.92 0.92 1130 663 0 282 1130 381 custom custom 79 3 3 505 1900 7.0 0.95 1.00 1.00 3185 1.00 3185 0.92 549 0 549 33.0 33.0 0.33 1020 c0.14 0.42 26.1 0.00 0.0 0.0 A 0.0 A SER 1 24.0 24.0 0.24 6.0 3.0 602 c0.45 24.0 24.0 0.24 6.0 3.0 342 0.27 14.0 14.0 0.14 7.0 3.0 446 c0.17 1.88 38.0 1.00 401.0 439.0 F 1.11 38.0 1.00 83.1 121.1 F 1.23 43.0 1.00 122.2 165.2 F 165.2 F HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH F 19.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 2: Charles Street Ext. & Nashua Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBR EBR2 NBT SBT SBR SWL SWT 1170 1900 215 1900 Yes 395 1900 845 1900 220 1900 240 1900 60 1900 0.92 30 252 5.7 0.92 30 200 4.5 0.92 0.92 0 429 1157 0 7 39 39 39 0.92 0% 1506 custom 6 6 6 20.0 26.0 40.0 40.0% 4.0 2.0 0.0 6.0 Lag Yes C-Min 1.28 161.3 289.6 450.8 ~550 #666 1178 395 0 0 1.92 7 0.0 0.0% 0.0 4.0 10.0 16.0 30.0 30.0% 4.0 2.0 0.0 6.0 39.0 39.0% 0.0 0.0% 0.0 6.0 0.0 4.0 None 1.07 101.8 225.6 327.4 ~304 #492 172 1.14 77.6 164.0 241.6 ~473 m4 120 402 132 0 0 1.59 1019 250 0 0 1.50 0.92 38% 162 Split 5 ø1 ø2 ø3 ø9 1 2 3 9 8.0 19.0 21.0 21% 3.0 4.0 20.0 31.0 40.0 40% 4.0 2.0 10.0 24.0 30.0 30% 4.0 2.0 2.0 8.0 9.0 9% 4.0 2.0 Lead Yes None Lag Yes C-Min None Max 30 277 6.3 0.92 164 5 5 5 10.0 15.0 21.0 21.0% 4.0 1.0 0.0 5.0 Lead Yes None 0.75 86.7 0.0 86.7 117 m#198 10.0 15.0 21.0 21.0% 4.0 1.0 0.0 5.0 Lead Yes None 0.74 85.8 0.0 85.8 118 m#196 197 242 0 0 0 0.67 247 0 0 0 0.66 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 90 (90%), Referenced to phase 2:WBL and 6:, Start of Green Natural Cycle: 145 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 2: Charles Street Ext. & Nashua Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 2: Charles Street Ext. & Nashua Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBR EBR2 NBT SBT SBR SWL SWT 1170 1900 6.0 0.76 0.85 1.00 3249 1.00 3249 0.92 1272 19 1487 custom 6 6 35.7 35.7 0.36 6.0 3.0 1160 c0.46 215 1900 395 1900 6.0 1.00 1.00 1.00 1676 1.00 1676 0.92 429 0 429 845 1900 6.0 0.95 0.97 1.00 3087 1.00 3087 0.92 918 0 1157 220 1900 60 1900 5.0 0.95 1.00 0.97 1546 0.97 1546 0.92 65 0 164 7 39 39 33.0 33.0 0.33 240 1900 5.0 0.95 1.00 0.95 1513 0.95 1513 0.92 261 0 162 Split 5 14.3 14.3 0.14 5.0 3.0 216 c0.11 14.3 14.3 0.14 5.0 3.0 221 0.11 0.75 41.1 1.66 12.2 80.6 F 0.74 41.1 1.66 11.3 79.6 E 80.1 F 1.28 32.1 1.00 133.4 165.6 F 0.92 234 0 0 24.0 24.0 0.24 6.0 3.0 402 0.26 1019 c0.37 1.07 38.0 1.00 63.9 101.9 F 101.9 F 1.14 33.5 0.31 62.2 72.8 E 72.8 E 118.0 1.06 100.0 93.0% 15 0.92 239 0 0 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 5 F 11.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 3: Nashua Street & Ramp N-LC Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBL WBT NBL2 NBL NBR NWL2 NWL NWR 280 1900 735 1900 10 1900 Yes 150 1900 180 1900 10 1900 555 1900 180 1900 Yes 0.92 30 207 4.7 0.92 304 custom 1 1 1 799 20.0 25.0 40.0 40.0% 4.0 1.0 0.0 5.0 Lead Yes C-Max 0.47 26.3 0.0 26.3 141 240 20.0 25.0 40.0 40.0% 4.0 1.0 0.0 5.0 Lead Yes C-Max 0.62 27.4 2.2 29.6 210 301 127 641 0 0 0 0.47 1281 0 331 0 0.84 0.92 0 custom 1 2 2 1 2 10.0 21.0 29.0 29.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 30 383 8.7 0.92 0.92 0.92 11% 196 174 0 custom custom 2 2 3 2 3 2 2 3 10.0 21.0 29.0 29.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 0.67 48.6 0.5 49.1 116 181 303 10.0 21.0 29.0 29.0% 4.0 2.0 0.0 6.0 Lag Yes Ped 0.70 53.0 0.0 53.0 110 177 365 0 28 0 0.58 311 0 0 0 0.56 30 294 6.7 0.92 0.92 614 196 custom 3 13 13 3 13 10.0 29.0 31.0 31.0% 4.0 3.0 0.0 7.0 10.0 29.0 31.0 31.0% 4.0 3.0 0.0 7.0 Ped Ped 0.85 49.1 55.5 104.6 191 #276 214 0.18 1.3 0.0 1.3 0 22 742 0 190 0 1.11 1047 0 0 0 0.19 71.0 71.0% 0.0 5.0 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 88 (88%), Referenced to phase 1:WBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: Nashua Street & Ramp N-LC \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 3: Nashua Street & Ramp N-LC Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening WBL WBT NBL2 NBL 280 1900 5.0 1.00 1.00 0.95 1593 0.95 1593 0.92 304 0 304 custom 1 1 40.2 40.2 0.40 5.0 3.0 640 0.19 735 1900 5.0 0.95 1.00 1.00 3185 1.00 3185 0.92 799 0 799 10 1900 150 1900 6.0 1.00 0.98 0.96 1578 0.96 1578 0.92 163 2 194 0.47 22.1 1.00 2.5 24.6 C 0.92 11 0 0 custom 1 2 2 40.2 40.2 0.40 5.0 3.0 1280 c0.25 0.62 23.9 1.00 2.3 26.2 C 25.7 C 2 18.4 18.4 0.18 6.0 3.0 290 0.12 0.67 38.0 1.00 5.7 43.7 D 45.0 D 32.7 0.70 100.0 69.4% 15 NBR NWL2 NWL NWR 180 10 1900 1900 6.0 0.95 0.85 1.00 1354 1.00 1354 0.92 0.92 196 11 0 0 174 0 custom custom 2 3 2 3 18.4 18.4 0.18 6.0 3.0 249 c0.13 555 1900 7.0 0.97 1.00 0.95 3090 0.95 3090 0.92 603 0 614 180 1900 5.0 1.00 0.85 1.00 1425 1.00 1425 0.92 196 71 125 custom 13 13 70.6 63.6 0.64 0.70 38.2 1.00 8.3 46.5 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 3 23.4 23.4 0.23 7.0 3.0 723 c0.20 0.85 36.6 1.00 9.2 45.8 D 36.5 D 906 0.09 0.14 7.3 1.00 0.1 7.3 A C 18.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 901: Land Boulevard & O'Brien Highway Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 370 1900 11 610 1 25 1095 1900 11 550 1900 11 0 1 25 No 255 1900 11 0 0 25 380 1900 11 100 1900 11 0 0 25 No 330 1900 11 0 1 25 650 1900 11 365 1900 11 0 1 25 No 365 1900 11 175 1 250 730 1900 11 210 1900 15 375 1 130 No 0.92 2% 30 930 21.1 0.92 2% 0.92 2% 0 359 Split 3 707 13.0 29.0 24.2% 4.0 1.0 -1.0 4.0 Lead Yes 1.12 133.0 142.1 275.1 ~330 #527 321 73 0 0 1.45 0.92 2% 585 Prot 4 0 Split 5 799 26.0 28.0 23.3% 4.0 1.0 -1.0 4.0 26.0 28.0 23.3% 4.0 1.0 -1.0 4.0 1190 19.0 37.0 30.8% 4.0 1.0 -1.0 4.0 Lag Yes 0.95 75.9 0.0 75.9 306 #505 19.0 37.0 30.8% 4.0 1.0 -1.0 4.0 Lag Yes 1.40 223.7 0.0 223.7 ~650 #786 850 19.0 37.0 30.8% 4.0 1.0 -1.0 4.0 Lag Yes 1.52 277.4 78.6 355.9 ~632 #854 847 0 0 0 1.40 386 0 40 0 1.69 610 424 0 0 0 0.95 0.92 2% 0.94 0% 402 Split 4 4 30 713 16.2 0.92 2% 5 1.35 205.2 0.0 205.2 ~426 #553 633 593 0 0 0 1.35 0.0 0.0% 0.0 4.0 30 297 6.8 0.92 2% 0.94 2% 0.92 2% 388 Prot 3 397 Prot 1 13.0 29.0 24.2% 4.0 1.0 -1.0 4.0 Lead Yes 1.10 115.3 142.2 257.5 ~337 #465 217 13.0 29.0 24.2% 4.0 1.0 -1.0 4.0 Lead Yes 1.35 219.4 100.3 319.7 ~408 #608 13.0 26.0 21.7% 4.0 1.0 -1.0 4.0 641 146 0 0 1.43 287 41 0 0 1.58 3 1.41 240.5 0.0 240.5 ~412 #609 175 282 0 0 0 1.41 30 