Massachusetts Division U.S.Department of Transportation August 17, 2015 Federal Highway Administration 55 Broadway, 10 h Floor Cambridge, MA 02142 (617) 494-3657 (phone) (617) 494-3355 (fax) www.fhwa.dot.gov/madiv In Reply Refer To: l-IDA-MA Mr. David J. Mohler Executive Director Office of Transportation Planning Massachusetts Department of Transportation 10 Park Plaza, Room 4150 Boston, MA 02116-3969 Subject: Statewide Transportation Improvement Program Amendment Dear Mr. Mohler: Thank you for your letter of August 11,2015. The Federal Highway Administration has reviewed the Fiscal Years 2015-2018 Statewide Transportation Improvement Program (STIP) actions and amendments received from the Massachusetts Depmiment of Transportation. Action .41-.48 27.01-27.03 28.01-28.16 29.01-29.08 30.01-30.11 31.01 32.01-32.02 Organization Adjustments Berkshire Boston Central Mass Southeastern Mass Merrimack Valley Nmihern Middlesex In accordance with §93.104(c)(2), a Transportation Improvement Program (TIP) amendment requires a new conformity determination for the entire TIP before the amendment is approved by the MPO or accepted by DOT, unless the amendment merely adds or deletes exempt projects as defined in §93.126 or §93.127. Because these amendments affect exempt projects only, we are making the following determinations: • The projects in the STIP are based on a planning process that substantially meets the requirements of Title 23, U.S.C., the Federal Transit Act and Subparts A, B, and C of 23 CFR 450. The TIPs are based on a continuing, comprehensive transpmiation planning process carried out cooperatively by the State, the MPOs, and the transit operators. The FY 2015-2018 highway actions identified above are hereby approved. Should you have any additional questions or concerns, please contact me at (617) 494-3275 or Leah Sirmin at (617) 494-2426. 2 Sincerely, Michael A. Chong Planning & Environment Manager cc: Nicolas Garcia, FTA Region I Donald Cooke, EPA Region I Charles D. Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO August 11, 2015 Pamela Stephenson Division Administrator Federal Highway Administration 55 Broadway – 10th floor Cambridge, Massachusetts 02142 Dear Ms. Stephenson: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached regional highway actions pertaining to the Federal Fiscal Years 2015-2018 State Transportation Improvement Program, as endorsed by the Berkshire Metropolitan Planning Organization, Boston Metropolitan Planning Organization, Central Massachusetts Metropolitan Planning Organization, Merrimack Valley Metropolitan Planning Organization, Northern Middlesex Metropolitan Planning Organization, Old Colony Metropolitan Planning Organization and Southeastern Massachusetts Metropolitan Planning Organization: .41-.48 27.01-27.03 28.01-28.16 29.01-29.08 30.01-30.11 31.01 32.01-32.02 Adjustments Berkshire Boston Central Mass Southeastern Mass Merrimack Valley Northern Middlesex August 6, 2015 August 6, 2015 July 30, 2015 July 22, 2015 July 28, 2015 July 29, 2015 July 23, 2015 These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4150, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot cc: Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities William Betts, FAPO Federal Transit Administration Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # .41 MPO Project Location ID OLD COLONY604957 PEMBROKE CURRENT Description Source Total PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 CMAQ REVISED Year Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description Federal Non Federal Date $1,709,829 $1,367,863 $341,966 2015 CMAQ $1,709,829 $1,367,863 $341,966 2015 ADJUSTMENT::Change Addl Info 07/28/15 STP $4,723,031 $3,778,425 $944,606 2015 STP $4,723,031 $3,778,425 $944,606 2015 ADJUSTMENT::Change Addl Info 07/28/15 TAP $300,009 $240,007 $60,002 2015 TAP $60,002 07/28/15 STP $1,383,947 $1,107,158 $276,789 2016 STP CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is .42 OLD COLONY604957 PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 ; AC Year 1 of 2 .43 OLD COLONY604957 PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 $300,009 $240,007 2015 ADJUSTMENT::Change Addl Info CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is .44 OLD COLONY604957 PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 2 OF 2 $1,943,304 $1,554,643 $388,661 2016 ADJUSTMENT:Increase Cost 07/28/15 ADJUSTMENT::Change Addl Info CMAQ/ TAP/ STP; YOE is $2,455,008; Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7; AC Year 2 of 2 .45 OLD COLONY604957 PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 2 OF 2 TAP $511,704 $409,363 $102,341 2016 TAP NHPP $5,904,802 $4,723,842 $1,180,960 2015 NHPP $511,704 $409,363 $102,341 2016 ADJUSTMENT::Change Addl Info 07/28/15 $860,297 2015 ADJUSTMENT:Decrease Cost 08/06/15 CMAQ/ TAP/ STP; YOE is $2,455,008; Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 .46 BERKSHIRE 605299 GREAT BARRINGTON GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER $4,301,484 $3,441,187 ADJUSTMENT::Change Addl Info Total Project cost reduced by $1,603,318 .47 CENTRAL MA606485 MULTIPLE MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 2015 STP-TE $60,000 $48,000 $12,000 2015 ADJUSTMENT:Add Funding Source 07/22/15 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP + Storwater Total Project Cost = $6,047,950 / Added $60k in Stormwater funding to project .48 CENTRAL MA604675 HOLDEN HOLDEN - BRIDGE REHABILITATION, H-18-020, RIVER STREET OVER QUINAPOXET STREET STP-BROFF $4,806,620 $3,845,296 $961,324 2015 STP-BR-OFF $2,301,270 $1,841,016 $460,254 2015 ADJUSTMENT:Decrease Cost ADJUSTMENT::Change Addl Info Construction / Design Status = 25% / Total Project Cost = $2,301,270 / decrease of $2,505,350 Date: 8/10/2015 07/22/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 27.01 BERKSHIRE 607900 PITTSFIELD Description PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) CURRENT Federal REVISED Source Total Non Federal Year HSIP $395,516 $355,964 $39,552 2015 HSIP $355,964 $320,368 $35,596 2016 CMAQ $200,000 $160,000 $40,000 2016 HSIP $2,000,000 $1,800,000 $200,000 2015 Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description AMENDMENT:Remove Project Date 08/06/15 CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% 27.02 BERKSHIRE 607745 LENOX LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERANS MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) HSIP $395,516 $355,964 $39,552 2015 AMENDMENT:Move Project 08/06/15 Move from 2016; Total Cost = 395,516; MPO evaluation score 3 of 7; Design Status: 75% 27.03 BERKSHIRE 607745 LENOX LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERANS MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) AMENDMENT:Remove Funding Src 08/06/15 CMAQ + HSIP; Total Cost = 555,964; MPO evaluation score 3 of 7; Design Status: <25%; YOE = 4% 28.01 BOSTON 605146 SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE HSIP $1,955,000 $1,759,500 $195,500 2015 AMENDMENT:Decrease Cost 07/30/15 AMENDMENT:Change Addl Info HSIP funding reduced by $45,000; STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 28.02 BOSTON 605146 SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE CMAQ $2,000,000 $1,600,000 $400,000 2015 CMAQ $2,000,000 $1,600,000 $400,000 2015 AMENDMENT:Change Addl Info 07/30/15 STP $3,867,762 $3,094,210 $773,552 2015 STP $3,867,884 $3,094,307 $773,577 2015 AMENDMENT:Increase Cost 07/30/15 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081 28.03 BOSTON 605146 SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE AMENDMENT:Change Addl Info STP funding increased by $122; STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 28.04 BOSTON 603711 MULTIPLE NEEDHAM- WELLESLEYREHAB/REPLACEMENT OF 6 BRIDGES ON I95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-ALANE - CONTRACT V) 2015 STP $26,250,000 $21,000,000 $5,250,000 2015 AMENDMENT:Add Funding Source AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 201518 TIP) Date: 8/10/2015 07/30/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION MPO Project Location ID 28.05 BOSTON 603711 MULTIPLE # CURRENT Description Source Total NEEDHAM- WELLESLEYREHAB/REPLACEMENT OF 6 BRIDGES ON I95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-ALANE - CONTRACT V) NHPP $30,000,000 REVISED Federal Non Federal $24,000,000 $6,000,000 Year 2015 Source NHPP Total Federal $3,750,000 $3,000,000 FINANCIAL CONSTRAINT NonFederal Year Amendment Description $750,000 2015 AMENDMENT:Decrease Cost Date 07/30/15 AMENDMENT:Change Addl Info AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 201518 TIP); NHPP was $30 million 28.06 BOSTON 607338 GLOUCESTER GLOUCESTER- BRIDGE PRESERVATION, G-05017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) NHPP $5,506,585 $4,405,268 $1,101,317 2015 NHPP $2,064,424 $1,651,539 $412,885 2015 AMENDMENT:Decrease Cost 07/30/15 AMENDMENT:Change Addl Info cost decrease of $3,442,161; AC Yr 2 of 2; Total Cost = $10,514,424; was $5,506,585 in FFY 2015 28.07 BOSTON 605146 SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 2015 CMAQ $1,901,197 $1,520,957 $380,239 2015 AMENDMENT:Add Funding Source 07/30/15 AMENDMENT:Change Addl Info cost increase of $1,856,319; STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 28.08 BOSTON 607174 MULTIPLE CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 TAP $324,434 $259,547 $64,887 2015 STP-TE $324,434 $259,547 $64,887 2015 AMENDMENT:Change Funding Src 07/30/15 AMENDMENT:Change Addl Info NHPP+TAP Total Cost = $10,815,386; previously funded with TAP 28.09 BOSTON 607891 BEVERLY BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 TAP $219,420 $175,536 $43,884 2015 STP-TE $219,420 $175,536 $43,884 2015 AMENDMENT:Change Funding Src 07/30/15 AMENDMENT:Change Addl Info NHPP+TAP Total Cost = $5,938,411; previously funded with TAP 28.10 BOSTON 608131 BEVERLY DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 TAP $2,950,000 $2,360,000 $590,000 2015 STP-TE $2,950,000 $2,360,000 $590,000 2015 AMENDMENT:Change Funding Src 07/30/15 AMENDMENT:Change Addl Info previously funded with TAP 28.11 STATEWIDE 606997 BRAINTREE BRAINTREE- MILTON- BOSTON- WEYMOUTHSTORMWATER RETROFITS ON I-93, ROUTE 3 & ROUTE 18 STP-TE $2,152,030 $1,721,624 $430,406 2015 STP-TE $1,620,450 $1,296,360 $324,090 2015 AMENDMENT:Add Project NHPP $5,018,477 $4,014,782 $1,003,695 2015 NHPP $7,089,000 $5,671,200 $1,417,800 2016 AMENDMENT:Move Project 07/30/15 new addition 28.12 BOSTON 603008 WOBURN WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA project will move to FFY 2016; was $5,018,477 in FFY 2015 28.13 BOSTON 604173 BOSTON BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER 07/30/15 AMENDMENT:Increase Cost AMENDMENT:Change Addl Info NHPP $5,000,000 $4,000,000 $1,000,000 2016 NHPP $1,000,000 $800,000 $200,000 2016 AMENDMENT:Decrease Cost AMENDMENT:Change Addl Info decrease of $4 million; AC Yr 1 of 5; Total Cost = $112,700,000 ($49,035,161 programmed within FFYs 2015-18 TIP); was $5,000,000 in FFY 2016 Date: 8/10/2015 07/30/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO 28.14 BOSTON CURRENT Project Location ID Description Source Total 605789 BOSTON BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) HPP $2,429,730 REVISED Federal Non Federal $1,943,784 $485,946 Year 2016 Source HPP Total Federal $2,429,730 $1,943,784 FINANCIAL CONSTRAINT NonFederal Year Amendment Description $485,946 2018 AMENDMENT:Move Project Date 07/30/15 AMENDMENT:Change Addl Info project will move to FFY 2018; Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 28.15 BOSTON 605789 BOSTON BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) HPP $5,007,375 $4,005,900 $1,001,475 2016 HPP $5,007,375 $4,005,900 $1,001,475 2018 AMENDMENT:Move Project 07/30/15 AMENDMENT:Change Addl Info Project moved from FFY 2015. Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105 28.16 BOSTON 606134 BOSTON BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET HPP $2,377,900 $1,902,320 $475,580 2015 HPP $2,377,900 $1,902,320 $475,580 2018 AMENDMENT:Move Project 07/30/15 AMENDMENT:Change Addl Info project will move to FFY 2018; Construction; HPP 2129 (MA155); was $2,377,900 29.01 CENTRAL MA606485 MULTIPLE MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD HSIP $1,000,000 $900,000 $100,000 2015 HSIP $1,637,950 $1,474,155 $163,795 2015 AMENDMENT:Increase Cost 07/22/15 AMENDMENT:Change Addl Info Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $6,047,950 / increase of $637,950; Added $60k in Stormwater funding 29.02 CENTRAL MA606347 STURBRIDGE STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 HSIP $1,000,000 $900,000 $100,000 2015 HSIP $1,000,000 $900,000 $100,000 2015 AMENDMENT:Change Addl Info TAP $100,000 $80,000 $20,000 2015 STP $3,100,000 $2,480,000 $620,000 2015 STP $3,100,000 $2,480,000 $620,000 2015 AMENDMENT:Change Addl Info 07/22/15 STP $1,398,000 $1,118,400 $279,600 2015 STP $1,922,995 $1,538,396 $384,599 2015 AMENDMENT:Increase Cost 07/22/15 07/22/15 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $3,193,904 29.03 CENTRAL MA TAP02 WORCESTER WORCESTER - INSTALLION OF INFORMATIONAL KIOSK AT UNION STATION AMENDMENT:Remove Project 07/22/15 Construction / TEC Score = 1.23 / Design Status = Pre 25% / Total Project Cost = $100,000 29.04 CENTRAL MA606485 MULTIPLE MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $$6,047,950 / increase of $637,950; Added $60k in Stormwater funding 29.05 CENTRAL MA605559 WARREN WARREN - RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOWN CENTER) Construction / Design Status = 75% / TEC Score = 4.57 / Total Project Cost = $1,922,995 / cost increase of $524,995 Date: 8/10/2015 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 29.06 CENTRAL MA606686 WARREN Description WARREN - RESURFACING AND RELATED WORK ON ROUTE 67 @ WEST WARREN AND WARREN TOWN CENTERS CURRENT Source Total STP STP REVISED Federal Non Federal Year $1,530,000 $1,224,000 $306,000 2015 $1,700,000 $1,360,000 $340,000 2015 Source Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description AMENDMENT:Remove Project Date 07/22/15 Construction / Design Status = 25% / TEC Score = 1.7 / Total Project Cost = $1,530,000 29.07 CENTRAL MA606347 STURBRIDGE STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 STP $2,193,904 $1,755,123 $438,781 2015 AMENDMENT:Increase Cost 07/22/15 AMENDMENT:Change Addl Info Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $3,193,904 / increase of 493,904 29.08 CENTRAL MA606485 MULTIPLE MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD HSIP $1,250,000 $1,125,000 $125,000 2015 HSIP $1,250,000 $1,125,000 $125,000 2015 AMENDMENT:Change Addl Info 07/22/15 HSIP $1,560,000 $1,404,000 $156,000 2015 HSIP $1,560,000 $1,404,000 $156,000 2015 AMENDMENT:Change Addl Info 07/28/15 CMAQ $2,308,045 $1,846,436 $461,609 2015 CMAQ $2,308,045 $1,846,436 $461,609 2015 AMENDMENT:Change Addl Info 07/28/15 TAP $428,067 $342,454 $85,613 2015 TAP $428,067 $342,454 $85,613 07/28/15 2015 STP $1,151,849 $921,479 $230,370 2015 AMENDMENT:Add Funding Source Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $6,047,950 / increase of $637,950; Added $60k in Stormwater funding 30.01 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA HSIP ($1,560,000) / STP ($1,151,849) / Statewide TE ($843,066) Total Cost = $3,554,915; Construction; EC Score 26 Of 93; Status 100% 30.02 SE MASS 605848 DARTMOUTH DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% 30.03 SE MASS 605848 DARTMOUTH DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 2015 AMENDMENT:Change Addl Info STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $3,820,431; Construction; EC Score 59 Of 93; Status 100% Eligible for CMAQ Funding 30.04 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA HSIP ($1,560,000) / STP ($1,151,849) / Statewide TE ($843,066) Total Cost = $3,554,915; Construction; EC Score 26 Of 93; Status 100% Amendment #3 - Cost Increase from $2,403,066 to $3,554,915 (Increase $1,151 Date: 8/10/2015 07/28/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 30.05 SE MASS 605848 DARTMOUTH Description CURRENT Source Total Federal REVISED Non Federal DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) Year 2015 Source STP Total $1,084,319 Federal $867,455 FINANCIAL CONSTRAINT NonFederal Year Amendment Description $216,864 2015 AMENDMENT:Add Funding Source Date 07/28/15 AMENDMENT:Change Addl Info STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% 30.06 SE MASS 606525 ATTLEBORO ATTLEBORO - BRIDGE REPLACEMENT, A-16053, I-95 (NB & SB) OVER NORTH AVENUE NHPP $2,710,161 $2,168,129 $542,032 2015 NHPP $12,500,000 $10,000,000 $2,500,000 2015 AMENDMENT:Increase Cost 07/28/15 AMENDMENT:Change Addl Info AC Year 1 of 3; Total Cost $22,361,409 Amendment #3 Project Cost Increase from $12,075,000 to $22,361,409, AC from 2 to 3 years 30.07 SE MASS 605848 DARTMOUTH DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 2015 STP $513,741 $410,993 $102,748 2015 AMENDMENT:Add Funding Source 07/28/15 AMENDMENT:Change Addl Info STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% 30.08 SE MASS 606729 TAUNTON TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA STP-TE $843,066 $674,453 $168,613 2015 STP-TE STP $23,128,495 $18,502,796 $4,625,699 2015 STP NHPP $9,364,839 $7,491,871 $1,872,968 2016 NHPP 2017 NHPP $843,066 $674,453 $168,613 2015 AMENDMENT:Change Addl Info 07/28/15 HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 30.09 STATEWIDE EWO MULTIPLE Award Adjustments, Change Orders, Project Value Changes, Etc. $22,614,754 $18,091,803 $4,522,951 2015 AMENDMENT:Decrease Cost 07/28/15 $9,364,839 $7,491,871 $1,872,968 2016 AMENDMENT:Change Addl Info 07/28/15 Reduce the Statewide EWO Item from $23,128,495 to $22,614,754 30.10 SE MASS 606525 ATTLEBORO ATTLEBORO - BRIDGE REPLACEMENT, A-16053, I-95 (NB & SB) OVER NORTH AVENUE AC Year 2 of 3; Total Cost $22,361,409 Amendment #3 - Project Cost Increase from $12,075,000 to $22,361,409, AC from 30.11 SE MASS 606525 ATTLEBORO ATTLEBORO - BRIDGE REPLACEMENT, A-16053, I-95 (NB & SB) OVER NORTH AVENUE $496,570 $397,256 $99,314 2017 AMENDMENT:Add Project AC Year 3 of 3; Total Cost $22,361,409 Amendment #3 Project Cost Increase from $12,075,000 to $22,361,409, AC from 2 to 3 years Date: 8/10/2015 07/28/15 Massachusetts Department of Transportation - State Transportation Improvement Program Highway Actions Report 2015-2018 PROJECT INFORMATION # MPO Project Location ID 31.01 MERRIMACK 603682 AMESBURY Description Amesbury - Bridge Replacement, A-07-026, Route I-495 (NB & SB) Over the bikeway (Abandoned B&M RR line) CURRENT Source Total NHPP $11,288,692 REVISED Federal Non Federal $9,030,954 $2,257,738 Year 2015 Source NHPP Total Federal FINANCIAL CONSTRAINT NonFederal Year Amendment Description $9,310,817 $7,448,654 $1,862,163 2015 AMENDMENT:Decrease Cost Date 07/29/15 AMENDMENT:Change Addl Info Total Project Cost = $11,288,692 decreased to $9,310,817 by Administrative Amendment Endorsed June 24, 2015 (Construction) (M) 32.01 N. 602932 LOWELL MIDDLESEX LOWELL-BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) NHPP $14,017,076 $11,213,661 $2,803,415 2015 NHPP $14,017,076 $11,213,661 $2,803,415 2015 AMENDMENT:Increase Cost 07/23/15 2016 NHPP $6,014,274 $4,811,419 $1,202,855 2016 AMENDMENT:Add Project 07/23/15 Revised Cost Estimate 6/21/15 $20,031,350 AC Year 1 of 2 32.02 N. 602932 LOWELL MIDDLESEX LOWELL-BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) Revised Cost Estimate 6/21/15 $20,031,350 AC Year 2 of 2 Date: 8/10/2015 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts 2015 FEDERAL APPORTIONMENTS Federal Fiscal Year 2015 STIP Action # 9 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ACTUAL BALANCE FROM FY 2014 III ANTICIPATED TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS $305,023,572 $53,776,670 $2,766,821 $15,939,977 $307,790,393 $69,716,647 $276,593,227 $28,763,880 $31,197,166 $40,952,766 ($65,606,595) ($1,936,549) BRIDGE-OFF SYSTEM $28,456,838 $215,116,118 $243,572,956 $15,772,286 $85,748,867 ($5,848,925) STP NON-FLEX $72,218,612 $18,671,504 $90,890,116 $77,732,408 $13,157,708 $23,951,478 $45,136,794 $3,316 $45,140,110 $45,140,110 $0 $21,556,354 -BOSTON URBAN AREA $2,724,025 $7,349,935 $10,073,960 $3,064,386 $7,009,574 $0 -BARNSTABLE URBAN AREA $5,869,846 $4,162,993 $10,032,839 $10,032,838 $1 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,008,531 $7,155,261 $12,163,792 $8,443,306 $3,720,485 $2,395,123 -WORCESTER URBAN AREA $2,873,988 $6,074,567 $8,948,555 $446,340 $8,502,215 $0 -PROVIDENCE, PAWTUCKET $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $46,651,144 $46,651,144 $12,878,919 $33,772,225 $57,819 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $847,732 $847,732 $600,000 $247,732 $0 $1,186,729 $3,296,728 $4,483,457 $800,000 $3,683,457 $0 TAP FLEX $5,268,579 $9,696,702 $14,965,281 $2,648,799 $12,316,483 ($515,083) TAP NON-FLEX $5,268,579 $7,873,084 $13,141,663 $3,985,003 $9,156,660 $0 $3,289,194 $6,041,263 $9,330,457 $2,920,743 $5,509,714 $0 -BOSTON URBAN AREA $198,504 $393,616 $592,120 $175,953 $416,167 $0 -BARNSTABLE URBAN AREA $427,746 $848,182 $1,275,928 $379,151 $896,777 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $364,980 $723,724 $1,088,704 $323,517 $765,187 $0 -WORCESTER URBAN AREA $209,432 $415,286 $624,718 $185,639 $439,079 $0 -PROVIDENCE, PAWTUCKET $338,467 $851,013 $1,189,480 $0 $1,189,480 $0 $32,218,108 $14,316 $32,232,424 $29,171,923 $3,060,500 $498,059 $0 $5,304,843 $5,304,843 $0 $5,304,843 $0 RLWY/HWY CROSSINGS- HAZARD ELIMINATION $1,212,443 $12,372,204 $13,584,647 $3,900,000 $9,684,647 $0 RLWY/HWY CROSSINGS- PROTECTIVE DEVICES $1,212,443 $8,015,029 $9,227,472 $3,900,000 $5,327,472 $0 $505,842,573 $290,465,755 $847,103,932 $456,746,446 $253,610,527 ($49,399,796) $60,820,818 $20,038,477 $40,086,735 $33,674,246 $100,907,553 $53,712,723 $65,151,846 $24,800,000 $35,755,707 $28,912,723 ($479,042) $0 $586,701,868 $364,226,737 $1,001,724,209 $546,698,292 $318,278,957 ($49,878,838) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office August 13, 2015 $0 $0 Page 1 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts Federal Fiscal Year 2015 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY II ACTUAL BALANCE FROM FY 2014 III ANTICIPATED TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING HIGH PRIORITY PROJECTS $0 $147,060,180 $0 $147,060,180 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $87,262 $777,603 $0 $0 $87,262 $777,603 SECTION 117 PROJECTS $0 $186,027 $0 $186,027 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $4,142,809 $8,813,446 $48,709,245 $0 $57,522,690 $9,625,995 $47,896,695 $0 $1,211,500,780 $568,342,457 $506,411,363 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > Federal Aid and Programming Office August 13, 2015 $595,515,313 $ 561,047,054 $ 112,209,411 $11,068,170 $0 $0 $0 $950,000 $135,992,010 NET CHANGE IN PROGRAMMED OBLIGATIONS ($1,902,320) $87,262 $777,603 $0 $0 $186,027 $0 $3,192,809 $0 $0 ($51,781,158) $121,848,328 ($12,423,158) $690,190,786 ($64,204,316) Page 2 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts 2016 FEDERAL APPORTIONMENTS Federal Fiscal Year 2016 STIP Action # 9 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2015 III ANTICIPATED TRANSFER OF FUNDS $305,023,572 $43,842,580 $31,197,166 $40,952,766 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS $336,220,738 $84,795,346 $263,904,973 $50,612,284 $72,315,764 $34,183,062 ($4,373,799) $3,679,485 $85,748,867 $114,205,705 $28,779,296 $85,426,409 $0 $13,157,708 $85,376,320 $72,218,612 $13,157,708 $0 $45,136,794 $0 $45,136,794 $45,136,794 $0 $0 -BOSTON URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -BARNSTABLE URBAN AREA $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 -WORCESTER URBAN AREA $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $0 -PROVIDENCE, PAWTUCKET $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $33,772,225 $33,772,225 $10,805,308 $22,966,917 ($104,240) $0 $0 $1,186,729 $3,683,457 $4,870,186 $800,000 $4,070,186 $0 TAP FLEX $5,268,579 $12,316,483 $17,585,062 $6,475,572 $11,109,489 TAP NON-FLEX $5,268,579 $9,156,660 $14,425,239 $3,985,003 $10,440,236 $0 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $0 $0 $3,289,194 $5,509,714 $8,798,908 $2,920,743 $5,878,165 $0 -BOSTON URBAN AREA $198,504 $416,167 $614,671 $175,953 $438,718 $0 -BARNSTABLE URBAN AREA $427,746 $896,777 $1,324,523 $379,151 $945,372 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $364,980 $765,187 $1,130,167 $323,517 $806,650 $0 -WORCESTER URBAN AREA $209,432 $439,079 $648,511 $185,639 $462,872 $0 -PROVIDENCE, PAWTUCKET $338,467 $1,189,480 $1,527,947 $0 $1,527,947 $32,218,108 $3,060,500 $35,278,608 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office August 13, 2015 $34,224,683 $0 $1,053,925 ($320,368) $0 $5,304,843 $5,304,843 $561,600 $4,743,243 $0 $1,212,443 $9,684,647 $10,897,090 $400,000 $10,497,090 $0 $1,212,443 $5,327,472 $495,908,483 $253,362,795 $60,820,818 $20,038,477 $35,755,707 $28,912,723 $576,767,778 $318,031,226 $6,539,915 $400,000 $6,139,915 $0 $749,271,278 $473,167,332 $276,103,946 ($1,118,921) $96,576,525 $48,951,200 $83,359,265 $24,800,000 $13,217,260 $24,151,200 ($3,392,000) $0 $894,799,004 $581,326,597 $313,472,407 ($4,510,921) FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 $0 $0 Page 3 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts 2016 FEDERAL APPORTIONMENTS Federal Fiscal Year 2016 HIGH PRIORITY PROJECTS STIP Action # 9 $135,992,010 $135,992,010 FERRY BOAT DESC SECTION 115 PROJECTS $450,000 $0 $450,000 $0 $450,000 $0 $0 $0 $0 SECTION 117 PROJECTS $186,027 $186,027 $0 $186,027 $0 $0 $0 $0 $0 $47,896,695 $47,897,655 $2,512,638 $45,385,017 $1,079,324,696 $607,145,279 $472,179,417 ($10,460,605) $87,857,027 ($2,544,596) SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $960 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $502,555,958 $100,511,192 $0 $215,864,939 $22,856,044 $128,007,912 $113,135,966 ($5,949,684) $0 $0 $735,153,191 ($13,005,201) NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office August 13, 2015 Page 4 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts 2017 FEDERAL APPORTIONMENTS Federal Fiscal Year 2017 STIP Action # 9 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2016 III ANTICIPATED TRANSFER OF FUNDS IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY ($5,000,000) $372,339,336 $78,025,642 V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING $279,639,842 $47,810,225 NET CHANGE IN PROGRAMMED OBLIGATIONS $305,023,572 $43,842,580 $72,315,764 $34,183,062 $92,699,494 $30,215,417 $397,400 $0 BRIDGE-OFF SYSTEM $28,456,838 $85,426,409 $113,883,247 $28,456,768 $85,426,479 $0 STP NON-FLEX $72,218,612 $13,157,708 $85,376,320 $72,218,612 $13,157,708 $0 $45,136,794 $0 $45,136,794 $45,136,794 $0 $0 -BOSTON URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -BARNSTABLE URBAN AREA $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 -WORCESTER URBAN AREA $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $0 -PROVIDENCE, PAWTUCKET $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $22,966,917 $22,966,917 $14,350,000 $8,616,917 $0 $0 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $1,186,729 $0 $4,070,186 $5,256,915 $800,000 $4,456,915 $0 TAP FLEX $5,268,579 $11,109,489 $16,378,068 $4,747,559 $11,630,509 TAP NON-FLEX $5,268,579 $10,440,236 $15,708,815 $3,985,003 $11,723,812 $0 $0 $3,289,194 $5,878,165 $9,167,359 $2,920,743 $6,246,616 $0 -BOSTON URBAN AREA $198,504 $438,718 $637,222 $175,953 $461,269 $0 -BARNSTABLE URBAN AREA $427,746 $945,372 $1,373,118 $379,151 $993,967 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $364,980 $806,650 $1,171,630 $323,517 $848,113 $0 -WORCESTER URBAN AREA $209,432 $462,872 $672,304 $185,639 $486,665 $0 -PROVIDENCE, PAWTUCKET $338,467 $1,527,947 $1,866,414 $0 $1,866,414 $0 $32,218,108 $1,053,925 $38,272,033 $32,684,706 $5,587,327 $0 $4,743,243 $4,743,243 $561,600 $4,181,643 $0 $1,212,443 $10,497,090 $11,709,533 $2,000,000 $9,709,533 $0 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office August 13, 2015 $5,000,000 $0 $1,212,443 $6,139,915 $7,352,358 $2,000,000 $5,352,358 $0 $495,908,483 $276,103,946 $0 $772,012,429 $489,254,315 $282,758,115 $397,400 $60,820,818 $20,038,477 $13,217,260 $24,151,200 $0 $74,038,078 $44,189,677 $71,378,134 $25,800,000 $2,659,944 $18,389,677 $0 $0 $576,767,778 $313,472,407 $0 $890,240,185 $586,432,449 $303,807,736 $397,400 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 Page 5 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts HIGH PRIORITY PROJECTS $113,135,966 $113,135,966 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $0 $0 $0 $0 $0 $0 $0 SECTION 117 PROJECTS $186,027 $186,027 $0 $186,027 $0 $0 $0 $45,385,017 $45,385,017 $0 $45,385,017 $0 $1,048,947,195 $592,968,422 $455,978,773 $397,400 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID $0 $472,179,417 $94,435,883 NON-FEDERAL AID + FEDERAL AID TOTAL > $0 $209,789,439 $6,535,973 $0 $110,767,277 $106,599,993 $0 $0 $0 $99,022,162 $99,350 $703,735,699 $496,750 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office August 13, 2015 Page 6 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts 2018 FEDERAL APPORTIONMENTS Federal Fiscal Year 2018 STIP Action # 9 I ANTICIPATED NET APPORTIONMENTS OF FEDERAL FUNDS FUNDING CATEGORY NATIONAL HIGHWAY PERFORMANCE STP FLEX II ESTIMATED BALANCE FROM FY 2017 III ANTICIPATED TRANSFER OF FUNDS $305,023,572 $43,842,580 $92,699,494 $30,215,417 BRIDGE-OFF SYSTEM $28,456,838 STP NON-FLEX $72,218,612 V PROGRAMMED OBLIGATIONS VI ESTIMATED BALANCE REMAINING NET CHANGE IN PROGRAMMED OBLIGATIONS $382,723,066 $74,057,997 $305,161,481 $51,562,658 $77,561,585 $22,495,339 $0 $0 $85,426,479 $113,883,317 $28,456,837 $85,426,480 $0 $13,157,708 $85,376,320 $72,218,612 $13,157,708 $0 $45,136,794 $0 $45,136,794 $45,136,794 $0 $0 -BOSTON URBAN AREA $2,724,025 $7,009,574 $9,733,599 $2,724,025 $7,009,574 $0 -BARNSTABLE URBAN AREA $5,869,846 $1 $5,869,847 $5,869,846 $1 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $5,008,531 $3,720,485 $8,729,016 $5,008,531 $3,720,485 $0 -WORCESTER URBAN AREA $2,873,988 $8,502,215 $11,376,203 $2,873,988 $8,502,215 $0 -PROVIDENCE, PAWTUCKET $10,605,428 $0 $10,605,428 $10,605,428 $0 $0 $0 $8,616,917 $8,616,917 $0 $8,616,917 $0 -OTHER AREAS (RURAL & SMALL URBAN) STP-ENHANCEMENT ($15,000,000) IV TOTAL FUNDS AVAILABLE (10/1) SUBJECT TO OBLIGATION AUTHORITY SAFE ROUTES TO SCHOOLS PGM. TAP RECREATIONAL TRAILS $0 $0 $0 $0 $0 $0 $1,186,729 $4,456,915 $5,643,644 $800,000 $4,843,644 $0 TAP FLEX $5,268,579 $11,630,509 $16,899,088 $2,964,717 $13,934,371 TAP NON-FLEX $5,268,579 $11,723,812 $16,992,391 $3,985,003 $13,007,388 $0 $0 $3,289,194 $6,246,616 $9,535,810 $2,920,743 $6,615,067 $0 -BOSTON URBAN AREA $198,504 $461,269 $659,773 $175,953 $483,820 $0 -BARNSTABLE URBAN AREA $427,746 $993,967 $1,421,713 $379,151 $1,042,562 $0 -SPRINGFIELD, CHICOPEE, HOLYOKE $364,980 $848,113 $1,213,093 $323,517 $889,576 $0 -WORCESTER URBAN AREA $209,432 $486,665 $696,097 $185,639 $510,458 $0 -PROVIDENCE, PAWTUCKET $338,467 $1,866,414 $2,204,881 $0 $2,204,881 $0 $32,218,108 $5,587,327 $37,805,435 $27,246,291 $10,559,144 $0 $4,181,643 $4,181,643 $0 $4,181,643 $0 $1,212,443 $9,709,533 $10,921,976 $400,000 $10,521,976 $0 $0 -OTHER AREAS (RURAL & SMALL URBAN) HWY SAFETY IMPROVEMENT PGM. HSIP - High Risk Rural RLWY/HWY CROSSINGS- HAZARD ELIMINATION RLWY/HWY CROSSINGS- PROTECTIVE DEVICES SUB-TOTAL> CMAQ PLANNING FEDERAL AID SUB-TOTAL: Federal Aid and Programming Office August 13, 2015 $0 $1,212,443 $5,352,358 $6,564,801 $400,000 $6,164,801 $495,908,483 $274,141,198 ($15,000,000) $755,049,681 $493,195,599 $261,854,081 $0 $60,820,818 $20,038,477 $2,659,944 $18,389,677 $15,000,000 $78,480,762 $38,428,154 $72,557,188 $24,800,000 $5,923,574 $13,628,154 $0 $0 $576,767,778 $295,190,819 $0 $871,958,597 $590,552,787 $281,405,810 $0 FEDERAL OBLIGATION LIMITATION GUIDANCE $600,000,000 Page 7 of 8 2015 - 2018 Statewide Transportation Improvement Program Fiscal Constraint Charts HIGH PRIORITY PROJECTS $0 $106,599,993 $106,599,993 FERRY BOAT DESC SECTION 115 PROJECTS $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 SECTION 117 PROJECTS $0 $186,027 $186,027 $0 $186,027 $0 SECTION 125 PROJECTS MISCELLANEOUS / OTHER / UNDETERMINED $0 $0 $0 $0 $45,385,017 $45,385,017 $0 $45,385,017 $0 $1,024,129,634 $599,044,791 $425,084,843 $7,852,004 FEDERAL AID TOTAL > STATE MATCH FOR FEDERAL AID NON-FEDERAL AID + FEDERAL AID TOTAL > $447,361,856 $89,472,371 $0 $204,825,927 $8,492,004 $0 $112,054,244 $98,107,989 $7,852,004 $0 $0 $92,771,683 $1,963,001 $711,099,035 $9,815,005 NOTES: MISCELLANEOUS / OTHER / UNDETERMINED Apportionment Includes estimated NHPP Exempt. Federal Aid and Programming Office August 13, 2015 Page 8 of 8 2015Old Colony Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program Amendment/Adjustment Type ▼ 07/28/2015 Adjusted Municipality Name ▼ 608087 Old Colony Brockton 608025 Old Colony Brockton 05/20/2014 Draft Released 06/24/2014 Endorsed 12/16/2014 TIP Amendment 1 Released 01/29/2015 TIP Amendment 1 Endorsed 01/29/2015 TIP Amendment 2 Released 03/17/2015 TIP Amendment 2 Endorsed MassDOT Project Description▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ 5 HSIP $ 506,616 $ 455,954 $ 50,662 HSIP, YOE IS $506,616 5 HSIP $ 455,954 $ 410,359 $ 45,595 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 HSIP Subtotal ► $ 962,570 $ 866,313 $ 96,257 $ 1,709,829 $ 1,367,863 $ 341,966 CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 CMAQ Subtotal ► $ 1,709,829 $ 1,367,863 $ 341,966 ◄ 80% Federal + 20% Non-Federal $ 300,009 $ 240,007 $ 60,002 CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 TAP Subtotal ► $ 300,009 $ 240,007 $ 60,002 ◄ 80% Federal + 20% Non-Federal 2,847,976 $ 2,278,381 $ 569,595 HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 CMAQ/ TAP/ STP; YOE is $6,732,869; New Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 ; AC Year 1 of 2 BROCKTONPEDESTRIAN IMPROVEMENTS AT VARIOUS LOCATIONS BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL MassDOT District ▼ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program ADJUSTMENT:Change Additional Information 604957 Old Colony Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Pembroke PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 ►TAP - Transportation Alternatives Program ADJUSTMENT:Change Additional Information 604957 Old Colony ►Non-CMAQ/HSIP/TAP (Other) ADJUSTMENT:Change Additional Information 608025 Old Colony Brockton 604957 Old Colony Pembroke ►Section 1A / Fiscal Constraint Analysis 5 CMAQ TAP ◄ 90% Federal + 10% Non-Federal BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), 5 STP $ INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO 5 STP $ WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 4,723,031 $ 3,778,425 $ 944,606 7,571,007 $ 6,056,806 $ 1,514,201 Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 10,543,415 7,571,007 $ $ 7,239,485 4,723,031 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ $ 962,570 $ $ 1,709,829 $ $ 300,009 $ $ (455,954) 506,616 1,709,829 300,009 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► HSIP, CMAQ, TAP Overprogrammed ◄ 80% Federal + 20% Non-Federal (3,303,930) Funds Over Programmed (3,303,930) Non-CMAQ/HSIP/TAP (Other) E (455,954) HSIP Minimum Met - CMAQ Minimum Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - ►On System No Projects Programmed $ Page 1 ◄ 80% Federal + 20% Non-Federal On System Subtotal ► $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 608025 Old Colony Brockton BROCKTONCORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), $ INCLUDING TRAFFIC SIGNALS UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL Statewide Infrastructure Program Subtotal ► $ HSIP/ STP/ Statewide Infrastructure Program; 100 Percent Design; YOE is $4,071,487.60; Formerly 602606 767,557 $ 614,046 $ 153,511 767,557 $ 614,046 $ 153,511 - $ $ - $ $ - $ $ - $ $ - - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - -$ - -$ - ◄ 90% Federal + 10% Non-Federal No Projects $ Statewide NHS Preservation Program Subtotal ► $ - -$ - -$ - ◄ 80% Federal + 20% Non-Federal No Projects - - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program - - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ Statewide CMAQ ► $ - - - ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings $ Statewide RR Grade Crossings Subtotal ► $ $ - - ►Statewide Stormwater Retrofits No Projects $ Statewide Stormwater Retrofits Subtotal ► $ - ►Statewide ADA Implementation Plan No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ - Other Statewide Items Subtotal ► $ - $ - $ $ $ - - $ ►Other Statewide Items ►Section 2A / Non-Federal Projects Page 2 - - - - - - $ - $ - - - - ►Non Federal Aid No Projects NFA $ Non-Federal Aid Subtotal► $ - $ $ - No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - $ $ ◄100% Non-Federal Total of All Projects ▼ ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Old Colony TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 11,310,972 9,145,035 2,165,937 TIP Section 2: ▼ $ - $ - $ $ $ 11,310,972 9,145,035 2,165,937 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Page 3 2016Old Colony Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program Amendment/Adjustment Type ▼ 606036 Old Colony Municipality Name ▼ 607337 Old Colony Old Colony MassDOT Project Description▼ Brockton BROCKTON- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT ROUTE 123 (BELMONT STREET)/LINWOOD STREET/LORRAINE AVENUE Brockton BROCKTON- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT ROUTE 123 (BELMONT STREET)/LINWOOD STREET/LORRAINE AVENUE PEMBROKE- ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 606036 Pembroke INTERSECTION IMPROVEMENTS AND RELATED WORK AT WASHINGTON STREET (ROUTE 53) AND PLEASANT STREET MassDOT District ▼ 5 604957 Old Colony Pembroke ►Non-CMAQ/HSIP/TAP (Other) ADJUSTMENT:Increase Cost,ADJUSTMENT:Change Additional Information 606036 Old Colony Brockton 604957 Old Colony Pembroke ►Section 1A / Fiscal Constraint Analysis PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 2 OF 2 Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ HSIP $ 455,954 $ 410,359 $ 45,595 HSIP Subtotal ► $ 455,954 $ 410,359 $ 45,595 HSIP/ CMAQ/ STP; YOE is $3,683,052; 75 Percent Design; TEC Score is 8.1 ◄ 90% Federal + 10% Non-Federal 5 CMAQ $ 1,424,858 $ 1,139,886 $ 284,972 HSIP/ CMAQ/ STP; YOE is $3,683,052; 75 Percent Design; TEC Score is 8.1 5 CMAQ $ 1,490,715 $ 1,192,572 $ 298,143 CMAQ; YOE is $1,490,715; 25 Percent Design; TEC Score is 6.85 CMAQ Subtotal ► $ 2,915,573 $ 2,332,458 $ 583,115 $ 511,704 $ 409,363 $ 102,341 TAP Subtotal ► $ 511,704 $ 409,363 $ 102,341 1,802,240 $ 1,441,792 $ 360,448 HSIP/ CMAQ/ STP; YOE is $3,683,052; 75 Percent Design; TEC Score is 8.1 ►TAP - Transportation Alternatives Program ADJUSTMENT:Change Additional Information 07/28/2015 Adjusted 05/20/2014 Draft Released 06/24/2014 Endorsed 5 TAP ◄ 80% Federal + 20% Non-Federal CMAQ/ TAP/ STP; YOE is $2,455,008; Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7 ◄ 80% Federal + 20% Non-Federal BROCKTON- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT ROUTE 123 5 STP $ (BELMONT STREET)/LINWOOD STREET/LORRAINE AVENUE PEMBROKERECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO 5 STP $ WASHINGTON STREET (ROUTE 53) AC PHASE 2 OF 2 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 1,943,304 $ 1,554,643 $ 388,661 CMAQ/ TAP/ STP; YOE is $2,455,008; Total Project Cost is $9,187,877 (was $8,628,250); 100 Percent Design; TEC Score is 7; AC Year 2 of 2 3,745,544 $ 2,996,435 $ 749,109 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 7,628,775 3,745,544 $ $ 7,959,824 5,567,308 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ $ 455,954 $ $ 2,915,573 $ $ 511,704 $ $ (1,490,715) 455,954 1,424,858 511,704 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► HSIP, CMAQ, TAP Overprogrammed 331,049 Target Funds Available 331,049 Non-CMAQ/HSIP/TAP (Other) A - HSIP Minimum Met (1,490,715) CMAQ Minimum Met - TAP Minimum Met ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ ►On System 26 - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $ - $ - $ - On System Subtotal ► $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - $ $ - $ $ - $ $ - $ $ - $ $ - $ $ - - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - -$ - -$ - ◄ 90% Federal + 10% Non-Federal ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - - $ Statewide HSIP Program Subtotal ► $ - No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program - - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ No Projects Programmed $ Statewide CMAQ ► $ - - - ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ 607175 Old Colony Multiple $ 11,331,965 Statewide NHS Preservation Program Subtotal ► $ 11,331,965 KINGSTON‐ PLYMOUTH‐ RESURFACING & RELATED WORK ON ROUTE 3 NHPP 5 - - $ 9,065,572 9,065,572.0 - $ 2,266,393 2,266,393.0 - ◄ 80% Federal + 20% Non-Federal $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - -$ - -$ - ◄ 80% Federal + 20% Non-Federal ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - - - $ - - - $ $ - - - $ - Other Statewide Items Subtotal ► $ - - ◄ Funding Split Varies by Funding Source - ◄100% Non-Federal - ◄100% Non-Federal ►Statewide RR Grade Crossings No Projects ►Statewide Stormwater Retrofits No Projects ►Statewide ADA Implementation Plan ►Other Statewide Items ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects NFA $ Non-Federal Aid Subtotal► $ - No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects $ - - $ $ $ $ $ 2016 Old Colony TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 18,960,740 15,214,187 3,746,553 Total of All Projects ▼ TIP Section 2: ▼ $ - $ - $ $ $ 18,960,740 15,214,187 3,746,553 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 26 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustme Project ID ▼ nt Type ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 06/24/2014 Endorsed 02/03/2015 3rd Amendment Released 04/28/2015 4th Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program AMENDMENT:Remove 607900 Project AMENDMENT:Move Project - (FROM 2016) 607745 Berkshire Berkshire Pittsfield PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 HSIP $ 395,516 $ 355,964 $ 39,552 CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% Lenox LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) 1 HSIP $ 395,516 $ 355,964 $ 39,552 Move from 2016; Total Cost = 395,516; MPO evaluation score 3 of 7; Design Status: 75% $ HSIP Subtotal ► $ - $ 395,516 $ - $ 355,964 $ 39,552 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $ 1,334,867 $ 1,067,894 $ CMAQ Subtotal ► $ 1,334,867 $ 1,067,894 $ Increase CMAQ to $1,334,867; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total 266,973 Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% 266,973 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program No Projects Programmed $ TAP Subtotal ► $ - $ $ - - $ $ ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601320 Berkshire Lee LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 Reduce STP to $660,062; $1,139,304 (current) - $660,062 (proposed) = $479,242 132,012 STP remaining; AC - Year 3 of 3; Total Project Cost = 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% 1 STP $ 660,062 $ 528,050 $ 1 STP $ 3,261,435 $ 2,609,148 $ 652,287 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,921,497 $ 3,137,198 $ 784,299 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ 5,651,880 $ 5,651,880 ◄Total Target $ - Target Funds Available 3,921,497 395,516 1,334,867 - 3,921,497 395,516 1,334,867 - ◄ Max. Non◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ $ - Non-CMAQ/HSIP/TAP HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met Increase STP by 479,242; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% ►Section 1A / Fiscal Constraint Analysis Total Non-CMAQ/HSIP/TAP (Other) Programmed ► Total HSIP Programmed ► Total CMAQ Programmed ► Total TAP Programmed ► $ $ $ $ $ $ $ $ Remaining HSIP, CMAQ, and TAP Funds $ ‐ Page 1 of 5 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustme Project ID ▼ nt Type ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Sandisfield SANDISFIELD- SYSTEMATIC BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (S.MAIN ST.) OVER W. BRANCH FARMINGTON RIVER (PHASE II) Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ 05/20/2014 Draft Released 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 06/24/2014 Endorsed 02/03/2015 3rd Amendment Released 04/28/2015 4th Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 607510 ►On System ADJUSTMENT:Decreas e Cost,ADJUSTMENT:Ch 605299 ange Additional Information Berkshire Berkshire Great Barrington $ 309,920 $ 247,936 $ 61,984 $ Statewide Bridge Maintenance Program Subtotal ► $ - $ 309,920 $ - $ 247,936 $ 61,984 ◄ 80% Federal + 20% Non-Federal $ 4,301,484 $ 3,441,187 $ 860,297 $ On System Subtotal ► $ - $ 4,301,484 $ - $ 3,441,187 $ 860,297 ◄ 80% Federal + 20% Non-Federal $ 1,811,552 $ 1,449,242 $ 362,310 $ Off-System Subtotal ► $ - $ 1,811,552 $ - $ 1,449,242 $ 362,310 ◄ 80% Federal + 20% Non-Federal GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER 1 1 NHPP NHPP - Total Project cost reduced by $1,603,318 - ►Off-System 607121 Berkshire Savoy SAVOY- BRIDGE REPLACEMENT, S-06004, RIVER ROAD OVER THE WESTFIELD RIVER 1 STP-BROFF Total Project cost reduced by $778,308 - ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 605930 Berkshire Adams ADAMS - MOUNT GREYLOCK SCENIC BYWAYS IMPROVEMENTS AT BASCOM LODGE AND WAR MEMORIAL TOWER 1 SBYWY $ 996,800 $ 797,440 $ 199,360 Design Cost = $150,095 & Construction Cost = $846,705; Total Cost = $996,800 Page 2 of 5 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustme Project ID ▼ nt Type ▼ MPO ▼ 608071 Berkshire Municipality Name ▼ Adams MassDOT Project Description▼ ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION 05/20/2014 Draft Released 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 06/24/2014 Endorsed 02/03/2015 3rd Amendment Released 04/28/2015 4th Amendment Released Total Federal Funds Non-Federal MassDOT Funding Programmed Additional ▼ District ▼ Source ▼ Funds ▼ Funds ▼ Information ▼ 1 HPP $ 3,360,000 $ 2,688,000 $ 672,000 Construction; SAFETEA-LU, HPP 2850 - MA Berkshire County Bike Paths, Design & Construction - $5,000,000 (Earmark Total) Other Federal Aid Subtotal ► $ 4,356,800 $ 3,485,440 $ 871,360 ◄ Funding Split Varies by Funding Source Page 3 of 5 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustme Project ID ▼ nt Type ▼ MPO ▼ Municipality Name ▼ ►Section 1D / Federal Aid Major & State Category Projects Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 06/24/2014 Endorsed 02/03/2015 3rd Amendment Released 04/28/2015 4th Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ $ - $ $Statewide HSIP Program Subtotal ► $ - $ No Projects Programmed $Statewide Safe Routes to Schools Program Subtotal ► $ - $ - $ $ - - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program $ - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 No Projects Programmed 1 CMAQ $ 1,500,000 $ $ Statewide CMAQ ► $ 1,500,000 $ $ Add $1,500,000 Statewide CMAQ; AC - Year 1 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% 1,200,000 $ 300,000 $ 1,200,000 $ 300,000 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $Statewide ITS Subtotal ► $ - $ - - $ - - ◄ 80% Federal + 20% Non-Federal No Projects Programmed $Statewide Interstate Maintenance Program Subtotal ► $ - $ - - $ - - ◄ 90% Federal + 10% Non-Federal ►Statewide ITS No Projects Programmed ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ - 605887 606544 Berkshire Berkshire Multiple Multiple SHEFFIELD - GREAT BARRINGTON RESURFACING AND RELATED WORK ROUTE 7 LENOX- PITTSFIELD RESURFACING NHPP $ - 6,641,040 1 5,312,832 1 NHPP $ 1,328,208 Statewide NHS Preservation Program Subtotal ► $ 3,422,162 10,063,202 $ 8,050,562 $ 2,012,640 ◄ 80% Federal + 20% Non-Federal 2,737,730 684,432 Page 4 of 5 2015 Berkshire MPO Transportation Improvement Program MassDOT Amendment/Adjustme Project ID ▼ nt Type ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ 05/20/2014 Draft Released 10/28/2014 1st Amendment Released 12/09/2014 2nd Amendment Released 06/24/2014 Endorsed 02/03/2015 3rd Amendment Released 04/28/2015 4th Amendment Released Federal Funds ▼ Additional Information ▼ Non-Federal Funds ▼ ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $No Projects Programmed Statewide Stormwater Retrofits Subtotal ► $ - $ - - $ - - ◄ 80% Federal + 20% Non-Federal $No Projects Programmed Statewide ADA Implementation Plan Subtotal ► $ - $ - - $ - - ◄ 80% Federal + 20% Non-Federal ABP GANS Repayment $ - - Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of W ay Statewide Recreational Trails Other Statewide Items Subtotal ► $ - $ - $ $ $ $ - - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan ►Other Statewide Items - - - - $ - - ►Section 2A / Non-Federal Projects $ - ►Non Federal Aid No Projects Programmed NFA $ Non-Federal Aid Subtotal► $ - $ $ - ◄100% Non-Federal NFA $ No Projects Programmed Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Berkshire MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section2: ▼ 27,994,838 $ 22,435,422 5,559,416 $ Total of All Projects ▼ - $ $ $ 27,994,838 ◄ Total Spending in Region 22,435,422 ◄ Total Federal Spending in Region 5,559,416 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. Th M i i l Li it ti f d i thi R l ti i li bl l t j t h th M i i lit i th A di A th it F ll j t t i d i th TIP th C lth i th A di A th it Th f ll j t tb id d d i l t di d ith 701 CMR 7 00 d th R d Page 5 of 5 05/20/2014 Draft Released 06/24/2014 Endorsed 2016 Berkshire MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ Municipality Name ▼ MassDOT Project Description▼ Lenox LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) Federal Funds ▼ Non-Federal Funds ▼ $ $ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607745 Berkshire 1 HSIP $ HSIP Subtotal ► $ - - - $ - $ - - $ - $ - CMAQ + HSIP; Total Cost = 555,964; MPO evaluation score 3 of 7; Design Status: <25%; YOE = 4% ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program AMENDMENT:Remove Funding Source 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $ 912,389 $ 729,911 $ 607745 Berkshire Lenox LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR 183 (WALKER STREET) 1 CMAQ $ 200,000 $ 160,000 $ CMAQ Subtotal ► $ 1,112,389 $ 889,911 $ 182,478 Increase CMAQ to $1,334,867; AC - Year 2 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% CMAQ + HSIP; Total Cost = 555,964; MPO 40,000 evaluation score 3 of 7; Design Status: <25%; YOE = 4% 222,478 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program $ - $ - $ - TAP Subtotal ► $ - $ - $ - No Projects Programmed ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 602280 Berkshire Dalton DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 STP Increase CMAQ to $1,334,867; AC - Year 2 of 3; STP + CMAQ + Statewide CMAQ; Total Cost = 11,181,141; MPO evaluation score 4 of 7; Design Status: 100% $ 4,745,895 $ 3,796,716 $ 949,179 $ Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ - $ 4,745,895 $ - $ 3,796,716 $ 949,179 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,858,284 $ 4,745,895 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 1,112,389 $ - $ 6,214,248 ◄Total Target $ 4,745,895 ◄ Max. Non$ CMAQ/HSIP/TA P Min. HSIP 355,964 ◄ $ 1,112,389 ◄ Min. CMAQ $ - ◄ Min. TAP $ - ►Section 1A / Fiscal Constraint Analysis 355,964 Target Funds Available - Non-CMAQ/HSIP/TAP (Other) Available 355,964 HSIP Minimum Not Met - CMAQ Minimum Met TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 355,964 - Page 1 of 4 05/20/2014 Draft Released 06/24/2014 Endorsed 2016 Berkshire MPO Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Section 1B / Federal Aid Bridge Projects Amendment/Adjustment Type ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ Municipality Name ▼ MassDOT Project Description▼ Dalton DALTON- SYSTEMATIC BRIDGE MAINTENANCE, D-01-005, ROUTE 8 (MAIN ST.) OVER E. BRANCH HOUSATONIC RIVER Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Bridge Maintenance Program 607511 Berkshire $ 309,960 $ 247,968 $ 61,992 YOE = 4% Statewide Bridge Maintenance Program Subtotal ► $ 309,960 $ 247,968 $ 61,992 ◄ 80% Federal + 20% Non-Federal 1 NHPP ►On System $ No Projects Programmed $ On System Subtotal ► $ - $ - - $ - $ - - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Off-System NEW MARLBOROUGH- BRIDGE 605314 Berkshire New Marlborough REPLACEMENT, HADSELL ST ROAD 1 STP-BROFF $ 2,693,454 $ 2,154,763 $ 538,691 YOE = 4% OVER THE UMPACHENE RIVER 607116 Berkshire Florida FLORIDA- BRIDGE REPLACEMENT, F05-002, SOUTH COUNTY ROAD OVER THE COLD RIVER 1 STP-BROFF $ 2,921,400 $ 2,337,120 $ 584,280 YOE = 4% 603778 Berkshire Lanesborough LANESBOROUGH- BRIDGE REPLACEMENT, L-03-024, NARRAGANSETT AVENUE OVER PONTOOSUC LAKE 1 STP-BROFF $ 2,037,420 $ 1,629,936 $ 407,484 YOE = 4% Off-System Subtotal ► $ 7,652,274 $ 6,121,819 $ 1,530,455 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - $ - $ - $ - $ - $ - $ - Other Federal Aid Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed No Projects Programmed ◄ Funding Split Varies by Funding Source Page 2 of 4 05/20/2014 Draft Released 06/24/2014 Endorsed 2016 Berkshire MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ MassDOT Project Description▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program $ - $ - $ - No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ No Projects Programmed - $ $ - $ $ - - - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed $ - No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ - $ $ - $ - $ $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program $ - No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ No Projects Programmed - $ - $ $ - - Funding Split Varies by Funding Source $ - Funding Split Varies by Funding Source - ◄ Funding Split Varies by Funding Source $ $ ► Statewide CMAQ 606891 Berkshire ►Statewide Transportation Enhancements Berkshire 607254 Pittsfield North Adams PITTSFIELD- ASHUWILLTICOOK RAIL TRAIL EXTENTION $ 1,802,630 $ 1,442,104 $ Construction; YOE = 4%; $300,000 STP-TE + 360,526 $1,802,630 CMAQ = $2,102,630 Total $ Statewide CMAQ ► $ - $ 1,802,630 $ 1,442,104 360,526 ◄ 80% Federal + 20% Non-Federal 1 NORTH ADAMS/ WILLIAMSTOWN MOHAWK BIKE TRAIL PROJECT 1 PITTSFIELD- ASHUWILLTICOOK RAIL TRAIL EXTENTION 1 CMAQ STP-TE $ 4,906,138 STP-TE $ 300,000 Construction; YOE = 4% 3,924,910 606891 Berkshire Pittsfield Statewide Transportation Enhancements Subtotal ► $ $ $ 981,228 Construction; YOE = 4%; $300,000 STP-TE + $1,802,630 CMAQ = $2,102,630 Total 1,041,228 ◄ 80% Federal + 20% Non-Federal 5,206,138 240,000 4,164,910 60,000 $ $ ►Statewide ITS No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - $ - ◄ 90% Federal + 10% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ $ $ - - $ - Page 3 of 4 2016 Berkshire MPO Transportation Improvement Program MassDOT Project ID ▼ MPO ▼ ►Statewide RR Grade Crossings Amendment/Adjustment Type ▼ Municipality Name ▼ MassDOT Project Description▼ 05/20/2014 Draft Released 06/24/2014 Endorsed Total MassDOT Funding Programmed District ▼ Source ▼ Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ No Projects Programmed $ No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - - - $ - $ $ $ $ - - - $ Additional Information ▼ - $ - ◄ 80% Federal + 20% Non-Federal - $ - ◄ 80% Federal + 20% Non-Federal - $ - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits $ ►Statewide ADA Implementation Plan - ►Other Statewide Items $ - - ►Section 2A / Non-Federal Projects -$ - ►Non Federal Aid No Projects Programmed No Projects Programmed NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects Programmed NFA $ No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2016 Berkshire MPO TIP Summary TIPSection 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 20,829,286 $ 16,663,429 4,165,857 $ - Total of All Projects ▼ $ $ $ 20,829,286 ◄ Total Spending in Region 16,663,429 ◄ Total Federal Spending in Region 4,165,857 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Page 4 of 4 The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ 07/30/2015 Action on Amendment Four MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program AMENDMENT:Decr ease Cost,AMENDMENT :Change Additional Inform ation 605146 Boston Salem SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 HSIP $ 1,955,000 $ 1,759,500 $ HSIP funding reduced by $45,000; 195,500 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 605657 Boston Medway MEDW AY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. W EST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 HSIP $ 3,000,000 $ 2,700,000 $ 300,000 HSIP Subtotal ► $ 4,955,000 $ 4,459,500 $ 495,500 ◄ 90% Federal + 10% Non-Federal 4 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 N/A CMAQ $ 400,000 $ 320,000 $ 80,000 4 CMAQ $ 5,429,110 $ 4,343,288 $ 1,085,822 6 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 3 CMAQ $ 5,000,000 $ 4,000,000 $ 1,000,000 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 CMAQ Subtotal ► $ 17,829,110 $ 14,263,288 $ STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program AMENDMENT:Cha nge Additional Inform ation 605146 Boston Salem SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE INTERSECTION IMPROVEMENT PROGRAM 1559 Boston N/A 604652 Boston Multiple 606284 Boston Boston 605657 Boston Medway STONEHAM- W INCHESTER- W OBURN- TRICOMMUNITY BIKEWAY BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET MEDW AY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. W EST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081 3,565,822 ◄ 80% Federal + 20% Non-Federal The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ 07/30/2015 Action on Amendment Four Municipality Name ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Medway MEDW AY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. W EST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►TAP - Transportation Alternatives Program 605657 Boston 3 TAP STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 $ 2,548,719 $ 2,038,975 $ 509,744 TAP Subtotal ► $ 2,548,719 $ 2,038,975 $ 509,744 ◄ 80% Federal + 20% Non-Federal STP funding increased by $122; 773,577 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Incr ease Cost,AMENDMENT :Change Additional Inform ation 605146 Boston Salem SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 STP $ 3,867,884 $ 3,094,307 $ 606284 Boston Boston BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STP $ 7,446,852 $ 5,957,482 $ 1,489,370 605657 Boston Medway MEDW AY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. W EST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 STP $ 1,513,848 $ 1,211,078 $ 302,770 AMENDMENT:Add Funding Source 603711 Boston Multiple NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 STP $ 26,250,000 $ 21,000,000 $ 5,250,000 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) AMENDMENT:Decr ease Cost,AMENDMENT :Change Additional Inform ation 603711 Boston Multiple NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 3,750,000 $ 3,000,000 $ 750,000 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP); NHPP was $30 million Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 42,828,584 $ 34,262,867 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 68,161,413 $ 42,828,584 $ 68,221,673 ◄Total Target 44,786,168 ◄ Max. NonCMAQ/HSIP/TAP $ $ 4,955,000 17,829,110 2,548,719 4,774,123 ◄ Min. HSIP 16,112,664 ◄ Min. CMAQ 2,548,719 ◄ Min. TAP $ $ $ STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 8,565,717 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ $ $ $ 60,260 Target Funds Available 60,261 Non-CMAQ/HSIP/TAP (Other) Available (180,877) HSIP Minimum Met (1,716,446) CMAQ Minimum Met TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,897,323) - The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ Municipality Name ▼ 07/30/2015 Action on Amendment Four MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System AMENDMENT:Decr ease Cost,AMENDMENT :Change Additional Inform ation 600703 Boston Lexington LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $ 14,886,555 $ 11,909,244 $ 2,977,311 607338 Boston Gloucester GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 NHPP $ 2,064,424 $ 1,651,539 $ 412,885 607273 Boston Franklin 3 NHPP $ 1,780,272 $ 1,424,218 $ 356,054 605883 Boston Dedham 6 NHPP $ 3,918,939 $ 3,135,151 $ 783,788 603008 Boston Woburn W OBURN- BRIDGE REPLACEMENT, W -43-003, SALEM STREET OVER MBTA 4 NHPP $ 608019 Boston Boston BOSTON- ADVANCED UTILITY RELOCATIONS FOR BRIDGE B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 NHPP $ 6,000,000 $ 4,800,000 $ On System Subtotal ► $ 28,650,190 $ 22,920,152 $ FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRIAN BRIDGE CONSTRUCTION DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH - $ - $ - AC Yr 3 of 4; Total Cost = $35,108,000 cost decrease of $3,442,161; AC Yr 2 of 2; Total Cost = $10,514,424; was $5,506,585 in FFY 2015 project will move to FFY 2016; was $5,018,477 in FFY 2015 1,200,000 5,730,038 ◄ 80% Federal + 20% Non-Federal ►Off-System No Projects Programmed $ - $ - $ - Off-System Subtotal ► $ - $ - $ - $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed ◄ 80% Federal + 20% Non-Federal The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ 07/30/2015 Action on Amendment Four MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Municipality Name ▼ MassDOT Project Description▼ Boston BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND W ARREN STREET 6 HPP $ BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 HPP $ 1,012,389 $ 809,911 $ BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS 6 TI $ 2,505,854 $ 2,004,683 $ 4 HPP $ 2,587,214 $ 2,069,771 $ 517,443 6 HPP $ 1,114,501 $ 891,601 $ 222,900 Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid Boston 606134 Boston BOSTON 606889 Boston BOSTON 606889 Boston SOMERVILLE Boston $ 980,000 $ 980,000 $ - Boston BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 Sec 125 $ 475,000 $ 475,000 $ - Boston BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STPP $ 599,897 $ 599,897 $ Boston BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 TCSP $ 1,250,000 $ 1,000,000 $ MEDFORD CLIPPERSHIP LINEAR PARK AND BIKEWAY 4 Sec 125 $ 475,000 $ 475,000 $ MEDFORD W ATER TAXI, Phase 1 - Feasibility Analysis 4 FBD $ 155,000 $ 124,000 $ BOSTON 607839 Boston N/A Construction; HPP 2012 (MA153); SAFETEA-LU Earmark + HPP TI 180 Earmark Total Cost = $3,518,243 Construction; TI 180 (MA216); SAFETEA-LU Earmark + HPP TI Earmark Total Cost = 501,171 $3,518,243 Sec 129 Boston BOSTON Other Federal Aid Subtotal ► $ 11,154,855 $ 9,429,863 $ project will move to FFY 2018; Construction; HPP 2129 (MA155); was $2,377,900 202,478 6 Boston 606284 - Boston Boston 606284 $ BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET Boston 606284 - Boston Boston 606284 $ SOMERVILLE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO CAMBRIDGE C.L. BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 607209 606284 - - 250,000 Construction; HPP 431 (MA118); SAFETEA-LU Earmark+NFA Total Cost = $8,940,346. Construction; HPP 682 (MA124); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; TCSP (11MA008); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 125 (MA250) of $475,000 + local funding sources of $502,487 Total Cost = $977,487 Feasibility Study Analysis and Preliminary Engineering; Ferry Boat Discretionary (FBD) 31,000 Program; City of Medford match 1,724,992 ◄ Funding Split Varies by Funding Source - The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ Municipality Name ▼ 07/30/2015 Action on Amendment Four MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 607700 Boston Multiple DISTRICT 4- HIGHW AY LIGHTING BRANCH CIRCUIT RE-CABLING FROM SIX (6) LIGHTING LOAD 4 STP $ CENTERS ALONG ROUTE I-95 (128) LEXINGTONW OBURN Statewide Infrastructure Program Subtotal ► $ 2,500,000 $ 2,000,000 $ 500,000 2,500,000 $ 2,000,000 $ 500,000 ◄ 80% Federal + 20% Non-Federal - $ $ - $ $ ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607920 Boston Milton 607892 Boston Somerville MILTON- SAFE ROUTES TO SCHOOL (GLOVER 6 TAP $ ELEMENTARY SCHOOL) SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY 4 TAP $ SCHOOL) Statewide Safe Routes to Schools Program Subtotal ► $ 725,000 $ 700,000 $ 1,425,000 $ 580,000 $ 560,000 $ 1,140,000 $ 145,000 80% Federal + 20% Non-Federal 140,000 80% Federal + 20% Non-Federal 285,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ Boston 604531 AMENDMENT:Add Funding Source,AMENDME NT:Change Additional Inform ation 605146 ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL Multiple Boston Salem SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 3 CMAQ $ 5,976,941 $ 4,781,553 $ 4 CMAQ $ 1,901,197 $ 1,520,957 $ 7,878,138 $ 6,302,510 $ $ 426,483 $ Statewide CMAQ ► $ ►Statewide Transportation Enhancements Boston 604531 Multiple ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL $ 533,104 Statewide Transportation Enhancements Subtotal ► $ 3 STP-TE 533,104 1,195,388 Statewide TE+Statewide CMAQ Total Cost = $6,510,045 cost increase of $1,856,319; 380,239 STP+HSIP+CMAQ+Statewide CMAQ Total Cost = $9,724,081, was $7,867,762 1,575,628 ◄ 80% Federal + 20% Non-Federal Statewide TE+Statewide CMAQ Total Cost = $6,510,045 106,621 ◄ 80% Federal + 20% Non-Federal 426,483 ►Statewide ITS No Projects Programmed $ 106,621 Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Statewide Interstate Maintenance Program Subtotal ► $ - -$ - $ - - ◄ 90% Federal + 10% Non-Federal ►Statewide Interstate Maintenance Program No Projects Programmed - The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ ►Statewide NHS Preservation Program+ Boston 607174 607891 Boston Municipality Name ▼ Multiple Beverly 07/30/2015 Action on Amendment Four MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ CHELSEA- REVERE- RESURFACING & RELATED 4 NHPP $ W ORK ON ROUTE 1 BEVERLY - RESURFACING & RELATED W ORK ON 4 NHPP $ ROUTE 128 Statewide NHS Preservation Program Subtotal ► $ ►Statewide RR Grade Crossings No Projects Programmed $ Statewide RR Grade Crossings Subtotal ► $ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ NHPP+TAP Total Cost = $10,815,386 10,490,952 NHPP+TAP Total Cost = $5,938,411 5,718,991 8,392,762 2,098,190 16,209,943 $ 12,967,954 $ 3,241,989 ◄ 80% Federal + 20% Non-Federal 4,575,193 1,143,798 - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits AMENDMENT:Cha nge Funding Source,AMENDME NT:Change Additional Inform ation Boston 607174 CHELSEA- REVERE- RESURFACING & RELATED W ORK ON ROUTE 1 Multiple NHPP+TAP Total Cost = $10,815,386; previously funded with TAP 4 STP-TE $ - 324,434 259,547 AMENDMENT:Cha nge Funding Source,AMENDME NT:Change Additional Inform ation AMENDMENT:Cha nge Funding Source,AMENDME NT:Change Additional Inform ation AMENDMENT:Add Project Boston 607891 BEVERLY - RESURFACING & RELATED W ORK ON ROUTE 128 Beverly Boston 608131 4 STP-TE $ 219,420 175,536 DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1/I-95/I-93 Beverly NHPP+TAP Total Cost = $5,938,411; previously funded with TAP 64,887 previously funded with TAP 43,884 4 STP-TE $ 2,950,000 2,360,000 Boston 606997 Beverly BRAINTREE- MILTON- BOSTON- WEYMOUTHSTORMWATER RETROFITS ON I-93, ROUTE 3 & 6 STP-TE $ ROUTE 18 Statewide Stormwater Retrofits Subtotal ► $ new addition 590,000 1,620,450 5,114,304 1,296,360 $ 4,091,443 ►Statewide ADA Implementation Plan $ 1,022,861 ◄ 80% Federal + 20% Non-Federal 324,090 No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Other Statewide Items Boston N/A No Projects Programmed The file you have accessed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Transportation Improvement Program.” Contained in the file are the Massachusetts Department of Transportation’s project identification number, project description, district number, funding source, programmed funds, and the split between federal and non-federal funds for each of the years of the highway section. Similar information is contained for the transit section. This file is not currently available in an accessible format. The Massachusetts Department of Transportation is working collaboratively with each of the state’s regional planning agencies to address this issue. While this work is ongoing, alternative formats are available by calling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 2015 Boston Region MPO Transportation Improvement Program Amendment/Adjus MassDOT tment Type ▼ Project ID ▼ MPO ▼ 07/30/2015 Action on Amendment Four Municipality Name ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Multiple CANTON- NORW OOD- W ESTW OOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON CANTON STREET/DEDHAM STREET, INCLUDES REPLACEMENT OF C-02-034, REHAB OF C-02-024, C-02-002=N-25-016=W -31-002 & 5 SIGNALIZED INTERSECTIONS Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2A / Non-Federal Projects ►Non Federal Aid Boston 606146 1568 Boston 5/6 NFA $ 38,000,000 $ 38,000,000 N/A NFA $ 4,863,082 $ 4,863,082 Lists cash flows (based on state fiscal year) for Fairmount Improvements MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. FAIRMOUNT IMPROVEMENTS N/A Boston 1572 Non-federal aid RED LINE-BLUE LINE CONNECTOR DESIGN N/A N/A NFA $ 10,000,000 $ 10,000,000 Non-Federal Aid Subtotal► $ 52,863,082 $ 52,863,082 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2015 Boston Region MPO TIP Summary NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - TIP Section 1: ▼ - $ $ TIP Section 2: ▼ Total ► $ 141,626,947 $ Federal Funds ► $ 114,303,037 Non-Federal Funds ► $ 27,323,910 $ ◄100% Non-Federal Total of All Projects ▼ 52,863,082 $ $ 52,863,082 $ 194,490,029 ◄ Total Spending in Region 114,303,037 ◄ Total Federal Spending in Region 80,186,992 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public W orks Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 601630 HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 604810 (MAPLE STREET) 6 HSIP $ 1,000,000 $ 900,000 $ 3 HSIP $ 3,397,727 $ 3,057,954 $ HSIP Subtotal ► $ 4,397,727 $ 3,957,954 $ 100,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) HSIP+CMAQ Total Cost = $5,397,727; HSIP pending Road Safety Audit 439,773 ◄ 90% Federal + 10% Non-Federal 339,773 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 1559 1569 604810 605110 CLEAN AIR AND MOBILITY GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 MARLBOROUGH- RECONSTRUCTION OF ROUTE 85 (MAPLE STREET) BROOKLINE- INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) ►TAP - Transportation Alternatives Program BROOKLINE- INTERSECTION & SIGNAL 605110 IMPROVEMENTS @ ROUTE 9 & VILLAGE SQUARE (GATEWAY EAST) N/A CMAQ $ 374,850 $ 299,880 $ 74,970 N/A CMAQ $ 8,100,000 $ 6,480,000 $ 1,620,000 3 CMAQ $ 2,000,000 $ 1,600,000 $ 400,000 HSIP+CMAQ Total Cost = $5,397,727 6 CMAQ $ 244,171 $ 195,337 $ 48,834 TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 CMAQ Subtotal ► $ 10,719,021 $ 8,575,217 $ $ 4,346,838 $ 3,477,470 $ 869,368 TAP Subtotal ► $ 4,346,838 $ 3,477,470 $ 869,368 ◄ 80% Federal + 20% Non-Federal 6 TAP Yr 1 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,143,804 ◄ 80% Federal + 20% Non-Federal TAP+CMAQ+Private Sector Contribution ($1,000,000) Total Cost = $5,591,009 ►Non-CMAQ/HSIP/TAP (Other) 29492 BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE IMPROVEMENTS, FROM CROSBY DRIVE NORTH TO MANNING ROAD, INCLUDES RECONSTRUCTION OF B-04-006 (PHASE III) 4 STP $ 21,691,442 $ 17,353,154 $ 4,338,288 AC Yr 1 of 2; STP+Northern Middlesex Council of Governments contribution ($1,000,000) Total Cost = $29,296,348 603711 NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 6 NHPP $ 30,000,000 $ 24,000,000 $ 6,000,000 AC Yr 3 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) 3,800,000 $ 3,040,000 $ 760,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 55,491,442 $ 44,393,154 $ 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM 6 STP $ HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 11,098,288 ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,955,028 $ 55,491,442 $ 75,009,821 ◄Total Target 52,939,052 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 4,397,727 $ 10,719,021 $ 4,346,838 $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 4,346,838 ◄ Min. TAP $ $ $ 54,793 Target Funds Available (2,552,390) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum (101,017) HSIP Minimum Met 2,708,199 CMAQ Minimum Not Met TAP Minimum Met Remaining HSIP, CMAQ, and TAP Funds $ 2,607,182 ►Section 1B / Federal Aid Bridge Projects - ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System 600703 LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $ 5,108,000 $ 4,086,400 $ 1,021,600 AC Yr 4 of 4; Total Cost = $35,108,000 600867 BOSTON- BRIDGE REPLACEMENT, B-16-237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 NHPP $ 3,135,181 $ 2,508,145 $ 627,036 AC Yr 1 of 2; Total Cost = $9,100,020 AMENDMENT:Move Project - (FROM 2015),AMENDMENT:Inc rease Cost,AMENDMENT:Cha nge Additional Information 603008 WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 4 NHPP $ 7,089,000 $ 5,671,200 $ 1,417,800 AMENDMENT:Decrease Cost,AMENDMENT:Cha nge Additional Information 604173 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER 6 NHPP $ 1,000,000 $ 800,000 $ 200,000 607685 BRAINTREE- BRIDGE REHABILITATION, B-21-060 AND B-21-061, ST 3 (SB) AND ST 3 (NB) OVER RAMP C (QUINCY ADAMS) 6 NHPP $ 6,668,480 $ 5,334,784 $ 1,333,696 606553 HANOVER- NORWELL- SUPERSTRUCTURE REPLACEMENT, H-06-010, ST 3 OVER ST 123 (WEBSTER STREET) & N-24-003, ST 3 OVER ST 123 (HIGH STREET) 6 NHPP $ 8,554,209 $ 6,843,367 $ 1,710,842 On System Subtotal ► $ 31,554,870 $ ►Off-System 25,243,896 $ project will move to FFY 2016; was $5,018,477 in FFY 2015 decrease of $4 million; AC Yr 1 of 5; Total Cost = $112,700,000 ($49,035,161 programmed within FFYs 2015-18 TIP); was $5,000,000 in FFY 2016 AC Yr 1 of 2; Total Cost = $11,434,190 6,310,974 ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ 607345 MassDOT Project Description▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ $ 6,416,550 $ 5,133,240 $ 1,283,310 Off-System Subtotal ► $ 6,416,550 $ 5,133,240 $ 1,283,310 ◄ 80% Federal + 20% Non-Federal MassDOT Funding District ▼ Source ▼ COHASSET- SUPERSTRUCTURE REPLACEMENT & SUBSTRUCTURE REHABILITATION, C-17-002, ATLANTIC AVENUE OVER LITTLE HARBOR INLET 5 STP-BR-OFF Additional Information ▼ ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 601630 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 6 6 HPP HPP HPP $ 8,600,000 $ $ - $ - Other Federal Aid Subtotal ► $ $ $ 8,600,000 $ 6,880,000 $ - $ - $ 6,880,000 $ 1,720,000 AC Yr 1 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) project will move to FFY 2018; Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105; was $2,429,730 - project will move to FFY 2018; Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105; was $5,007,375 - 1,720,000 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 603917 605733 MEDFORD- STONEHAM- WOBURN- READINGHIGHWAY LIGHTING REHABILITATION ON I-93 4 STP $ 15,000,000 $ (PHASE II) DISTRICT 6- HIGHWAY LIGHTING SYSTEM 6 STP $ 2,500,000 $ Statewide Infrastructure Program Subtotal ► $ 17,500,000 $ AC Yr 1 of 2; Total Cost = $17,500,000 12,000,000 $ 3,000,000 2,000,000 $ 14,000,000 $ AC Yr 1 of 3; Total Cost = $8,250,000 500,000 3,500,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607997 607998 607999 608000 SAUGUS- SAFE ROUTES TO SCHOOL (VETERANS 4 TAP MEMORIAL) EVERETT- SAFE ROUTES TO SCHOOL (MADELAINE 4 TAP ENGLISH) REVERE- SAFE ROUTES TO SCHOOL (GARFIELD 4 TAP ELEMENTARY & MIDDLE SCHOOL) BEDFORD- SAFE ROUTES TO SCHOOL (JOHN 4 TAP Statewide Safe Routes to Schools Program Subtotal ► $ 676,000 $ 540,800 $ 135,200 80% Federal + 20% Non-Federal $ 624,000 $ 499,200 $ 124,800 80% Federal + 20% Non-Federal $ 936,000 $ 748,800 $ $ $ 780,000 $ 3,016,000 $ 624,000 $ 2,412,800 $ 187,200 80% Federal + 20% Non-Federal 156,000 80% Federal + 20% Non-Federal 603,200 ◄ Funding Split Varies by Funding Source The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ► Statewide CMAQ 601579 WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30 (COMMONWEALTH ROAD) 3 CMAQ $ 1,931,854 $ 1,545,483 $ 386,371 602165 STONEHAM- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 28/NORTH STREET 4 CMAQ $ 3,268,366 $ 2,614,693 $ 653,673 4 CMAQ $ 5,753,887 $ 4,603,110 $ 1,150,777 CMAQ $ $ 12,801,559 $ Statewide CMAQ ► $ 1,847,452 1,477,962 $ 10,241,247 $ 605189 606316 CONCORD- BRUCE FREEMAN RAIL TRAIL CONSTRUCTION, FROM COMMONWEALTH AVENUE TO POWDER MILL ROAD, INCLUDES 2 RAILROAD BRIDGES & 1 CULVERT (PHASE II-C) BROOKLINE- PEDESTRIAN BRIDGE ►Statewide Transportation Enhancements No Projects Programmed 6 $ Statewide Transportation Enhancements Subtotal ► $ 369,490 2,560,312 ◄ 80% Federal + 20% Non-Federal - $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed $Statewide ITS Subtotal ► $ ►Statewide Interstate Maintenance Program 606176 5 NHPP $ FOXBOROUGH- PLAINVILLE- WRENTHAM14,692,038 Statewide Interstate Maintenance Program Subtotal ► $ 14,692,038 $ 13,222,834 13,222,834 $ 1,469,204 ◄ 90% Federal + 10% Non-Federal 1,469,204 ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $Statewide RR Grade Crossings Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $Statewide Stormwater Retrofits Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal $Statewide ADA Implementation Plan Subtotal ► $ - -$ - $ - - ◄ 80% Federal + 20% Non-Federal - -$ - $ - - ◄ Funding Split Varies by Funding Source ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed ►Other Statewide Items - No Projects Programmed Other Statewide Items Subtotal ► $ The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2016 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 2A / Non-Federal Projects ►Non Federal Aid 87790 CANTON- DEDHAM- NORWOOD- WESTWOODINTERCHANGE IMPROVEMENTS AT I-95/I-93/ UNIVERSITY AVENUE/I-95 WIDENING 1572 RED LINE-BLUE LINE CONNECTOR DESIGN Non-federal aid 5/6 NFA $ 190,000,000 $ 190,000,000 N/A NFA $ 29,000,000 Non-Federal Aid Subtotal► $ 219,000,000 $ $ 29,000,000 MassDOT made a formal request on Aug. 1, 219,000,000 ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2016 Boston Region MPO TIP Summary NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - TIP Section 1: ▼ Total ► $ 169,536,045 Federal Funds ► $ 137,537,813 Non-Federal Funds ► $ 31,998,233 $ $ - TIP Section 2: ▼ Total of All Projects ▼ $ 219,000,000 $ $ $ $ 219,000,000 ◄100% Non-Federal 388,536,045 ◄ Total Spending in Region 137,537,813 ◄ Total Federal Spending in Region 250,998,233 ◄ Total Non-Federal Spending in Region The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element (cost not reflected in total) Indicates a new addition to the TIP (action taken as denoted) Indicates a new funding category ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed $ HSIP Subtotal ► $ ►CMAQ - Congestion Mitigation and Air Quality Improvement Program GREEN LINE EXTENSION PROJECT (PHASE II), 1569 COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 N/A CMAQ - $ $ - - $ $ $ 13,427,220 $ 10,741,776 $ CMAQ Subtotal ► $ 13,427,220 $ 10,741,776 $ ◄ 90% Federal + 10% Non-Federal Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 2,685,444 ◄ 80% Federal + 20% Non-Federal 2,685,444 ►TAP - Transportation Alternatives Program No Projects Programmed $ - $ - $ - TAP Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 1569 601630 603711 N/A STP $ 26,572,780 $ 21,258,224 $ 5,314,556 Yr 3 of 6; CMAQ+STP Total Cost = $190,100,000 ($78,000,000 programmed within FFYs 2015-18 TIP) 6 STP $ 21,031,758 $ 16,825,406 $ 4,206,352 AC Yr 3 of 4; STP+HSIP+TEA-21 Earmark Total Cost = $60,053,518 ($53,453,518 programmed in FFYs 2015-18 TIP) 6 NHPP $ 13,768,183 $ 11,014,546 $ 2,753,637 AC Yr 5 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 61,372,721 $ 49,098,177 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 74,799,941 $ 61,372,721 $ 75,009,821 ◄Total Target 54,461,509 ◄ Max. NonCMAQ/HSIP/TAP $ $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 13,427,220 $ - $ 4,296,710 ◄ Min. HSIP 13,427,220 ◄ Min. CMAQ 2,824,382 ◄ Min. TAP $ $ $ GREEN LINE EXTENSION PROJECT (PHASE II), COLLEGE AVENUE TO MYSTIC VALLEY PARKWAY/ROUTE 16 WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REHAB OF W-32-013, ROUTE 18 OVER THE OLD COLONY RAILROAD (MBTA) NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADDA-LANE - CONTRACT V) 12,274,544 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ 7,121,092 209,880 Target Funds Available (6,911,212) Non-CMAQ/HSIP/TAP (Other) Exceeds Maximum 4,296,710 HSIP Minimum Not Met - CMAQ Minimum Met TAP Minimum Not Met 2,824,382 The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ ►Section 1B / Federal Aid Bridge Projects MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Bridge Maintenance Program 607915 NEWTON- WELLESLEY- WESTON- BRIDGE MAINTENANCE OF N-12-063, N-12-054, N-12-055 & N6 NHPP $ 12-056 ON I-95/ROUTE 128 Statewide Bridge Maintenance Program Subtotal ► $ 1,724,400 $ 1,379,520 $ 344,880 1,724,400 $ 1,379,520 $ 344,880 ◄ 