Appendix A Guidance Documents 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2014 Draft MAP-21 ANTICIPATED NET APPORTIONMENTS OF ESTIMATED BALANCE FROM FEDERAL FUNDS FY 2013 $305,385,113 $1,898,992 $43,947,012 $9,696,605 $28,456,838 $205,629,022 $73,207,617 $1,599,520 $45,201,991 $904,940 $2,727,959 $100,021 $5,878,325 $134,996 $5,015,765 $171,892 $2,878,139 $57,563 $11,505,438 $230,109 $0 $65,455,145 FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX BRIDGE-OFF SYSTEM STP NON-FLEX -BOSTON URBAN AREA -BARNSTABLE URBAN AREA -SPRINGFIELD, CHICOPEE, HOLYOKE -WORCESTER URBAN AREA -PROVIDENCE, PAWTUCKET STP-ENHANCEMENT -OTHER AREAS (RURAL & SMALL URBAN) SAFE ROUTES TO SCHOOLS PGM. ANTICIPATED TOTAL FUNDS AVAILABLE TRANSFER OF (10/1) SUBJECT TO FY 2014 PROGRAMMED (2014FUNDS OBLIGATION AUTHORITY 2017) ($50,000,000) $257,284,105 $235,334,830 $50,000,000 $103,643,617 $92,311,319 $234,085,860 $11,122,934 $74,807,137 $73,310,995 $46,106,931 $45,184,792 $2,827,980 $2,771,420 $6,013,321 $5,893,055 $5,187,657 $5,083,904 $2,935,702 $2,876,988 $11,735,547 $11,500,836 $65,455,145 $12,191,672 BALANCE REMAINING $21,949,275 $11,332,298 $222,962,927 $1,496,143 $922,139 $56,560 $120,266 $103,753 $58,714 $234,711 $53,263,473 $0 $3,180,887 $3,180,887 $1,425,500 $1,755,387 $1,174,862 $5,188,933 $5,188,933 $3,203,903 $193,357 $416,654 $355,516 $204,002 $761,152 $3,407,754 $5,188,933 $5,188,933 $3,203,903 $193,357 $416,654 $355,516 $204,002 $761,152 $4,582,616 $10,377,866 $10,377,866 $6,407,806 $386,714 $833,308 $711,032 $408,003 $1,522,304 $800,000 $1,822,000 $3,985,002 $2,920,743 $175,953 $379,151 $323,517 $185,639 $685,037 $3,782,616 $8,555,866 $6,392,864 $3,487,063 $210,761 $454,157 $387,515 $222,364 $837,267 $32,277,307 $17,474,090 $49,751,397 $36,305,564 $13,445,833 $0 $5,627,938 $5,627,938 $0 $5,627,938 RWY/HWY CROSSINGS- HAZARD ELIMINATION $1,207,226 $8,656,632 $9,863,858 $4,000,000 $5,863,858 RWY/HWY CROSSINGS- PROTECTIVE DEVICES $1,207,227 $6,105,589 $7,312,816 $4,000,000 $3,312,816 $497,241,068 $333,482,103 $0 $830,723,171 $476,609,815 $359,741,293 $60,908,669 $20,064,084 $121,328,051 $32,175,272 $0 $182,236,720 $52,239,356 $93,444,029 $25,774,942 $88,792,692 $26,464,414 $578,213,821 $486,985,426 $0 $1,065,199,247 $595,828,786 $474,998,399 TAP RECREATIONAL TRAILS TAP FLEX TAP NON-FLEX -BOSTON URBAN AREA -BARNSTABLE URBAN AREA -SPRINGFIELD, CHICOPEE, HOLYOKE -WORCESTER URBAN AREA -PROVIDENCE, PAWTUCKET -OTHER AREASIMPROVEMENT (RURAL & SMALL URBAN) HWY SAFETY PGM. HSIP - High Risk Rural SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: $0 FEDERAL O/A GUIDANCE Federal Aid and Programming Office $600,000,000 Page 1 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2014 Draft MAP-21 FUNDING CATEGORY ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS ESTIMATED BALANCE FROM FY 2013 ANTICIPATED TRANSFER OF FUNDS TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO FY 2014 PROGRAMMED (2014OBLIGATION AUTHORITY 2017) BALANCE REMAINING HIGH PRIORITY PROJECTS $0 $171,251,829 $0 $170,525,021 $5,016,379 $132,167,668 SECTION 115 PROJECTS $0 $3,088,758 $0 $3,304,755 $359,000 $2,478,204 SECTION 117 PROJECTS $0 $6,986,857 $0 $6,986,857 $0 $6,986,857 SECTION 125 PROJECTS $0 $2,527,809 $0 $3,667,809 $1,095,000 $957,809 $12,644,837 $0 $22,080,558 $5,118,247 $16,962,311 MISCELLANEOUS / OTHER / UNDETERMINED FEDERAL AID TOTAL > $9,435,721 $587,649,542 $683,485,516 $0 $1,271,764,247 $607,417,412 STATE MATCH FOR FEDERAL AID $121,483,482 NON-FEDERAL AID + FEDERAL AID TOTAL > $728,900,895 Federal Aid and Programming Office $634,551,248 Page 2 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2015 DRAFT MAP-21 ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX ESTIMATED BALANCE FROM ANTICIPATED FY 2014 TRANSFER OF FUNDS $305,385,113 $43,947,012 $21,949,275 $11,332,298 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $73,207,617 TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY FY 2015 PROGRAMMED (2014-2017) BALANCE REMAINING $327,334,388 $55,279,310 $280,697,217 $17,285,652 $46,637,170 $37,993,658 $222,962,927 $251,419,765 $26,378,706 $87,293,792 $1,496,143 $74,703,760 $73,209,685 $1,494,075 $45,201,991 $922,139 $46,124,130 $45,201,647 $922,483 -BOSTON URBAN AREA $2,727,959 $56,560 $2,784,519 $2,728,828 $55,690 -BARNSTABLE URBAN AREA $5,878,325 $120,266 $5,998,591 $5,878,620 $119,972 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,015,765 $103,753 $5,119,518 $5,017,128 $102,390 -WORCESTER URBAN AREA $2,878,139 $58,714 $2,936,853 $2,878,116 $58,737 -PROVIDENCE, PAWTUCKET $11,505,438 $234,711 $11,740,149 $11,505,346 $234,803 $0 $8,118,882 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT $0 $53,263,473 $53,263,473 $45,144,591 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $1,755,387 $1,755,387 $1,663,268 $92,119 $1,174,862 $3,782,616 $4,957,478 $800,000 $4,157,478 TAP FLEX $5,188,933 $8,555,866 $13,744,799 $3,435,346 $10,309,453 TAP NON-FLEX $5,188,933 $6,392,864 $11,581,797 $3,123,594 $8,458,202 $3,203,903 $3,487,063 $6,690,966 $6,557,147 $133,819 -BOSTON URBAN AREA $193,357 $210,761 $404,118 $396,036 $8,082 -BARNSTABLE URBAN AREA $416,654 $454,157 $870,810 $853,394 $17,416 -SPRINGFIELD, CHICOPEE, HOLYOKE $355,516 $387,515 $743,031 $728,170 $14,861 -WORCESTER URBAN AREA $204,002 $222,364 $426,365 $417,838 $8,527 -PROVIDENCE, PAWTUCKET $338,467 $837,267 $1,175,734 $1,152,220 $23,515 $32,277,307 $13,445,833 $45,723,140 $24,371,813 $21,351,328 $0 $5,627,938 $5,627,938 $0 $5,627,938 $1,207,226 $1,207,227 $497,241,068 $5,863,858 $3,312,816 $359,741,293 $7,071,084 $4,520,043 $856,982,361 $400,000 $400,000 $476,909,872 $6,671,084 $4,120,043 $242,325,223 $60,908,669 $20,064,084 $88,792,692 $26,464,414 $0 $149,701,361 $46,528,498 $86,629,840 $24,800,000 $63,071,520 $21,728,498 $578,213,821 $474,998,399 $0 $1,053,212,220 $588,339,712 $327,125,241 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RWY/HWY CROSSINGS- HAZARD ELIMINATION RWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: $0 FEDERAL O/A GUIDANCE Federal Aid and Programming Office $600,000,000 Page 3 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2015 DRAFT MAP-21 FUNDING CATEGORY HIGH PRIORITY PROJECTS ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS ESTIMATED BALANCE FROM ANTICIPATED FY 2014 TRANSFER OF FUNDS $0 $132,167,668 TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY $132,167,668 FY 2015 PROGRAMMED (2014-2017) $35,637,794 BALANCE REMAINING $96,529,874 SECTION 115 PROJECTS $0 $2,478,204 $2,478,204 $0 $2,478,204 SECTION 117 PROJECTS $0 $6,986,857 $6,986,857 $0 $6,986,857 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $957,809 $957,809 $475,000 $482,809 $9,435,721 $16,962,311 $26,398,032 $5,319,535 $21,078,497 $1,222,200,790 $629,772,041 $454,681,482 $244,440,158 $125,954,408 $118,485,750 $1,466,640,948 $755,726,449 $573,167,232 FEDERAL AID TOTAL > $634,551,248 STATE MATCH FOR FEDERAL AID $126,910,250 NON-FEDERAL AID + FEDERAL AID TOTAL > $761,461,497 Federal Aid and Programming Office $0 $0 Page 4 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2016 DRAFT MAP-21 ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX ESTIMATED BALANCE FROM FY 2015 $305,385,113 $43,947,012 $46,637,170 $37,993,658 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $73,207,617 ANTICIPATED TRANSFER OF FUNDS TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY ($15,000,000) $15,000,000 FY 2016 PROGRAMMED (2014-2017) BALANCE REMAINING $337,022,283 $96,940,670 $294,592,791 $41,195,681 $42,429,493 $55,744,989 $87,293,792 $115,750,630 $34,999,994 $80,750,637 $1,494,075 $74,701,692 $73,207,658 $1,494,034 $45,201,991 $922,483 $46,124,474 $45,201,984 $922,489 -BOSTON URBAN AREA $2,727,959 $55,690 $2,783,649 $2,727,976 $55,673 -BARNSTABLE URBAN AREA $5,878,325 $119,972 $5,998,297 $5,878,331 $119,966 $102,363 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,015,765 $102,390 $5,118,155 $5,015,792 -WORCESTER URBAN AREA $2,878,139 $58,737 $2,936,876 $2,878,139 $58,738 -PROVIDENCE, PAWTUCKET $11,505,438 $234,803 $11,740,241 $11,505,436 $234,805 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT $0 $8,118,882 $8,118,882 $0 SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $92,119 $92,119 $642,015 $1,174,862 $4,157,478 $5,332,340 $800,000 $4,532,340 TAP FLEX $5,188,933 $10,309,453 $15,498,386 $1,560,000 $13,938,386 TAP NON-FLEX $0 ($549,896) $5,188,933 $8,458,202 $13,647,135 $579,261 $13,067,874 $3,203,903 $133,819 $3,337,722 $3,270,968 $66,754 -BOSTON URBAN AREA $193,357 $8,082 $201,439 $197,410 $4,029 -BARNSTABLE URBAN AREA $416,654 $17,416 $434,070 $425,389 $8,681 -SPRINGFIELD, CHICOPEE, HOLYOKE $355,516 $14,861 $370,376 $362,969 $7,408 -WORCESTER URBAN AREA $204,002 $8,527 $212,529 $208,278 $4,251 -PROVIDENCE, PAWTUCKET $338,467 $23,515 $361,982 $354,742 $7,240 $32,277,307 $21,351,328 $53,628,635 $34,918,695 $18,709,939 $0 $5,627,938 $5,627,938 $0 $0 $0 $0 $494,826,615 $6,671,084 $4,120,043 $242,325,223 $6,671,084 $4,120,043 $737,151,838 $400,000 $400,000 $483,296,095 $6,271,084 $3,720,043 $240,108,923 $60,908,669 $20,064,084 $63,071,520 $21,728,498 $0 $123,980,189 $41,792,582 $84,712,931 $24,800,000 $39,267,259 $16,992,582 $575,799,368 $327,125,241 $0 $902,924,609 $592,809,026 $296,368,763 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RWY/HWY CROSSINGS- HAZARD ELIMINATION RWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: $0 $0 FEDERAL O/A GUIDANCE Federal Aid and Programming Office $600,000,000 Page 5 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2016 DRAFT MAP-21 FUNDING CATEGORY ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS ESTIMATED BALANCE FROM FY 2015 ANTICIPATED TRANSFER OF FUNDS TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY FY 2016 PROGRAMMED (2014-2017) BALANCE REMAINING HIGH PRIORITY PROJECTS $0 $96,529,874 $96,529,874 $4,597,494 SECTION 115 PROJECTS $0 $2,478,204 $2,478,204 $0 $2,478,204 SECTION 117 PROJECTS $0 $6,986,857 $6,986,857 $0 $6,986,857 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > Federal Aid and Programming Office $91,932,381 $0 $482,809 $482,809 $0 $482,809 $9,435,721 $21,078,497 $30,514,218 $0 $30,514,218 $1,039,916,571 $597,406,519 $428,763,232 $207,983,314 $119,481,304 $88,502,010 $1,247,899,885 $716,887,823 $517,265,242 $454,681,482 $0 $90,936,296 $545,617,778 $0 Page 6 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2017 CURRENT TARGETS MAP-21 ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX ESTIMATED BALANCE FROM FY 2016 $305,385,113 $43,947,012 $42,429,493 $55,744,989 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $73,207,617 DRAFT TOTAL FUNDS AVAILABLE ANTICIPATED (10/1) SUBJECT TO TRANSFER OF FUNDS OBLIGATION AUTHORITY BALANCE REMAINING $337,814,606 $109,692,001 $281,276,498 $29,801,998 $56,538,107 $79,890,003 $80,750,637 $109,207,475 $31,865,298 $77,342,176 $1,494,034 $74,701,651 $73,207,618 $1,494,033 $45,201,991 $922,489 $46,124,480 $45,201,991 $922,490 -BOSTON URBAN AREA $2,727,959 $55,673 $2,783,632 $2,727,959 $55,673 -BARNSTABLE URBAN AREA $5,878,325 $119,966 $5,998,291 $5,878,325 $119,966 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,015,765 $102,363 $5,118,128 $5,015,766 $102,363 -WORCESTER URBAN AREA $2,878,139 $58,738 $2,936,877 $2,878,139 $58,738 -PROVIDENCE, PAWTUCKET $11,505,438 $234,805 $11,740,243 $11,505,438 $234,805 -OTHER AREASTO (RURAL & SMALL SAFE ROUTES SCHOOLS PGM.URBAN) TAP RECREATIONAL TRAILS $1,174,862 $4,532,340 TAP FLEX $5,188,933 TAP NON-FLEX $5,188,933 $0 ($10,000,000) $10,000,000 FY 2017 PROGRAMMED (2014-2017) ($549,896) ($549,896) $0 ($549,896) $5,707,202 $800,000 $4,907,202 $13,938,386 $19,127,319 $3,080,000 $16,047,319 $13,067,874 $18,256,807 $3,241,726 $15,015,082 $3,203,903 $66,754 $3,270,657 $3,205,244 $65,413 -BOSTON URBAN AREA $193,357 $4,029 $197,386 $193,438 $3,948 -BARNSTABLE URBAN AREA $416,654 $8,681 $425,335 $416,829 $8,507 -SPRINGFIELD, CHICOPEE, HOLYOKE $355,516 $7,408 $362,923 $355,665 $7,258 -WORCESTER URBAN AREA $204,002 $4,251 $208,252 $204,087 $4,165 -PROVIDENCE, PAWTUCKET $338,467 $7,240 $345,707 $338,793 $6,914 $32,277,307 $18,709,939 $50,987,246 $29,660,191 $21,327,056 $0 $0 $0 $0 $0 $0 $0 $494,826,615 $6,271,084 $3,720,043 $240,108,923 $6,271,084 $3,720,043 $734,935,538 $2,000,000 $2,000,000 $456,933,329 $4,271,084 $1,720,043 $278,002,209 $60,908,669 $20,064,084 $39,267,259 $16,992,582 $100,175,928 $37,056,666 $89,012,422 $24,800,000 $11,163,506 $12,256,666 $575,799,368 $296,368,763 $872,168,131 $570,745,750 $301,422,381 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RWY/HWY CROSSINGS- HAZARD ELIMINATION RWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: $0 $0 $0 $0 FEDERAL O/A GUIDANCE Federal Aid and Programming Office $600,000,000 Page 7 of 8 2014 - 2017 Statewide Transportation Improvement Program Fiscal Constraint Charts FFY 2017 CURRENT TARGETS MAP-21 FUNDING CATEGORY ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS ESTIMATED BALANCE FROM FY 2016 DRAFT TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO ANTICIPATED TRANSFER OF FUNDS OBLIGATION AUTHORITY FY 2017 PROGRAMMED (2014-2017) BALANCE REMAINING HIGH PRIORITY PROJECTS $0 $91,932,381 $91,932,381 $4,483,425 $87,448,956 SECTION 115 PROJECTS $0 $2,478,204 $2,478,204 $0 $2,478,204 SECTION 117 PROJECTS $0 $6,986,857 $6,986,857 $0 $6,986,857 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $482,809 $482,809 $0 $482,809 $9,435,721 $30,514,218 $39,949,939 $0 $39,949,939 $1,013,998,321 $575,229,175 $438,769,146 $202,799,664 $115,045,835 $87,753,829 $1,216,797,985 $690,275,010 $526,522,975 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > Federal Aid and Programming Office $428,763,232 $0 $85,752,646 $514,515,878 $0 Page 8 of 8 DRAFT Summary of Proposed FFY 2013 - 2016 MPO Targets March 14, 2012 Current 2013 Proposed 2013 Current 2014 Proposed 2014 Current 2015 Proposed 2015 Proposed 2016 Base Obligation Authority Redistribution, as Estimated by FHWA $560,000,000 $0 $550,000,000 $50,000,000 $560,000,000 $0 $550,000,000 $50,000,000 $560,000,000 $0 $550,000,000 $50,000,000 $550,000,000 $50,000,000 Total Estimated Obligation Authority Available: $560,000,000 $600,000,000 $560,000,000 $600,000,000 $560,000,000 $600,000,000 $600,000,000 -$170,710,000 -$141,005,000 -$178,390,000 -$122,840,000 -$150,000,000 -$150,000,000 -$150,000,000 Total Non-Earmarked O/A Available Statewide $389,290,000 $458,995,000 $381,610,000 $477,160,000 $410,000,000 $450,000,000 $450,000,000 Total Non-Earmarked Available Statewide ( Including State Match ) $475,737,500 $561,443,750 $466,137,500 $584,993,750 $501,625,000 $551,450,000 $551,455,000 $6,000,000 $5,000,000 $3,500,000 $6,250,000 $3,500,000 $783,000 $6,250,000 $2,000,000 $75,000,000 $12,000,000 $500,000 $10,000,000 $6,000,000 $5,000,000 $3,500,000 $6,250,000 $3,500,000 $783,000 $6,250,000 $2,000,000 $75,000,000 $12,000,000 $500,000 $10,000,000 $130,783,000 $6,000,000 $6,000,000 $5,200,000 $33,000,000 $12,500,000 $1,000,000 $15,700,000 $0 $65,250,000 $29,218,750 $10,000,000 $10,000,000 $4,000,000 $197,868,750 $6,000,000 $5,000,000 $3,500,000 $6,250,000 $3,500,000 $783,000 $6,250,000 $2,000,000 $75,000,000 $12,000,000 $500,000 $10,000,000 $130,783,000 $6,000,000 $5,000,000 $4,200,000 $37,000,000 $7,500,000 $783,000 $15,750,000 $0 $75,000,000 $12,000,000 $10,000,000 $10,000,000 $3,000,000 $186,233,000 $130,783,000 $6,000,000 $5,000,000 $5,200,000 $24,000,000 $12,500,000 $1,000,000 $12,700,000 $0 $63,000,000 $25,500,000 $500,000 $10,000,000 $4,000,000 $169,400,000 $6,000,000 $5,000,000 $5,180,000 $23,000,000 $12,500,000 $1,000,000 $12,700,000 $0 $63,000,000 $25,500,000 $2,500,000 $10,000,000 $4,000,000 $170,380,000 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, CEPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $43,750,000 $23,000,000 $0 $66,750,000 $42,750,000 $23,000,000 $1,000,000 $66,750,000 $43,750,000 $23,000,000 $0 $66,750,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 $43,750,000 $23,000,000 $0 $66,750,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 Regional Major Infrastructure Projects: $21,875,000 $0 $15,625,000 $21,875,000 $40,000,000 $40,000,000 $40,000,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program $0 $121,483,328 $10,000,000 $139,175,000 $0 $121,483,328 $10,000,000 $99,175,000 $0 $121,483,328 $10,000,000 $122,000,000 $10,000,000 $82,000,000 Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $6,250,000 $127,733,328 $6,250,000 $155,425,000 $6,250,000 $127,733,328 $6,250,000 $115,425,000 $6,250,000 $127,733,328 $6,250,000 $138,250,000 $6,250,000 $98,250,000 $20,000,000 $10,000,000 $98,596,173 $128,596,173 $20,000,000 $10,000,000 $123,035,750 $153,035,750 $20,000,000 $10,000,000 $95,246,173 $125,246,173 $20,000,000 $10,000,000 $154,075,000 $184,075,000 $20,000,000 $10,000,000 $106,358,673 $136,358,673 $20,000,000 $10,000,000 $108,050,000 $138,050,000 $20,000,000 $10,000,000 $147,075,000 $177,075,000 Central Artery/Tunnel or ABP GANS Obligation Authority Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Design and Right of Way Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide Railroad Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target MassDOT - Federal Aid and Programming Office DRAFT Page 1 of 5 DRAFT TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2013 FEDERAL REGIONAL TARGETS March 14, 2012 Obligation Authority Obl. Auth. Matching State Funds Total Funding Based On Obl. Auth. 458,995,000 102,448,750 561,443,750 $4,800,000 $4,500,000 $4,200,000 $29,600,000 $6,000,000 $626,400 $12,600,000 $0 $67,500,000 $9,600,000 $8,000,000 $8,000,000 $2,400,000 $157,826,400 $1,200,000 $500,000 $0 $7,400,000 $1,500,000 $156,600 $3,150,000 $0 $7,500,000 $2,400,000 $2,000,000 $2,000,000 $600,000 $28,406,600 $6,000,000 $5,000,000 $4,200,000 $37,000,000 $7,500,000 $783,000 $15,750,000 $0 $75,000,000 $12,000,000 $10,000,000 $10,000,000 $3,000,000 $186,233,000 $34,200,000 $18,400,000 $800,000 $53,400,000 $8,550,000 $4,600,000 $200,000 $13,350,000 $42,750,000 $23,000,000 $1,000,000 $66,750,000 $0 $0 $0 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program $8,000,000 $111,340,000 $2,000,000 $27,835,000 $10,000,000 $139,175,000 Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $5,000,000 $124,340,000 $1,250,000 $31,085,000 $6,250,000 $155,425,000 $16,000,000 $9,000,000 $98,428,600 $123,428,600 $4,000,000 $1,000,000 $24,607,150 $29,607,150 $20,000,000 $10,000,000 $123,035,750 $153,035,750 Base Obligation Authority $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 Central Artery/Tunnel Obligation Authority (141,005,000) Total Non-Earmarked Available Statewide - (Including State Match) Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Design and Right of Way Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide Railroad Grade Crossings Statewide Stormwater retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: Regional Major Infrastructure Projects: Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum Regional Minimum HSIP Component CMAQ Component With State Match With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 $711,929 $8,593,421 $917,028 $1,738,026 $507,949 $61,994 $885,911 $891,911 $43,996 $781,922 $911,909 $2,161,984 $1,792,021 $20,000,000 Total Regional Target With State Match STP with State Match $5,447,528 $65,755,029 $7,016,906 $13,299,007 $3,886,719 $474,363 $6,778,806 $6,824,712 $336,645 $5,983,099 $6,977,732 $16,543,041 $13,712,162 $4,379,635 $52,864,898 $5,641,363 $10,691,968 $3,124,796 $381,373 $5,449,939 $5,486,846 $270,652 $4,810,217 $5,609,869 $13,300,065 $11,024,131 $153,035,750 $123,035,750 Note 1: Base Obligation Authority includes Estimated Equity Bonus Exempt from Limitation Federal Aid and Programming Office DRAFT Page 2 of 5 DRAFT TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2014 FEDERAL REGIONAL TARGETS March 14, 2012 Obligation Authority Base Obligation Authority Obl. Auth. Matching State Funds Total Funding Based On Obl. Auth. $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 Central Artery/Tunnel Obligation Authority (122,840,000) Total Non-Earmarked Available Statewide - (Including State Match) Final CAT/GANS 477,160,000 107,833,750 584,993,750 $4,800,000 $5,400,000 $5,200,000 $26,400,000 $10,000,000 $800,000 $12,560,000 $0 $58,725,000 $23,375,000 $8,000,000 $8,000,000 $3,200,000 $166,460,000 $1,200,000 $600,000 $0 $6,600,000 $2,500,000 $200,000 $3,140,000 $0 $6,525,000 $5,843,750 $2,000,000 $2,000,000 $800,000 $31,408,750 $6,000,000 $6,000,000 $5,200,000 $33,000,000 $12,500,000 $1,000,000 $15,700,000 $0 $65,250,000 $29,218,750 $10,000,000 $10,000,000 $4,000,000 $197,868,750 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $33,400,000 $18,400,000 $800,000 $52,600,000 $8,350,000 $4,600,000 $200,000 $13,150,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 Regional Major Infrastructure Projects: $17,500,000 $4,375,000 $21,875,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program $8,000,000 $79,340,000 $2,000,000 $19,835,000 $10,000,000 $99,175,000 Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $5,000,000 $92,340,000 $1,250,000 $23,085,000 $6,250,000 $115,425,000 $16,000,000 $9,000,000 $123,260,000 $148,260,000 $4,000,000 $1,000,000 $30,815,000 $35,815,000 $20,000,000 $10,000,000 $154,075,000 $184,075,000 Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Design and Right of Way Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide Railroad Grade Crossings Statewide Stormwater retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum Regional Minimum HSIP Component CMAQ Component With State Match With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 $711,929 $8,593,421 $917,028 $1,738,026 $507,949 $61,994 $885,911 $891,911 $43,996 $781,922 $911,909 $2,161,984 $1,792,021 $20,000,000 Total Regional Target With State Match STP with State Match $6,552,415 $79,091,696 $8,440,099 $15,996,359 $4,675,037 $570,575 $8,153,707 $8,208,924 $404,925 $7,196,613 $8,392,981 $19,898,358 $16,493,311 $5,484,521 $66,201,565 $7,064,557 $13,389,319 $3,913,114 $477,585 $6,824,840 $6,871,058 $338,931 $6,023,730 $7,025,117 $16,655,383 $13,805,280 $184,075,000 $154,075,000 Note 1: Base Obligation Authority includes Estimated Equity Bonus Exempt from Limitation Federal Aid and Programming Office DRAFT Page 3 of 5 DRAFT TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2015 FEDERAL REGIONAL TARGETS March 14, 2012 Obligation Authority Base Obligation Authority Obl. Auth. Matching State Funds Total Funding Based On Obl. Auth. $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 ABP GANS Repayment (150,000,000) Total Non-Earmarked Available Statewide - (Including State Match) First ABP Gans 450,000,000 101,450,000 551,450,000 $4,800,000 $4,500,000 $5,200,000 $19,200,000 $10,000,000 $800,000 $10,160,000 $0 $56,700,000 $20,400,000 $400,000 $8,000,000 $3,200,000 $143,360,000 $1,200,000 $500,000 $0 $4,800,000 $2,500,000 $200,000 $2,540,000 $0 $6,300,000 $5,100,000 $100,000 $2,000,000 $800,000 $26,040,000 $6,000,000 $5,000,000 $5,200,000 $24,000,000 $12,500,000 $1,000,000 $12,700,000 $0 $63,000,000 $25,500,000 $500,000 $10,000,000 $4,000,000 $169,400,000 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $33,400,000 $18,400,000 $800,000 $52,600,000 $8,350,000 $4,600,000 $200,000 $13,150,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 Regional Major Infrastructure Projects: $32,000,000 $8,000,000 $40,000,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program $8,000,000 $97,600,000 $2,000,000 $24,400,000 $10,000,000 $122,000,000 Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $5,000,000 $110,600,000 $1,250,000 $27,650,000 $6,250,000 $138,250,000 $16,000,000 $9,000,000 $86,440,000 $111,440,000 $4,000,000 $1,000,000 $21,610,000 $26,610,000 $20,000,000 $10,000,000 $108,050,000 $138,050,000 Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Design and Right of Way Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide Railroad Grade Crossings Statewide Stormwater retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum Regional Minimum HSIP Component CMAQ Component With State Match With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 $711,929 $8,593,421 $917,028 $1,738,026 $507,949 $61,994 $885,911 $891,911 $43,996 $781,922 $911,909 $2,161,984 $1,792,021 $20,000,000 Total Regional Target With State Match STP with State Match $4,914,089 $59,316,086 $6,329,788 $11,996,726 $3,506,119 $427,912 $6,115,003 $6,156,414 $303,680 $5,397,215 $6,294,450 $14,923,093 $12,369,424 $3,846,195 $46,425,955 $4,954,245 $9,389,687 $2,744,196 $334,922 $4,786,136 $4,818,548 $237,686 $4,224,333 $4,926,587 $11,680,117 $9,681,392 $138,050,000 $108,050,000 Note 1: Base Obligation Authority includes Estimated Equity Bonus Exempt from Limitation Federal Aid and Programming Office DRAFT Page 4 of 5 DRAFT TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2016 FEDERAL REGIONAL TARGETS March 14, 2012 Obligation Authority Obl. Auth. Matching State Funds Total Funding Based On Obl. Auth. 450,000,000 101,455,000 551,455,000 $4,800,000 $4,500,000 $5,180,000 $18,400,000 $10,000,000 $800,000 $10,160,000 $0 $56,700,000 $20,400,000 $2,000,000 $8,000,000 $3,200,000 $144,140,000 $1,200,000 $500,000 $0 $4,600,000 $2,500,000 $200,000 $2,540,000 $0 $6,300,000 $5,100,000 $500,000 $2,000,000 $800,000 $26,240,000 $6,000,000 $5,000,000 $5,180,000 $23,000,000 $12,500,000 $1,000,000 $12,700,000 $0 $63,000,000 $25,500,000 $2,500,000 $10,000,000 $4,000,000 $170,380,000 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $33,400,000 $18,400,000 $800,000 $52,600,000 $8,350,000 $4,600,000 $200,000 $13,150,000 $41,750,000 $23,000,000 $1,000,000 $65,750,000 Regional Major Infrastructure Projects: $32,000,000 $8,000,000 $40,000,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program $8,000,000 $65,600,000 $2,000,000 $16,400,000 $10,000,000 $82,000,000 Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $5,000,000 $78,600,000 $1,250,000 $19,650,000 $6,250,000 $98,250,000 $16,000,000 $9,000,000 $117,660,000 $142,660,000 $4,000,000 $1,000,000 $29,415,000 $34,415,000 $20,000,000 $10,000,000 $147,075,000 $177,075,000 Base Obligation Authority $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 ABP GANS Repayment (150,000,000) Total Non-Earmarked Available Statewide - (Including State Match) Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Design and Right of Way Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide Railroad Grade Crossings Statewide Stormwater retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum Regional Minimum HSIP Component CMAQ Component With State Match With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 $711,929 $8,593,421 $917,028 $1,738,026 $507,949 $61,994 $885,911 $891,911 $43,996 $781,922 $911,909 $2,161,984 $1,792,021 $20,000,000 Total Regional Target With State Match STP with State Match $6,303,240 $76,083,999 $8,119,139 $15,388,049 $4,497,255 $548,878 $7,843,638 $7,896,755 $389,526 $6,922,940 $8,073,813 $19,141,664 $15,866,104 $5,235,346 $63,193,867 $6,743,597 $12,781,010 $3,735,331 $455,887 $6,514,771 $6,558,889 $323,533 $5,750,057 $6,705,949 $15,898,688 $13,178,073 $177,075,000 $147,075,000 Note 1: Base Obligation Authority includes Estimated Equity Bonus Exempt from Limitation Federal Aid and Programming Office DRAFT Page 5 of 5 FFY2014-2017 Bridge List OFF SYSTEM PROGRAM MPO Region Berkshire Berkshire Pioneer Valley Montachusett PROJ No. 606706 605935 604429 607114 Town Name Pittsfield Williamstown Pelham Lancaster District 01 01 02 03 Location HWY WOODLAWN AVE HWY HOPPER RD HWY MEETNGHSE RD HWY JACKSON RD District 04 06 03 06 Location ST128 HWY PROVDNCE HWY ST126 S MAIN ST HWY WASHNGTON AV RR CSX WATER GREEN RIVER WATER AMETHYST BROOK ST 2 TIP YR. 2014 2014 2014 2014 Budget TIP Cost ($) $4,594,259.00 $3,348,000.00 $1,846,800.00 $4,144,608.00 $13,933,667.00 WATER ANNISQUAM RIVER WATER MOTHER BROOK RR CSX (ABANDONED) RR MBTA/BMRR TIP YR. 2014 2014 2014 2014 Budget TIP Cost ($) $8,450,000.00 $5,859,000.00 $1,705,200.00 $4,581,284.00 $20,595,484.00 TIP YR. Budget TIP Cost ($) Total Amount to be AC'd $7,576,608.00 ON SYSTEM PROGRAM MPO Region Boston Region Boston Region Boston Region Boston Region PROJ No. 607338 604796 605895 604428 Town Name Gloucester Dedham Bellingham Chelsea Total Amount to be AC'd $17,250,000.00 $10,868,550.00 ADVANCE CONSTRUCTION PROGRAM MPO Region Boston Region PROJ No. Town Name Needham603711 Wellesley District Location $8,500,000 06 I-95 Rte 128 2014 $10,000,000 Martha's Vineyard Boston Region Southeastern MassDOT Planning 604029 Oak Bluffs - Tisbury 600703 Lexington 605223 Fall River 05 04 05 Beach Road Rte 2 I-195/Rte. 79/Rte. 138 Lagoon Pond I-95/Rte. 128 2014 2014 2014 $15,000,000 $31,075,000 April 12, 2013 FFY2014-2017 Bridge List OFF SYSTEM PROGRAM MPO Region PROJ No. Town Name Berkshire Franklin Boston Region Berkshire 603778 602320 607133 607116 Pioneer Valley Southeastern Boston Region Central Mass. Central Mass. Franklin Boston Region Central Mass. Belchertown/ West 604626 Springfield/ Warren Fall River 607345 Cohasset 606303 Rutland 607113 Dudley 607118 Heath 606632 Hopkinton 604468 West Brookfield Lanesborough Deerfield Quincy Florida Inflation District Location TIP YR. 01 02 06 01 HWY HWY HWY HWY NARRAGANSETT MCCLELLN FRM ROBERTSON ST S COUNTY RD WATER PONTOOSUC LAKE RR BMRR I 93 /US1/ST3 WATER COLD RIVER 2016 2016 2016 2016 Budget TIP Cost ($) $1,673,327.00 $5,071,472.00 $4,563,576.41 $2,705,000.00 02 05 05 03 03 01 03 02 HWY HWY HWY HWY HWY HWY HWY HWY WILSON ST AIRPORT RD ATLANTIC AVE INTERVALE RD CARPENTER RD SADOGA RD FRUIT ST WICKABG VLLY RR NECRR ST 24 WATER LITTLE HARBOR INLT WATER E BR WARE RIVER RR ABANDONED PWRR WATER BURRINGTON BROOK COMB CSX & SUDBURY RIV WATER SUCKER BROOK 2016 2016 2016 2016 2016 2016 2016 2016 $1,605,700.40 $3,124,570.00 $4,670,896.00 $1,680,000.00 $1,674,750.00 $1,560,000.00 $8,700,660.00 $2,200,600.00 Budget TIP Cost Inflated ($) 8% $1,807,193.00 $5,477,189.76 $4,928,662.52 $2,921,400.00 $3,115,152.00 $3,374,535.60 $5,044,567.68 $1,814,400.00 $1,808,730.00 $1,684,800.00 $9,396,713.00 $2,376,648.00 $43,749,991.56 ON SYSTEM PROGRAM MPO Region Boston Region PROJ No. Town Name 604173 Boston District Location 06 HWY N WSHNGTN ST WATER CHARLES RIVER TIP YR. 2016 Budget TIP Cost ($) $4,631,371.30 Budget TIP Cost Inflated ($) $5,001,881.00 $5,001,881.00 Total Amount to be AC'd $69,501,881.00 ADVANCE CONSTRUCTION PROGRAM MPO Region Boston Region Southeastern Martha's Vineyard Boston Region MassDOT Planning PROJ No. Town Name 600867 Boston 605223 Fall River 604029 600703 Oak Bluffs - Tisbury Lexington District Location 06 ST 2 A/MASS AVE 05 I-195/Rte. 79/Rte. 138 05 04 Beach Road Rte 2 ST 2 COMMONWEALTH AVE Lagoon Pond I-95/Rte. 128 TIP YR. 2016 2016 2016 2016 $ Budget TIP Cost ($) Budget TIP Cost 9,100,000 $ 9,100,000 $12,040,119 $12,040,119 $7,000,000 $7,000,000 $5,108,000 $5,108,000 April 12, 2013