820 18.6 0.92 2% 793 6 6 26.0 26.0 21.7% 4.0 1.0 -1.0 4.0 0.98 75.6 0.0 75.6 226 #316 740 811 0 0 0 0.98 0.92 2% 228 Free Free 0.0 0.0% 0.0 4.0 0.15 0.2 0.0 0.2 0 0 375 1567 0 0 0 0.15 Intersection Summary Area Type: CBD Cycle Length: 120 Actuated Cycle Length: 120 Offset: 0 (0%), Referenced to phase 1:SBL, Start of Green Natural Cycle: 145 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 901: Land Boulevard & O'Brien Highway \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 901: Land Boulevard & O'Brien Highway Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 370 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 402 0 402 2% Split 4 1095 1900 11 4.0 0.95 1.00 1.00 3079 1.00 3079 0.92 1190 0 1190 2% 255 1900 11 380 1900 11 4.0 0.95 0.98 0.98 2965 0.98 2965 0.92 413 0 799 2% 100 1900 11 365 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 397 0 397 2% Prot 1 210 1900 15 4.0 1.00 0.85 1.00 1567 1.00 1567 0.92 228 0 228 2% Free 3 365 1900 11 4.0 1.00 0.85 1.00 1378 1.00 1378 0.94 388 0 388 2% Prot 3 730 1900 11 4.0 0.91 1.00 1.00 4424 1.00 4424 0.92 793 0 793 2% 5 330 1900 11 4.0 1.00 1.00 0.95 1540 0.95 1540 0.92 359 0 359 2% Split 3 650 1900 11 4.0 0.95 1.00 1.00 3079 1.00 3079 0.92 707 0 707 2% 4 550 1900 11 4.0 1.00 0.85 1.00 1405 1.00 1405 0.94 585 0 585 0% Prot 4 32.0 33.0 0.28 5.0 424 0.26 32.0 33.0 0.28 5.0 847 0.39 32.0 33.0 0.28 5.0 386 c0.42 23.0 24.0 0.20 5.0 593 c0.27 24.0 25.0 0.21 5.0 321 0.23 24.0 25.0 0.21 5.0 641 0.23 24.0 25.0 0.21 5.0 287 c0.28 21.0 22.0 0.18 5.0 282 c0.26 0.95 42.7 1.00 32.5 75.1 E 1.40 43.5 1.00 189.3 232.8 F 218.7 F 1.52 43.5 1.00 245.0 288.5 F 1.35 48.0 1.00 167.3 215.3 F 215.3 F 1.12 47.5 1.13 84.5 138.3 F 1.10 47.5 1.14 66.0 120.0 F 154.5 F 1.35 47.5 1.14 178.3 232.3 F 1.41 49.0 1.00 203.4 252.4 F 176.6 1.41 120.0 112.8% 15 0.92 277 0 0 2% Split 5 0.92 109 0 0 2% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 6 6 21.0 22.0 0.18 5.0 811 0.18 0.98 48.8 1.00 26.7 75.4 E 112.9 F Free 120.0 120.0 1.00 1567 0.15 0.15 0.0 1.00 0.2 0.2 A F 16.0 H HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 30: Washington St & McGrath Hwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 715 1900 14 355 1900 12 0 1900 12 Yes 0 1800 14 810 1800 14 135 1800 14 No 55 1900 12 470 1900 12 605 1900 12 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 0.95 1% 30 86 2.0 0.97 4% 0.97 4% 0.87 2% 30 905 20.6 0.87 2% 0.87 2% 0.95 4% 30 410 9.3 0.95 4% 0.95 4% 0.92 2% 30 438 10.0 0.92 2% 0.92 2% 366 0 0 1086 0 58 Split 5 1132 0 0 0 0 10.0 20.0 15.0% 3.0 2.0 0.0 5.0 10.0 20.0 15.0% 3.0 2.0 0.0 5.0 753 Split 123 123 57.0 42.9% 57.0 42.9% 0.0 0.0% 0.0 0.0% 0.0 5.0 0.0 5.0 1.0 5.0 1.0 5.0 0.52 3.9 0.0 3.9 54 m62 1446 0 0 0 0.52 4 0.19 0.8 0.0 0.8 1 m1 6 22.0 56.0 42.1% 4.0 2.0 -1.0 5.0 Lag Yes 0.56 33.6 0.0 33.6 267 301 825 1950 0 0 0 0.19 1929 0 4 0 0.56 0.0 0.0% 1.0 5.0 0.15 54.4 0.0 54.4 23 45 380 0 0 0 0.15 5 2.12 535.2 0.0 535.2 ~741 #880 330 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 1.0 5.0 0.0 4.0 0.0 4.0 0.0 4.0 ø1 ø2 ø3 1 2 3 11.0 11.0 8% 4.0 1.0 21.0 31.0 23% 4.0 2.0 10.0 15.0 11% 3.0 2.0 Lead Yes Lag Yes Lead Yes 358 533 0 0 0 2.12 Intersection Summary Area Type: Other Cycle Length: 133 Actuated Cycle Length: 133 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 120 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 30: Washington St & McGrath Hwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 30: Washington St & McGrath Hwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 715 1900 14 5.0 0.97 1.00 0.95 3698 0.95 3698 0.95 753 0 753 1% Split 123 355 1900 12 5.0 0.91 1.00 1.00 4988 1.00 4988 0.97 366 0 366 4% 0 1900 12 0 1800 14 135 1800 14 470 1900 12 5.0 0.95 0.92 1.00 3178 1.00 3178 0.95 495 174 958 4% 0 1900 12 0 1900 12 0 1900 12 0.87 0 0 0 2% 0.95 637 0 0 4% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 123 4 55 1900 12 5.0 0.97 1.00 0.95 3367 0.95 3367 0.95 58 0 58 4% Split 5 605 1900 12 0.97 0 0 0 4% 810 1800 14 5.0 0.91 0.98 1.00 5029 1.00 5029 0.87 931 0 1086 2% 52.0 46.0 0.35 52.0 46.0 0.35 1279 c0.20 1725 0.07 50.0 51.0 0.38 6.0 1928 c0.22 15.0 15.0 0.11 5.0 380 0.02 15.0 15.0 0.11 5.0 358 c0.30 0.59 35.7 0.09 1.6 4.8 A 0.21 30.7 0.02 0.2 0.9 A 3.5 A 0.56 32.2 1.00 1.2 33.4 C 33.4 C 0.15 53.3 1.00 0.9 54.1 D 2.68 59.0 1.00 762.3 821.3 F 783.9 F 286.6 0.85 133.0 94.0% 15 0.87 155 0 0 2% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 5 0.0 A F 20.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 31: Washington St & McGrath Hwy Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1800 12 1045 1800 12 35 1800 12 Yes 340 1900 12 525 1900 12 0 1900 12 Yes 0 1900 12 0 1900 12 0 1900 12 Yes 25 1750 14 120 1750 14 310 1750 14 Yes 0.95 1% 30 598 13.6 0.95 1% 0.97 4% 0.90 4% 30 86 2.0 0.90 2% 0.90 2% 0.92 2% 30 285 6.5 0.92 2% 0.92 2% 0.85 3% 30 691 15.7 0.92 0% 0.92 0% 0 1136 0 378 Split 45 583 0 0 0 0 0 Perm 496 0 12 45 3 0.0 0.0% 42.0 31.6% 0.0 0.0% 76.0 57.1% 76.0 57.1% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 1.0 5.0 0.0 5.0 1.0 5.0 -1.0 5.0 -1.0 5.0 1.0 5.0 0.0 4.0 0.0 4.0 0.0 4.0 0.57 42.2 0.1 42.3 207 239 518 0.41 1.4 0.0 1.4 0 7 2000 0 98 0 0.60 927 0 0 0 0.41 0.31 0.4 0.0 0.4 0 0 6 1889 0 0 0 0.31 205 3 10.0 15.0 11.3% 3.0 2.0 0.0 5.0 Lead Yes 10.0 15.0 11.3% 3.0 2.0 0.0 5.0 Lead Yes 1.72dr 310.0 2.3 312.2 ~286 #403 611 0.0 0.0% ø1 ø2 ø4 ø5 1 2 4 5 11.0 11.0 8% 4.0 1.0 21.0 31.0 23% 4.0 2.0 22.0 56.0 42% 4.0 2.0 10.0 20.0 15% 3.0 2.0 Lead Yes Lag Yes Lag Yes 1.0 5.0 313 0 1 0 1.59 Intersection Summary Area Type: Other Cycle Length: 133 Actuated Cycle Length: 133 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 120 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dr Defacto Right Lane. Recode with 1 though lane as a right lane. Splits and Phases: 31: Washington St & McGrath Hwy \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 31: Washington St & McGrath Hwy Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1800 12 1045 1800 12 5.0 0.81 1.00 1.00 7177 1.00 7177 0.95 1100 4 1132 1% 35 1800 12 340 1900 12 5.0 1.00 1.00 0.95 1736 0.95 1736 0.90 378 0 378 4% Split 45 525 1900 12 5.0 0.95 1.00 1.00 3539 1.00 3539 0.90 583 0 583 2% 0 1900 12 0 1900 12 0 1900 12 0 1900 12 25 1750 14 310 1750 14 0.90 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.92 