80% Federal + 20% Non-Federal ►On System 604173 604952 BOSTON- BRIDGE REHABILITATION, B-16-016, NORTH WASHINGTON STREET OVER THE CHARLES RIVER LYNN- SAUGUS- BRIDGE REPLACEMENT, L-18016=S-05-008, ROUTE 107 OVER THE SAUGUS RIVER (AKA - BELDEN G. BLY BRIDGE) 6 NHPP $ 30,000,000 $ 24,000,000 $ 4 NHPP $ 16,250,000 $ 13,000,000 $ On System Subtotal ► $ 46,250,000 $ 37,000,000 $ AC Yr 3 of 5; Total Cost = $112,700,000 ($49,035,161 programmed within FFYs 2015-18 TIP) AC Yr 2 of 4; Total Cost = $45,000,000 3,250,000 ($20,400,000 programmed within the FFYs 201518 TIP) 9,250,000 ◄ 80% Federal + 20% Non-Federal 6,000,000 ►Off-System 606632 607133 604655 607533 HOPKINTON- WESTBOROUGH- BRIDGE REPLACEMENT, H-23-006=W-24-016, FRUIT STREET OVER CSX & SUDBURY RIVER QUINCY- BRIDGE REPLACEMENT, Q-01-039, ROBERTSON STREET OVER I-93/US 1/SR 3 MARSHFIELD- BRIDGE REPLACEMENT, M-07-007, BEACH STREET OVER THE CUT RIVER WALTHAM- WOERD AVENUE OVER THE CHARLES RIVER 3 STP-BR-OFF $ 12,727,339 $ 10,181,871 $ 2,545,468 6 STP-BR-OFF $ 6,435,763 $ 5,148,610 $ 1,287,153 5 STP-BR-OFF $ 4,822,854 $ 3,858,283 $ 964,571 4 STP-BR-OFF $ 3,873,360 $ 3,098,688 $ Off-System Subtotal ► $ 27,859,316 $ 22,287,453 $ 774,672 5,571,863 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Move Project - (FROM 2016),AMENDMENT:Ch ange Additional Information AMENDMENT:Move Project - (FROM 2016),AMENDMENT:Ch ange Additional Information 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 605789 BOSTON- RECONSTRUCTION OF MELNEA CASS BOULEVARD (HPP 756 & 4284) 6 6 HPP HPP $ $ 2,429,730 $ 5,007,375 $ 1,943,784 $ 4,005,900 $ project will move to FFY 2018; Construction; HPP 756 (MA126); SAFETEA-LU Earmark (HPP 485,946 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105; was $2,429,730 1,001,475 project will move to FFY 2018; Construction; HPP 4284 (MA203); SAFETEA-LU Earmark (HPP 756)+ SAFETEA-LU Earmark (HPP 4284) =Total Cost $7,437,105; was $5,007,375 The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or emailing publicinformation@ctps.org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ AMENDMENT:Move Project - (FROM 2015),AMENDMENT:Ch 606134 ange Additional Information MassDOT Project Description▼ BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ $ 2,377,900 $ 1,902,320 $ Other Federal Aid Subtotal ► $ 9,815,005 $ 7,852,004 $ MassDOT Funding District ▼ Source ▼ 6 HPP Additional Information ▼ project will move to FFY 2018; Construction; HPP 2129 (MA155); was $2,377,900 475,580 1,963,001 ◄ Funding Split Varies by Funding Source The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program 605733 606381 DISTRICT 6- HIGHWAY LIGHTING SYSTEM 6 STP $ ARLINGTON- BELMONT- HIGHWAY LIGHTING 4 STP $ Statewide Infrastructure Program Subtotal ► $ 1,250,000 $ 5,750,000 $ 7,000,000 $ 1,000,000 $ 4,600,000 $ 5,600,000 $ 250,000 AC Yr 3 of 3; Total Cost = $8,250,000 1,150,000 1,400,000 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ Statewide HSIP Program Subtotal ► $ ► Statewide Safe Routes to Schools Program No Projects Programmed - $ $ - $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ - $ - $ ◄ 90% Federal + 10% Non-Federal - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 607329 WAKEFIELD- LYNNFIELD- RAIL TRAIL EXTENSION, ►Statewide Transportation Enhancements No Projects Programmed 4 CMAQ $ $ Statewide CMAQ ► $ 7,084,000 7,084,000 $ $ Statewide Transportation Enhancements Subtotal ► $ 5,667,200 $ 5,667,200 $ 1,416,800 1,416,800 ◄ 80% Federal + 20% Non-Federal - $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - $ - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed $Statewide ITS Subtotal ► $ ►Statewide Interstate Maintenance Program 606546 3 NHPP $ FRANKLIN- INTERSTATE MAINTENANCE & Statewide Interstate Maintenance Program Subtotal ► $ 6,280,243 6,280,243 $ 5,652,219 5,652,219 $ - 628,024 ◄ 90% Federal + 10% Non-Federal 628,024 ►Statewide NHS Preservation Program+ 608008 607988 607989 SAUGUS - RESURFACING AND RELATED WORK ON 4 NHPP ROUTE 1 5 NHPP MARSHFIELD - PLYMOUTH - RESURFACING & 5 NHPP MARSHFIELD - RESURFACING & RELATED WORK Statewide NHS Preservation Program Subtotal ► $ 10,620,378 $ 8,496,302 $ 16,229,512 12,983,610 6,249,635 ◄ 80% Federal + 20% Non-Federal 31,248,175 $ 24,998,540 2,124,076 $ $ 4,398,285 3,245,902 3,518,628 ►Statewide RR Grade Crossings No Projects Programmed 879,657 $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - - ◄ 80% Federal + 20% Non-Federal The file y ou hav e ac c es s ed is entitled “Draft Amendment Four to the FFYs 2015 – 18 Trans portation Improv ement Program.” Contained in the file are the Mas s ac hus etts Department of Trans portation’s projec t identific ation number, projec t des c ription, dis tric t number, funding s ourc e, programmed funds , and the s plit between federal and non-federal funds for eac h of the y ears of the highway s ec tion. Similar information is c ontained for the trans it s ec tion. This file is not c urrently av ailable in an ac c es s ible format. The Mas s ac hus etts Department of Trans portation is work ing c ollaborativ ely with eac h of the s tate’s regional planning agenc ies to addres s this is s ue. While this work is ongoing, alternativ e formats are av ailable by c alling 617-973-7100 or e ma iling public inf orma t ion@c t ps .org. 07/10/2014 Endorsed 07/30/2015 Action on Amendment Four 2018 Boston Region MPO Transportation Improvement Program Amendment/Adjustme MassDOT nt Type ▼ Project ID ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Statewide Stormwater Retrofits No Projects Programmed $ Statewide Stormwater Retrofits Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal - -$ - $ - - ◄ 80% Federal + 20% Non-Federal Other Statewide Items Subtotal ► $ - -$ - $ - - ◄ Funding Split Varies by Funding Source $ Non-Federal Aid Subtotal► $ $ - $ - ◄100% Non-Federal - $ $ - ◄100% Non-Federal ►Statewide ADA Implementation Plan No Projects Programmed $Statewide ADA Implementation Plan Subtotal ► $ ►Other Statewide Items - No Projects Programmed ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed 2018 Boston Region MPO TIP Summary NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ TIP Section 1: ▼ TIP Section 2: ▼ Total ► $ 212,061,080 $ Federal Funds ► $ 170,276,888 Non-Federal Funds ► $ 41,784,192 $ - Total of All Projects ▼ $ $ $ 212,061,080 ◄ Total Spending in Region 170,276,888 ◄ Total Federal Spending in Region 41,784,192 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the 05/14/2014 Draft Released 06/25/2014 Endorsed 2015 Central Mass MPO Transportation Improvement Program Amendment/Adjustment Type▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD Non-Federal Funds Additional ▼ Information ▼ Funding Source ▼ Total Programmed Funds ▼ 3 HSIP $ 1,637,950 $ 1,474,155 $ 3 HSIP $ 1,000,000 $ 900,000 $ HSIP Subtotal ► $ 2,637,950 $ 2,374,155 $ 263,795 ◄ 90% Federal + 10% Non-Federal CMAQ 1,300,000 $ 1,040,000 $ 260,000 Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program AMENDMENT:Increase Cost,AMENDMENT:Change Additional Information 606485 Central Mass Multiple AMENDMENT:Change Additional Information 606347 Central Mass Sturbridge STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project 163,795 Cost = $6,047,950 / increase of $637,950; Added $60k in Stormwater funding to project 100,000 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $3,193,904 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 608018 605964 Central Mass Central Mass Worcester Millbury WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK MILLBURY - BRIDGE REPLACEMENT, M-22020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET AND IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROTARY) 3 3 $ Construction / HPP#2351 - MA158, HPP#4283 MA202, HPP#2218 - MA157, HPP#2509 MA165 / Design Status = Pre 25% / CMAQ + TAP + HPP Total Project Cost = $4,368,638 $ 2,317,000 $ 1,853,600 $ Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/NFA Funding = $13,647,354 / See also NFA Bridge Project under 463,400 Section 2B CMAQ Subtotal ► $ 3,617,000 $ 2,893,600 $ 723,400 ◄ 80% Federal + 20% Non-Federal 100,000 $ 80,000 $ CMAQ ►TAP - Transportation Alternatives Program AMENDMENT:Remove Project TAP01 Central Mass Multiple CMRPC REGION - BIKE RACKS INTALLATION 3 TAP TAP02 Central Mass Worcester WORCESTER - INSTALLION OF INFORMATIONAL KIOSK AT UNION STATION 3 TAP 608018 Central Mass Worcester 3 TAP WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK $ $ - $ 20,000 - Construction / TEC Score = 1.03 / Total Project Cost = $100,000 Construction / TEC Score = 1.23 / Design Status = Pre 25% / Total Project Cost = $100,000 Construction / HPP#2351 - MA158, HPP#4283 MA202, HPP#2218 - MA157, HPP#2509 MA165 / Design Status = Pre 25% / CMAQ + TAP + HPP Total Project Cost = $4,368,638 $ 226,039 $ 180,831 $ 45,208 TAP Subtotal ► $ 326,039 $ 260,831 $ 65,208 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) AMENDMENT:Change Additional Information 606485 Central Mass Multiple AMENDMENT:Increase Cost 605559 Central Mass Warren AMENDMENT:Remove Project 606686 Central Mass Warren AMENDMENT:Increase Cost,AMENDMENT:Change Additional Information 606347 Central Mass Sturbridge ►Section 1A / Fiscal Constraint Analysis MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD WARREN - RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOWN CENTER) WARREN - RESURFACING AND RELATED WORK ON ROUTE 67 @ WEST WARREN AND WARREN TOWN CENTERS STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 3 STP $ 3,100,000 $ 2,480,000 $ 620,000 2 STP $ 1,922,995 $ 1,538,396 $ 384,599 2 STP 3 STP Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $$6,047,950 / increase of $637,950; Added $60k in Stormwater funding to project Construction / Design Status = 75% / TEC Score = 4.57 / Total Project Cost = $1,922,995 / cost increase of $524,995 Construction / Design Status = 25% / TEC Score = 1.7 / Total Project Cost = $1,530,000 $ - $ $ 2,193,904 $ 1,755,123 $ Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 7,216,899 $ 5,773,519 $ - 438,781 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $3,193,904 / increase of 493,904 1,443,380 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 13,797,888 $ 7,216,899 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 2,637,950 $ 3,617,000 $ 326,039 $ 13,797,888 ◄Total Target 9,147,480 ◄ Max. NonCMAQ/HSIP/TAP $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) A 965,570 ◄ Min. HSIP 3,258,799 ◄ Min. CMAQ 426,039 ◄ Min. TAP $ $ $ Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,053,780 (1,672,380) HSIP Minimum Met (358,201) CMAQ Minimum Met 100,000 TAP Minimum Not Met HSIP, CMAQ, TAP Overprogrammed $ (1,930,581) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program 605588 Central Mass Multiple WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B 3 NHPP $ 3,501,980 $ 2,801,584 $ 700,396 Statewide Bridge Maintenance Program Subtotal ► $ 3,501,980 $ 2,801,584 $ 700,396 ◄ 80% Federal + 20% Non-Federal $ 4,168,395 $ 3,334,716 $ 833,679 On System Subtotal ► $ 4,168,395 $ 3,334,716 $ 833,679 ◄ 80% Federal + 20% Non-Federal STP-BR-OFF $ 2,301,270 $ 1,841,016 $ 460,254 Off-System Subtotal ► $ 2,301,270 $ 1,841,016 $ 460,254 ◄ 80% Federal + 20% Non-Federal ►On System 605972 Central Mass Southbridge SOUTHBRIDGE - BRIDGE PRESERVATION, S-21-002, SR 131 (MAIN STREET) OVER QUINEBAUG RIVER 3 NHPP Construction / Design Status = TBD / Total Project Cost = $4,168,395 ►Off-System ADJUSTMENT:Decrease Cost,ADJUSTMENT:Change Additional Information 604675 Central Mass Holden HOLDEN - BRIDGE REHABILITATION, H-18020, RIVER STREET OVER QUINAPOXET STREET 3 Construction / Design Status = 25% / Total Project Cost = $2,301,270 / decrease of $2,505,350 ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 604892 608018 Central Mass Central Mass Worcester Worcester WORCESTER - BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND ROAD RESURFACING OF GARDNER AND KILBY STREET. WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK HPP $ 2,918,510 $ 2,334,808 $ 583,702 Construction / HPP#918 - MA136 & HPP#4288 MA207 / Design Status = 75-100% / Total Project Cost = $2,918,510 HPP $ 2,842,599 $ 2,274,079 $ 568,520 Construction / HPP#2351 - MA158, HPP#4283 MA202, HPP#2218 - MA157, HPP#2509 MA165 / Design Status = Pre 25% / CMAQ + TAP + HPP Total Project Cost = $4,368,638 Other Federal Aid Subtotal ► $ 5,761,109 $ 4,608,887 $ 3 3 1,152,222 ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program AMENDMENT:Change Additional Information 606485 Central Mass Multiple MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 HSIP $ Statewide HSIP Program Subtotal ► $ ► Statewide Safe Routes to Schools Program 1,250,000 $ 1,125,000 $ 1,250,000 $ 1,125,000 $ Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project 125,000 Cost = $6,047,950 / increase of $637,950; Added $60k in Stormwater funding to project 125,000 ◄ 90% Federal + 10% Non-Federal No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - - $ $ - $ $ $ - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source $ $ - - $ $ - ◄ 80% Federal + 20% Non-Federal - $ - ◄ 80% Federal + 20% Non-Federal ► Statewide CMAQ No Projects Programmed $ - Statewide CMAQ ► $ - $ - Statewide Transportation Enhancements Subtotal► $ - - - ►Statewide Transportation Enhancements No Projects Programmed ►Statewide ITS 607484 Central Mass Multiple DISTRICT 3 - INSTALLATION OF CCTV CAMERAS AND VMS ON I-290 BETWEEN I495 AND I-90 STP $ Statewide ITS Subtotal ► $ ►Statewide Interstate Maintenance Program 605588 Central Mass Multiple NHPP WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B 607181 Central Mass Northborough NORTHBOROUGH - MARLBOROUGH INTERSTATE MAINTENANCE & RELATED WORK ON I-290 2,500,000 Construction / Design Status = TBD / AC Year 1 of 2 Total Project Cost = $6,540,000 / Change from CMAQ to STP 3 $ 2,000,000.0 2,500,000 $ 2,000,000 500,000.0 $ 14,317,162 3 12,885,445.8 NHPP $ 500,000 ◄ 80% Federal + 20% Non-Federal Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,053,780 1,431,716.2 Construction / Design Status = TBD / IM + Stormwater Total Project Cost = $12,055,380 11,643,083 3 10,478,774.7 Statewide Interstate Maintenance Program Subtotal► $ 25,960,245 $ 1,164,308.3 23,364,221 $ 2,596,025 ◄ 90% Federal + 10% Non-Federal ►Statewide NHS Preservation Program+ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - $ Statewide RR Grade Crossings Subtotal ► $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - ◄ 80% Federal + 20% Non-Federal ►Statewide RR Grade Crossings No Projects Programmed ►Statewide Stormwater Retrofits 607181 Central Mass Northborough NORTHBOROUGH - MARLBOROUGH INTERSTATE MAINTENANCE & RELATED WORK ON I-290 STP-TE $ - 412,297 3 Construction / Design Status = TBD / IM + Stormwater Total Project Cost = $12,055,380 - - 329,837.6 ADJUSTMENT:Add Funding Source 606485 605588 Central Mass Central Mass Multiple MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD $ 60,000 STP-TE $ 1,234,637 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP + Storwater Total Project Cost = $6,047,950 / Added $60k in Stormwater funding to project 3 Multiple WORCESTER, WEST BOYLSTON INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44-124, I190 OVER ROUTE 12 & RAMP B STP-TE 82,459.4 48,000.0 12,000.0 987,709.6 246,927.4 Construction / Design Status = Pre 25% / Bridge Maintenance + Interstate Maintenance + Stormwater Total Project Cost = $19,053,780 3 Statewide Stormwater Retrofits Subtotal ► $ 1,706,934 $ 1,365,547 $ 341,387 ◄ 80% Federal + 20% Non-Federal ►Statewide ADA Implementation Plan No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment $ - Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way $ - $ - $ $ - $ - $ - ►Other Statewide Items - - - - - - - - - - - ◄ 80% Federal + 20% Non-Federal Statewide Recreational Trails $ Other Statewide Items Subtotal ► $ - NFA $ Non-Federal Aid Subtotal► $ - $ - $ - ◄ Funding Split Varies by Funding Source - ◄100% Non-Federal ►Section 2A / Non-Federal Projects - ►Non Federal Aid No Projects Programmed $ $ ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 605964 2015 Central Mass MPO TIP Summary Central Mass $ 11,330,354 $ 11,330,354 Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/CMAQ Funding = $13,647,354 Section 2B / Non-Federal Bridge Projects Subtotal► $ 11,330,354 $ 11,330,354 ◄100% Non-Federal MILLBURY - BRIDGE REPLACEMENT, M-22020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET NFA 3 TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 60,947,821 $ 51,743,076 9,204,745 $ Total of All Projects ▼ 11,330,354 $ $ 11,330,354 $ 72,278,175 ◄ Total Spending in Region 51,743,076 ◄ Total Federal Spending in Region 20,535,099 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation Lists Are in Hidden Cells 2015 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ 05/13/2014 Draft Released 06/17/2014 Endorsed 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 MassDOT Project Description▼ MassDOT District ▼ 04/21/2015 Amendment #1 Funding Source ▼ 05/19/15 Amendment #2 Total Programmed Funds ▼ 06/23/15 Adjustment #3 Federal Funds ▼ 07/28/15 Non-Federal Funds Additional ▼ Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program AMENDMENT:Change Additional Information 606729 Southeastern Mass Taunton TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 HSIP $ HSIP Subtotal ► $ 1,560,000 $ 1,560,000 $ 1,404,000 $ 1,404,000 $ 156,000 HSIP ($1,560,000) / STP ($1,151,849) / Statewide TE ($843,066) Total Cost = $3,554,915; Construction; EC Score 26 Of 93; Status 100% Amendment #3 - Cost Increase from $2,403,066 to $3,554,915 (Increase $1,151,849) / Added Funding Source – STP ($1,151,849) 156,000 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program AMENDMENT:Change Additional Information 605848 605368 Southeastern Mass Southeastern Mass Dartmouth DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 CMAQ $ 2,308,045 $ 1,846,436 North Attleborough NORTH ATTLEBOROUGH - TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120) 5 CMAQ $ 1,843,146 $ 1,474,517 CMAQ Subtotal ► $ 4,151,191 $ $ 461,609 $ 368,629 STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% Eligible for CMAQ Funding Amendment #3 - Cost Increase from $2,736,112 to $4,334,172 (Increase $1,598,060) / Added Funding Source – STP ($1,084,319) / Added Funding Source – Statewide Infrastructure ($513,741) CMAQ ($1,843,146) / Statewide CMAQ ($1,805,589) Total Cost = $3,648,735; Construction; EC Score 43 Of 93; Status 100% Eligible for HSIP & CMAQ Funding 3,320,953 $ 830,238 ◄ 80% Federal + 20% Non-Federal 342,454 STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $3,820,431; Construction; EC Score 59 Of 93; Status 100% Eligible for CMAQ Funding 85,613 Amendment #3 - Cost Increase from $2,736,112 to $4,334,172 (Increase $1,598,060) / Added Funding Source – STP ($1,084,319) / Added Funding Source – Statewide Infrastructure ($513,741) ►TAP - Transportation Alternatives Program AMENDMENT:Change Additional Information 605848 Southeastern Mass Dartmouth DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 TAP No Projects Programmed $ $ TAP Subtotal ► $ 428,067 $ $ 428,067 $ $ $ 342,454 $ 85,613 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 STP $ 5,851,116 $ 4,680,893 $ 1,170,223 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status 100% AMENDMENT:Add Funding Source AMENDMENT:Add Funding Source,AMENDMENT:Change Additional Information 606729 605848 Southeastern Mass Southeastern Mass Taunton Dartmouth TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 5 STP STP $ $ 1,151,849 1,084,319 $ $ Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 8,087,284 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 14,226,542 $ 8,087,284 $ 921,479 867,455 $ $ 6,469,827 $ 230,370 HSIP ($1,560,000) / STP ($1,151,849) / Statewide TE ($843,066) Total Cost = $3,554,915; Construction; EC Score 26 Of 93; Status 100% Amendment #3 - Cost Increase from $2,403,066 to $3,554,915 (Increase $1,151,849) / Added Funding Source – STP ($1,151,849) 216,864 STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% Eligible for CMAQ Funding Amendment #3 - Cost Increase from $2,736,112 to $4,334,172 (Increase $1,598,060) / Added Funding Source – STP ($1,084,319) / Added Funding Source – Statewide Infrastructure ($513,741) 1,617,457 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,560,000 4,151,191 428,067 $ $ $ 14,226,542 ◄Total Target 9,442,869 ◄ Max. NonCMAQ/HSIP/TAP $ $ 995,567 ◄ Min. HSIP 3,360,039 ◄ Min. CMAQ 428,067 ◄ Min. TAP $ $ $ - Target Funds Available Non-CMAQ/HSIP/TAP (Other) A (564,433) HSIP Minimum Met (791,152) CMAQ Minimum Met - TAP Minimum Met HSIP, CMAQ, TAP Overprogrammed $ (1,355,585) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System AMENDMENT:Increase Cost,AMENDMENT:Change Additional Information 605223 Southeastern Mass Fall River FALL RIVER - INTERCHANGE IMPROVEMENTS AT ROUTE I195/ROUTE 79/ROUTE 138 5 NHPP $ 6,600,000 $ 5,280,000 $ 1,320,000 This project was combined with 606354 for a total construction cost of $270,626,756. - $171,911,637 is for the I-195/Route 79/Route 138 Interchange Improvements (Spaghetti Ramps) of which $167,600,637 is identified as GANS funding (federal & state match), $3,317,500 is additional state funding, and $993,500 is Section 330 federal funding designated for Route 79. - $98,715,119 is for Structural Repairs, Cleaning and Painting to the Braga Bridge. This portion of the project is being advance constructed with federal Bridge funds over FY 2013-2016 (Year 3 of 4) 606525 Southeastern Mass Attleboro ATTLEBORO - BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE 5 NHPP $ 12,500,000 $ 10,000,000 $ 2,500,000 AC Year 1 of 3; Total Cost $22,361,409 Amendment #3 - Project Cost Increase from $12,075,000 to $22,361,409, AC from 2 to 3 years On System Subtotal ► $ ►Off-System 19,100,000 $ 15,280,000 $ 3,820,000 ◄ 80% Federal + 20% Non-Federal 604589 Southeastern Mass Norton 606372 Southeastern Mass Wareham NORTON - BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE CANOE RIVER WAREHAM - BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER 5 5 STP-BR-OFF $ 2,005,055 $ 1,604,044 $ 401,011 Status 75% STP-BR-OFF $ 2,039,319 $ 1,631,455 $ 407,864 Status 25% Off-System Subtotal ► $ 4,044,374 $ 3,235,499 $ 808,875 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 Other FA $ 342,125 $ - $ 342,125 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status 100% 603893 Southeastern Mass Dartmouth DARTMOUTH - PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 Other FA $ 1,308,114 $ - $ 1,308,114 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status 100% 607314 Southeastern Mass Rehoboth REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET 5 ER $ 1,536,119 $ 1,228,895 $ 307,224 FLAP02 Southeastern Mass New Bedford NEW BEDFORD - SAFETY ENHANCEMENTS AND STRUCTURAL REHABILITATION OF ELM ST GARAGE - FLAP PROJECT 5 Other FA $ 700,000 $ 560,000 $ 140,000 3,886,358 $ 1,788,895 $ 2,097,463 ◄ Funding Split Varies by Funding Source Other Federal Aid Subtotal ► $ Status 100% Adjustment #2 - Project moved from FY14 to FY15 ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program AMENDMENT:Add Funding Source,AMENDMENT:Change Additional Information 605848 Southeastern Mass Dartmouth DARTMOUTH - IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 STP $ Statewide Infrastructure Program Subtotal ► $ 513,741 513,741 $ $ 410,993 410,993 $ $ 102,748 STP ($1,084,319) / CMAQ ($2,308,045) / TAP ($428,067) / Statewide Infrastructure ($513,741) Total Cost = $4,334,172; Construction; EC Score 59 Of 93; Status 100% Eligible for CMAQ Funding Amendment #3 - Cost Increase from $2,736,112 to $4,334,172 (Increase $1,598,060) / Added Funding Source – STP ($1,084,319) / Added Funding Source – Statewide Infrastructure ($513,741) 102,748 ◄ 80% Federal + 20% Non-Federal ► Statewide HSIP Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ $ - $ $ - Statewide HSIP Program Subtotal ► $ - - - ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 607716 Southeastern Mass Mansfield MANSFIELD - SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDANJACKSON ELEMENTARY SCHOOL (SRTS) 5 TAP Statewide Safe Routes to Schools Program Subtotal ► $ $ 900,000 $ 720,000 $ 900,000 $ 720,000 $ 180,000 80% Federal + 20% Non-Federal Status 100% 180,000 ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 605368 Southeastern Mass North Attleborough NORTH ATTLEBOROUGH - TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120) 5 CMAQ $ No Projects Programmed $ 1,805,589 $ Statewide CMAQ ► $ 1,805,589 STP-TE 843,066 1,444,471 $ $ 1,444,471 $ 674,453 $ 361,118 CMAQ ($1,843,146) / Statewide CMAQ ($1,805,589) Total Cost = $3,648,735; Construction; EC Score 43 Of 93; Status 100% Eligible for HSIP & CMAQ Funding 361,118 ◄ 80% Federal + 20% Non-Federal $ $ ►Statewide Transportation Enhancements AMENDMENT:Change Additional Information 606729 Southeastern Mass Taunton TAUNTON - COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 $ Statewide Transportation Enhancements Subtotal ► $ 843,066 $ 674,453 $ 168,613 HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 168,613 ◄ 80% Federal + 20% Non-Federal $ ►Statewide ITS No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - No Projects Programmed No Projects Programmed - $ - $ - ◄ 80% Federal + 20% Non-Federal -$ - - -$ - - ◄ 90% Federal + 10% Non-Federal - ◄ 80% Federal + 20% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ $ $ Statewide NHS Preservation Program Subtotal ► $ -$ - -$ ►Statewide RR Grade Crossings No Projects Programmed No Projects Programmed $ $ Statewide RR Grade Crossings Subtotal ► $ - -$ - - -$ - ►Statewide Stormwater Retrofits 608132 608132 Southeastern Mass Southeastern Mass Multiple Multiple MANSFIELD-SWANSEA-SOMERSETNEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I195 MANSFIELD-SWANSEA-SOMERSETNEW BEDFORD - STORMWATER IMPROVEMENTS ALONG I-495 AND I195 5 STP-TE $ 1,327,236 1,061,788.8 5 STP $ Statewide Stormwater Retrofits Subtotal ► $ STP-TE ($1,327,236) / STP ($557,925) Total Cost = $1,885,161 - - 265,447.2 STP-TE ($1,327,236) / STP ($557,925) Total Cost = $1,885,161 557,925 1,885,161 446,340.01,508,129 $ 111,585.0 377,032 ◄ 80% Federal + 20% Non-Federal $ ►Statewide ADA Implementation Plan No Projects Programmed No Projects Programmed $ $ Statewide ADA Implementation Plan Subtotal ► $ - $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Other Statewide Items ABP GANS Repayment AMENDMENT:Decrease Cost EWO Statewide Multiple Award Adjustments, Change Orders, Project Value Changes, Etc. - Statewide STP $ - 18,091,803.2 DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails ►Section 2A / Non-Federal Projects $ $ $ $ Other Statewide Items Subtotal ► $ Reduce the Statewide EWO Item from $23,128,495 to $22,614,754 22,614,754 22,614,754 - -4,522,950.8 $ 18,091,803 $ - - - - 4,522,951 ◄ Funding Split Varies by Funding Source ►Non Federal Aid No Projects Programmed No Projects Programmed NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal NFA $ NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed No Projects Programmed 2015 SRPEDD TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section 2: ▼ 69,819,585 $ 54,691,477 15,128,108 $ - Total of All Projects ▼ $ $ $ 69,819,585 ◄ Total Spending in Region 54,691,477 ◄ Total Federal Spending in Region 15,128,108 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2016 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ 05/13/2014 Draft Released 06/17/2014 Endorsed 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 MassDOT Project Description▼ 04/21/2015 Amendment #1 MassDOT District ▼ Funding Source ▼ 05/19/15 Amendment #2 Total Programmed Funds ▼ 06/23/15 Adjustment #3 07/28/15 Amendment #3 Non-Federal Funds Additional ▼ Information ▼ Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 605372 Southeastern Mass North Attleborough NORTH ATTLEBOROUGH - TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS @ EAST WASHINGTON STREET (ROUTE 1) & CHESTNUT STREET 5 HSIP $ HSIP Subtotal ► $ 1,676,915 $ 1,509,224 $ 1,676,915 $ 1,509,224 $ 2,003,016 $ 1,602,413 $ 167,692 Total Cost = $1,676,915; Construction; EC Score 36 Of 93; Status Pre 25% - Plans Received 07-23-13 Eligible for HSIP Funding 167,692 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 605677 606910 Southeastern Mass Southeastern Mass Mattapoisett MATTAPOISETT - MULTI-USE PATH CONSTRUCTION (PENN CENTRAL RIGHT OF WAY) FROM MATTAPOISETT NECK ROAD TO DEPOT STREET (PHASE 1B) New Bedford NEW BEDFORD - CORRIDOR IMPROVEMENTS AND RELATED WORK ON COGGESHALL STREET, FROM PURCHASE STREET TO MITCHELL AVENUE 5 5 CMAQ CMAQ $ $ 1,000,000 $ 800,000 $ CMAQ Subtotal ► $ 3,003,016 $ 2,402,413 $ TAP 730,779 $ 584,623 $ 730,779 $ 584,623 $ 6,772,894 $ 5,418,315 $ CMAQ ($2,003,016) / TAP ($730,779) Total Cost = $2,733,795; Construction; EC Score 400,603 28 Of 93; Status Pre 25% - Plans Received 04-12-12 Eligible for CMAQ Funding CMAQ ($1,000,000) / STP ($2,399,261)Total Cost = $3,399,261; Construction; EC Score 60 Of 93; Status 25% - Plans Received 04200,000 16-14 Eligible for CMAQ Funding (Up To $1,000,000) 600,603 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 605677 Southeastern Mass Mattapoisett MATTAPOISETT - MULTI-USE PATH CONSTRUCTION (PENN CENTRAL RIGHT OF WAY) FROM MATTAPOISETT NECK ROAD TO DEPOT STREET (PHASE 1B) 5 $ TAP Subtotal ► $ CMAQ ($2,003,016) / TAP ($730,779) Total Cost = $2,733,795; Construction; EC Score 146,156 28 Of 93; Status Pre 25% - Plans Received 04-12-12 Eligible for CMAQ Funding 146,156 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 606118 606910 Southeastern Mass Southeastern Mass New Bedford NEW BEDFORD - RECONSTRUCTION OF ROUTE 18 (JFK HIGHWAY), FROM COVE STREET TO GRIFFIN COURT (PHASE II) New Bedford NEW BEDFORD - CORRIDOR IMPROVEMENTS AND RELATED WORK ON COGGESHALL STREET, FROM PURCHASE STREET TO MITCHELL AVENUE 5 5 STP STP $ $ 2,399,261 $ 1,919,409 $ Non-CMAQ/HSIP/TAP (Other) Subtotal► $ 9,172,155 $ 7,337,724 $ 1,354,579 Total Cost = $6,772,894; Construction; EC Score 54 Of 93; Status 25% - Plans Received 7-31-12, Comments to DE 05-3013 CMAQ ($1,000,000) / STP ($2,399,261)Total Cost = $3,399,261; Construction; EC Score 60 Of 93; Status 25% - Plans Received 04479,852 16-14 Eligible for CMAQ Funding (Up To $1,000,000) 1,834,431 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Total Federal Aid Target Funds Programmed► $ 14,582,865 $ Total Non-CMAQ/HSIP/TAP (Other) Programmed► $ 9,172,155 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 1,676,915 $ 3,003,016 $ 730,779 $ 15,642,102 ◄Total Target 11,215,279 ◄ Max. NonCMAQ/HSIP/TAP 896,010 ◄ Min. HSIP 2,800,033 ◄ Min. CMAQ 730,779 ◄ Min. TAP HSIP, CMAQ, TAP Overprogrammed $ ( 983,888) ►Statewide Bridge Maintenance Program $ - $ - $ 1,059,237 Target Funds Available 1,059,236 Non-CMAQ/HSIP/TAP (Other) A $ $ $ ►Section 1B / Federal Aid Bridge Projects No Projects Programmed $ $ - (780,905) HSIP Minimum Met (202,983) CMAQ Minimum Met - TAP Minimum Met No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System AMENDMENT:Change Additional Information 605223 Southeastern Mass Fall River FALL RIVER - INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 5 NHPP $ 1,598,263 $ 1,278,610 $ 606525 Southeastern Mass Attleboro ATTLEBORO - BRIDGE REPLACEMENT, A-16053, I-95 (NB & SB) OVER NORTH AVENUE 5 NHPP $ 9,364,839 $ 7,491,871 $ 10,963,102 $ 8,770,482 $ 4,364,720 $ 3,491,776 $ 4,364,720 $ 3,491,776 $ On System Subtotal ► $ This project was combined with 606354 for a total construction cost of $270,626,756. - $171,911,637 is for the I-195/Route 79/Route 138 Interchange Improvements (Spaghetti Ramps) of which $167,600,637 is identified as GANS funding (federal & state match), $3,317,500 is additional state 319,653 funding, and $993,500 is Section 330 federal funding designated for Route 79. - $98,715,119 is for Structural Repairs, Cleaning and Painting to the Braga Bridge. This portion of the project is being advance constructed with federal Bridge funds over FY 2013-2016 (Year 4 of 4) 1,872,968 AC Year 2 of 3; Total Cost $22,361,409 Amendment #3 - Project Cost Increase from $12,075,000 to $22,361,409, AC from 2 to 3 years 2,192,620 ◄ 80% Federal + 20% Non-Federal ►Off-System 607537 Southeastern Mass Fall River FALL RIVER - SUPERSTRUCTURE REPLACEMENT. F-02-040, AIRPORT ROAD OVER STATE ROUTE 24 5 STP-BR-OFF $ Off-System Subtotal ► $ 872,944 Status - Pre 25% 872,944 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Other Federal Aid Subtotal► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ - $ - $ No Projects Programmed $ - $ $ - $ $ Statewide Infrastructure Program Subtotal► $ - - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed $ - $ - $ No Projects Programmed $ - $ $ - $ $ Statewide HSIP Program Subtotal ► $ - - ◄ 90% Federal + 10% Non-Federal - ► Statewide Safe Routes to Schools Program No Projects Programmed $ - $ - $ No Projects Programmed $ - $ $ - $ $ Statewide Safe Routes to Schools Program Subtotal► $ - - - Funding Split Varies by Funding Source - - Funding Split Varies by Funding Source ◄ Funding Split Varies by Funding Source ► Statewide CMAQ 605679 Southeastern Mass Taunton TAUNTON - INTERSECTION IMPROVEMENTS @ ROUTE 140 (COUNTY STREET) & HART STREET 5 CMAQ $ 1,909,107 $ 1,527,286 $ 381,821 Funding Source: Statewide CMAQ Status Pre 25% - Plans Received 07-29-11 605367 Southeastern Mass Taunton TAUNTON - INTERSECTION IMPROVEMENTS AT THE HON. GORDON M. OWEN RIVERWAY & WILLIAMS STREET 5 CMAQ $ Statewide CMAQ ► $ 922,086 $ 2,831,193 $ 737,669 $ 2,264,954 $ 184,417 Funding Source: Statewide CMAQ Status Pre 25% - Plans Received 12-16-13 566,239 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements No Projects Programmed No Projects Programmed $ $ Statewide Transportation Enhancements Subtotal► $ - $ $ Statewide ITS Subtotal ► $ - $ $ Statewide Interstate Maintenance Program Subtotal► $ - $ $ Statewide NHS Preservation Program Subtotal► $ - $ $ Statewide RR Grade Crossings Subtotal► $ - $ $ Statewide Stormwater Retrofits Subtotal► $ - $ $ Statewide ADA Implementation Plan Subtotal► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal $ - - $ - - ◄ 80% Federal + 20% Non-Federal $ - - $ - - ◄ 90% Federal + 10% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed No Projects Programmed ►Statewide Interstate Maintenance Program No Projects Programmed No Projects Programmed ►Statewide NHS Preservation Program+ No Projects Programmed No Projects Programmed $ - $ ►Statewide RR Grade Crossings No Projects Programmed No Projects Programmed $ - - $ - - ◄ 80% Federal + 20% Non-Federal -$ - -$ - ◄ 80% Federal + 20% Non-Federal -$ - -$ - ◄ 80% Federal + 20% Non-Federal - ◄ Funding Split Varies by Funding Source ►Statewide Stormwater Retrofits No Projects Programmed No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed No Projects Programmed ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ Other Statewide Items Subtotal► $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed No Projects Programmed - $ - - $ - - - - - NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal NFA $ NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed No Projects Programmed 2016 SRPEDD TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds► $ TIP Section 2: ▼ 32,741,880 $ 26,361,196 6,380,685 $ - Total of All Projects ▼ $ $ $ 32,741,880 ◄ Total Spending in Region 26,361,196 ◄ Total Federal Spending in Region 6,380,685 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 2017 SRPEDD Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ 05/13/2014 Draft Released 06/17/2014 Endorsed 07/03/2014 Adjustment #1 10/21/2014 Adjustment #2 MassDOT Project Description▼ 04/21/2015 Amendment #1 MassDOT District ▼ Funding Source ▼ 05/19/15 Amendment #2 Total Programmed Funds ▼ 06/23/15 Adjustment #3 Federal Funds ▼ 07/28/15 Amendment #3 Non-Federal Funds Additional ▼ Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 117106 Southeastern Mass Wareham WAREHAM - RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO EAST OF RED BROOK ROAD 5 HSIP $ HSIP Subtotal ► $ 896,010 $ 806,409 $ 896,010 $ 806,409 $ 1,687,296 $ 1,349,837 $ STP ($11,115,138) / HSIP ($896,010) / CMAQ ($1,112,737) / TAP ($474,828) Total Cost = $13,598,713; Construction; EC Score 51 Of 93; Status 25% - Design Public 89,601 Hearing 07-12-12 Eligible for HSIP funding Anticipating Project Will be CMAQ Eligible 89,601 ◄ 90% Federal + 10% Non-Federal ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607392 117106 Southeastern Mass Southeastern Mass Seekonk SEEKONK - INTERSECTION IMPROVEMENTS & RELATED WORK AT FALL RIVER AVENUE (ROUTE 114A) AND COUNTY STREET Wareham WAREHAM - RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO EAST OF RED BROOK ROAD 5 5 CMAQ CMAQ $ $ CMAQ Subtotal ► $ 1,112,737 $ 890,190 $ 2,800,033 $ 2,240,026 $ Total Cost = $1,687,296; Construction; EC 337,459 Score 26 Of 93; Status Pre 25% Eligible for CMAQ Funding STP ($11,115,138) / HSIP ($896,010) / CMAQ ($1,112,737) / TAP ($474,828) Total Cost = $13,598,713; Construction; EC Score 51 Of 93; Status 25% - Design Public 222,547 Hearing 07-12-12 Eligible for HSIP funding Anticipating Project Will be CMAQ Eligible 560,007 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 117106 Southeastern Mass Wareham WAREHAM - RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO EAST OF RED BROOK ROAD 5 TAP $ TAP Subtotal ► $ 474,828 $ 379,862 $ 474,828 $ 379,862 $ STP ($11,115,138) / HSIP ($896,010) / CMAQ ($1,112,737) / TAP ($474,828) Total Cost = $13,598,713; Construction; EC Score 51 Of 93; Status 25% - Design Public 94,966 Hearing 07-12-12 Eligible for HSIP funding Anticipating Project Will be CMAQ Eligible 94,966 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 117106 Southeastern Mass Wareham WAREHAM - RECONSTRUCTION OF ROUTE 6 & 28, FROM 500 FT. EAST OF TYLER AVENUE TO EAST OF RED BROOK ROAD 5 STP $ 11,115,138 $ 8,892,110 $ Non-CMAQ/HSIP/TAP (Other) Subtotal► $ 11,115,138 $ 8,892,110 $ Total Federal Aid Target Funds Programmed► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed► $ 15,286,009 $ 11,115,138 $ Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 896,010 $ 2,800,033 $ 474,828 $ STP ($11,115,138) / HSIP ($896,010) / CMAQ ($1,112,737) / TAP ($474,828) Total Cost = $13,598,713; Construction; EC Score 51 Of 93; Status 25% - Design Public 2,223,028 Hearing 07-12-12 Eligible for HSIP funding Anticipating Project Will be CMAQ Eligible 2,223,028 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ ‐ ►Section 1B / Federal Aid Bridge Projects 15,642,102 ◄Total Target 11,471,231 ◄ Max. NonCMAQ/HSIP/TAP 896,010 ◄ Min. HSIP 2,800,033 ◄ Min. CMAQ 474,828 ◄ Min. TAP $ $ $ $ $ 356,093 Target Funds Available 356,093 Non-CMAQ/HSIP/TAP (Other) A - HSIP Minimum Met CMAQ Minimum Met TAP Minimum Met ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System AMENDMENT:Add Project 605328 Southeastern Mass Raynham RAYNHAM - BRIDGE REPLACEMENT, R02-013 (3PA), US 44 (CAPE HIGHWAY) OVER SR 24 5 NHPP $ 22,213,170 $ 17,770,536 $ 4,442,634 606525 Southeastern Mass Attleboro ATTLEBORO - BRIDGE REPLACEMENT, A16-053, I-95 (NB & SB) OVER NORTH AVENUE 5 NHPP $ 496,570 $ 397,256 $ 99,314 22,709,740 $ 18,167,792 $ 3,835,720 $ 3,068,576 $ 3,835,720 $ 3,068,576 $ On System Subtotal ► $ AC Year 3 of 3; Total Cost $22,361,409 Amendment #3 - Project Cost Increase from $12,075,000 to $22,361,409, AC from 2 to 3 years 4,541,948 ◄ 80% Federal + 20% Non-Federal ►Off-System 602564 Southeastern Mass Carver / Middleborough CARVER - MIDDLEBOROUGH - BRIDGE REPLACEMENT, C-04-004=M-18-025, ROCHESTER ROAD OVER WEWEANTIC RIVER 5 STP-BR-OFF $ Off-System Subtotal ► $ 767,144 767,144 ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Other Federal Aid Subtotal► $ - $ - $ - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects Programmed $ No Projects Programmed $ Statewide Infrastructure Program Subtotal► $ - $ - $ $ - - $ - $ $ - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program 607916 Southeastern Mass Multiple MULTIPLE - ROUTE 24 SIGN UPGRADE, RANDOLPH - FALL RIVER 5 HSIP $ Statewide HSIP Program Subtotal ► $ 5,500,000 $ 4,950,000 $ 550,000 5,500,000 $ 4,950,000 $ 550,000 ◄ 90% Federal + 10% Non-Federal ► Statewide Safe Routes to Schools Program 608001 Southeastern Mass Fall River FALL RIVER - SAFE ROUTES TO SCHOOL (VIVEIROS ELEMENTARY) SLADE STREET IMPROVEMENTS 5 TAP No Projects Programmed $ 788,400 $ 630,720 $ 157,680 80% Federal + 20% Non-Federal $ - $ 788,400 $ - $ 630,720 $ - Funding Split Varies by Funding Source 157,680 ◄ Funding Split Varies by Funding Source Statewide Safe Routes to Schools Program Subtotal► $ ► Statewide CMAQ No Projects Programmed $ - $ - $ No Projects Programmed $ - - $ $ - ◄ 80% Federal + 20% Non-Federal - $ - ◄ 80% Federal + 20% Non-Federal Statewide CMAQ ► $ - $ $ $ $ - $ - ►Statewide Transportation Enhancements No Projects Programmed No Projects Programmed Statewide Transportation Enhancements Subtotal► $ - - ►Statewide ITS No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - $ $ Statewide Interstate Maintenance Program Subtotal► $ - $ $ Statewide NHS Preservation Program Subtotal► $ - $ $ Statewide RR Grade Crossings Subtotal► $ - $ $ Statewide Stormwater Retrofits Subtotal► $ - $ $ Statewide ADA Implementation Plan Subtotal► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal -$ - -$ - ◄ 90% Federal + 10% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide Interstate Maintenance Program No Projects Programmed No Projects Programmed ►Statewide NHS Preservation Program+ No Projects Programmed No Projects Programmed $ - $ ►Statewide RR Grade Crossings No Projects Programmed No Projects Programmed -$ - -$ - ◄ 80% Federal + 20% Non-Federal -$ - -$ - ◄ 80% Federal + 20% Non-Federal -$ - -$ - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed No Projects Programmed ►Statewide ADA Implementation Plan No Projects Programmed No Projects Programmed ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails $ $ - $ - $ $ - $ Other Statewide Items Subtotal► $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed No Projects Programmed - $ - - $ - - - - - - ◄ Funding Split Varies by Funding Source NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal NFA $ NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects No Projects Programmed No Projects Programmed 2017 SRPEDD TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds► $ TIP Section 2: ▼ 48,119,869 $ 39,135,496 8,984,373 $ - Total of All Projects ▼ $ $ $ 48,119,869 ◄ Total Spending in Region 39,135,496 ◄ Total Federal Spending in Region 8,984,373 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx Administrative Amendment 06/24/2015 Endorsed 2015 Merrimack Valley MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Non-Federal Funds Additional ▼ Information ▼ Funding Source ▼ Total Programmed Funds ▼ HSIP $ 492,173 $ 442,956 $ 49,217 HSIP Subtotal ► $ 492,173 $ 442,956 $ 49,217 ◄ 90% Federal + 10% Non-Federal Federal Funds ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 608075 Merrimack Valley Lawrence Lawrence - Intersection Improvements at Lawrence Street and Park Street 4 Total Project Cost = $1,265,561 = FY 2015 HSIP & CMAQ & TAP & STP (Construction) TEC = 10.53 out of 18 (C) ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 608075 Merrimack Valley Lawrence Lawrence - Intersection Improvements at Lawrence Street and Park Street 4 CMAQ $ 194,807 $ 155,846 $ 38,961 Total Project Cost = $1,265,561 = FY 2015 HSIP & CMAQ & TAP & STP (Construction) TEC = 10.53 out of 18 (C) 606503 Merrimack Valley Newburyport Newburyport - Clipper City Rail Trail along the City Branch (Phase II) 4 CMAQ $ 450,000 $ 360,000 $ 90,000 Total Project Cost = $4,061,158 = FY 2015 CMAQ + Statewide STP-TE + Statewide CMAQ (Construction) TEC = 5.75 (C) CMAQ Subtotal ► $ 644,807 $ 515,846 $ $ 305,423 $ 244,338 $ 61,085 TAP Subtotal ► $ 305,423 $ 244,338 $ 61,085 ◄ 80% Federal + 20% Non-Federal 128,961 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 608075 Merrimack Valley Lawrence Lawrence - Intersection Improvements at Lawrence Street and Park Street 4 TAP Total Project Cost = $1,265,561 = FY 2015 HSIP & CMAQ & TAP & STP (Construction) TEC = 10.53 out of 18 (C) ►Non-CMAQ/HSIP/TAP (Other) 605114 Merrimack Valley Groveland Groveland Rehabilitation of Route 97 (School Street & Salem Street) 608075 Merrimack Valley Lawrence Lawrence - Intersection Improvements at Lawrence Street and Park Street Total Project Cost Same Just moving some funding from 2016 to 2015 AC Year 1 of 2. Total Project Cost = $6,341,761 to be converted to FA STP FY 2015 + FY 2016 (Construction) TEC = 6.72 out of 18. (M) 4 STP $ 4,301,259 $ 3,441,007 $ 860,252 4 STP $ 273,158 $ 218,526 $ 54,632 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 4,574,417 $ 3,659,534 $ Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 6,016,820 $ 4,574,417 $ 7,033,097 ◄Total Target 4,574,417 ◄ Max. NonCMAQ/HSIP/TAP $ $ 1,016,277 Target Funds Available Non-CMAQ/HSIP/TAP (Other) A Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 492,173 $ 644,807 $ 305,423 $ 492,173 ◄ Min. HSIP 1,661,084 ◄ Min. CMAQ 305,423 ◄ Min. TAP $ $ $- HSIP Minimum Met 1,016,277 CMAQ Minimum Not Met TAP Minimum Met Total Project Cost = $1,265,561 = FY 2015 HSIP & CMAQ & TAP & STP (Construction) TEC = 10.53 out of 18 (C) 914,883 ◄ 80% Federal + 20% Non-Federal ►Section 1A / Fiscal Constraint Analysis Remaining HSIP, CMAQ, and TAP Funds $ 1,016,277 - Administrative Amendment 06/24/2015 Endorsed 2015 Merrimack Valley MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Non-Federal Funds Additional ▼ Information ▼ Funding Source ▼ Total Programmed Funds ▼ NHPP $ 9,310,817 $ 7,448,654 $ 1,862,163 $ Statewide Bridge Maintenance Program Subtotal ► $ $ 9,310,817 $ $ 7,448,654 $ 1,862,163 ◄ 80% Federal + 20% Non-Federal Federal Funds ▼ ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program AMENDMENT:Decrease Cost,AMENDMENT:Change Additional Information 603682 Merrimack Valley Amesbury Amesbury - Bridge Replacement, A-07-026, Route I-495 (NB & SB) Over the bikeway (Abandoned B&M RR line) 4 Total Project Cost = $11,288,692 decreased to $9,310,817 by Administrative Amendment Endorsed June 24, 2015 (Construction) (M) ►On System No Projects Programmed No Projects Programmed $- $ - $ - $ $ $ On System Subtotal ► $ $ $ - - - $- $ $ - $ $ - $ $ ►Off-System No Projects Programmed No Projects Programmed ► Statewide Bridge Inspection Program ◄ 80% Federal + 20% Non-Federal $Off-System Subtotal ► $ - ◄ 80% Federal + 20% Non-Federal - No Projects $ Programmed No Projects $Programmed Statewide Bridge Inspection Program Subtotal ► $ $ $ $ $ - - - - - - - - ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid $ $ $ $ $ $ Other Federal Aid Subtotal ► $ $ ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program ◄ Funding Split Varies by Funding Source $ - - - - - - - - No Projects Programmed No Projects Statewide Infrastructure Program Subtotal ► $ ◄ 80% Federal + 20% Non-Federal - $ No Projects Programmed No Projects Programmed Programmed $ - - $ $ $ $ $ $ ◄ 80% Federal + 20% Non-Federal $ $ $- $ $ $- ◄ 90% Federal + 10% Non-Federal ► Statewide HSIP Program No Projects Programmed No Projects Programmed $ $ Statewide HSIP Program Subtotal ► $ - ► Statewide Safe Routes to Schools Program 607776 Merrimack Valley North Andover North Andover - Safe Routes to School (North Andover Middle) 4 TAP - - - $ - 1,086,000 $ - 868,800 $ - $ 1,086,000 $ $ 868,800 $ $ Statewide Safe Routes to Schools Program Subtotal ► $ - - 217,200 Total Project Cost = $1,086,000 TAP is 80% Federal + 20% Non-Federal (Construction) (C) Funding Split Varies by Funding Source 217,200 ◄ Funding Split Varies by Funding Source - Administrative Amendment 06/24/2015 Endorsed 2015 Merrimack Valley MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ 606503 Newburyport MassDOT Project Description▼ MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ ► Statewide CMAQ Merrimack Valley Newburyport - Clipper City Rail Trail along the City Branch (Phase II) 4 CMAQ Total Project Cost = $4,061,158 = FY 2015 CMAQ + Statewide STP-TE + Statewide CMAQ (Construction) TEC = 5.75 (C) $ 491,158 $ 392,926 $ 98,232 Statewide CMAQ ► $ 491,158 $ 392,926 $ 98,232 ◄ 80% Federal + 20% Non-Federal ►Statewide Transportation Enhancements $ 606503 Merrimack Valley Newburyport Newburyport - Clipper City Rail Trail along the City Branch (Phase II) 4 3,120,000 2,496,000 624,000 Total Project Cost = $4,061,158 = FY 2015 CMAQ + Statewide STP-TE + Statewide CMAQ (Construction) TEC = 5.75 (C) STP-TE Statewide Transportation Enhancements Subtotal ► $ 3,120,000 $ 2,496,000 $ 624,000 ◄ 80% Federal + 20% Non-Federal $ $ ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects No Projects $ $ Statewide ITS Subtotal ► $ ►Statewide Interstate Maintenance Program 606549 Merrimack Valley Multiple 607985 Merrimack Valley Multiple Georgetown- NewburyWest NewburyNewburyport- AmesburySalisbury- Interstate Maintanence & related work on I-95 4 NHPP $- 21,240,000 -$ - 19,116,000 -$ - 4 NHPP $ 7,788,000 $ 7,009,200 $ Statewide Interstate Maintenance Program Subtotal ► $ 29,028,000 $ 26,125,200 $ 2,902,800 ◄ 90% Federal + 10% Non-Federal No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ $ $ ◄ 80% Federal + 20% Non-Federal $ $ Statewide RR Grade Crossings Subtotal ► $ - $ - - $ - $ $ Statewide Stormwater Retrofits Subtotal ► $ - $ - - $ - - ◄ 80% Federal + 20% Non-Federal $ - $ - ◄ 80% Federal + 20% Non-Federal Lawrence - North Andover Interstate Maintenance and Related W ork on I-495 2,124,000 Total Project Cost = $21,240,000 (Construction) (M) 778,800 Total Project Cost = $7,788,000 (Construction) (M) ►Statewide NHS Preservation Program+ ►Statewide RR Grade Crossings No Projects No Projects - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits No Projects No Projects ►Statewide ADA Implementation Plan No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - - - ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning $ $- - - - - - $ $ - - - - - - - - - - Administrative Amendment 06/24/2015 Endorsed 2015 Merrimack Valley MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ Statewide Design and Right of W ay Statewide Recreational Trails MassDOT District ▼ Funding Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds Additional ▼ Information ▼ $ $ - - $ $ Other Statewide Items Subtotal ► $ ◄ Funding Split Varies by Funding Source ►Section 2A / Non-Federal Projects - ►Non Federal Aid - No Projects No Projects - NFA $ NFA $ Non-Federal Aid Subtotal► $ $ $ $ ◄100% Non-Federal $ $ $ ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Merrimack Valley MPO TIP Summary No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ TIP- Section 1: ▼ TIP Section 2: ▼ Total ► $ 49,052,795 $ Federal Funds ► $ 42,194,253 Non-Federal Funds ► $ 6,858,542 $ - Total of All Projects ▼$ $ $ 49,052,795 ◄ Total Spending in Region 42,194,253 ◄ Total Federal Spending in Region 6,858,542 ◄ Total Non-Federal Spending in Region 701 CMR 7.00 Use of Road Flaggers and Police Details on Public W orks Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all proj ects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all proj ects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 05/20/2014 Draft Released 06/24/2014 Endorsed 2015 Northern Middlesex MPO Transportation Improvement Program Amendment/Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT Funding District ▼ Source ▼ Total Programmed Funds ▼ Federal Funds ▼ Non-Federal Funds ▼ Additional Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program No Projects Programmed $ - $ - $ - HSIP Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non- ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 601426 Northern Middlesex Billerica BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 CMAQ AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 1,789,585 $ 1,431,668 $ 357,917 CMAQ Subtotal ► $ 1,789,585 $ 1,431,668 $ 357,917 ◄ 80% Federal + 20% Non- ►TAP - Transportation Alternatives Program 601426 Northern Middlesex Billerica BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 TAP AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 $ 245,303 $ 196,242 $ 49,061 TAP Subtotal ► $ 245,303 $ 196,242 $ 49,061 ◄ 80% Federal + 20% Non- ►Non-CMAQ/HSIP/TAP (Other) 601426 Northern Middlesex Billerica 606238 Northern Middlesex Tewksbury BILLERICA RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 STP $ 1,677,251 $ 1,341,801 $ 335,450 AC Year 1 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 Total Estimated Cost at 75% Design is $2,061,000. TEC = 4.77. TEWKSBURY RESURFACING & 4 STP $ RELATED WORK ON ROUTE 38 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 2,061,000 $ 1,648,800 $ 412,200 3,738,251 $ 2,990,601 $ 747,650 ◄ 80% Federal + 20% Non- Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 5,773,139 $ 3,738,251 $ 6,207,540 ◄Total Target 4,061,733 ◄ Max. NonCMAQ/HSIP/TA P 434,401 ◄ Min. HSIP 1,466,103 ◄ Min. CMAQ 245,303 ◄ Min. TAP ►Section 1A / Fiscal Constraint Analysis Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ - $ 1,789,585 $ 245,303 $ $ $ 434,401 Target Funds 323,482 Non-CMAQ/HSIP/ $ $ $ 434,401 HSIP Minimum (323,482) CMAQ Minimum TAP Minimum - ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program $ No Projects $ Programmed Statewide Bridge Maintenance Program Subtotal ► $ $ - $ - - - $ - $ - - $ - $ - ◄ 80% Federal + 20% NonFederal ►On System AMENDMENT:Increase Cost,AMENDMENT:Chang 602932 e Additional Information 604537 Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) 4 NHPP $ 14,017,076 $ 11,213,661 $ 2,803,415 Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15045, MARKET STREET OVER THE WESTERN CANAL (BR-ON) 4 NHPP $ 3,792,941 $ 3,034,353 $ 758,588 On System Subtotal ► $ 17,810,017 $ 14,248,014 $ $ 10,404,940 $ 8,323,952 $ $ - $ 10,404,940 $ - $ 8,323,952 $ Revised Cost Estimate 6/21/15 $20,031,350 AC Year 1 of 2 Total project cost estimate for FY 2015 $3,792,941 3,562,003 ◄ 80% Federal + 20% NonFederal ►Off-System 607123 Northern Middlesex Chelmsford CHELMSFORD - HUNT RD OVER I-495 (BROFF) No Projects Programmed 4 STP-BR-OFF Off-System Subtotal ► $ 2,080,988 Year of Estimate 2014. 