Working Group Meeting #4 UMass Center at Springfield Tower Square 1500 Main Street Springfield, Massachusetts December 3, 2015 Agenda Welcome & Introductions Overview of Working Group Meeting #3 Summary of Work Completed Initial Preliminary Alternatives o Impacts & Benefits Next Steps 2 December 3, 2015 Welcome & Introductions Michael Clark – Transportation Planner (MassDOT) Ethan Britland – Project Manager (MassDOT) Ben Wood – MassDPH Mark Arigoni, L.A. – Principal-in-Charge (MMI) Van Kacoyannakis, P.E. – Traffic (MMI) John Hoey – Facilitator (MMI) Nancy Farrell – Public Involvement (Regina Villa) Sarah Paritsky – Public Involvement (Regina Villa) 3 December 3, 2015 Combined Study Areas 4 December 3, 2015 Opportunities Reconfiguration of the I-91 Viaduct and Longmeadow curve may facilitate safety and circulation improvements for all modes Create Stronger Link to the New Union Station Link Riverwalks in Agawam and Springfield Transit Oriented Developments Link Forest Park to the Riverwalk 5 Create a Regional Draw to an expanded Riverfront Economic Development Areas December 3, 2015 Issues & Constraints Transportation Five Pedestrian Fatalities between 2010 – 2014 Lack of Designated Provisions for Bicycles Number of On & Off Ramps in a Short Distance No connection to Memorial Bridge from I-291 6 Location of N-S Rail Line, Riverfront Barrier o o Only three connections between the Riverfront & the Bikeway with Downtown Core At-grade crossing at Riverfront Park is a Passive Crossing December 3, 2015 Issues & Constraints Economic & Land Use Natural Resources Cultural Resources Public Health 7 December 3, 2015 Summary of Work Completed Study Area Goals & Objectives Fine Tuning the Evaluation Criteria Public Involvement Plan Existing Conditions Transportation o Economic Development & Land Use o Environmental o 8 Future No-Build Conditions 2040 – Transportation Demand Model (TransCAD) Beginning Stages of Implementing the Future No Build to traffic micro simulations Process of defining short and mid-term solutions to improve safety, traffic flow and health Preliminary Alternatives Development – Potential Impacts & Benefits December 3, 2015 Alternatives Development Preliminary Concepts (Line Drawings) Potential Impacts & Benefits of Each Alternative Themes o o o Elevated At-Grade Depression o o o Relocated Railroad Tunnel Working Group Member Comments/Questions are Encouraged. But orderly thank you. 9 December 3, 2015 Retain Existing 10 December 3, 2015 Retain Existing 11 December 3, 2015 At-Grade Section 12 December 3, 2015 At-Grade Section 13 December 3, 2015 Public domain images At-Grade Section Example 14 December 3, 2015 Public domain images Public domain images At-Grade Section Example Pedestrian Bridge 15 December 3, 2015 Depressed Section 16 December 3, 2015 Depressed Section 17 December 3, 2015 Public domain images Depressed Section Example 18 December 3, 2015 Public domain images Public domain images Depressed Section Example Before 19 After December 3, 2015 20 Public domain images Public domain images Depressed Section Example December 3, 2015 Depressed Section with Railroad 21 December 3, 2015 Depressed Section with Railroad 22 December 3, 2015 Public domain images PublicPublic domain images domain images Public domain images Depressed Section with Railroad Examples 23 December 3, 2015 Tunnel Section 24 December 3, 2015 Tunnel Section 25 December 3, 2015 Public domain images Tunnel Section Example 26 December 3, 2015 Public domain images Tunnel Section Example 27 December 3, 2015 Elevated Section 28 December 3, 2015 Elevated Section 29 December 3, 2015 30 Public domain images Public domain images Elevated Section Example December 3, 2015 Route 5 Realignment 31 December 3, 2015 Route 5 Realignment 32 December 3, 2015 Signature Bridge 33 December 3, 2015 Public domain images Public domain images Route 5 Realignment Example I-91 on West Side 34 December 3, 2015 I-91 on West Side 35 December 3, 2015 North & Southbound Split 36 December 3, 2015 North & Southbound Split 37 December 3, 2015 Railroad Right-of-Way 38 December 3, 2015 Railroad Right-of-Way 39 December 3, 2015 Public domain images Railroad Right-of-Way Example 40 December 3, 2015 Short-Term & Medium-Term Recommendations Pavement Marking and Signing Improvements Signal Optimization, timing changes Guide Signs for Walkability Minor Geometric Improvements, Auxiliary Lanes, Improved Radii at Intersection Corners Improved Wheelchair Ramps and ADA Accessibility at Intersections Provide Bike Lanes and/or Shared Bike Routes 41 Improvements to Crossings with Railroad at Riverfront Park December 3, 2015 Revised Schedule 42 December 3, 2015 Next Steps Complete Future No-Build Traffic Micro-Simulations Finalize Evaluation Criteria Define Short-term and Medium-term Alternatives to Improve Safety, Traffic Flow and Health-based on 2040 No-Build Micro-Simulations 43 Narrow Down Long-Term Alternatives for Further Development Conduct First Public Meeting on December 15, 2015 Next Working Group Meeting January 2016 December 3, 2015 Long-Term Alternatives Example 44 December 3, 2015 Questions & Comments Contacts: Ethan Britland, Project Manager Phone: 857-368-8840 Email: ethan.britland@state.ma.us Michael Clark, Transportation Planner Phone: 857-368-9800 Email: michael.clark@state.ma.us Study Website Link: www.massdot.state.ma.us/i91viaductstudy 45 December 3, 2015