0 0 0 2% 0.85 29 0 0 3% Perm 120 1750 14 5.0 0.95 0.90 1.00 3170 1.00 3170 0.92 130 75 421 0% 0.95 0 0 0 1% 12 0.97 36 0 0 4% 45 0.92 337 0 0 0% 3 3 36.0 36.0 0.27 71.0 72.0 0.54 71.0 72.0 0.54 1943 c0.16 940 c0.22 1916 0.16 0.58 42.0 1.00 1.3 43.3 D 43.3 D 0.40 17.9 0.01 1.1 1.3 A 0.30 16.7 0.00 0.3 0.4 A 0.8 A Intersection Summary HCM Average Control Delay 100.4 HCM Level of Service HCM Volume to Capacity ratio 0.57 Actuated Cycle Length (s) 133.0 Sum of lost time (s) Intersection Capacity Utilization 94.0% ICU Level of Service Analysis Period (min) 15 dr Defacto Right Lane. Recode with 1 though lane as a right lane. c Critical Lane Group \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 10.0 10.0 0.08 5.0 238 0.13 1.72dr 61.5 1.00 362.8 424.3 F 424.3 F 0.0 A F 15.0 F HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 8: Sullivan Square & Cambridge Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBL NBT NBR SBL SBT SBR SEL2 SEL SER 0 1900 0 0 25 0 1900 0 0 25 0 1900 0 0 25 0 1900 1100 1900 0 2 25 No 225 1900 0 2 25 410 1900 0 1900 0 0 25 Yes 0 1900 1275 1900 0 3 25 180 1900 400 1 25 Yes 30 250 5.7 0.92 2% 0.92 2% 0.93 2% 30 580 13.2 0.93 2% 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 170 0.93 2% 0.92 5% 1183 245 custom custom 6 5 6 5 6 5 4.0 20.0 52.0 37.1% 3.0 3.0 -2.0 4.0 Lag Yes None 1.23 152.3 0.0 152.3 ~757 #907 4.0 20.0 20.0 14.3% 3.0 3.0 -2.0 4.0 Lead Yes None 0.66 66.7 0.0 66.7 111 m142 961 0 0 0 1.23 381 0 0 0 0.64 500 30 438 10.0 0.92 5% 0.92 5% 446 0 56 56 56 0.91 5% 0% 0 Perm 1 1 30 740 16.8 0.91 5% ø9 0.91 5% 1401 198 custom 1 1 1 1 1 1 9 4.0 20.0 54.0 38.6% 3.0 2.0 0.0 5.0 4.0 20.0 54.0 38.6% 3.0 2.0 -1.0 4.0 4.0 20.0 54.0 38.6% 3.0 2.0 -1.0 4.0 4.0 11.0 14.0 10% 6.0 1.0 C-Min C-Min 0.98 56.8 0.0 56.8 677 #858 660 C-Min 0.25 5.1 0.0 5.1 11 57 None 0.27 22.7 0.0 22.7 127 m152 358 1657 0 0 0 0.27 1430 0 0 0 0.98 72.0 51.4% 0.0 0.0% -2.0 4.0 0.0 4.0 400 798 0 0 0 0.25 Intersection Summary Area Type: Other Cycle Length: 140 Actuated Cycle Length: 140 Offset: 58 (41%), Referenced to phase 1:SEL, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 8: Sullivan Square & Cambridge Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 8: Sullivan Square & Cambridge Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBL NBT NBR 0 1900 0 1900 0 1900 0 1900 0.92 0 0 0 2% 0.92 0 0 0 2% 0.93 0 0 0 2% 0.93 0 0 0 2% SBL SBT SBR SEL2 SEL SER 1100 225 1900 1900 4.0 4.0 0.88 0.97 0.85 1.00 1.00 0.95 2787 3335 1.00 0.95 2787 3335 0.93 0.92 1183 245 0 0 1183 245 2% 5% custom custom 6 5 6 5 46.3 13.7 48.3 15.7 0.34 0.11 6.0 6.0 3.0 3.0 962 374 c0.42 c0.07 410 1900 4.0 0.95 1.00 1.00 3438 1.00 3438 0.92 446 0 446 5% 0 1900 0 1900 0.92 0 0 0 5% 0.91 0 0 0 5% Perm 1275 1900 4.0 0.91 1.00 0.95 3129 0.95 3129 0.91 1401 0 1401 5% 180 1900 4.0 1.00 0.85 1.00 1538 1.00 1538 0.91 198 95 103 5% custom 1 1 63.0 64.0 0.46 5.0 3.0 703 0.07 1.23 45.9 1.00 112.6 158.4 F 0.0 A 0.66 59.6 0.98 4.0 62.1 E 158.4 F 85.4 1.03 140.0 142.3% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 56 56 66.0 68.0 0.49 1670 0.13 1 1 63.0 64.0 0.46 5.0 3.0 1430 c0.45 0.27 21.3 1.04 0.1 22.3 C 36.4 D 0.98 37.4 1.00 19.4 56.8 E 52.6 D 1 0.15 22.1 1.00 0.4 22.5 C F 12.0 H HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 5: Sullivan Square & Rutherford Avenue Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Evening EBT EBR WBL WBT NBL NBR 1730 Free 0% 0.93 1860 0 0 0.92 0 0 Yield 0% 0.90 0 875 0.93 0 0 Free 0% 0.92 0 0.90 972 1860 1860 930 1860 4.1 1860 6.8 930 6.9 2.2 100 321 3.5 100 65 3.3 0 269 None None 250 EB 1 930 0 0 1700 0.55 0 0.0 0.0 EB 2 930 0 0 1700 0.55 0 0.0 NB 1 486 0 486 269 1.81 818 409.9 F 409.9 F 140.7 85.1% 15 NB 2 486 0 486 269 1.81 818 409.9 F ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH E HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 6: Main Street & Sullivan Square Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Evening WBL WBR NBT NBR SBL SBT 0 Yield 0% 0.92 0 935 1980 Free 0% 0.91 2176 625 0 0.91 687 0.92 0 0 Free 0% 0.92 0 0.92 1016 None None 410 2519 1431 2863 2519 6.8 1431 6.9 2863 4.1 3.5 100 23 3.3 0 124 2.2 100 128 WB 1 508 0 508 124 4.11 Err Err F Err F WB 2 508 0 508 124 4.11 Err Err F NB 1 1451 0 0 1700 0.85 0 0.0 NB 2 1412 0 687 1700 0.83 0 0.0 0.0 2619.8 114.1% 15 ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH H HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 9: Alford Street SB & Sullivan Square Movement Lane Configurations Volume (veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (ft) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Charles River Base Model - Existing Conditions Weekday Evening NBT NBR SBL SBT SWL SWR 0 Stop 0% 0.92 0 0 0 0.94 0 1720 Free 0% 0.97 1773 0 0.92 0 785 Stop 0% 0.94 835 0.97 0 None 1003 3546 0 3546 3546 0 3546 6.5 0 6.2 3546 7.1 3546 6.5 0 4.1 4.0 0 0 3.3 100 1085 3.5 0 0 4.0 0 0 2.2 0 1630 SB 1 418 0 0 0 Err Err Err F Err F SB 2 418 0 0 0 Err Err Err F SW 1 887 887 0 1630 1.09 907 65.4 F 65.4 SW 2 887 887 0 1630 1.09 907 65.4 F Err 106.6% 15 ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH G HCM Unsignalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 162: Land Boulevard & Rutherford Avenue Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 920 1900 420 1900 0 1900 Yes 0 1900 310 1900 20 1900 Yes 200 1900 60 1900 95 1900 Yes 0 1900 0 1900 0 1900 Yes 0.89 1% 0.75 1% 0 0.78 0% 28% 849 custom 3 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 2.34 619.6 0.0 619.6 ~715 m#53 363 0 0 0 2.34 30 99 2.3 0.78 0% 0.78 0% 0.89 1% 30 498 11.3 0.89 1% 868 0 0 370 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 2 2.31 608.8 0.0 608.8 ~729 m#53 19 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 0.23 14.6 0.0 14.6 60 87 418 375 0 0 0 2.31 1589 0 2 0 0.23 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 0.0% 0.0 4.0 0.93 1% 10% 193 custom 1 1 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.57 38.1 672.9 711.1 98 170 340 0 278 0 3.11 30 313 7.1 0.93 1% 0.93 1% 0.75 1% 30 350 8.0 0.75 1% 189 0 0 0 0 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 1 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.50 25.3 362.2 387.5 62 130 233 270 376 0 270 0 1.78 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of Green Natural