2,080,988 ◄ 80% Federal + 20% NonFederal ► Statewide Bridge Inspection Program No Projects $ Programmed No Projects $ Programmed Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - - $ - $ - - $ - $ - ◄ 80% Federal + 20% NonFederal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid Amendment Northern Middlesex Lowell Merrimack Riverwalk Other FA $ 4 Phase II - FLAP Project $ No Projects Programmed Other Federal Aid Subtotal ► $ 293,311 $ - $ 293,311 $ 235,000 $ - $ 235,000 $ 58,311 58,311 ◄ Funding Split Varies by Funding ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program No Projects $ Programmed No Projects $ Programmed Statewide Infrastructure Program Subtotal ► $ - - $ - $ - - $ $ - $ $ - - - ◄ 80% Federal + 20% Non- ► Statewide HSIP Program No Projects Programmed No Projects Programmed $ - $ - $ $ - $ $ - $ $ Statewide HSIP Program Subtotal ► $ - - ◄ 90% Federal + 10% Non- - ► Statewide Safe Routes to Schools Program No Projects $ Programmed No Projects $ Programmed Statewide Safe Routes to Schools Program Subtotal ► $ - $ - $ $ $ - $ - - $ - $ $ - - Funding Split Varies by Funding Source Split Varies by Funding Funding Source - ◄ Funding Split Varies by Funding - ► Statewide CMAQ No Projects Programmed No Projects $ - $ - - Statewide CMAQ ► $ - $ $ - $ $ - ◄ 80% Federal + 20% Non- No Projects $ No Projects $ Statewide Transportation Enhancements Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non- No Projects No Projects $ $ Statewide ITS Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non- No Projects $ No Projects $ Statewide Interstate Maintenance Program Subtotal ► $ - $ - $ - ◄ 90% Federal + 10% Non- No Projects $ No Projects $ Statewide NHS Preservation Program Subtotal ► $ - No Projects $ No Projects $ Statewide RR Grade Crossings Subtotal ► $ - $ No Projects $ No Projects $ Statewide Stormwater Retrofits Subtotal ► $ - $ No Projects $ No Projects $ Statewide ADA Implementation Plan Subtotal ► $ - $ Programmed ►Statewide Transportation Enhancements ►Statewide ITS ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ - $ - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- - $ - ◄ 80% Federal + 20% Non- ►Statewide RR Grade Crossings ►Statewide Stormwater Retrofits ►Statewide ADA Implementation Plan - - ►Other Statewide Items ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - $ - $ $ - $ - $ - - - - - -$ - - - ◄ Funding Split Varies by Funding - - ►Section 2A / Non-Federal Projects -$ - ►Non Federal Aid No Projects No Projects NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects NFA $ No Projects NFA $ Section 2B / Non-Federal Bridge Projects Subtotal► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2015 Northern Middlesex MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ TIP Section2: ▼ 34,281,407 $ 27,425,477 6,855,930 $ Total of All Projects ▼ - $ $ $ 34,281,407 ◄ Total Spending in Region 27,425,477 ◄ Total Federal Spending in 6,855,930 ◄ Total Non-Federal Spending in 701 CMR 7.00 Use of Road Flaggers and Police Details on Public Works Projects / 701 CMR 7.00 (the Regulation) was promulgated and became law on October 3, 2008. Under this Regulation, the CMR is applicable to any Public works Project that is performed within the limits of, or that impact traffic on, any Public Road. The Municipal Limitation referenced in this Regulation is applicable only to projects where the Municipality is the Awarding Authority. For all projects contained in the TIP, the Commonwealth is the Awarding Authority. Therefore, all projects must be considered and implemented in accordance with 701 CMR 7.00, and the Road Flagger and Police Detail Guidelines. By placing a project on the TIP, the Municipality acknowledges that 701 CMR 7.00 is applicable to its project and design and construction will be fully compliant with this Regulation. This information, and additional information relative to guidance and implementation of the Regulation can be found at the following link on the MassDOT Highway Division website: http://www.massdot.state.ma.us/Highway/flaggers/main.aspx 05/20/2014 Draft Released 06/24/2014 Endorsed 2016 Northern Middlesex MPO Transportation Improvement Program Amendment/ Adjustment Type ▼ MassDOT Project ID ▼ MPO ▼ Municipality Name ▼ MassDOT Project Description▼ MassDOT District ▼ Chelmsford CHELMSFORD-TRAFFIC SIGNAL INSTALLATION AT ROUTE 110 & ROUTE 495 (2 LOCATIONS) Funding Source Total Programmed ▼ Funds ▼ Federal Funds ▼ HSIP Non-Federal Funds Additional ▼ Information ▼ ►Section 1A / Federal Aid Target Projects ►HSIP - Highway Safety Improvement Program 607401 Northern Middlesex 4 $ 675,548 $ 607,993 $ 67,555 Total Project Cost at 2016 YOE $1,219,400 ($1,172,500); Funding : STP, HSIP; TEC = 5.82 HSIP Subtotal ► $ 675,548 $ 607,993 $ 67,555 ◄ 90% Federal + 10% Non-Federal $ 1,703,240 $ 1,362,592 $ 340,648 CMAQ Subtotal ► $ 1,703,240 $ 1,362,592 $ 340,648 $ 418,360 $ 334,688 $ 83,672 TAP Subtotal ► $ 418,360 $ 334,688 $ 83,672 ►CMAQ - Congestion Mitigation and Air Quality Improvement Program 607251 Northern Middlesex Westford WESTFORD-INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 110 & TADMUCK ROAD 3 CMAQ Total Project Cost FFY 2016 YOE $2,121,600 (2,040,000) Funding CMAQ, TAP; TEC =6.50 ◄ 80% Federal + 20% Non-Federal ►TAP - Transportation Alternatives Program 607251 Northern Middlesex Westford WESTFORD-INTERSECTION & SIGNAL IMPROVEMENTS @ ROUTE 110 & TADMUCK ROAD 3 TAP Total Project Cost FFY 2016 YOE $2,121,600 (2,040,000) Funding CMAQ, TAP; TEC =6.50 ◄ 80% Federal + 20% Non-Federal ►Non-CMAQ/HSIP/TAP (Other) 601426 Northern Middlesex Billerica BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 STP $ 2,887,861 $ 2,310,289 $ 577,572 AC Year 2 of 2. Total project cost at 100% design $6,600,000 (Funding Sources - STP, CMAQ, TAP) TEC = 5.52 607401 Northern Middlesex Chelmsford CHELMSFORD-TRAFFIC SIGNAL INSTALLATION AT ROUTE 110 & ROUTE 495 (2 LOCATIONS) 4 STP $ 543,852 $ 435,082 $ 108,770 Total Project Cost at 2016 YOE $1,219,400 ($1,172,500); Funding : STP, HSIP; TEC = 5.82 Non-CMAQ/HSIP/TAP (Other) Subtotal ► $ 3,431,713 $ 2,745,370 $ 686,343 ◄ 80% Federal + 20% Non-Federal Total Federal Aid Target Funds Programmed ► $ Total Non-CMAQ/HSIP/TAP (Other) Programmed ► $ 6,228,861 3,431,713 $ $ 6,825,200 4,794,126 ◄Total Target ◄ Max. NonCMAQ/HSIP/TAP $ $ 596,339 Target Funds Available 596,339 Non-CMAQ/HSIP/TAP (Other) Available Total HSIP Programmed ► $ Total CMAQ Programmed ► $ Total TAP Programmed ► $ 675,548 1,703,240 418,360 $ $ $ 390,961 1,221,753 418,360 ◄ Min. HSIP ◄ Min. CMAQ ◄ Min. TAP $ $ $ (284,587) HSIP Minimum Met (481,487) CMAQ Minimum Met - TAP Minimum Met ►Section 1A / Fiscal Constraint Analysis HSIP, CMAQ, TAP Overprogrammed $ (766,074) ►Section 1B / Federal Aid Bridge Projects ►Statewide Bridge Maintenance Program No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Maintenance Program Subtotal ► $ - $ - $ - ◄ 80% Federal + 20% Non-Federal ►On System 607506 Northern Middlesex Chelmsford CHELMSFORD-BRIDGE DECK REPLACEMENT BRIDGE NO. C-038087 (2K7) ST4 NORTH STREET OVER I-495 4 NHPP $ 2,469,917 $ 1,975,934 $ 493,983 AMENDMENT:Add Project,AMENDME 602932 NT:Change Additional Northern Middlesex Lowell LOWELL-BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) 4 NHPP $ 6,014,274 $ 4,811,419 $ 1,202,855 On System Subtotal ► $ 8,484,191 $ 6,787,353 $ 1,696,838 Revised Cost Estimate 6/21/15 $20,031,350 AC Year 2 of 2 ►Off-System $ - $ - $ - $ - $ - $ - Off-System Subtotal ► $ - $ - $ - No Projects Programmed $ - $ - $ - No Projects Programmed $ - $ - $ - Statewide Bridge Inspection Program Subtotal ► $ - $ - $ - No Projects Programmed ◄ 80% Federal + 20% Non-Federal ► Statewide Bridge Inspection Program ◄ 80% Federal + 20% Non-Federal ►Section 1C / Federal Aid Non-Target Projects ►Other Federal Aid AMENDMENT:Add Project Northern Middlesex Lowell Merrimack Riverwalk Phase II FLAP Project No Projects Programmed 4 Other FA $ $ Other Federal Aid Subtotal ► $ 293,750 - $ $ 293,750 $ 235,000 - $ $ 58,750 - 235,000 $ 58,750 - ◄ Funding Split Varies by Funding Source ►Section 1D / Federal Aid Major & State Category Projects ► Statewide Infrastructure Program $ - $ - $ No Projects Programmed $ Statewide Infrastructure Program Subtotal ► $ No Projects Programmed - $ $ - $ $ - - ◄ 80% Federal + 20% Non-Federal - ► Statewide HSIP Program No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide HSIP Program Subtotal ► $ - $ $ - $ $ - - ◄ 90% Federal + 10% Non-Federal - ► Statewide Safe Routes to Schools Program $ - $ - $ - Funding Split Varies by Funding Source No Projects Programmed $ Statewide Safe Routes to Schools Program Subtotal ► $ - $ $ - $ $ - Funding Split Varies by Funding Source No Projects Programmed - - ◄ Funding Split Varies by Funding Source - ► Statewide CMAQ No Projects Programmed $ - $ - $ No Projects Programmed $ Statewide CMAQ ► $ - $ $ - $ $ - - ►Statewide Transportation Enhancements No Projects Programmed $ - - - - ◄ 80% Federal + 20% Non-Federal ►Statewide ITS No Projects Programmed No Projects Programmed $ $ Statewide ITS Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide Interstate Maintenance Program Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide NHS Preservation Program Subtotal ► $ - No Projects Programmed No Projects Programmed $ $ Statewide RR Grade Crossings Subtotal ► $ - $ $ Statewide Stormwater Retrofits Subtotal ► $ - No Projects Programmed $ No Projects Programmed $ Statewide ADA Implementation Plan Subtotal ► $ - ABP GANS Repayment Award Adjustments, Change Orders, Project Value Changes, Etc. DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Planning Statewide Design and Right of Way Statewide Recreational Trails Other Statewide Items Subtotal ► $ $ - $ - - - $ $ - $ $ $ - $ - ◄ 80% Federal + 20% Non-Federal $ - - -$ - - ◄ 90% Federal + 10% Non-Federal - ◄ 80% Federal + 20% Non-Federal ►Statewide Interstate Maintenance Program ►Statewide NHS Preservation Program+ $ - -$ ►Statewide RR Grade Crossings $ - - -$ - - ◄ 80% Federal + 20% Non-Federal $ - - -$ - - ◄ 80% Federal + 20% Non-Federal $ - - -$ - - ◄ 80% Federal + 20% Non-Federal ►Statewide Stormwater Retrofits No Projects Programmed No Projects Programmed ►Statewide ADA Implementation Plan ►Other Statewide Items $ $ ►Section 2A / Non-Federal Projects ►Non Federal Aid No Projects Programmed No Projects Programmed - - - - - - ◄ Funding Split Varies by Funding Source - NFA $ NFA $ Non-Federal Aid Subtotal► $ - $ $ $ - ◄100% Non-Federal No Projects Programmed NFA $ No Projects Programmed NFA $ Section 2B / Non-Federal Bridge Projects Subtotal ► $ - $ $ $ - ◄100% Non-Federal ►Section 2B / Non-Federal Bridge Projects ►Section 2B / Non-Federal Bridge Projects 2016 Northern Middlesex MPO TIP Summary TIP Section 1: ▼ Total ► $ Federal Funds ► $ Non-Federal Funds ► $ 15,006,802 12,072,996 2,933,806 Total of All Projects ▼ TIP Section 2: ▼ $ - $ - $ $ $ 15,006,802 12,072,996 2,933,806 ◄ Total Spending in Region ◄ Total Federal Spending in Region ◄ Total Non-Federal Spending in Region U.S. Department of Transportation Federal Transit Administration REGION I Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, Vermont Mr. David J. Mohler Executive Director Office of Transportation Planning Massachusetts Department of Transportation 10 Park Plaza, Room 4150 Boston, MA 02116-3969 Volpe Center 55 Broadway Suite 920 Cambridge, MA 021421093 617-494-2055 617-494-2865 (fax) August 12, 2015 Re: Massachusetts FY15-18 STIP Amendment #9 (Transit Only) Dear Mr. Mohler: The Federal Transit Administration (FTA) has reviewed the transit portions of the Fiscal Years 20152018 Statewide Transportation Improvement Program (STIP) Amendment #9 sent by the Massachusetts Department of Transportation on August 11, 2015. In accordance with the 1990 Clean Air Act Amendments and §450.324(b), a conformity determination is not needed since the projects in this amendment fall under the air quality conformity exemption for Mass Transit (40 CFR §93.126, Table 2). Furthermore, we make the following determinations: 1. The projects in the STIP are based on a planning process that substantially meets the requirements of Title 23 U.S.C., the Federal Transit Act, and 23 CFR 450 A-C. 2. The component TIPs are based on a continuing, comprehensive transportation planning process carried on cooperatively with the State, the MPOs, and the transit operators in accordance with the provisions of 23 U.S.C. 134 and §5303 of the Federal Transit Act. 3. The changes called for in this STIP amendment maintain financial constraint as required under 23 CFR 450.216 (m). On behalf of the Federal Highway Administration, the FTA has determined that the STIP, as revised, substantially meets all requirements and is hereby approved. If you have any questions please send them to Nicolas Garcia (617-494-3940 | nicolas.garcia@dot.gov). Sincerely, Mary Beth Mello Regional Administrator cc: Donald O. Cooke, Environmental Scientist, EPA Michael Chong, FHWA Charles D. Baker, Governor Karyn Polito, Lt. Governor Stephanie Pollack, MassDOT Secretary & CEO August 10, 2015 Mary Beth Mello Regional Administrator Federal Transit Administration 55 Broadway – 9th floor Cambridge, Massachusetts 02142 Dear Ms. Mello: On behalf of Secretary Stephanie Pollack, I am writing to request your approval of the attached transit actions pertaining to the Federal Fiscal Years 2015-2018 State Transportation Improvement Program, as endorsed by the then Metropolitan Planning Organizations (MPOs) and three Transportation Planning Organizations (TPOs). Project additions, removals and changes are highlighted in green, pink and yellow, respectively. These actions do not require an air quality conformity determination. If you have any questions, please call me at (857)368-8865. Sincerely, David J. Mohler Executive Director Office of Transportation Planning cc: Steve Woelfel, Director of Strategic Planning Trey Wadsworth, Manager of MPO Activities Bryan K. Pounds, MPO Activities Tom Schiavone, Manager of Transit Programs Federal Transit Administration Federal Highway Administration Leading the Nation in Transportation Excellence Ten Park Plaza, Suite 4150, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot Fiscal Constraint Analysis - 2015 Federal Funding Source Current Year Available Carryover Programmed Funds Unprogrammed Funds Change from prior STIP Action State Funding Current Year Source Available Programmed Funds Unprogrammed Funds Change from prior STIP Action 5307 $372,364,357 $199,553,260 $151,167,852 $420,749,765 $10,006,325 RTACAP $31,650,825 $31,650,825 $0 5309 $3,670,154 $100,000,000 $100,000,000 $3,670,154 $0 SCA $22,388,594 $22,388,594 $0 5310 $6,120,564 $0 $6,120,564 $0 $5,211,759 TDC n/a $1,708,939 n/a 5311 $2,734,326 $2,761,670 $3,206,057 $2,289,939 $471,731 MAP $3,074,173 $3,074,173 $0 5337 $240,253,324 $121,965,273 $174,668,442 $187,550,155 $0 ITCCAP $0 $0 $0 5339 $14,318,379 $7,703,009 $12,437,571 $9,583,817 $3,454,500 Local $398,739,789 $398,739,789 n/a $13,497,804 $701,897 $756,387 $2,980,682 $0 $23,459,685 Total NonFederal Aid $455,853,381 $455,853,381 $0 $41,396,455 Discr. Federal Funds $0 $56,617,732 $56,617,732 $0 $1,002,600 $639,461,104 $431,983,212 $435,162,915 $623,843,830 $6,706,744 Fiscal Constraint Analysis - 2016 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $430,756,090 $201,548,794 $112,353,547 $499,007,225 -$20,944,112 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $2,289,939 $2,789,286 $2,498,397 $2,580,828 $0 $187,550,155 $123,184,924 $123,564,061 $187,171,018 -$662,154 $9,583,817 $7,780,038 $6,717,047 $10,646,808 -$2,266,024 $0 $1,042,292 $1,042,292 $0 $0 $633,850,155 $485,303,042 $395,133,052 $703,076,033 -$23,872,290 Discr. Federal Funds State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change from prior STIP Action $15,334,024 $15,334,024 $0 -$681,641 $18,624,436 $18,624,436 $0 -$2,944,801 $467,522 n/a $0 $0 $0 $0 n/a $0 $0 $0 $0 $0 $296,049,673 $296,049,673 n/a $0 $0 -$3,626,442 $330,008,133 $330,008,133 Fiscal Constraint Analysis - 2017 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $499,007,225 $203,564,284 $91,553,481 $611,018,028 -$6,513,135 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 $0 $0 $0 $2,580,828 $2,817,180 $2,523,223 $2,874,785 $0 $187,171,018 $124,416,773 $123,587,796 $187,999,995 $0 $10,646,808 $7,857,836 $6,233,618 $12,271,026 -$19,436 $703,076,033 $488,656,073 $373,898,118 $817,833,988 -$6,532,571 State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change from prior STIP Action $24,179,513 $24,179,513 $0 -$32,371,000 $21,554,775 $21,554,775 n/a $0 n/a $378,000 n/a $0 $0 $0 $0 $0 $0 $0 $0 $0 $425,830,013 $425,830,013 n/a $28,559,943 $471,564,301 $471,564,301 $0 -$3,811,057 Fiscal Constraint Analysis - 2018 Federal Funding Source Current Year Available Carryover 5307 5309 5310 5311 5337 5339 Programmed Funds Unprogrammed Funds Change from prior STIP Action $611,018,028 $205,599,926 $88,340,335 $728,277,619 -$7,302,624 $3,670,154 $150,000,000 $150,000,000 $3,670,154 $0 $0 $0 0 $0 $0 $2,874,785 $2,845,350 $2,548,297 $3,171,838 $0 $187,999,995 $125,660,941 $124,311,768 $189,349,168 $0 $12,271,026 $7,936,418 $6,243,084 $13,964,360 -$19,631 $817,833,988 $492,042,635 $371,443,484 $938,433,139 -$7,322,255 State Funding Current Year Source Available RTACAP SCA TDC MAP ITCCAP Local Total NonFederal Aid Programmed Funds Unprogrammed Funds Change from prior STIP Action $4,763,696 $4,763,696 $0 -$8,354,909 $38,413,016 $38,413,016 $0 $19,206,508 n/a $0 n/a $0 $0 $0 $0 $0 $0 $0 $0 $0 $561,244,340 $561,244,340 n/a $174,338,434 $604,421,052 $604,421,052 $0 $185,190,033 FFY 2015 FTA Program Transit Agency Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority FTA Activity Line Item Project Description 117A00 Preventive Maintenance 114211 Replacement support vehicles (2) 114211 ACQUIRE ‐ SUPPORT VEHICLES Federal Funds RTACAP MAP ICB TDC SCA LocalFunds Total Cost Notes $80,000 $34,387 $0 $0 $0 $0 $0 $114,387 STIP Action #9 $100,000 $25,000 $0 $0 $0 $0 $0 $125,000 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 STIP Action #9 $20,800 $0 $0 $0 $0 $0 $0 $20,800 STIP Action #9 $120,000 $0 $0 $0 $0 $0 $0 $120,000 STIP Action #9 $20,000 $0 $0 $0 $0 $0 $0 $20,000 STIP Action #9 $75,000 $0 $0 $0 $0 $0 $0 $75,000 STIP Action #9 $40,000 $0 $0 $0 $0 $0 $0 $40,000 STIP Action #9 $0 $0 $0 $0 $59,800 STIP Action #9 ACQUIRE ‐ MOBILE SURV/SECURITY 114209 EQUIP Match FY 16 PREVENTIVE MAINTENANCE match 117A00 FY 16 MAINTENANCE FACILITY BUS LIFT 114402 REPLACE Match FY 16 TERMINAL, INTERMODAL(BUS 113403 DECK) Match FY 16 ACQUIRE ‐ SUPPORT VEHICLES (1) 114211 Match FY 16 BUY REPLACEMENT VAN (3) Match 111215 FY 16 Construction: Upgrade facility to 114305 CNG $59,800 $0 $0 $560,000 $140,000 $0 $0 $0 $0 $700,000 STIP Action #9 111215 BUY REPLACEMENT VAN (5) $280,000 $70,000 $0 $0 $0 $0 $350,000 STIP Action #9 111215 BUY REPLACEMENT VAN (1) $95,680 $23,920 $0 $0 $0 $0 $119,600 STIP Action #9 117A00 Preventive Maintenance REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP VEH OVERHAUL (UP TO 20% VEH 111700 MAINT) $80,000 $20,000 $0 $0 $0 $0 $100,000 STIP Action #9 $16,000 $4,000 $0 $0 $0 $0 $0 $20,000 $472,000 $118,000 $0 $0 $0 $0 $0 $590,000 114211 ACQUIRE ‐ SUPPORT VEHICLE $46,400 $11,600 $0 $0 $0 $0 $0 $58,000 111240 BUY ASSOC CAP MAINT ITEMS ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 $2,400,000 $0 $0 $0 $0 $2,400,000 $0 $4,800,000 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000 $120,000 $0 $0 $0 $0 $0 $0 $120,000 STIP Action #9 $24,000 $0 $0 $0 $0 $0 $0 $24,000 STIP Action #9 $480,000 $0 $0 $0 $0 $0 $0 $480,000 STIP Action #9 $30,400 $0 $0 $0 $0 $0 $0 $30,400 STIP Action #9 $80,000 $0 $0 $0 $0 $0 $0 $80,000 STIP Action #9 $64,000 $0 $0 $0 $0 $0 $0 $64,000 STIP Action #9 $20,000 $0 $0 $0 $0 $0 $0 $20,000 STIP Action #9 300900 Operating/PM/ADA REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP ACQUIRE ‐ EXCLUSIVE BICYCLE 114241 EQUIP PURCHASE COMMUNICATIONS 116202 SYSTEM ‐ Match in FY16 ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT ‐ Match in FY16 VEH OVERHAUL (UP TO 20% VEH 111700 MAINT) ‐ Match in FY16 ACQUIRE ‐ SUPPORT VEHICLES ‐ 114211 Match in FY16 BUY ASSOC CAP MAINT ITEMS ‐ 111240 Match in FY16 PURCHASE COMMUNICATIONS 116202 SYSTEM ‐ Match in FY16 ENG/DESIGN ‐ YARDS & SHOPS ‐ 114105 Match in FY16 FFY 2015 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority 117A00 PREVENTIVE MAINTENANCE $325,000 $0 $0 $0 $0 $0 $81,250 $406,250 STIP Action #9 ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $14,241 $3,560 $0 $0 $0 $0 $0 $17,801 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (2) $185,600 $188,400 $0 $0 $0 $0 $0 $374,000 STIP Action #9 117A00 PREVENTIVE MAINTENANCE $388,858 $0 $0 $0 $0 $0 $97,215 $486,073 STIP Action #9 MISC SUPPORT EQUIP‐MATCH 114220 LISTED IN FY16 $16,700 $0 $0 $0 $0 $0 $0 $16,700 STIP Action #9 REHAB/RENO ‐ OPS FACILITY‐ 114403 MATCH LISTED IN FY16 $62,400 $0 $0 $0 $0 $0 $0 $62,400 STIP Action #9 SHOP EQ/SOFTWARE MAINT‐ 114206 MATCH LISTED IN FY16 $40,000 $0 $0 $0 $0 $0 $0 $40,000 STIP Action #9 111203 BUY REPLACEMENT 30‐FT BUS $320,000 $80,000 $0 $0 $0 $0 $400,000 STIP Action #1* 117C00 NON FIXED ROUTE ADA PARA SERV $496,566 $0 $0 $0 $0 $124,142 $0 $620,708 117L00 MOBILITY MANAGEMENT $1,095,574 $0 $0 $0 $0 $273,894 $0 $1,369,468 117A00 PREVENTIVE MAINTENANCE $2,071,307 $0 $0 $0 $0 $517,826 $0 $2,589,133 300900 OPERATING ASSISTANCE $600,000 $0 $0 $0 $0 $600,000 $0 $1,200,000 113101 North Attleboro Hub Design $240,000 $0 $0 $0 $0 $0 $60,000 $300,000 442400 SHORT RANGE TRANSIT PLANNING $80,000 $0 $0 $0 $0 $20,000 $0 $100,000 111203 BUY REPLACEMENT 30‐FT BUS ‐ 2 $422,000 $105,500 $0 $0 $0 $0 $0 $527,500 $2,800,000 $0 $0 $0 $0 $700,000 $0 $3,500,000 PURCHASE LANDSCAPING / SCENIC 119203 BEAUTIFICATION $30,000 $7,500 $0 $0 $0 $0 $0 $37,500 117C00 NON FIXED ROUTE ADA PARA SERV $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000 300901 Operating Assistance $375,000 $0 $0 $0 $0 $375,000 $0 $750,000 111215 BUY REPLACEMENT VAN ‐ 8 $500,000 $0 $0 $0 $0 $0 $125,000 $625,000 $24,000 $6,000 $0 $0 $0 $0 $0 $30,000 117A00 PREVENTIVE MAINTENANCE ACQUIRE ‐ MOBILE SURV/SECURITY 114209 EQUIP FFY 2015 5307 5307 5307 5307 5307 5307 5307 5307 5307 Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Massachusetts Bay Transportation 5307 Authority Massachusetts Bay Transportation 5307 Authority Massachusetts Bay Transportation 5307 Authority Massachusetts Bay Transportation 5307 Authority Merrimack Valley Regional Transit 5307 Authority Merrimack Valley Regional Transit 5307 Authority Merrimack Valley Regional Transit 5307 Authority Merrimack Valley Regional Transit 5307 Authority Merrimack Valley Regional Transit 5307 Authority ENG/DESIGN ‐ Plymouth BUS 113101 TERMINAL $560,000 $0 $0 $0 $0 $0 $140,000 $700,000 111204 BUS < 30 FT (8) $373,964 $0 $93,491 $0 $0 $0 $0 $467,455 $800,000 $0 $0 $0 $0 $0 $0 $800,000 STIP Action #9 $320,000 $80,000 $0 $0 $0 $0 $0 $400,000 $30,400 $7,600 $0 $0 $0 $0 $0 $38,000 $80,000 $0 $0 $0 $0 $0 $20,000 $100,000 $104,000 $26,000 $0 $0 $0 $0 $0 $130,000 117A00 PREVENTIVE MAINTENANCE 2015 $1,074,404 $0 $0 $0 $0 $269,601 $0 $1,344,005 300901 Operating Assistance 2015 $1,663,686 $0 $0 $0 $0 $3,310,590 $2,476,697 $7,450,973 $240,000 $60,000 $0 $0 $0 $0 $0 $300,000 $2,058,854 $2,058,854 $0 $0 $0 $0 $0 $4,117,708 $25,000 $0 $0 $0 $0 $0 $6,250 $31,250 $2,000,000 $0 $0 $0 $0 $0 $0 $55,000 $0 $0 $0 $0 $0 $0 $55,000 STIP Action #9 $56,000 $0 $0 $0 $0 $0 $0 $56,000 STIP Action #9 123302 Elevators/Escalators $25,924,448 $0 $0 $0 $0 $6,481,112 HEAVY RAIL CARS ‐ Red/Orange 121221 Lines $64,000,000 $0 $0 $0 $0 $16,000,000 Government Center (Blue Line 123402 Modernization) $32,761,068 $0 $0 $0 $0 $8,190,267 $40,951,335 117A00 PREVENTIVE MAINTENANCE $12,000,000 $0 $0 $0 $0 $3,000,000 $15,000,000 $501,600 $125,400 $0 $0 $0 $0 $0 $627,000 $216,000 $54,000 $0 $0 $0 $0 $0 $270,000 117C00 ADA Operating Expense $1,069,635 $0 $0 $0 $0 $267,410 $0 $1,337,045 117A00 Preventive Maintenance Expense $2,427,775 $0 $0 $0 $0 $606,945 $0 $3,034,720 300900 Operating Assistance $1,064,460 $0 $0 $0 $0 $1,064,460 $0 $2,128,920 CONST ‐ N. ATTLEBORO BUS 113301 TERMINAL (Match in FY16) Purchase ‐ Replacement: Fixed 111215 Route Vans (4) 114211 ACQUIRE ‐ Supervisory Vehicle SHORT RANGE TRANSIT PLANNING 442400 2015 111240 Purchase ‐ Capital Spare Parts ENGINEERING/DESIGN FOR 119100 GALLAGHER INTERMODAL LOBBY Construction: Gallagher 1 Parking 113304 Garage SHORT RANGE TRANSIT PLANNING 442400 (RTP) BUY (6) REPLACEMENT 30‐FT BUS 111203 (st match in 2016) Sealcoat & Stripe Bus Hub (Match in 113401 FY16) Purchase Dump/Plow Truck FR 114211 (Match in FY16) Purchase ‐ Replacement: Vans 11 111315 Model Year 2009 De Rehab/Renovation: Refurbish Engine/Transmission 9 Model Year 111404 2009 Buses $2,000,000 STIP Action #3* $32,405,560 $80,000,000 STIP Action #9 FFY 2015 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 5307 Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority MetroWest Regional Transit Authority Replace 17 Model Year Buses with 111201 new 10 of 17 Deli $3,360,000 $840,000 $0 $0 $0 $0 $0 $4,200,000 State of Good Repair Maintenance 114402 Facility $92,000 $23,000 $0 $0 $0 $0 $0 $115,000 State of Good Repair McGovern 113403 Center $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 $192,000 $48,000 $0 $0 $0 $0 $0 $240,000 440000 Short RangeTransit Planning $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 440000 MVPC Technical Support to MVRTA $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 113402 SGR Buckley Center $12,000 $0 $0 $0 $2,400 $0 $0 $12,000 STIP Action #9 $2,391,200 $0 $0 $0 $0 $0 $0 $2,391,200 STIP Action #9 ACQUIRE ‐ SUPPORT VEHICLES 114211 Match in FY 2016 $72,000 $0 $0 $0 $0 $0 $0 $72,000 STIP Action #9 114402 SGR Maintenance Facility $58,800 $0 $0 $0 $11,760 $0 $0 $58,800 STIP Action #9 113403 SGR McGovern Center $32,000 $0 $0 $0 $6,400 $0 $0 $32,000 STIP Action #9 $256,000 $0 $0 $0 $0 $0 $0 $256,000 STIP Action #9 $15,176 $3,794 $0 $0 $0 $0 $0 $18,970 STIP Action #3* $22,940 $5,735 $0 $0 $0 $0 $0 $28,675 STIP Action #3* $3,524 $881 $0 $0 $0 $0 $0 $4,405 STIP Action #3* 117C00 NON FIXED ROUTE ADA PARA SERV $1,378,983 $0 $0 $0 $0 $344,746 $0 $1,723,729 STIP Action #3* 113303 TERMINAL, INTERMODAL (TRANSIT) $20,000 $5,000 $0 $0 $0 $0 $0 113403 TERMINAL, INTERMODAL (TRANSIT) ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES $262,791 $156,180 $0 $0 $0 $0 $0 $418,971 STIP Action #3* $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 STIP Action #3* $40,000 $10,000 $0 $0 $0 $0 $50,000 STIP Action #3* $2,344,000 $0 $0 $0 $0 $2,344,000 $0 $4,688,000 STIP Action #2* $0 $0 $0 $0 $660,800 STIP Action #9 $0 $200,000 $0 $1,000,000 STIP Action #9 114420 Replace Bus Wash System Purchase ‐7 Replacement Buses 7 111202 Match in FY 2016 Purchase 5 Replacement Vans 111215 Match in FY 2016 119208 PURCHASE SIGNAGE ACQUIRE ‐ MOBILE SURV/SECURITY 114209 EQUIP ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 114211 ACQUIRE ‐ SUPPORT VEHICLES Montachusett Regional 