Cycle: 90 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 162: Land Boulevard & Rutherford Avenue \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 162: Land Boulevard & Rutherford Avenue Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 920 1900 4.0 0.95 1.00 0.95 1715 0.95 1715 0.78 1179 0 849 0% custom 3 3 17.0 18.0 0.21 5.0 363 c0.50 420 1900 4.0 0.95 1.00 0.98 1771 0.98 1771 0.78 538 0 868 0% 0 1900 0 1900 20 1900 60 1900 4.0 0.95 0.92 0.99 1633 0.99 1633 0.93 65 50 139 1% 0 1900 0 1900 0 1900 0.89 0 0 0 1% 200 1900 4.0 0.95 1.00 0.95 1698 0.95 1698 0.93 215 0 193 1% custom 1 1 16.0 17.0 0.20 5.0 340 c0.11 95 1900 0.78 0 0 0 0% 310 1900 4.0 0.95 0.99 1.00 3542 1.00 3542 0.89 348 6 364 1% 0.93 102 0 0 1% 0.75 0 0 0 1% 0.75 0 0 0 1% 0.75 0 0 0 1% 2.34 33.5 0.28 603.3 612.5 F 0.57 30.7 1.00 6.7 37.4 D 0.43 29.7 1.00 4.0 33.8 C 35.6 D 3 2 17.0 18.0 0.21 5.0 375 0.49 37.0 38.0 0.45 5.0 1583 c0.10 2.31 33.5 0.28 592.4 601.6 F 607.0 F 0.23 14.5 1.00 0.3 14.8 B 14.8 B 429.9 0.83 85.0 65.7% 15 0.89 22 0 0 1% HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 1 16.0 17.0 0.20 5.0 327 0.09 0.0 A F 12.0 C HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 161: Charlestown Ave & Rutherford Ave. Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 0 1900 0 0 25 1315 1900 795 1900 200 1 25 Yes 70 1900 0 0 25 440 1900 0 1900 0 0 25 No 0 1900 0 0 25 0 1900 0 1900 0 0 25 Yes 25 1900 0 0 25 20 1900 490 1900 0 1 25 Yes 0.78 0% 30 506 11.5 0.78 0% 0 1686 3 0.0 0.0% 0.0 4.0 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 2.21 569.1 130.6 699.7 ~772 #755 426 764 0 230 0 3.16 30 99 2.3 0.89 1% 0.89 1% 0.78 0% 0.89 1% 1019 custom 3 3 21.0 22.0 25.9% 3.0 2.0 -1.0 4.0 0 Split 2 573 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 21.0 42.0 49.4% 3.0 2.0 -1.0 4.0 Lag Yes 0.36 9.2 0.0 9.2 71 92 19 1.31 163.6 0.0 163.6 ~456 #505 200 780 0 0 0 1.31 0.93 1% 30 305 6.9 0.93 1% 0.93 1% 0.75 1% 0 0 0 0 0 Split 1 60 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 0.0 4.0 0.0 4.0 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 21.0 21.0 24.7% 3.0 2.0 -1.0 4.0 Lead Yes 0.09 28.2 0.2 28.4 13 25 348 2 1587 0 0 0 0.36 225 30 428 9.7 0.75 1% 0.75 1% 653 custom 1 13 696 0 348 0 0.17 43.0 50.6% -1.0 4.0 0.75 17.3 0.0 17.3 167 195 874 0 0 0 0.75 Intersection Summary Area Type: Other Cycle Length: 85 Actuated Cycle Length: 85 Offset: 0 (0%), Referenced to phase 2:WBTL and 6:, Start of Green Natural Cycle: 90 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 161: Charlestown Ave & Rutherford Ave. \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/8/2010 10989.00: DCR Bridge Program 161: Charlestown Ave & Rutherford Ave. Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT 0 1900 1315 1900 4.0 0.95 1.00 1.00 3610 1.00 3610 0.78 1686 0 1686 0% 795 1900 4.0 1.00 0.85 1.00 1615 1.00 1615 0.78 1019 438 581 0% custom 3 3 17.0 18.0 0.21 5.0 342 0.36 70 1900 440 1900 4.0 0.95 1.00 0.99 3550 0.99 3550 0.89 494 0 573 1% 0 1900 0 1900 0 1900 0 1900 25 1900 0.89 0 0 0 1% 0.93 0 0 0 1% 0.93 0 0 0 1% 0.93 0 0 0 1% 0.75 33 0 0 1% Split 1 20 1900 4.0 0.95 1.00 0.97 3479 0.97 3479 0.75 27 0 60 1% 0.78 0 0 0 0% 3 17.0 18.0 0.21 5.0 764 c0.47 2.21 33.5 1.00 547.3 580.8 F 497.6 F 1.70 33.5 1.00 326.5 360.0 F 342.9 0.87 85.0 76.8% 15 0.89 79 0 0 1% Split 2 2 490 1900 4.0 1.00 0.85 1.00 1599 1.00 1599 0.75 653 140 513 1% custom 1 13 37.0 38.0 0.45 5.0 1587 c0.16 16.0 17.0 0.20 5.0 696 0.02 0.36 15.5 0.55 0.6 9.1 A 9.1 A 0.09 27.7 1.00 0.2 27.9 C 24.1 C HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 0.0 A SBR 38.0 39.0 0.46 734 c0.32 0.70 18.3 1.00 5.5 23.8 C F 8.0 D HCM Signalized Intersection Capacity Analysis 3/8/2010 10989.00: DCR Bridge Program 400: N Washington Street & Causeway Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWR 25 1900 675 1900 75 1900 Yes 240 1900 975 1900 300 1900 Yes 375 1900 140 1900 15 1900 Yes 85 1900 150 1900 625 1900 Yes 30 240 5.5 15 0.90 2% 0 Perm 30 214 4.9 0.90 2% 45 0.90 2% 45 0.90 2% 861 0 267 pm+pt 1 6 24.0 35.0 23.3% 3.0 3.0 -2.0 4.0 Lead 2 2 22.0 52.0 34.7% 3.0 3.0 -2.0 4.0 Lag 22.0 52.0 34.7% 3.0 3.0 -2.0 4.0 Lag 0.0 0.0% 0.0 4.0 0.90 2% 1083 30 1674 38.0 15 0.90 2% 5 0.90 2% 333 Perm 0.90 2% 65 0.90 2% 65 0.90 2% 417 Split 4 173 0 6 22.0 87.0 58.0% 3.0 3.0 -2.0 4.0 22.0 38.0 25.3% 3.0 3.0 -2.0 4.0 22.0 38.0 25.3% 3.0 3.0 -2.0 4.0 6 22.0 87.0 58.0% 3.0 3.0 -2.0 4.0 30 697 15.8 4 0.0 0.0% 0.0 4.0 0.90 2% 5 0.90 2% 0 Split 8 955 0 22.0 25.0 16.7% 3.0 3.0 -2.0 4.0 22.0 25.0 16.7% 3.0 3.0 -2.0 4.0 8 1.00 80.9 0.0 80.9 ~442 #593 160 0.68 39.6 0.0 39.6 170 276 0.61 24.6 0.0 24.6 365 437 134 0.37 2.8 0.0 2.8 0 45 1.16 146.7 0.0 146.7 ~480 #697 0.47 54.2 0.0 54.2 145 224 1594 1.41 221.3 0.0 221.3 ~503 #642 617 860 0 0 0 1.00 394 0 0 0 0.68 1762 0 0 0 0.61 895 0 0 0 0.37 361 0 0 0 1.16 370 0 0 0 0.47 678 0 0 0 1.41 0.0 0.0% 0.0 4.0 Intersection Summary Area Type: CBD Cycle Length: 150 Actuated Cycle Length: 150 Offset: 0 (0%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 140 Control Type: Pretimed ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 400: N Washington Street & Causeway Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 400: N Washington Street & Causeway Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening NBL NBT NBR SBL SBT SBR NEL NET NER SWL SWT SWR 25 1900 675 1900 4.0 0.95 0.98 1.00 0.99 1.00 3065 0.87 2671 0.90 750 5 856 75 1900 240 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.11 188 0.90 267 0 267 45 2% pm+pt 1 6 81.0 83.0 0.55 6.0 394 c0.14 0.24 0.68 33.3 1.00 9.0 42.3 D 975 1900 4.0 0.95 1.00 1.00 1.00 1.00 3185 1.00 3185 0.90 1083 0 1083 300 1900 4.0 1.00 0.95 1.00 0.85 1.00 1349 1.00 1349 0.90 333 149 184 15 2% Perm 375 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.95 1593 0.90 417 0 417 5 2% Split 4 140 1900 4.0 1.00 0.98 1.00 0.99 1.00 1621 1.00 1621 0.90 156 2 171 15 1900 85 1900 625 1900 0.90 17 0 0 65 2% 0.90 94 0 0 65 2% Split 8 150 1900 4.0 0.95 0.98 1.00 0.89 1.00 2771 1.00 2771 0.90 167 290 665 32.0 34.0 0.23 6.0 361 c0.26 32.0 34.0 0.23 6.0 367 0.11 19.0 21.0 0.14 6.0 388 c0.24 1.16 58.0 1.00 96.6 154.6 F 0.47 50.1 1.00 4.2 54.3 D 125.2 F 1.71 64.5 1.00 332.2 396.7 F 396.7 F 0.90 28 0 0 15 2% Perm 2% 0.90 83 0 0 45 2% 2 2 46.0 48.0 0.32 6.0 855 c0.32 1.00 51.0 1.00 30.9 81.9 F 81.9 F 138.7 1.08 150.0 121.1% 15 2% 6 81.0 83.0 0.55 6.0 1762 0.34 0.61 22.7 1.00 1.6 24.3 C 25.9 C 6 81.0 83.0 0.55 6.0 746 0.14 0.25 17.3 1.00 0.8 18.1 B HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 2% 4 2% 0.90 694 0 0 5 2% 8 F 16.0 H HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 410: Merrimack Street & Staniford Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening WBU WBL WBR WBR2 NBU NBL NBR NBR2 SEL2 SEL SER SWL2 SWL SWR 10 1900 105 1900 150 1900 50 1900 Yes 5 1900 125 1900 355 1900 285 1900 Yes 175 1900 230 1900 250 1900 Yes 65 1900 290 1900 175 1900 Yes 0.93 4% 30 657 14.9 100 0.93 4% 70 0.93 2% 80 0.94 2% 30 536 12.2 70 0.94 2% 100 0.94 2% 70 0.92 4% 30 1674 38.0 100 0.92 4% 382 306 custom custom 186 Prot 1 266 Perm 0 Perm 4 4 4 0 Perm 5 5 375 0.93 4% 80 0.93 0.93 4% 2% 10% 124 166 49 0 custom custom custom 5 2 2 4 5 2 2 4 30 276 6.3 375 0.93 2% 139 80 0.93 2% 4 4 4 4 45 45 245 6 190 custom 4 3 1 6 8.0 14.0 21.0 21.0% 3.0 3.0 -2.0 4.0 Lead 8.0 14.0 30.0 30.0% 3.0 3.0 -2.0 4.0 Lag 8.0 14.0 30.0 30.0% 3.0 3.0 -2.0 4.0 Lag 4.0 10.0 29.0 29.0% 3.0 3.0 -2.0 4.0 Lag 4.0 10.0 29.0 29.0% 3.0 3.0 -2.0 4.0 Lag None None 1.06dl 71.8 0.0 71.8 125 #219 1594 0.39 4.5 0.0 4.5 0 34 407 0 0 0 0.95 491 0 0 0 0.39 8.0 14.0 21.0 21.0% 3.0 3.0 -2.0 4.0 Lead 8.0 14.0 30.0 30.0% 3.0 3.0 -2.0 4.0 Lag 8.0 14.0 30.0 30.0% 3.0 3.0 0.0 6.0 Lag 4.0 10.0 29.0 29.0% 3.0 3.0 0.0 6.0 Lag 4.0 10.0 29.0 29.0% 3.0 3.0 -2.0 4.0 Lag 4.0 10.0 29.0 29.0% 3.0 3.0 -2.0 4.0 Lag Min Min 2.00 527.7 0.0 527.7 ~124 #240 577 C-Max 0.30 20.6 0.0 20.6 73 144 C-Max 0.09 6.4 0.0 6.4 0 25 None None 1.12 159.0 0.0 159.0 ~105 m#186 196 None 1.20 156.0 0.0 156.0 ~303 m#428 0.40 6.3 0.0 6.3 9 m35 None 0.65 47.9 0.0 47.9 111 172 C-Max 0.33 18.9 0.0 18.9 97 155 456 C-Max 0.37 3.6 0.0 3.6 0 44 62 0 0 0 2.00 554 0 0 0 0.30 535 0 0 0 0.09 124 0 0 0 1.12 319 0 0 0 1.20 759 0 0 0 0.40 309 0 0 0 0.60 733 0 0 0 0.33 717 0 0 0 0.37 -2.0 4.0 375 0.92 4% 6 6 8.0 14.0 21.0 21.0% 3.0 3.0 0.0 6.0 Lead 50.0 50.0% 386 ø3 41 41 50.0 50.0% 4.0 20.0 20.0 20% 2.0 0.0 -2.0 4.0 Lead Yes None Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:WBR and 6:SEL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. dl Defacto Left Lane. Recode with 1 though lane as a left lane. Splits and Phases: 410: Merrimack Street & Staniford Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 410: Merrimack Street & Staniford Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Peds. (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS WBU WBL 10 1900 105 1900 4.0 1.00 1.00 0.94 1.00 0.95 1464 0.24 363 0.93 113 0 124 100 4% 0.93 11 0 0 4% Perm 5 WBR Charles River Base Model - Existing Conditions Weekday Evening WBR2 NBU NBL 150 50 5 1900 1900 1900 4.0 6.0 0.88 0.95 1.00 0.93 1.00 1.00 0.85 0.85 1.00 1.00 1230 1239 1.00 1.00 1230 1239 0.93 0.93 0.93 161 54 5 1 28 0 165 21 0 375 80 4% 4% 2% custom custom custom 5 2 2 4 15.0 42.9 42.9 17.0 44.9 42.9 0.17 0.45 0.43 6.0 6.0 6.0 2.0 2.0 2.0 62 552 532 0.13 c0.34 0.02 2.00 0.30 0.04 41.5 17.5 16.6 1.00 1.00 1.00 502.0 1.4 0.1 543.5 18.9 16.7 F B B 210.5 F 125 1900 4.0 1.00 1.00 0.71 1.00 0.95 1135 0.42 496 0.93 134 0 139 375 2% Intersection Summary HCM Average Control Delay 87.7 HCM Volume to Capacity ratio 0.86 Actuated Cycle Length (s) 100.0 Intersection Capacity Utilization 67.1% Analysis Period (min) 15 dl Defacto Left Lane. Recode with 1 though lane as a left lane. c Critical Lane Group NBR2 SEL2 SEL SER SWL2 SWL SWR 355 285 1900 1900 4.0 4.0 1.00 1.00 0.89 0.91 1.00 1.00 0.85 0.85 1.00 1.00 1274 1290 1.00 1.00 1274 1290 0.93 0.93 382 306 0 165 382 141 80 70 2% 2% custom custom 175 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.95 1593 0.94 186 0 186 80 2% Prot 1 230 1900 4.0 1.00 1.00 1.00 1.00 0.95 1593 0.95 1593 0.94 245 0 245 70 2% 250 1900 4.0 1.00 0.92 1.00 0.85 1.00 1317 1.00 1317 0.94 266 144 122 100 2% Perm 65 1900 290 1900 4.0 0.97 1.00 0.86 1.00 0.95 2621 0.59 1627 0.92 315 0 386 100 4% 175 1900 4.0 1.00 0.59 1.00 0.85 1.00 824 1.00 824 0.92 190 101 89 375 4% custom 4 23.0 25.0 0.25 6.0 2.0 124 4 23.0 25.0 0.25 6.0 2.0 319 45 44.0 46.0 0.46 0.28 1.12 37.5 1.29 114.1 162.5 F 116.8 F c0.30 1.20 37.5 1.30 113.7 162.5 F 0.11 0.24 16.4 2.38 0.1 39.0 D HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH NBR 593 0.92 71 0 0 70 4% Perm 6 16.1 18.1 0.18 6.0 2.0 288 0.12 44.0 46.0 0.46 6.0 2.0 733 c0.15 0.65 38.0 1.00 3.7 41.7 D 0.33 17.2 1.00 1.2 18.5 B 24.0 C 4 6 44.0 46.0 0.46 6.0 2.0 606 0.09 0.20 16.1 1.00 0.7 16.8 B 4 23.0 25.0 0.25 6.0 2.0 407 0.24 1.06dl 36.9 1.00 31.0 67.9 E 50.7 D 41 45.1 47.1 0.47 388 0.11 0.23 15.7 1.00 0.1 15.8 B F 8.0 C HCM Signalized Intersection Capacity Analysis 3/10/2010 10989.00: DCR Bridge Program 121: Cambridge Street & Staniford Street Lane Group Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width (ft) Storage Length (ft) Storage Lanes Taper Length (ft) Right Turn on Red Link Speed (mph) Link Distance (ft) Travel Time (s) Confl. Bikes (#/hr) Peak Hour Factor Heavy Vehicles (%) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode v/c Ratio Control Delay Queue Delay Total Delay Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 305 1900 10 180 1 25 595 1900 11 0 1900 11 0 0 25 No 0 1900 12 0 0 25 680 1900 12 190 1900 12 0 1 25 No 0 1900 12 0 0 25 0 1900 12 5 1900 12 0 1 25 Yes 180 1900 10 0 1 25 0 1900 12 230 1900 12 0 1 25 No 30 379 8.6 30 261 5.9 30 236 5.4 0.97 1% 0.97 1% 21 0.97 1% 0.95 1% 0.95 1% 314 Prot 4 613 0 0 716 2 6 200 pt+ov 36 4 2 6 36 8.0 22.0 26.0 26.0% 3.0 1.0 0.0 4.0 Lag Yes Ped 0.96 70.1 0.0 70.1 200 #371 8.0 12.0 35.0 35.0% 3.0 1.0 0.0 4.0 Lag Yes C-Max 0.46 37.3 0.7 38.0 208 262 299 8.0 22.0 47.0 47.0% 3.0 1.0 0.0 4.0 180 330 0 0 0 0.95 0.0 0.0% 0.0 0.0% 0.0 4.0 0.0 4.0 1337 385 0 0 0.64 78 0.95 1% 0.63 0% 0.63 0% 0 0 74.0 74.0% 0.0 0.0% 0.0 0.0% 0.0 5.0 0.0 4.0 0.0 4.0 C-Max 0.50 21.5 6.5 28.0 171 226 181 0.20 6.1 1.2 7.4 40 67 1441 664 63 0 0.92 1019 619 0 0 0.50 30 816 18.5 1 0.63 0% 0.94 3% 0.94 3% 0.94 3% 8 custom 1 191 Prot 3 0 245 custom 3 1 3 3 5.0 9.0 12.0 12.0% 3.0 1.0 0.0 4.0 Lead Yes None 0.02 0.0 0.0 0.0 0 0 8.0 23.0 27.0 27.0% 4.0 1.0 0.0 5.0 Lead Yes Ped 0.63 46.0 0.0 46.0 124 m145 8.0 23.0 27.0 27.0% 4.0 1.0 0.0 5.0 Lead Yes Ped 0.85 56.9 0.0 56.9 162 m185 156 0.0 