5307 Transit Authority 300901 UP TO 50% FEDERAL SHARE Montachusett Regional 5307 Transit Authority BUY REPLACEMENT 30‐FT BUS (2) 111203 (Match in FY16) $660,800 $0 $0 Montachusett Regional 5307 Transit Authority 117A00 PREVENTIVE MAINTENANCE $800,000 $0 $0 $25,000 FFY 2015 Montachusett Regional 5307 Transit Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority 111203 BUY REPLACEMENT 30‐FT BUS (2) $600,000 $150,000 $0 $0 $0 $0 $750,000 STIP Action #1* 114402 Rehab/Renovations: Northampton $320,000 $80,000 $0 $0 $0 $0 $0 $400,000 STIP Action #9 111202 BUY REPLACEMENT 35‐FT BUS, (5) BUY <30‐FT BUS FOR EXPANSION, 111304 (4) Rehab/Renovation: Support 114211 Vehicles (2) $1,614,045 $403,511 $0 $0 $0 $0 $0 $2,017,556 STIP Action #9 $304,000 $76,000 $0 $0 $0 $0 $0 $380,000 $100,026 $25,006 $0 $0 $0 $0 $0 $125,032 STIP Action #9 114206 Rehab/Renovation: Shop Equipment $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 STIP Action #9 119302 Transit Enhancements: Shelters Transit Enhancements: 119308 Signs/Lighting Rehab/Renovation: 114220 Communications Systems (ITS) $16,037 $4,010 $0 $0 $0 $0 $0 $20,047 STIP Action #9 $292,664 $73,166 $0 $0 $0 $0 $0 $365,830 STIP Action #9 $1,402,929 $350,732 $0 $0 $0 $0 $0 $180,000 $0 $0 $0 $0 $45,000 $0 $225,000 STIP Action #9 117C00 ADA Operating Projects $1,183,574 $0 $0 $0 $0 $295,894 $0 $1,479,468 STIP Action #9 117A00 Preventive Maintenance Rehab/Renovation: Misc. 116220 Communications $2,500,000 $0 $0 $0 $0 $625,000 $0 $3,125,000 $710,742 $177,686 $0 $0 $0 $0 $0 $888,428 STIP Action #9 111216 Purchase ‐ Replacement: Vans (6) Purchase ‐ Buses for Expanded 111301 Service, 40' (8) BUY < 30' mini bus, Replacements 111204 (4) CONSTRUCT BICYCLE ACCESS, FACIL 119306 & EQUIP ON BUSES REHAB/RENOVATE ‐ Environmental 114402 Compliance $313,590 $78,398 $0 $0 $0 $0 $0 $391,988 STIP Action #9 $871,448 $657,362 $0 $0 $0 $0 $0 $1,528,810 STIP Action #9 $304,000 $76,000 $0 $0 $0 $0 $0 $380,000 STIP Action #9 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 STIP Action #9 $76,252 $19,063 $0 $0 $0 $0 $0 $95,315 STIP Action #9 113303 Rehab/Renovations: Roof Designs Rehab/Renovation: Surveillance 113307 Systems $280,000 $70,000 $0 $0 $0 $0 $0 $350,000 STIP Action #9 $114,999 $28,750 $0 $0 $0 $0 $0 $143,749 STIP Action #9 112220 Farebox $230,139 $57,535 $0 $0 $0 $0 $0 $287,674 STIP Action #9 $1,700,000 $0 $0 $0 $0 $0 $0 $1,700,000 STIP Action #9 $2,373,838 $0 $0 $0 $0 $0 $0 $2,373,838 STIP Action #5* $1,958,199 $0 $0 $0 $0 $0 $0 $1,958,199 STIP Action #5* $1,582,559 $0 $0 $0 $0 $0 $0 $1,582,559 STIP Action #5* $40,000 $0 $0 $0 $0 $0 $0 $40,000 STIP Action #9 $120,000 $0 $0 $0 $0 $0 $0 $120,000 STIP Action #9 $80,000 $0 $0 $0 $0 $0 $0 $80,000 STIP Action #9 $80,000 $0 $0 $0 $0 $0 $0 $80,000 STIP Action #9 $80,000 $0 $0 $0 $0 $0 $0 $80,000 STIP Action #9 442301 Planning 113303 Westfield Intermodal Center BUY REPLACEMENT 40‐FT BUS (6) ‐ 111201 Match in FY 16 BUY REPLACEMENT 35‐FT BUS (5) ‐ 111202 Match in FY16 BUY 40‐FT BUS FOR EXPANSION (4) 111301 Match in FY16 Rehab/Renovation: Shop Equipment 114206 ‐ Match in FY 16 Transit Enmts: Shelters, etc ‐ Match 119302 in FY 16 Transit Enmts: Signs/Lighting ‐ 119308 Match in FY 16 ACQUIRE ‐ SUPPORT VEHICLES (1) ‐ 114211 Match in FY 16 Environmental Compliance ‐ Match 114402 in FY 16 $1,753,661 FFY 2015 Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority BUY REPL SEDAN/STATION WAGON 111216 (3) ‐ Match in FY 16 BUY 40‐FT BUS FOR EXPANSION (2) ‐ 111301 Match in FY 16 442301 Planning ‐ Match in FY 16 PREVENTIVE MAINTENANCE ‐ Match 117A00 in FY 16 NON FIXED ROUTE ADA PARA SERV ‐ 117C00 Match in FY 16 Communications Sys, Including ITS ‐ 114220 Match in FY 16 Purchase ‐ Buses for Expanded 111301 Service, 40' (14) BUY REPL SEDAN/STATION WAGON, 111216 (10) 114402 Rehab/Renovations: UMTS $67,200 $0 $0 $0 $0 $0 $0 $67,200 STIP Action #9 $635,220 $0 $0 $0 $0 $0 $0 $635,220 STIP Action #9 $216,000 $0 $0 $0 $0 $0 $0 $216,000 STIP Action #9 $1,703,581 $0 $0 $0 $0 $0 $0 $1,703,581 STIP Action #9 $1,138,689 $0 $0 $0 $0 $0 $0 $1,138,689 STIP Action #9 $1,311,607 $0 $0 $0 $0 $0 $0 $1,311,607 STIP Action #9 $871,448 $1,895,715 $0 $0 $0 $0 $2,615,270 STIP Action #9 $0 $56,000 $0 $0 $0 $0 $280,000 STIP Action #9 $0 $140,000 $0 $0 $0 $0 $700,000 STIP Action #9 $4,302,361 $0 $0 $0 $0 $4,452,513 $0 $8,754,874 Southeastern Regional 5307 Transit Authority 300901 UP TO 50% FEDERAL SHARE Southeastern Regional 5307 Transit Authority 117C00 ADA Operating Projects $160,000 $0 $0 $0 $0 $40,000 $0 $200,000 Southeastern Regional 5307 Transit Authority 117A00 Preventive Maintenance $640,000 $6,529 $0 $0 $0 $150,000 $0 $796,529 STIP Action #9 Southeastern Regional 5307 Transit Authority 442400 SHORT RANGE TRANSIT PLANNING $96,000 $0 $0 $0 $0 $0 $24,000 Southeastern Regional 5307 Transit Authority 111315 Purchase ‐ Replacement: Vans $280,000 $4,219 $0 $0 $0 $0 $0 $284,219 STIP Action #9 $200,000 $26,592 $0 $0 $0 $0 $0 $226,592 STIP Action #9 $89,600 $22,400 $0 $0 $0 $0 $0 $112,000 STIP Action #9 $116,000 $29,000 $0 $0 $0 $0 $0 $145,000 STIP Action #2* $5,200 $1,300 $0 $0 $0 $0 $0 $6,500 $297,876 $74,469 $0 $0 $0 $0 $0 $372,345 $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 114208 Computer Technologies ‐ Software $152,000 $38,000 $0 $0 $0 $0 $0 $190,000 114207 Computer Technologies ‐ Hardware $146,000 $36,500 $0 $0 $0 $0 $0 $182,500 119302 Enhancements ‐ Shelters $30,000 $7,500 $0 $0 $0 $0 $0 $37,500 119208 Enhancements ‐ Signage $72,800 $18,200 $0 $0 $0 $0 $0 $91,000 113403 TERMINAL, INTERMODAL (TRANSIT) $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 $3,588,677 $0 $0 $0 $0 $897,169 $0 $4,485,846 $52,475 $0 $0 $0 $0 $13,119 $0 $65,594 Southeastern Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Rehab/Renovation: 113407 Surveillance/Security ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT 114211 Purchase ‐ Support Vehicle (3) Purchase ‐ Miscellaneous Support 114220 Equipment Spare Parts / Associated Capital 114220 Maintenance 114306 Purchase Shop Equipment 117A00 PREVENTIVE MAINTENANCE 117900 PROJECT ADMINISTRATION $120,000 FFY 2015 Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Worcester Regional 5307 Transit Authority Massachusetts Bay Transportation 5309 Authority Berkshire Community 5310 Action Council, Inc. Brockton Area Transit 5310 Authority Brookline Multi Service Senior Center 5310 Corporation Cape Ann Transportation 5310 Authority Cape Cod Regional 5310 Transit Authority Cape Cod Regional 5310 Transit Authority 5310 City of Salem (NSCC) 5310 City of Salem (NSCC) 5310 City of Salem (NSCC) Friends of the Acton 5310 Council on Aging 5310 GAAMHA, Inc. 5310 GAAMHA, Inc. Greater Attleboro‐ Taunton Regional 5310 Transit Authority Greater Attleboro‐ Taunton Regional 5310 Transit Authority Greater Lynn Senior 5310 Services, Inc. Greater Lynn Senior 5310 Services, Inc. 5310 HealthCare Options, Inc. Human Resources 5310 Unlimited, Inc. Kennedy Donovan 5310 Center, Inc. Living Independently for 5310 Equality (LIFE) Lowell Regional Transit 5310 Authority Lowell Regional Transit 5310 Authority Martha’s Vineyard Regional Transit 5310 Authority 117C00 NON FIXED ROUTE ADA PARA SERV $902,208 $0 $0 $0 $0 $225,552 $0 $1,127,760 442400 SHORT RANGE TRANSIT PLANNING CONSTRUCT ‐ ADMIN/MAINT 114303 FACILITY $294,824 $0 $0 $0 $0 $73,706 $0 $368,530 $3,512,339 $0 $0 $0 $702,468 $0 $0 $3,512,339 $89,600 $22,400 $0 $0 $0 $0 $100,000,000 $0 $0 $0 $0 $0 $225,202,000 $28,530 $0 $0 $0 $0 $0 $28,530 $57,060 STIP Action #9 $357,152 $0 $89,288 $0 $0 $0 $0 $446,440 STIP Action #9 $59,000 $0 $0 $0 $0 $0 $14,750 $73,750 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (3) $159,144 $0 $39,786 $0 $0 $0 $0 $198,930 STIP Action #9 111215 BUY REPLACEMENT VAN (5) $210,155 $0 $52,540 $0 $0 $0 $0 $262,695 STIP Action #9 $1,591,440 STIP Action #9 Purchase ‐ Replacement: Vans GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR 993000 FLEET MANAGEMENT 111204 BUY REPLACEMENT <30 FT BUS (7) 1000048 MOBILITY MANAGEMENT 111204 BUY REPLACEMENT <30 FT BUS (24) Mobility Management ‐ 442700 Employment Express Mobility Management ‐ 442700 Employment Express (Grant 2) Employment Express ‐ Operating 300900 Assistance $112,000 STIP Action #9 $325,202,000 STIP Action #1* $65,189 $0 ######## $0 $0 $0 $0 $91,784 $0 $0 $0 $0 $0 $22,946 $114,730 STIP Action #3* $53,559 $0 $0 $0 $0 $0 $13,390 $66,949 STIP Action #3* $662,600 $0 $0 $0 $0 $0 $662,600 $1,325,200 STIP Action #3* 300900 OPERATING ASSISTANCE 111204 2 REPLACEMENT Vehicles 440000 GPS/Schedule Management $75,000 $99,668 $18,144 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $75,000 $24,917 $4,536 $150,000 STIP Action #9 $124,585 STIP Action #9 $22,680 STIP Action #9 117L00 Ridematch Expansion $32,000 $0 $0 $0 $0 $0 $8,000 $40,000 STIP Action #9 300901 Med Wheels Operating $33,500 $0 $0 $0 $0 $0 $33,500 $67,000 STIP Action #9 $1,019,636 $0 $0 $0 $0 $0 $254,909 $1,274,545 STIP Action #9 $206,328 $0 $0 $0 $0 $0 $51,583 $257,911 STIP Action #9 $96,640 $0 $0 $0 $0 $0 $24,160 $120,800 STIP Action #9 $256,740 $0 $0 $0 $0 $0 $64,185 $320,925 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (1) $44,332 $0 $0 $0 $0 $0 $11,083 $55,415 STIP Action #9 300900 OPERATING ASSISTANCE MAP Replace 10 Paratransit 111204 Minivans $17,000 $0 $0 $0 $0 $0 $17,000 $34,000 STIP Action #9 $0 $115,815 $0 $0 $0 $0 $579,075 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (23) 440000 PLANNING 111215 BUY REPLACEMENT VANS (2) 131215 PURCHASE REPL VAN (5) $463,260 300900 Weekday Evening ADA Service $52,800 $0 $0 $0 $0 $26,400 $26,400 $105,600 STIP Action #9 111215 BUY REPLACEMENT VANS (1) $48,320 $0 $12,080 $0 $0 $0 $0 $60,400 STIP Action #9 FFY 2015 MetroWest Regional 5310 Transit Authority MetroWest Regional 5310 Transit Authority Montachusett Regional 5310 Transit Authority 111215 BUY REPLACEMENT VAN (8) 111204 BUY REPLACEMENT <30 FT BUS (10) $270,531 $0 $149,782 $0 $0 $0 $0 $420,313 STIP Action #9 $29,903 $0 $546,037 $0 $0 $0 $0 $575,940 STIP Action #9 $241,600 $0 $60,400 $0 $0 $0 $0 $302,000 STIP Action #9 Mystic Valley Elder 5310 Services, Inc. Pioneer Valley Transit 5310 Authority 111215 BUY REPLACEMENT VAN (5) COORDINATION OF NON‐ EMERGENCY HUMAN SERVICE 442612 TRANSPORTATION Rehab/Renovation: 114220 Communications System (ITS) $89,683 $0 $0 $0 $0 $0 $22,421 $112,104 STIP Action #9 $100,862 $25,216 $0 $0 $0 $0 $0 South Shore Community 5310 Action Council 111215 BUY REPLACEMENT VAN (10) $483,200 $0 $0 $0 $0 $0 $120,800 $604,000 STIP Action #9 Southeastern Regional 5310 Transit Authority 111215 BUY REPLACEMENT VAN (2) $96,640 $0 $24,160 $0 $0 $0 $0 $120,800 STIP Action #9 Southern Berkshire Elderly Transportation 5310 Corporation 300900 OPERATING ASSISTANCE $16,150 $0 $0 $0 $0 $0 $16,150 $32,300 STIP Action #9 5310 The Arc of Opportunity 111204 BUY REPLACEMENT <30 FT BUS (1) $44,332 $0 $0 $0 $0 $0 $11,083 $55,415 STIP Action #9 $286,208 $0 $0 $0 $0 $0 $80,919 $367,127 STIP Action #9 300901 Holden / Worcester $19,500 $0 $0 $0 $0 $14,625 $4,875 $39,000 STIP Action #9 300901 SCM Elderbus ReadyBus $33,500 $0 $0 $0 $0 $25,125 $8,375 $67,000 STIP Action #9 300901 SCM Elderbus Mid‐Day $18,935 $0 $0 $0 $0 $14,201 $4,734 $37,870 STIP Action #9 $239,039 $0 $90,575 $0 $0 $0 $0 $329,614 STIP Action #9 $6,270 $0 $0 $0 $0 $6,270 $0 $12,540 $254,862 $0 $0 $0 $0 $0 $254,862 $509,724 $1,095,869 $0 $0 $0 $0 $775,233 $320,636 $2,191,738 300901 UP TO 50% FEDERAL SHARE $845,522 $0 $0 $0 $0 $845,522 $0 $1,691,044 300900 Rural Operating Assistance $531,803 $0 $0 $0 $0 $394,651 $137,152 $1,063,606 300900 Plymouth to Providence Service $200,000 $0 $0 $0 $0 $0 $200,000 $400,000 STIP Action #9 $543,463 STIP Action #9 University of 5310 Massachusetts Amherst Worcester Regional 5310 Transit Authority Worcester Regional 5310 Transit Authority Worcester Regional 5310 Transit Authority Worcester Regional 5310 Transit Authority Berkshire Regional 5311 Transit Authority Berkshire Regional 5311 Transit Authority Franklin Regional Transit 5311 Authority Martha’s Vineyard Regional Transit 5311 Authority Nantucket Regional 5311 Transit Authority Plymouth & Brockton 5311 Street Railway Company Plymouth & Brockton 5311 Street Railway Company Lowell Regional Transit 5320 Authority Greater Attleboro‐ Taunton Regional 5337 Transit Authority Massachusetts Bay Transportation 5337 Authority 441000 STATE PLANNING & RESEARCH 111215 BUY REPLACEMENT VAN (6) 117C00 ADA Operating Projects 300900 Rural Operating Assistance 300900 OPERATING ASSISTANCE $126,078 INTERCITY BUS OPERATING 900000 ASSISTANCE Alternatives Analysis for Lowell 119107 Trolley Expansion $271,731 $0 $0 $0 $0 $0 $271,732 $550,000 $0 $0 $0 $0 $0 $0 123402 REHAB/RENOV ‐ RAIL STATION $673,014 $0 $0 $0 $0 $0 $168,254 $841,268 $60,000,000 $0 $0 $0 $0 $15,000,000 $75,000,000 122404 Bridge & Tunnel Program $550,000 STIP Action #3* FFY 2015 5337 5337 5337 5337 5339 5339 5339 5339 Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Worcester Regional Transit Authority Cape Ann Transportation Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority 123402 Stations ‐ T‐GAPS $40,000,000 $0 $0 $0 $0 $10,000,000 $50,000,000 119400 Systems Upgrades $21,190,546 $0 $0 $0 $0 $5,297,637 $26,488,183 122403 Resiliency Program $50,454,867 $0 $0 $0 $0 $0 $12,613,717 $2,350,015 $0 $0 $0 $0 $0 $587,504 $0 $0 $0 $0 $0 $3,811 $240,000 $60,000 $0 $0 $0 $0 $0 $300,000 STIP Action #9 $48,000 $12,000 $0 $0 $0 $0 $0 $60,000 STIP Action #9 $288,000 $72,000 $0 $0 $0 $0 $360,000 STIP Action #9 $0 $0 $0 $57,189 $0 $0 $285,945 STIP Action #9 $5,287,027 $0 $0 $0 $0 $1,321,757 $460,800 $0 $0 $0 $92,160 $0 $0 $1,037,306 $0 $0 $0 $207,462 $0 $0 $1,037,306 STIP Action #9 $115,000 $0 $0 $0 $23,000 $0 $0 $115,000 STIP Action #9 $50,000 $0 $0 $0 $10,000 $0 $0 $50,000 STIP Action #9 $20,000 $0 $0 $0 $4,000 $0 $0 $20,000 STIP Action #9 $804,733 $201,183 $0 $0 $0 $0 $0 $1,005,916 STIP Action #9 $25,644 $6,411 $0 $0 $0 $0 $0 $32,055 STIP Action #9 $1,654,259 $413,565 $0 $0 $0 $0 $0 $2,067,824 STIP Action #9 $757,970 $0 $0 $0 $0 $0 $0 $757,970 STIP Action #9 $20,000 $0 $0 $0 $0 $0 $0 $20,000 STIP Action #9 113403 TERMINAL, INTERMODAL (TRANSIT) REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP REHAB/RENOVATE ‐ TAUNTON 114403 ADMIN/MAINT FACILITY CONSTRUCT ‐ Wareham BUS 113302 STATION REAL ESTATE ACQUISITION East 117691 Maintenance Facility Lowell Regional Transit 5339 Authority Massachusetts Bay Transportation 5339 Authority Massachusetts Bay Transportation 5339 Authority Massachusetts Bay Transportation 5339 Authority ENGINEERING/DESIGN FOR 113103 GALLAGHER INTERMODAL LOBBY 113400 Bus Stop Accessibility Improvements Montachusett Regional 5339 Transit Authority 111215 BUY REPLACEMENT VANS (2) 119400 Systems Upgrades 111440 REHAB/REBUILD SPARE PARTS $0 $63,068,584 STIP Action #8* $2,937,519 STIP Action #9 $22,864 STIP Action #1* $6,608,784 $460,800 STIP Action #3* Montachusett Regional 5339 Transit Authority Nantucket Regional 5339 Transit Authority Pioneer Valley Transit 5339 Authority PURCHASE BICYCLE ACCESS, FACIL & 119206 EQUIP ON BUSES CONSTRUCTION OF BUS SUPPORT 114300 EQUIP/FACIL Pioneer Valley Transit 5339 Authority Pioneer Valley Transit 5339 Authority Pioneer Valley Transit 5339 Authority Pioneer Valley Transit 5339 Authority REHAB/RENOVATE ‐ Environmental 114103 Compliance & Misc. TERMINAL, INTERMODAL (TRANSIT), 113303 Westfield BUY 40‐FT BUS FOR EXPANSION (2) ‐ 111301 Match in FY 16 Rehab/Renovations: Northampton ‐ 114402 Match in FY 16 Southeastern Regional 5339 Transit Authority 113401 REHAB/RENOVATE ‐ BUS TERMINAL $275,000 $0 $0 $0 $55,000 $0 $0 $275,000 STIP Action #9 Southeastern Regional 5339 Transit Authority ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES $347,000 $0 $0 $0 $69,400 $0 $0 $347,000 STIP Action #9 111216 Purchase ‐ Replacement: Vans (18) FFY 2015 5339 5339 Other Federal Other Federal Other Federal Other Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Springfield Redevelopment Authority Worcester Regional Transit Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Worcester Regional Transit Authority Berkshire Regional Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Brockton Area Transit Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Cape Cod Regional Transit Authority Other Non‐Federal City of Fall River Danvers Council on Other Non‐Federal Aging Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority 113303 TERMINAL, INTERMODAL (TRANSIT) CONSTRUCT ‐ ADMIN/MAINT 114303 FACILITY $832,224 $0 $0 $0 $166,445 $0 $0 $832,224 STIP Action #5* $462,608 $0 $0 $0 $92,522 $0 $0 $462,608 STIP Action #9 113303 Ruggles Station Modernization $20,000,000 $0 $0 $0 $0 $0 $10,000,000 $30,000,000 STIP Action #3* 122400 Charlestown Seawall Replacement $13,391,443 $0 $0 $0 $0 $0 $4,463,815 $17,855,258 STIP Action #3* $21,673,689 $0 $0 $0 $0 $0 $7,224,564 $28,898,253 STIP Action #3* $1,002,600 $0 $0 $0 $200,520 $0 $0 $1,002,600 STIP Action #9 $0 $138,406 $0 $0 $0 $0 $0 $138,406 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (7) $0 $0 $0 $0 $0 $0 $455,000 $455,000 111215 BUY REPLACEMENT VAN COA (3) VEH OVERHAUL (UP TO 20% VEH 111700 MAINT) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $0 $0 $0 $0 $0 $0 $180,000 $180,000 $0 $70,000 $0 $0 $0 $0 $0 $70,000 STIP Action #9 $0 $8,000 $0 $0 $0 $0 $0 $8,000 STIP Action #9 $0 $14,040 $0 $0 $0 $0 $0 $14,040 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY $0 $121,824 $0 $0 $0 $0 $121,824 STIP Action #9 $0 $87,538 $0 $0 $0 $0 $0 $87,538 STIP Action #9 114207 ACQUIRE ‐ ADP HARDWARE CONSTRUCT BICYCLE ACCESS, FACIL 119306 & EQUIP ON BUSES $0 $10,575 $0 $0 $0 $0 $0 $10,575 STIP Action #9 $0 $13,000 $0 $0 $0 $0 $0 $13,000 STIP Action #9 113400 REHAB/RENOVATE BUS STATIONS ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES $0 $4,198 $0 $0 $0 $0 $0 $4,198 STIP Action #9 $0 $641,880 $0 $0 $0 $0 $0 $641,880 STIP Action #9 113400 REHAB/RENOVATE BUS STATIONS $0 $140,000 $0 $0 $0 $0 $0 $140,000 STIP Action #9 114208 ACQUIRE ‐ ADP SOFTWARE $0 $31,500 $0 $0 $8,213 $0 $0 $31,500 STIP Action #9 442400 SHORT RANGE TRANSIT PLANNING $0 $6,600 $0 $0 $0 $0 $0 $6,600 STIP Action #9 113103 TERMINAL, INTERMODAL (TRANSIT) BUY REPLACEMENTS ‐ CAPITOL BUS 111200 (1) $0 $24,000 $0 $0 $0 $0 $24,000 STIP Action #9 $0 $0 $44,332 $0 $0 $0 $11,083 $55,415 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (1) $0 $0 $44,332 $0 $0 $0 $11,083 $55,415 STIP Action #9 119402 Transit Enhancements: Bus Shelters ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT CONSTRUCT COMMUNICATIONS 116302 SYSTEM $0 $20,000 $0 $0 $0 $0 $0 $20,000 $0 $12,900 $0 $0 $0 $0 $0 $12,900 STIP Action #9 $0 $149,970 $0 $0 $0 $0 $0 $149,970 STIP Action #9 Green Line Fenway Portal Flood 112303 Proofing Electric Bus Charger w/Gen. (LoNo 114220 Section 5312) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT FFY 2015 Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Greater Attleboro‐ Taunton Regional Other Non‐Federal Transit Authority Lowell Regional Transit Other Non‐Federal Authority Martha's Vineyard Regional Transit Other Non‐Federal Authority BUY REPLACEMENT <30 FT BUS (3 111204 Minibuses) REAL ESTATE ACQUISITION ‐ 117691 MAINTENANCE FACILITY ACQUIRE ‐ ADA VEHICLE 114243 EQUIPMENT REHAB/RENOV COMMUNICATIONS 116402 SYSTEM Rehab/Renovation: Terminal, 113403 Intermodal REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP $0 $236,139 $0 $0 $0 $0 $0 $236,139 STIP Action #9 $0 $1,200,000 $0 $0 $0 $0 $0 $0 $15,000 $0 $0 $0 $0 $0 $15,000 STIP Action #9 $0 $4,500 $0 $0 $0 $0 $0 $4,500 STIP Action #9 $0 $10,000 $0 $0 $0 $0 $10,000 STIP Action #9 $0 $15,000 $0 $0 $0 $0 $15,000 STIP Action #9 114406 Rehab/Renovation: Shop Equipment $0 $10,000 $0 $0 $0 $0 $10,000 STIP Action #9 111203 BUY REPLACEMENT 30‐FT BUS ‐ 3 $0 $192,000 $0 $0 $0 $0 $0 111215 BUY REPLACEMENT VAN (12) $0 $0 $136,984 $0 $0 $0 $547,936 $684,920 STIP Action #9 114220 ACQUIRE ‐ Vehicle Lift $0 $34,000 $0 $0 $0 $0 $0 $34,000 STIP Action #9 REHAB/RENOVATE ‐ Taunton 114403 Admin/Terminal Facility $0 $15,000 $0 $0 $0 $0 $0 $15,000 STIP Action #9 111215 BUY REPLACEMENT VAN ‐ 3 $0 $30,000 $0 $0 $0 $0 $0 $30,000 STIP Action #9 BUY REPLACEMENT 8 Passenger 111215 VAN $0 $55,000 $0 $0 $0 $0 $0 $55,000 STIP Action #9 Acquire Conference/Training Room 114220 Replace Furniture $0 $12,000 $0 $0 $0 $0 $0 $12,000 STIP Action #9 REHAB/RENOVATE ‐ Painting 114402 Maintenance Facility $0 $6,000 $0 $0 $0 $0 $0 $6,000 STIP Action #9 114402 Replace Fuel Island Concrete Pad $0 $35,000 $0 $0 $0 $0 $0 $35,000 STIP Action #9 ACQUIRE ‐ Dispatching 114220 Enhancement Equipment $0 $2,000 $0 $0 $0 $0 $0 $2,000 STIP Action #9 Maintenance Facility ‐ Wash Bay 114402 Light Replacement $0 $15,000 $0 $0 $0 $0 $0 $15,000 STIP Action #9 Maintenance Facility ‐ Wash Bay 114402 Door Replacement $0 $65,000 $0 $0 $0 $0 $0 $65,000 STIP Action #9 Intermodal Center Security 113407 Enhancments $0 $40,000 $0 $0 $0 $0 $0 $40,000 STIP Action #9 ACQUIRE ‐ Administrative Office 114220 Furniture $0 $22,500 $0 $0 $0 $0 $0 $22,500 STIP Action #9 111403 Mid‐Life Overhaul 2008 Gilligs $0 $105,000 $0 $0 $0 $0 $0 111203 BUY REPLACEMENT 30‐FT BUS (4) $0 $1,385,000 $0 $0 $0 $0 $0 $1,200,000 $192,000 $105,000 $1,385,000 STIP Action #9 FFY 2015 Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Martha's Vineyard Regional Transit Authority Massachusetts Bay Transportation Authority Merrimack Valley Regional Transit Authority MetroWest Regional Transit Authority Rehab/Renovation: Maintenance 113420 Facility $0 $105,000 $0 $0 $0 $0 $0 $105,000 STIP Action #9 114206 ACQUIRE ‐ SHOP EQUIPMENT $0 $25,000 $0 $0 $0 $0 $0 $25,000 STIP Action #9 111400 REHAB/REBUILD ‐ CAPITOL BUS $0 $125,000 $0 $0 $0 $0 $0 $125,000 STIP Action #9 114211 ACQUIRE ‐ SUPPORT VEHICLES (1) $0 $85,000 $0 $0 $0 $0 $0 $85,000 STIP Action #9 ACQUIRE ‐ MISC BUS STATION 113220 EQUIP $0 $50,000 $0 $0 $0 $0 $0 $50,000 STIP Action #9 ACQUIRE ‐ SURVEIL/SECURITY 113207 EQUIP $0 $15,000 $0 $0 $0 $0 $0 $15,000 STIP Action #9 114220 ACQUIRE ‐ MISC EQUIPMENT $0 $78,000 $0 $0 $0 $0 $0 $78,000 STIP Action #9 114211 ACQUIRE ‐ SUPPORT VEHICLES $0 $152,000 $0 $0 $0 $0 $0 $152,000 STIP Action #9 REHAB/RENOVATE ‐ SUPPORT 114411 VEHICLES $0 $27,000 $0 $0 $0 $0 $0 $27,000 STIP Action #9 REHAB/RENOVATE ‐ MISC BUS 113420 STATION EQUIPMENT $0 $66,000 $0 $0 $0 $0 $0 $66,000 STIP Action #9 111215 BUY REPLACEMENT VAN (2) $0 $28,000 $0 $0 $0 $0 $28,000 STIP Action #9 REHAB/RENOVATE ‐ SHOP 114406 EQUIPMENT $0 $250,000 $0 $0 $0 $0 $250,000 STIP Action #9 HEAVY RAIL CARS ‐ Red/Orange 121221 Lines $0 $0 $0 $0 $0 $0 $82,130,340 $82,130,340 STIP Action #9 3 Model Year 2000 Commuter Buses 111207 Delivery FY2015 REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY $0 $330,000 $0 $0 $0 $0 $0 $0 $1,500,000 $0 $0 $0 $0 $0 $1,500,000 STIP Action #9 Montachusett Regional Other Non‐Federal Transit Authority 111215 Purchase ‐ Replacement: Vans (8) $0 $89,702 $0 $0 $0 $0 $0 $89,702 STIP Action #9 Montachusett Regional Other Non‐Federal Transit Authority ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $0 $60,000 $0 $0 $0 $0 $0 $60,000 Montachusett Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY $0 $440 $0 $0 $0 $0 $0 Montachusett Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY $0 $42,647 $0 $0 $0 $0 $0 $42,647 Montachusett Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FAC (FY13 5307 Match) $0 $15,777 $0 $0 $0 $0 $0 $15,777 STIP Action #9 Other Non‐Federal Other Non‐Federal $330,000 $440 STIP Action #9 FFY 2015 Montachusett Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY $0 $78,769 $0 $0 $0 $0 $0 $78,769 STIP Action #9 Montachusett Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ MISC SUPPORT 114420 EQUIPMENT $0 $54,087 $0 $0 $0 $0 $0 $54,087 STIP Action #9 Montachusett Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Nantucket Regional Other Non‐Federal Transit Authority Newbury Council on Other Non‐Federal Aging Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority REHAB/RENOVATE ‐ 114401 ADMINISTRATIVE FACILITY $0 $60,225 $0 $0 $0 $0 $0 $60,225 STIP Action #9 111203 BUY REPLACEMENT 30‐FT BUS (2) REHAB/RENOVATE ‐ MISC SUPPORT 114420 EQUIPMENT $0 $207,877 $0 $0 $0 $0 $0 $207,877 STIP Action #9 $0 $6,530 $0 $0 $0 $0 $0 $6,530 STIP Action #9 111304 BUY <30‐FT BUS FOR EXPANSION $0 $222,279 $0 $0 $0 $0 $0 $222,279 STIP Action #9 134406 REHAB SHOP EQUIPMENT $0 $249 $0 $0 $0 $0 $0 $249 STIP Action #9 1000002 PREVENTIVE MAINTENANCE $0 $7,260 $0 $0 $0 $0 $0 $7,260 STIP Action #9 111415 REHAB/REBUILD VAN $0 $5,085 $0 $0 $0 $0 $0 $5,085 STIP Action #9 116203 PURCHASE RADIOS REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP $0 $5,000 $0 $0 $0 $0 $0 $5,000 STIP Action #9 $0 $1,264 $0 $0 $0 $0 $0 $1,264 STIP Action #9 111404 REHAB/REBUILD <30‐FT BUS $0 $5,926 $0 $0 $0 $0 $0 $5,926 STIP Action #9 113400 REHAB/RENOVATE BUS STATIONS $0 $915 $0 $0 $0 $0 $0 $915 STIP Action #9 111204 BUY REPLACEMENT <30 FT BUS (1) Construction:Springfield O&M, Year 114303 1 REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY ENG/DESIGN ‐ BUSWAY‐Union 112101 Station CONSTRUCTION OF BUS TERMINAL‐ 113300 Union Station $0 $0 $48,320 $0 $0 $0 $12,080 $60,400 STIP Action #9 $0 $2,330,000 $0 $0 $0 $0 $0 $2,330,000 STIP Action #9 $0 $641,471 $0 $0 $0 $0 $0 $641,471 STIP Action #9 $0 $640,447 $0 $0 $0 $0 $0 $640,447 STIP Action #9 $0 $100,000 $0 $0 $0 $0 $0 $100,000 STIP Action #9 $0 $30,000 $0 $0 $0 $0 $0 $30,000 STIP Action #9 $0 $17,500 $0 $0 $0 $0 $0 $17,500 STIP Action #9 114402 Rehab/Renovation: SATCO $0 $1,925,000 $0 $0 $0 $0 $1,925,000 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority PRELIMINARY ENGINEERING ‐ 3RD 117101 PARTY $0 $40,000 $0 $0 $0 $0 $0 $40,000 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority 114102 ENG/DESIGN ‐ MAINT FACILITY $0 $5,538 $0 $0 $0 $0 $0 $5,538 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority 119202 PURCHASE BUS SHELTERS $0 $4,696 $0 $0 $0 $0 $0 $4,696 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority 119208 PURCHASE SIGNAGE $0 $10,703 $0 $0 $0 $0 $0 $10,703 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority 116100 ENGINEERING & DESIGN $0 $6,104 $0 $0 $0 $0 $0 $6,104 STIP Action #9 FFY 2015 Southeastern Regional Other Non‐Federal Transit Authority OTHER 3RD PARTYCONTRACTUAL 117111 SERVICES $0 $20,000 $0 $0 $0 $0 $0 $20,000 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $0 $1,987 $0 $0 $0 $0 $0 $1,987 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority 114207 ACQUIRE ‐ ADP HARDWARE $0 $1,662 $0 $0 $0 $0 $0 $1,662 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority ACQUIRE ‐ MOBILE FARE COLL 114210 EQUIP $0 $18,000 $0 $0 $0 $0 $0 $18,000 STIP Action #9 Southeastern Regional Other Non‐Federal Transit Authority Worcester Regional Other Non‐Federal Transit Authority REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY CONSTRUCT ‐ ADMIN/MAINT 114303 FACILITY $0 $971 $0 $0 $0 $0 $0 $971 STIP Action #9 $0 $12,225,274 $0 $0 $0 $0 $0 $12,225,274 STIP Action #9 FFY 2016 FTA Program Transit Agency FTA Activity Line Item Project Description Berkshire Regional 5307 Transit Authority Rehab/Renovation: 114301 Intermodal Bus