0.0% 0.0 4.0 736 538 0 0 0 0.01 324 0 0 0 0.59 310 0 0 0 0.79 Intersection Summary Area Type: CBD Cycle Length: 100 Actuated Cycle Length: 100 Offset: 77 (77%), Referenced to phase 2:EBT and 6:WBT, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 121: Cambridge Street & Staniford Street \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH Queues 3/10/2010 10989.00: DCR Bridge Program 121: Cambridge Street & Staniford Street Movement Lane Configurations Volume (vph) Ideal Flow (vphpl) Lane Width Total Lost time (s) Lane Util. Factor Frpb, ped/bikes Flpb, ped/bikes Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Peak-hour factor, PHF Adj. Flow (vph) RTOR Reduction (vph) Lane Group Flow (vph) Confl. Bikes (#/hr) Heavy Vehicles (%) Turn Type Protected Phases Permitted Phases Actuated Green, G (s) Effective Green, g (s) Actuated g/C Ratio Clearance Time (s) Vehicle Extension (s) Lane Grp Cap (vph) v/s Ratio Prot v/s Ratio Perm v/c Ratio Uniform Delay, d1 Progression Factor Incremental Delay, d2 Delay (s) Level of Service Approach Delay (s) Approach LOS Intersection Summary HCM Average Control Delay HCM Volume to Capacity ratio Actuated Cycle Length (s) Intersection Capacity Utilization Analysis Period (min) c Critical Lane Group Charles River Base Model - Existing Conditions Weekday Evening EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR 305 1900 10 4.0 1.00 1.00 1.00 1.00 0.95 1501 0.95 1501 0.97 314 0 314 595 1900 11 4.0 0.95 1.00 1.00 1.00 1.00 3110 1.00 3110 0.97 613 0 613 0 1900 11 0 1900 12 0 1900 12 0.63 0 0 0 0.63 0 0 0 180 1900 10 5.0 1.00 1.00 1.00 1.00 0.95 1472 0.95 1472 0.94 191 0 191 230 1900 12 5.0 1.00 1.00 1.00 0.85 1.00 1411 1.00 1411 0.94 245 0 245 1% Prot 4 1% 1% 1% 0% 0% 6 3% Prot 3 3% 2 5 1900 12 4.0 1.00 1.00 1.00 0.86 1.00 1479 1.00 1479 0.63 8 8 0 1 0% custom 1 0 1900 12 0.95 0 0 0 190 1900 12 5.0 1.00 1.00 1.00 0.85 1.00 1439 1.00 1439 0.95 200 0 200 78 1% pt+ov 36 0 1900 12 0.97 0 0 0 21 1% 680 1900 12 4.0 0.95 1.00 1.00 1.00 1.00 3217 1.00 3217 0.95 716 0 716 21.8 21.8 0.22 4.0 2.0 327 c0.21 39.8 39.8 0.40 4.0 2.0 1238 0.20 44.8 44.8 0.45 4.0 2.0 1441 c0.22 69.2 65.2 0.65 938 0.14 1.0 1.0 0.01 4.0 2.0 15 0.00 20.4 20.4 0.20 5.0 2.0 300 0.13 20.4 20.4 0.20 5.0 2.0 288 c0.17 0.96 38.7 0.75 36.5 65.6 E 0.50 22.6 1.68 1.3 39.2 D 48.1 D 0.50 19.6 1.00 1.2 20.8 C 17.8 B 0.21 7.0 1.00 0.0 7.1 A 0.01 49.0 1.00 0.1 49.1 D 0.64 36.4 1.14 1.4 42.8 D 0.85 38.3 1.14 9.7 53.3 D 36.1 0.70 100.0 60.7% 15 HCM Level of Service Sum of lost time (s) ICU Level of Service \\mawatr\ts\10989.00\tech\synchro\Charles River Base Model\01_Base_PM.syn VHB:NLH 49.1 D 0.94 0 0 0 3% custom 3 48.7 D D 13.0 B HCM Signalized Intersection Capacity Analysis 3/10/2010 Crash Data \\Mawatr\ts\10989.01\docs\memos\Existing Conditions Memo Attachments\Attachments.doc MassHighway CRASH RATE WORKSHEET CITY/TOWN : WATERTOWN, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MOUNT AUBURN STREET RIN # MINOR STREET(S) : FRESH POND PARKWAY / GERRY'S LANDING ROAD RIN # RIN # RIN # RIN # 1. FRESH POND PKWY 2. MT AUBURN INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 4. MT AUBURN ST 3. GERRY'S LANDING RD Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 1440 315 2385 900 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 57 APPROACH ADT : # OF YEARS : 0.70 4 RATE = 56000 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 14 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : FRESH POND PARKWAY RIN # MINOR STREET(S) : GREENOUGH BOULEVARD RIN # MEMORIAL DRIVE RIN # RIN # RIN # 2. MEMORIAL DR 1. FRESH POND PKWY INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 3. GREENOUGH BLVD Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : EB WB NB VOLUMES (PM) : 1990 780 2020 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 40 APPROACH ADT : # OF YEARS : 0.51 4 RATE = 4 53222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 10 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : GREENOUGH BOULEVARD RIN # MINOR STREET(S) : ELIOT BRIDGE RIN # RIN # RIN # RIN # 1. GREENOUGH BLVD INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 2. ELIOT BR 3. GREENOUGH BLVD Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB NB VOLUMES (PM) : 1895 2215 540 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 16 APPROACH ADT : # OF YEARS : 0.21 4 RATE = 4 51666.667 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 4 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : SOLDIERS FIELD ROAD (SFR) RIN # MINOR STREET(S) : ELIOT BRIDGE RIN # RIN # RIN # RIN # INTERSECTION North 2. SFR - WB INTERSECTION DIAGRAM REF # 1. ELIOT BR (Label Approaches) 3. SFR - EB Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : EB WB NB VOLUMES (PM) : 1440 3145 415 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 9 APPROACH ADT : # OF YEARS : 0.11 4 RATE = 4 55555.556 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 2 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MOUNT AUBURN STREET RIN # MINOR STREET(S) : JOHN F. KENNEDY STREET (JFK ST) RIN # RIN # RIN # RIN # JFK ST (ONE-WAY NB) INTERSECTION North INTERSECTION DIAGRAM REF # MT AUBURN ST (Label Approaches) 1. MT AUBURN ST (ONE-WAY EB) (ONE-WAY EB) 2. JFK ST (ONE-WAY NB) Peak Hour Volumes APPROACH : 1 2 DIRECTION : EB NB VOLUMES (PM) : 440 755 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 23 3 APPROACH ADT : # OF YEARS : 1.19 4 RATE = 4 13277.778 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 6 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MEMORIAL DRIVE RIN # MINOR STREET(S) : JOHN F. KENNEDY STREET (JFK ST) RIN # RIN # RIN # RIN # 1. JFK ST INTERSECTION North INTERSECTION DIAGRAM 2. MEMORIAL DR REF # (Label Approaches) 4. MEMORIAL DR 3. JFK ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 655 790 1055 735 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 56 APPROACH ADT : # OF YEARS : 1.07 4 RATE = 35944.444 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 14 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : ALLSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : WESTERN AVENUE RIN # MINOR STREET(S) : NORTH HARVARD STREET RIN # RIN # RIN # RIN # 1. N. HARVARD ST INTERSECTION North INTERSECTION DIAGRAM 2. WESTERN AVE REF # (Label Approaches) 4. WESTERN AVE 3. N. HARVARD ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 375 525 415 370 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 26 APPROACH ADT : # OF YEARS : 0.95 4 RATE = 18722.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 7 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MEMORIAL DRIVE RIN # MINOR STREET(S) : WESTERN AVENUE RIN # RIN # RIN # RIN # 1. MEMORIAL DR INTERSECTION North INTERSECTION DIAGRAM REF # 2. WESTERN AVE (ONE‐WAY WB) (Label Approaches) 3. MEMORIAL DR Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB NB VOLUMES (PM) : 825 1125 1300 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 61 APPROACH ADT : # OF YEARS : 1.16 4 RATE = 4 36111.111 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 15 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MEMORIAL DRIVE RIN # MINOR STREET(S) : RIVER STREET RIN # RIN # RIN # RIN # 1. MEMORIAL DR INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 3. RIVER ST (ONE-WAY EB) 2. MEMORIAL DR Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB NB EB VOLUMES (PM) : 715 1175 1725 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 87 APPROACH ADT : # OF YEARS : 1.48 4 RATE = 4 40166.667 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 22 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : COMMONWEALTH AVENUE (COMM. AVE) RIN # MINOR STREET(S) : BOSTON UNIVERSITY BRIDGE (BU BR) RIN # ESSEX STREET RIN # RIN # RIN # 1. BU BR INTERSECTION North INTERSECTION DIAGRAM 2. COMM AVE (Label Approaches) REF # 4. COMM AVE 3. ESSEX ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 1870 2375 380 1390 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 46 APPROACH ADT : # OF YEARS : 0.47 4 RATE = 66833.333 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 12 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : COMMONWEALTH AVENUE (COMM. AVE) RIN # MINOR STREET(S) : BOSTON UNIVERSITY BRIDGE (BU BR) RIN # UNIVERSITY ROAD / CARLTON STREET RIN # RIN # RIN # 1. UNIVERSITY RD INTERSECTION North INTERSECTION 2. COMM AVE DIAGRAM REF # (Label Approaches) 4. COMM AVE 3. CARLTON ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 270 990 1500 1055 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 12 APPROACH ADT : # OF YEARS : 0.19 4 RATE = 42388.889 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 3 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MASSACHUSETTS AVENUE (MASS AVE) RIN # MINOR STREET(S) : PROSPECT STREET RIN # RIVER STREET/WESTERN AVENUE RIN # RIN # RIN # 1. MASS AVE INTERSECTION North INTERSECTION DIAGRAM 2. PROSPECT ST REF # (Label Approaches) 4. RIVER ST/WESTERN AVE. 3. MASS AVE Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 385 520 440 825 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 26 APPROACH ADT : # OF YEARS : 0.74 4 RATE = 24111.111 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 7 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : CAMBRIDGE, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MASSACHUSETTS AVENUE (MASS AVE) RIN # MINOR STREET(S) : SIDNEY STREET/ SIDNEY EXTENSION RIN # RIN # RIN # RIN # 1. SIDNEY EXT. INTERSECTION North INTERSECTION DIAGRAM 2. MASS AVE REF # (Label Approaches) 4. MASS AVE 3. SIDNEY ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 360 645 70 415 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 13 APPROACH ADT : # OF YEARS : 0.54 4 RATE = 16555.556 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 3 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : COMMONWEALTH AVE (COMM AVE) RIN # MINOR STREET(S) : BEACON STREET RIN # BROOKLINE AVENUE RIN # DEERFIELD STREET RIN # RIN # 1. DEERFIELD ST INTERSECTION North INTERSECTION DIAGRAM (Label Approaches) 2. COMM AVE REF # 5. COMM AVE 4. BEACON ST 3. BROOKLINE AVE Peak Hour Volumes APPROACH : 1 2 3 4 5 DIRECTION : SB WB NB NE EB VOLUMES (PM) : 50 2350 575 665 765 " K " FACTOR : TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 0.09 30 APPROACH ADT : # OF YEARS : 0.42 4 RATE = 48944.444 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 8 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : CHARLESGATE WEST RIN # BAY STATE ROAD RIN # RIN # RIN # 1. CHARLESGATE W INTERSECTION North BAY STATE RD (ONE-WAY WB) (ONE-WAY SB) INTERSECTION DIAGRAM REF # (Label Approaches) 2. BEACON ST (ONE-WAY WB) BEACON ST (ONE-WAY WB) CHARLESGATE W Peak Hour Volumes APPROACH : 1 2 DIRECTION : SB WB VOLUMES (PM) : 1040 825 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 47 3 APPROACH ADT : # OF YEARS : 1.55 4 RATE = 4 20722.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 12 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : CHARLESGATE EAST RIN # RIN # RIN # RIN # STORROW DR EB ON-RAMP INTERSECTION North INTERSECTION DIAGRAM REF # 1. BEACON ST (ONE-WAY WB) (Label Approaches) BEACON ST 2. CHARLESGATE E Peak Hour Volumes APPROACH : 1 2 DIRECTION : WB NB VOLUMES (PM) : 960 720 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 38 3 APPROACH ADT : # OF YEARS : 1.39 4 RATE = 4 18666.667 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 10 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BOYLSTON STREET RIN # MINOR STREET(S) : BOWKER OVERPASS RIN # RIN # RIN # RIN # 1. BOWKER OP INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 2. BOYLSTON ST 3. BOYLSTON ST Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB EB VOLUMES (PM) : 1965 1335 875 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 18 APPROACH ADT : # OF YEARS : 0.27 4 RATE = 4 46388.889 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 5 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MASSACHUSETTS AVENUE (MASS AVE) RIN # MINOR STREET(S) : BEACON STREET RIN # RIN # RIN # RIN # 1. MASS AVE INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) BEACON ST 2. BEACON ST (ONE-WAY WB) 3. MASS AVE Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB NB VOLUMES (PM) : 1115 735 1165 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 33 APPROACH ADT : # OF YEARS : 0.67 4 RATE = 4 33500 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 8 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MASSACHUSETTS AVENUE (MASS AVE) RIN # MINOR STREET(S) : BOYLSTON STREET RIN # RIN # RIN # RIN # 1. MASS AVE INTERSECTION North INTERSECTION DIAGRAM 2. BOYLSTON ST REF # (Label Approaches) 4. BOYLSTON ST 3. MASS AVE Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 820 305 845 565 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 42 APPROACH ADT : # OF YEARS : 1.02 4 RATE = 28166.667 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 11 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : STUART STREET RIN # MINOR STREET(S) : DARTMOUTH STREET RIN # RIN # RIN # RIN # INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 2. STUART ST (ONE-WAY EB) 1. DARTMOUTH ST (ONE-WAY NB) Peak Hour Volumes APPROACH : 1 2 DIRECTION : NB EB VOLUMES (PM) : 510 1790 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 20 3 APPROACH ADT : # OF YEARS : 0.54 4 RATE = 4 25555.556 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 5 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : CLARENDON STREET RIN # RIN # RIN # RIN # 1. CLARENDON ST (ONE-WAY SB) INTERSECTION North INTERSECTION DIAGRAM 2. BEACON ST (Label Approaches) (ONE-WAY WB) REF # BEACON ST CLARENDON ST Peak Hour Volumes APPROACH : 1 2 DIRECTION : SB WB VOLUMES (PM) : 300 885 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 11 3 APPROACH ADT : # OF YEARS : 0.57 4 RATE = 4 13166.667 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 3 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : BERKELEY STREET RIN # RIN # RIN # RIN # STORROW DR ON-RAMP INTERSECTION North INTERSECTION DIAGRAM REF # 1. BEACON ST (ONE‐WAY WB) (Label Approaches) BEACON ST 2. BERKELEY ST Peak Hour Volumes APPROACH : 1 2 DIRECTION : WB NB VOLUMES (PM) : 1255 1335 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 18 3 APPROACH ADT : # OF YEARS : 0.43 4 RATE = 4 28777.778 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 5 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : ARLINGTON STREET RIN # STORROW DR EB OFF-RAMP RIN # RIN # RIN # 1. STORROW OFF-RAMP INTERSECTION North INTERSECTION DIAGRAM 2. BEACON ST (ONE‐WAY WB) (Label Approaches) REF # ARLINGTON ST (ONE-WAY SB) Peak Hour Volumes APPROACH : 1 2 DIRECTION : SB WB VOLUMES (PM) : 1230 2180 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 15 3 APPROACH ADT : # OF YEARS : 0.27 4 RATE = 4 37888.889 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 4 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BOYLSTON STREET RIN # MINOR STREET(S) : ARLINGTON STREET RIN # RIN # RIN # RIN # 2. ARLINGTON ST (ONE-WAY SB) INTERSECTION North INTERSECTION DIAGRAM REF # (Label Approaches) 1. BOYLSTON ST BOYLSTON ST (ONE-WAY EB) ARLINGTON ST Peak Hour Volumes APPROACH : 1 2 DIRECTION : EB SB VOLUMES (PM) : 920 1350 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 23 3 APPROACH ADT : # OF YEARS : 0.62 4 RATE = 4 25222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 6 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : BEACON STREET RIN # MINOR STREET(S) : CHARLES STREET RIN # RIN # RIN # RIN # 1. CHARLES ST (ONE-WAY SB) INTERSECTION North INTERSECTION DIAGRAM (Label Approaches) REF # 2. BEACON ST (TWO‐WAYS) BEACON ST (ONE-WAY WB) 3. CHARLES ST (ONE-WAY NB) Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB NB VOLUMES (PM) : 480 515 2265 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 40 APPROACH ADT : # OF YEARS : 0.76 4 RATE = 4 36222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 10 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : X MHD USE ONLY SIGNALIZED : Source # ~ INTERSECTION DATA ~ MAJOR STREET : LONGFELLOW BRIDGE RIN # MINOR STREET(S) : MEMORIAL DRIVE WB RAMP RIN # RIN # RIN # RIN # 1. MEMORIAL DR WB RAMP INTERSECTION North INTERSECTION DIAGRAM REF # 2. LONGFELLOW BR (Label Approaches) Peak Hour Volumes APPROACH : 1 2 DIRECTION : SB WB VOLUMES (PM) : 50 720 " K " FACTOR : TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 0.09 4 3 APPROACH ADT : # OF YEARS : 0.32 4 RATE = 4 8555.5556 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 1 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : MONSIGNOR O'BRIEN HIGHWAY RIN # MINOR STREET(S) : COMMERCIAL AVENUE RIN # CHARLESTOWN AVENUE RIN # RIN # RIN # 1. O'BRIEN HWY INTERSECTION North INTERSECTION DIAGRAM 2.CHARLESTOWN AVE REF # (Label Approaches) 4. COMMERCIAL AVE 3. O'BRIEN HWY Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 1345 735 1305 2035 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 52 APPROACH ADT : # OF YEARS : 0.59 4 RATE = 60222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 13 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : COMMERCIAL STREET RIN # MINOR STREET(S) : CHARLESTOWN BRIDGE RIN # CAUSEWAY STREET RIN # ENDICOTT STREET RIN # RIN # 1. CHARLESTOWN BR INTERSECTION North INTERSECTION DIAGRAM 2. COMMERCIAL ST REF # (Label Approaches) 4. CAUSEWAY ST 3. ENICOTT ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SB WB NB EB VOLUMES (PM) : 1515 860 775 530 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 35 APPROACH ADT : # OF YEARS : 0.59 4 RATE = 40888.889 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 9 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : CAUSEWAY STREET RIN # MINOR STREET(S) : MERRIMAC STREET RIN # LOMASNEY WAY RIN # STANIFORD STREET RIN # RIN # 1. LOMASNEY WAY INTERSECTION 2. CAUSEWAY ST North INTERSECTION DIAGRAM REF # (Label Approaches) 3. MERRIMAC ST 4. STANIFORD ST Peak Hour Volumes APPROACH : 1 2 3 4 DIRECTION : SE SW WB NB VOLUMES (PM) : 655 530 315 770 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 15 APPROACH ADT : # OF YEARS : 0.41 4 RATE = 25222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 4 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01 MassHighway CRASH RATE WORKSHEET CITY/TOWN : BOSTON, MA DISTRICT : 4 COUNT DATE : UNSIGNALIZED : SIGNALIZED : MHD USE ONLY X Source # ~ INTERSECTION DATA ~ MAJOR STREET : CAMBRIDGE STREET RIN # MINOR STREET(S) : STANIFORD STREET RIN # RIN # RIN # RIN # 1. STANIFORD ST INTERSECTION North INTERSECTION DIAGRAM 2. CAMBRIDGE ST REF # (Label Approaches) 3. CAMBRIDGE ST Peak Hour Volumes APPROACH : 1 2 3 DIRECTION : SB WB EB VOLUMES (PM) : 410 870 900 " K " FACTOR : 0.09 TOTAL # OF ACCIDENTS : CRASH RATE CALCULATION : 16 APPROACH ADT : # OF YEARS : 0.45 4 RATE = 4 24222.222 5 6 ADT = TOTAL VOL/"K" FACT. AVERAGE # OF ACCIDENTS ( A ) : 4 ( A * 1,000,000 ) ( ADT * 365 ) Source (optional): Comments: last updated: 11/06/01