Deck Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Berkshire Regional 5307 Transit Authority Transit Enhancements: 114403 Bus Lift Replacement Rehab/Renovation: 114409 Surveillance/Security Rehab/Renovation: 114406 Shop Equipment BUY REPLACEMENT VAN 111215 (5) ACQUIRE ‐ SUPPORT 114211 VEHICLES (2) BUY REPLACEMENT VAN 111215 (5) Carryover or Earmark Federal Funds Detail RTACAP MAP ICB TDC SCA LocalFunds Total Cost $120,000 $30,000 $0 $0 $0 $0 $0 $150,000.00 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000.00 $20,800 $5,200 $0 $0 $0 $0 $0 $26,000.00 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000.00 $292,000 $73,000 $0 $0 $0 $0 $0 $365,000.00 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000.00 $478,400 $119,600 $0 $0 $0 $0 $0 $598,000.00 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000.00 2015 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000.00 2015 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000.00 2015 $448,000 $112,000 $0 $0 $0 $0 $0 $560,000.00 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000.00 $140,000 $35,000 $0 $0 $0 $0 $0 $175,000.00 $2,138,584 $0 $0 $0 $0 $2,500,000 $0 $0 $0 $0 $0 $0 $400,000 $400,000 $800,000.00 300900 Operating: Rockland $0 $0 $0 $0 $0 $110,000 $110,000 $220,000.00 $0 $0 $0 $0 $0 $15,000 $15,000 $30,000.00 $0 $0 $0 $0 $0 $0 $470,000 $470,000.00 $0 $0 $0 $0 $0 $0 $185,000 $185,000.00 Preventive Maintenance Notes Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Other Non‐ Brockton Area Federal Transit Authority Other Non‐ Brockton Area Federal Transit Authority Other Non‐ Brockton Area Federal Transit Authority Other Non‐ Brockton Area Federal Transit Authority Other Non‐ Brockton Area Federal Transit Authority Brockton Area 5307 Transit Authority REHAB/RENOV‐ 116400 COMMUNICATIONS EQ ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT VEH OVERHAUL (UP TO 111700 20% VEH MAINT) ACQUIRE ‐ SUPPORT 114211 VEHICLES (2) BUY ASSOC CAP MAINT 111240 ITEMS 300900 Operating: Easton BUY REPLACEMENT <30 111204 FT BUS (7) BUY REPLACEMENT VAN 111215 COA (3) BUY <30‐FT BUS FOR 111304 EXPANSION 2013 $52,000 $13,000 $0 $0 $0 $0 $65,000.00 STIP Action #9 Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Brockton Area 5307 Transit Authority Cape Ann Transportation 5307 Authority REHAB/RENOVATE ‐ 114402 MAINTENANCE FACILITY 2013 $103,200 $25,800 $0 $0 $0 $0 $129,000.00 STIP Action #9 2014, 2015 $2,500,000 $0 $0 $0 $2,500,000 $0 $5,000,000.00 STIP Action #9 2014 $244,771 $61,193 $0 $0 $0 $114,036 $193,391 $0 $0 $0 $0 $48,347 300900 Operating/PM/ADA Operating: Sunday 300900 Service 300900 Operating/PM/ADA BUY REPLACEMENT 40‐ 111201 FT BUS 117A00 PREVENTIVE MAINTENANCE 2014, 2015 $0 $5,000,000.00 STIP Action #9 $420,000.00 STIP Action #3* $241,738.00 FFY 2016 5307 5307 Other Non‐ Federal 5339 5307 Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Ann Transportation Authority Cape Cod Regional Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority Cape Cod Regional 5307 Transit Authority 5320 City of Lowell Franklin Regional 5311 Transit Authority Other Non‐ Franklin Regional Federal Transit Authority Other Non‐ Federal Other Non‐ Federal Other Non‐ Federal Other Non‐ Federal Other Non‐ Federal Franklin Regional Transit Authority Franklin Regional Transit Authority Franklin Regional Transit Authority Franklin Regional Transit Authority Franklin Regional Transit Authority Greater Attleboro‐ Taunton Regional 5307 Transit Authority BUY REPLACEMENT 30‐ 111203 FT BUS (1) $320,000 $80,000 $0 $0 $0 $0 $0 ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT $22,001 $5,501 $0 $0 $0 $0 $0 $27,502.00 $0 $120,499 $0 $0 $0 $0 $0 $120,499.00 $0 $0 $0 $0 $0 $3,849 $44,000 $11,000 $0 $0 $0 $0 $0 $55,000.00 $42,436 $10,609 $0 $0 $0 $0 $0 $53,045.00 2013, 2014 $1,160,000 $0 $0 $0 $290,000 $0 $1,450,000.00 STIP Action #9 2014 $2,133,446 $0 $0 $0 $533,361 $0 $2,666,807.00 STIP Action #9 2013, 2014 $436,720 $109,180 $0 $0 $0 $0 $545,900.00 STIP Action #9 2014 $1,068,833 $267,208 $0 $0 $0 $0 $1,336,041.00 STIP Action #9 CONSTRUCT LANDSCAPING / SCENIC 119303 BEAUTIFICATION NON FIXED ROUTE ADA 117C00 PARA SERV 2014 $22,756 $5,689 $0 $0 $0 $0 $28,445.00 STIP Action #9 2013 $511,463 $0 $0 $0 $127,866 $0 $639,329.00 STIP Action #9 300900 OPERATING ASSISTANCE 2013 $700,000 $0 $0 $0 $700,000 $0 $1,400,000.00 STIP Action #9 $1,042,292 $0 $1 $0 $0 $0 $0 $1,042,293.00 STIP Action #9 $1,106,088 $0 $0 $0 $0 $775,233 $330,855 $2,212,176.00 $0 $10,000 $0 $0 $0 $0 $0 $10,000.00 $0 $100,000 $0 $0 $0 $0 $0 $100,000.00 $0 $10,000 $0 $0 $0 $0 $0 $10,000.00 $0 $45,000 $0 $0 $0 $0 $0 $45,000.00 $0 $10,000 $0 $0 $0 $0 $0 $10,000.00 $0 $12,000 $0 $0 $0 $0 $0 $12,000.00 $80,000 $0 $0 $0 $0 $20,000 $0 $100,000.00 1 29' bus REHAB/RENOVATE BUS 114400 SUPPORT FACIL/EQUIP ACQUIRE ‐ ADP 114207 HARDWARE CONSTRUCT BICYCLE ACCESS, FACIL & EQUIP 119306 ON BUSES MOBILITY 117L00 MANAGEMENT PREVENTIVE 117A00 MAINTENANCE REHAB/RENOVATE BUS 113400 STATIONS ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES Eng/Design for the 119107 Lowell Trolley Expansion 300900 OPERATING ASSISTANCE ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT Rehab/Renovation: Communications 116402 Systems Rehab/Renovation: 114409 Surveillance/Security Rehab/Renovation: 114411 Support Vehicles Rehab/Renovation: 114406 Shop Equipment Rehab/Renovation: 114403 Admin/Maint Facility SHORT RANGE TRANSIT 442400 PLANNING 2015 2014 $400,000.00 STIP Action #1* $23,093.00 STIP Action #1* FFY 2016 Greater Attleboro‐ Taunton Regional 5307 Transit Authority 5307 5307 5307 5307 5307 5307 5307 5307 5339 5307 Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional Transit Authority Greater Attleboro‐ Taunton Regional 5307 Transit Authority Greater Attleboro‐ Taunton Regional 5337 Transit Authority Greater Attleboro‐ Taunton Regional 5339 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority 117A00 117C00 PREVENTIVE MAINTENANCE 2014 $2,800,000 $0 $0 $0 $0 $700,000 $0 $3,500,000.00 PURCHASE LANDSCAPING / SCENIC 119203 BEAUTIFICATION 2014 $37,500 $7,500 $0 $0 $0 $0 $0 $45,000.00 NON FIXED ROUTE ADA PARA SERV 2014 $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000.00 300901 Operating Assistance 2015 $400,000 $0 $0 $0 $0 $400,000 $0 $800,000.00 Purchase ‐ 111203 Replacement: Buses ‐ 5 2015 $849,000 $206,000 $0 $0 $0 $0 $0 $1,055,000.00 Purchase ‐ 111215 Replacement: Vans ‐ 8 2015 $500,000 $0 $0 $0 $0 $0 $125,000 $625,000.00 ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT 2014 $40,000 $10,000 $0 $0 $0 $0 $0 $50,000.00 2014, 2015 $159,947 $130,000 $0 $0 $0 $0 $0 $650,000.00 STIP Action #9 ENG/DESIGN ‐ EAST 114102 MAINT. FACILITY 2015 $390,323 $97,581 $0 $0 $0 $0 $0 $487,904.00 ENG/DESIGN ‐ EAST 114102 MAINT FACILITY 2015 $31,448 $72,419 $0 $0 $0 $0 $0 $362,096.00 STIP Action #9 2013 $180,000 $0 $0 $0 $45,000 $0 $225,000.00 STIP Action #9 2014, 2015 $520,000 $130,000 $0 $0 $0 $0 $650,000.00 STIP Action #9 REHAB/RENOV ‐ RAIL 123402 STATION 2012 $662,154 $0 $0 $0 $0 $165,539 $827,693.00 STIP Action #9 ENG/DESIGN ‐ EAST 114102 MAINT FACILITY 2015 $289,677 $72,419 $0 $0 $0 $0 $362,096.00 STIP Action #9 2015 $80,000 $0 $0 $0 $0 $0 $20,000 $100,000.00 2015 $104,000 $26,000 $0 $0 $0 $0 $0 $130,000.00 2015 $1,078,440 $0 $0 $0 $0 $269,610 $0 $1,348,050.00 2014, 2015 $4,000 $0 $0 $0 $0 $3,405,200 $2,538,614 REHAB/RENOVATE ‐ TAUNTON 114403 ADMIN/MAINT FACILITY 117L00 MOBILITY MANAGEMENT REHAB/RENOVATE ‐ TAUNTON 114403 ADMIN/MAINT FACILITY SHORT RANGE TRANSIT 442400 PLANNING 2016 Purchase ‐ Capital Spare 111240 Parts PREVENTIVE 117A00 MAINTENANCE 2016 Operating Assistance 300901 2016 $7,607,500.00 STIP Action #9 FFY 2016 BUY REPLACEMENT 30‐ 111203 FT DIESEL BUSES (8) Replace (6) CNG Fixed 111203 Route Buses Operating Assistance 300901 2016 BUY REPLACEMENT 30‐ 111203 FT DIESEL BUSES (8) Lowell Regional 5307 Transit Authority Other Non‐ Lowell Regional Federal Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5307 Transit Authority Lowell Regional 5339 Transit Authority Martha’s Vineyard Regional 5311 Transit Authority Martha’s Other Non‐ Vineyard Regional Federal Transit Authority Martha’s Other Non‐ Vineyard Regional Federal Transit Authority Martha’s Other Non‐ Vineyard Regional Federal Transit Authority Martha’s Other Non‐ Vineyard Regional Federal Transit Authority Martha’s Other Non‐ Vineyard Regional Federal Transit Authority Massachusetts Bay Transportation 5307 Authority Massachusetts Bay Transportation 5307 Authority Massachusetts Bay Transportation 5309 Authority Massachusetts Bay Transportation 5337 Authority Massachusetts Bay Transportation 5337 Authority Massachusetts Bay Transportation 5337 Authority Massachusetts Bay Transportation 5339 Authority $561,030 $626,240 $0 $0 $0 $0 $0 $1,187,270.00 STIP Action #3* $0 $500,000 $0 $0 $0 $0 $0 $500,000.00 STIP Action #9 2014, 2015 2012, 2013, 2014 $1,663,686 $0 $0 $0 $3,405,200 $2,538,614 $7,607,500.00 STIP Action #9 $2,504,960 $626,240 $0 $0 $0 $0 $3,131,200.00 STIP Action #9 2012 $5,342 $1,336 $0 $0 $0 $0 $6,678.00 STIP Action #9 2013, 2014 $1,936,000 $484,000 $0 $0 $0 $0 $2,420,000.00 STIP Action #9 2014 $142,965 $49,997 $0 $0 $0 $0 $192,962.00 STIP Action #9 2015 $854,721 $0 $0 $0 $0 $854,721 $0 $1,709,442.00 BUY REPLACEMENT 30‐ 111203 FT BUS (3) $0 $975,000 $0 $0 $0 $0 $0 $975,000.00 Purchase ‐ 111215 Replacement: Vans (1) $0 $15,000 $0 $0 $0 $0 $0 $15,000.00 ACQUIRE ‐ SUPPORT 114211 VEHICLES $0 $100,000 $0 $0 $0 $0 $0 $100,000.00 REHAB/REBUILD ‐ 111400 CAPITOL BUS $0 $500,000 $0 $0 $0 $0 $0 $500,000.00 REHAB/RENOVATE ‐ 114402 MAINTENANCE FACILITY $0 $50,000 $0 $0 $0 $0 $0 $50,000.00 $12,000,000 $0 $0 $0 $0 $0 $3,000,000 $15,000,000.00 $58,685,516 $0 $0 $0 $0 $0 $14,671,379 $73,356,895.00 $150,000,000 $0 $0 $0 $0 $0 $222,626,000 $372,626,000.00 STIP Action #1* Bridge & Tunnel 122404 Program $85,000,000 $0 $0 $0 $0 $0 $21,250,000 $106,250,000.00 123402 Stations ‐ T‐GAPS $16,000,000 $0 $0 $0 $0 $0 $4,000,000 $20,000,000.00 119400 Systems Upgrades $20,190,546 $0 $0 $0 $0 $0 $5,047,637 $25,238,183.00 119400 Systems Upgrades $5,287,027 $0 $0 $0 $0 $0 $1,321,757 111215 BUY REPLACEMENT VAN Replace (6) CNG Fixed 111203 Route Buses Purchase ‐ Replacement: Fixed 111215 Route Vans (2) UP TO 50% FEDERAL 300901 SHARE 117A00 PREVENTIVE MAINTENANCE 119400 Systems Upgrades GREEN LINE EXTENSION: COLLEGE AVE/UNION 132303 SQ SPUR 2014 $6,608,784.00 FFY 2016 Massachusetts Bay Other Non‐ Transportation Federal Authority Massachusetts Bay Transportation 5307 Authority Merrimack Valley Regional Transit 5307 Authority 5307 5307 5307 5307 5307 5307 5307 Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority Merrimack Valley Regional Transit Authority HEAVY RAIL CARS ‐ 121221 Red/Orange Lines $0 $0 $0 $0 $0 $18,995,732 $18,995,732.00 STIP Action #9 $64,000,000 $0 $0 $0 $0 $16,000,000 $80,000,000.00 STIP Action #9 2014 $2,352,000 $588,000 $0 $0 $0 $0 $0 $2,940,000.00 Rehab/Renovation: Buckley Transportation Center Lawrence 2014 $200,000 $50,000 $0 $0 $0 $0 $0 $250,000.00 ADA Operating Expense 2014 $1,101,730 $0 $0 $0 $0 $275,430 $0 $1,377,160.00 2014, 2015 $364,410 $0 $0 $0 $0 $626,265 $0 $3,131,330.00 STIP Action #9 2014 $285,000 $57,000 $0 $0 $0 $0 $0 MVPC Technical Support 400000 to MVRTA 2015 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000.00 STIP Action #9 Continue Short 440000 RangeTransit Planning 2015 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000.00 STIP Action #9 2014, 2015 $2,505,065 $0 $0 $0 $626,265 $0 $3,131,330.00 STIP Action #9 HEAVY RAIL CARS ‐ 121221 Red/Orange Lines Purchase ‐ Replacement: Buses 7 Model Year 2004 De Preventive Maintenance Expense Replace 5 Model year Vans with New Preventive Maintenance Expense $0 $342,000.00 2015 $471,356 $117,840 $0 $0 $0 $0 $589,196.00 STIP Action #9 MetroWest Regional 5307 Transit Authority TERMINAL, 113403 INTERMODAL (TRANSIT) ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2015 $80,000 $20,000 $0 $0 $0 $0 $100,000.00 STIP Action #9 MetroWest Regional 5307 Transit Authority ACQUIRE ‐ MOBILE 114209 SURV/SECURITY EQUIP 2015 $50,000 $12,500 $0 $0 $0 $0 $62,500.00 STIP Action #9 MetroWest Regional 5307 Transit Authority TERMINAL, 113303 INTERMODAL (TRANSIT) 2015 $20,000 $5,000 $0 $0 $0 $0 $25,000.00 STIP Action #9 MetroWest Regional 5307 Transit Authority 119208 PURCHASE SIGNAGE 2015 $20,000 $5,000 $0 $0 $0 $0 $25,000.00 STIP Action #9 2015 $1,000,000 $0 $0 $0 $250,000 $0 $1,250,000.00 STIP Action #9 2015 $65,000 $16,250 $0 $0 $0 $0 $81,250.00 STIP Action #9 $120,000 $30,000 $0 $0 $0 $0 MetroWest Regional 5307 Transit Authority MetroWest Regional 5307 Transit Authority 117C00 MetroWest Regional 5307 Transit Authority Montachusett Regional Transit 5307 Authority NON FIXED ROUTE ADA PARA SERV ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT $0 $150,000.00 FFY 2016 5307 5307 5307 5307 5307 5307 Other Non‐ Federal Montachusett Regional Transit Authority Montachusett Regional Transit Authority Montachusett Regional Transit Authority Montachusett Regional Transit Authority Montachusett Regional Transit Authority Montachusett Regional Transit Authority Montachusett Regional Transit Authority Nantucket Regional 5311 Transit Authority 117A00 PREVENTIVE MAINTENANCE $800,000 $0 $0 $0 $0 $200,000 $0 $1,000,000.00 $1,455,500 $0 $0 $0 $0 $1,455,500 $0 $2,911,000.00 REHAB/RENOVATE ‐ 114403 ADMIN/MAINT FACILITY $108,000 $27,000 $0 $0 $0 $0 $0 $135,000.00 REHAB/RENOVATE ‐ 113404 BUS PARK & RIDE LOT $200,000 $50,000 $0 $0 $0 $0 $0 $250,000.00 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000.00 $160,000 $40,000 $0 $0 $0 $0 $0 $200,000.00 $0 $165,200 $0 $0 $0 $0 $0 $165,200.00 STIP Action #9 $537,588 $0 $0 $0 $0 $394,651 $142,937 $1,075,176.00 UP TO 50% FEDERAL 300901 SHARE REHAB/RENOVATE BUS 114400 SUPPORT FACIL/EQUIP BUY REPLACEMENT <30 111204 FT BUS (2) BUY REPLACEMENT 30‐ FT BUS (2) (Matching 111203 FY15 5307) 300900 OPERATING ASSISTANCE 2015 Other Non‐ Nantucket Regional Federal Transit Authority BUY REPLACEMENT 30‐ 111203 FT BUS (3) $0 $480,000 $0 $0 $0 $0 $0 $480,000.00 Other Non‐ Nantucket Regional Federal Transit Authority REHAB/RENOVATE ‐ 114402 MAINTENANCE FACILITY $0 $5,000 $0 $0 $0 $0 $0 $5,000.00 Other Non‐ Nantucket Regional Federal Transit Authority CONSTRUCTION ‐ BUS 119302 SHELTERS $0 $50,000 $0 $0 $0 $0 $0 $50,000.00 Other Non‐ Nantucket Regional Federal Transit Authority ACQUIRE ‐ MOBILE 114209 SURV/SECURITY EQUIP Construction: Maintenance/Storage 114402 Facility Rehab/Renovation: 114206 Shop Equipment $0 $150,000 $0 $0 $0 $0 $0 $150,000.00 $0 $50,000 $0 $0 $0 $0 $0 $50,000.00 2015 $24,000 $6,000 $0 $0 $0 $0 $0 $30,000.00 Pioneer Valley 5307 Transit Authority Transit Enhancements: 119302 Shelters 2015 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000.00 Pioneer Valley 5307 Transit Authority Transit Enhancements: 119308 Signs/Lighting Rehab/Renovation: Communications 114220 Systems (ITS) 2015 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000.00 2015 $1,438,006 $359,501 $0 $0 $0 $0 $0 $1,797,507.00 Rehab/Renovation: 116220 Misc. Communications 2015 $3,155,010 $829,821 $0 $0 $0 $0 $0 $3,984,831.00 442301 Planning 2015 $208,000 $0 $0 $0 $0 $52,000 $0 $260,000.00 Other Non‐ Nantucket Regional Federal Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority FFY 2016 Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority ACQUIRE ‐ SUPPORT 114211 VEHICLES, (1) Rehab/Renovations: 114402 Northampton REHAB/RENOVATE ‐ Environmental 114402 Compliance Transit Enhancements: Bike equipment shel. 119306 bus BUY REPLACEMENT <30 111204 FT BUS, (2) Pioneer Valley 5307 Transit Authority Purchase ‐ 111215 Replacement: Vans (20) 2015 $928,000 $232,000 $0 $0 $0 $0 $0 $1,160,000.00 Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5339 Transit Authority BUY REPLACEMENT VAN 111215 non accessable (5) 2015 $112,000 $28,000 $0 $0 $0 $0 $0 $140,000.00 Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Pioneer Valley 5307 Transit Authority Other Non‐ Federal Other Non‐ Federal Pioneer Valley Transit Authority Pioneer Valley Transit Authority Other Non‐ Pioneer Valley Federal Transit Authority Other Non‐ Federal Other Non‐ Federal Other Non‐ Federal Other Non‐ Federal Pioneer Valley Transit Authority Pioneer Valley Transit Authority Pioneer Valley Transit Authority Pioneer Valley Transit Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority 2015 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000.00 2015 $1,360,000 $340,000 $0 $0 $0 $0 $0 $1,700,000.00 2015 $68,000 $17,000 $0 $0 $0 $0 $0 $85,000.00 2015 $6,400 $1,600 $0 $0 $0 $0 $0 $8,000.00 2015 $152,000 $38,000 $0 $0 $0 $0 $0 $190,000.00 117C00 ADA Operating Projects 2015 $1,192,998 $0 $0 $0 $0 $298,250 $0 $1,491,248.00 117A00 Preventive Maintenance REHAB/RENOVATE ‐ UMTS Rehab/Renovations: UMTS BUY REPL SEDAN/STATION WAGON, (5) Construction: Northampton, Year 1 BUY 40‐FT BUS FOR EXPANSION (4) ‐Match for FY 15 BUY REPLACEMENT 35‐ FT BUS (5) ‐ Match for FY15 BUY ARTIC BUS FOR EXPANSION (5) BUY REPLACEMENT 40‐ FT BUS (6) ‐ Match for FY15 Purchase ‐ Expansion: Buses (16) 2015 $3,000,000 $0 $0 $0 $0 $750,000 $0 $3,750,000.00 2011 $5,566 $1,392 $0 $0 $0 $0 $0 $6,958.00 2015 $810,434 $202,609 $0 $0 $0 $0 $0 $1,013,043.00 $0 $140,000 $0 $0 $0 $0 $0 $140,000.00 $0 $250,000 $0 $0 $0 $0 $0 $250,000.00 $0 $395,640 $0 $0 $0 $0 $0 $395,640.00 STIP Action #9 $0 $489,549 $0 $0 $0 $0 $0 $489,549.00 STIP Action #9 $0 $4,655,901 $0 $0 $0 $0 $0 $4,655,901.00 STIP Action #9 $0 $593,460 $0 $0 $0 $0 $0 $593,460.00 STIP Action #9 $0 $6,134,730 $0 $0 $0 $0 $6,134,730.00 STIP Action #9 2015 $4,302,361 $0 $0 $0 $0 $4,452,513 $0 $8,754,874.00 ADA Operating Projects 2015 $160,000 $0 $0 $0 $0 $40,000 $0 $200,000.00 Preventive Maintenance 2015 $640,000 $10,000 $0 $0 $0 $150,000 $0 $800,000.00 114402 114402 111216 113101 111301 111202 111306 111201 111306 UP TO 50% FEDERAL 300901 SHARE FFY 2016 5307 5307 5307 5307 5307 5339 5307 5339 Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority Southeastern Regional Transit Authority SHORT RANGE TRANSIT 442400 PLANNING 2015 $96,000 $0 $0 $0 $0 $0 $24,000 $120,000.00 Transit Enhancements 2015 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000.00 Rehab/Renovation: Surveillance/Security 2015 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000.00 2014, 2015 $270,538 $287,271 $0 $0 $0 $0 $0 $8,000 $2,000 $0 $0 $0 $0 $0 2014, 2015 $125,530 $63,079 $0 $0 $0 $0 $0 $315,394.00 STIP Action #9 2014, 2015 $1,149,085 $287,271 $0 $0 $0 $0 $1,436,356.00 STIP Action #9 2014, 2015 $252,315 $63,079 $0 $0 $0 $0 $315,394.00 STIP Action #9 $33,600 $8,400 $0 $0 $0 $0 $0 $42,000.00 STIP Action #9 $920,252 $0 $0 $0 $0 $230,063 $0 Purchase ‐ Replacement / Expansion: Buses(5) ACQUIRE ‐ MISC 114220 SUPPORT EQUIPMENT BUY REPLACEMENTS ‐ 111200 CAPITOL BUS (1) Purchase ‐ Replacement / Expansion: Buses(5) BUY REPLACEMENTS ‐ 111200 CAPITOL BUS (1) $1,436,356.00 STIP Action #9 $10,000.00 Worcester Regional 5307 Transit Authority Miscellaneous Equipment Worcester Regional 5307 Transit Authority 117C00 NON FIXED ROUTE ADA PARA SERV Worcester Regional 5307 Transit Authority $146,000 $36,500 $0 $0 $0 $0 $0 $182,500.00 STIP Action #2* Worcester Regional 5307 Transit Authority Purchase ‐ Support Vehicle (3) Purchase ‐ Miscellaneous Support Equipment $101,600 $25,400 $0 $0 $0 $0 $0 $127,000.00 Worcester Regional 5307 Transit Authority Spare Parts / Associated Capital Maintenance $327,437 $81,859 $0 $0 $0 $0 $0 $409,296.00 Worcester Regional 5307 Transit Authority Purchase Shop Equipment $128,000 $32,000 $0 $0 $0 $0 $0 $160,000.00 Worcester Regional 5307 Transit Authority Computer Technologies ‐ Software $84,000 $21,000 $0 $0 $0 $0 $0 $105,000.00 Worcester Regional 5307 Transit Authority Computer Technologies ‐ Hardware $99,200 $24,800 $0 $0 $0 $0 $0 $124,000.00 Worcester Regional 5307 Transit Authority Enhancements ‐ Shelters $30,000 $7,500 $0 $0 $0 $0 $0 $37,500.00 Worcester Regional 5307 Transit Authority Enhancements ‐ Signage $48,800 $12,200 $0 $0 $0 $0 $0 $61,000.00 $1,150,315.00 FFY 2016 Worcester Regional 5307 Transit Authority Purchase ‐ Expansion: Buses (3) $1,875,000 $0 $0 $0 $375,000 $0 $0 $1,875,000.00 STIP Action #2* Worcester Regional 5337 Transit Authority TERMINAL, 113403 INTERMODAL (TRANSIT) $2,373,515 $0 $0 $0 $0 $0 $593,379 $2,966,894.00 Worcester Regional 5339 Transit Authority CONSTRUCT ‐ 114303 ADMIN/MAINT FACILITY $462,608 $0 $0 $0 $92,522 $0 $0 $462,608.00 $33,600 $8,400 $0 $0 $0 $0 $42,000.00 STIP Action #9 Worcester Regional 5307 Transit Authority Purchase ‐ Replacement: Vans Worcester Regional 5307 Transit Authority Preventive Maintenance 2015 $3,660,451 $0 $0 $0 $915,113 $0 $4,575,564.00 STIP Action #9 Worcester Regional 5307 Transit Authority Project Administration 2015 $53,525 $0 $0 $0 $13,381 $0 $66,906.00 STIP Action #9 Worcester Regional 5307 Transit Authority Transportation Planning 2015 $280,320 $0 $0 $0 $70,080 $0 $350,400.00 STIP Action #9 FFY 2017 FTA Program Transit Agency Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Other Non‐ Brockton Area Transit Federal Authority Other Non‐ Brockton Area Transit Federal Authority Other Non‐ Brockton Area Transit Federal Authority Other Non‐ Brockton Area Transit Federal Authority Other Non‐ Brockton Area Transit Federal Authority Other Non‐ Brockton Area Transit Federal Authority FTA Activity Line Item Project Description Carryover or Federal Funds Earmark Detail Purchase ‐ Replacement: Buses (1) RTACAP MAP ICB TDC SCA LocalFunds Total Cost Notes $103,488 $25,872 $0 $0 $0 $0 $0 $129,360 $16,665 $0 $0 $0 $0 $16,665 $0 $33,330 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 $95,680 $23,920 $0 $0 $0 $0 $0 $119,600 2016 $107,200 $26,800 $0 $0 $0 $0 $0 $134,000 119202 PURCHASE BUS SHELTERS REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP BUY <30‐FT BUS FOR 111304 EXPANSION (1) 2016 $32,000 $8,000 $0 $0 $0 $0 $0 $40,000 2016 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 2016 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000 111240 BUY ASSOC CAP MAINT ITEMS ACQUIRE ‐ SUPPORT VEHICLES 114211 (1) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT REHAB/RENOVATE ‐ MOBILE 114410 FARE COLL EQUIP 2016 $140,000 $35,000 $0 $0 $0 $0 $0 $175,000 2016 $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 STIP Action #3* 2016 $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 2016 $400,000 $100,000 $0 $0 $0 $0 $0 $500,000 2015, 2016 $1,353,069 $0 $0 $0 $0 $2,550,000 $0 $5,100,000 2015 $144,000 $36,000 $0 $0 $0 $0 $0 $180,000 Operating: Saturday Evening 300900 Service $0 $0 $0 $0 $0 $75,000 $75,000 $150,000 300900 Operating: Avon/Stoughton $0 $0 $0 $0 $0 $42,000 $42,000 $84,000 BUY REPLACEMENT 111207 COMMUTER BUS (3) $0 $0 $0 $0 $0 $0 $1,800,000 $1,800,000 BUY REPLACEMENT <30 FT BUS 111204 (7) $0 $0 $0 $0 $0 $0 $485,000 $485,000 BUY REPLACEMENT VAN COA 111215 (3) $0 $0 $0 $0 $0 $0 $190,000 $190,000 CONSTRUCT ‐ MISC BUS 113320 STATION EQUIPMENT $0 $120,000 $0 $0 $0 $0 $480,000 $600,000 117C00 ADA Operating Projects Preventive Maintenance Rehab/Renovation: Shop 114406 Equipment 111215 BUY REPLACEMENT VAN (1) REHAB/RENOVATE ‐ MISC BUS 113420 STATION EQUIPMENT 300900 Operating/PM/ADA REHAB/RENOVATE ‐ SHOP 114406 EQUIPMENT FFY 2017 Other Non‐ Brockton Area Transit Federal Authority Cape Ann Transportation 5307 Authority Cape Ann Transportation 5307 Authority Cape Ann Transportation 5307 Authority Other Non‐ Cape Ann Transportation Federal Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Franklin Regional Transit 5311 Authority Other Non‐ Franklin Regional Transit Federal Authority Other Non‐ Franklin Regional Transit Federal Authority Other Non‐ Franklin Regional Transit Federal Authority Other Non‐ Franklin Regional Transit Federal Authority Other Non‐ Franklin Regional Transit Federal Authority BUY REPLACEMENT 35‐FT BUS 111202 (9‐11) 117A00 PREVENTIVE MAINTENANCE BUY REPLACEMENT 30‐FT BUS 111203 (1) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT BUY REPLACEMENT <30 FT BUS 111204 (1) REHAB/RENOVATE BUS 113400 STATIONS CONSTRUCTION ‐ BUS 119302 SHELTERS 2015 $0 $800,000 $0 $0 $0 $0 $3,200,000 $4,000,000 $193,391 $0 $0 $0 $0 $0 $48,347 $241,738 $320,000 $80,000 $0 $0 $0 $0 $0 $27,355 $6,840 $0 $0 $0 $0 $0 $0 $119,160 $0 $0 $0 $0 $0 $119,160 STIP Action #9 $449,822 $112,455 $0 $0 $0 $0 $0 $562,277 $46,400 $11,600 $0 $0 $0 $0 $0 $58,000 $52,000 $13,000 $0 $0 $0 $0 $0 $65,000 $20,748 $5,187 $0 $0 $0 $0 $0 $25,935 $400,000 STIP Action #1* $34,195 114207 ACQUIRE ‐ ADP HARDWARE CONSTRUCT PED ACCESS / 119305 WALKWAYS NON FIXED ROUTE ADA PARA 117C00 SERV 2015 $526,807 $0 $0 $0 $0 $131,702 $0 $658,509 117A00 PREVENTIVE MAINTENANCE 2015 $2,197,449 $0 $0 $0 $0 $549,362 $0 $2,746,811 117L00 MOBILITY MANAGEMENT 2015 $1,095,574 $0 $0 $0 $0 $298,000 $0 $1,393,574 STIP Action #9 300900 OPERATING ASSISTANCE ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2015 $800,000 $0 $0 $0 $0 $800,000 $0 $1,600,000 2015 $493,012 $301,489 $0 $0 $0 $0 $0 $1,507,447 300900 OPERATING ASSISTANCE 2016 $1,116,154 $0 $0 $0 $0 $775,233 $340,921 $2,232,308 Rehab/Renovation: Terminal, 113403 Intermodal $0 $50,000 $0 $0 $0 $0 $0 $50,000 ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $0 $10,000 $0 $0 $0 $0 $0 $10,000 Rehab/Renovation: 114409 Surveillance/Security $0 $5,000 $0 $0 $0 $0 $0 $5,000 Rehab/Renovation: Shop 114406 Equipment $0 $10,000 $0 $0 $0 $0 $0 $10,000 Rehab/Renovation: 114403 Admin/Maint Facility $0 $15,500 $0 $0 $0 $0 $0 $15,500 Greater Attleboro‐Taunton 5307 Regional Transit Authority BUY REPLACEMENT 30‐FT BUS ‐ 111203 4 2016 $768,000 $192,000 $0 $0 $0 $0 $0 $960,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority 111215 BUY REPLACEMENT VAN ‐ 8 2016 $560,000 $140,000 $0 $0 $0 $0 $0 $700,000 FFY 2017 Greater Attleboro‐Taunton 5307 Regional Transit Authority PURCHASE LANDSCAPING / 119203 SCENIC BEAUTIFICATION 2015 $32,000 $8,000 $0 $0 $0 $0 $0 $40,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority PURCHASE MISC 116220 COMMUNICATIONS EQUIP 2016 $48,000 $12,000 $0 $0 $0 $0 $0 $60,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT 2015 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority NON FIXED ROUTE ADA PARA 117C00 SERV 2015 $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority 300901 Operating Assistance 2016 $500,000 $0 $0 $0 $0 $500,000 $0 $1,000,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority Construct Plymouth TERMINAL, 113303 INTERMODAL Yr. 1 2016 $387,514 $0 $0 $0 $0 $0 $300,000 $1,500,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority REHAB/RENOVATE ‐ TAUNTON 114402 MAINTENANCE FACILITY 2016 $280,000 $70,000 $0 $0 $0 $0 $0 $350,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority ENG/DESIGN ‐ ATTLEBORO 123104 PARK & RIDE FACIL 2016 $600,000 $0 $0 $0 $0 $0 $150,000 $750,000 Greater Attleboro‐Taunton 5307 Regional Transit Authority 117A00 PREVENTIVE MAINTENANCE 2015, 2016 $1,414,081 $0 $0 $0 $0 $700,000 $0 $3,500,000 2015 $80,000 $0 $0 $0 $0 $20,000 $0 $100,000 $0 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 2016 $104,000 $26,000 $0 $0 $0 $0 $0 $130,000 2016 $80,000 $0 $0 $0 $0 $0 $20,000 $100,000 2015, 2016 $1,324,404 $0 $0 $0 $0 $3,501,185 $2,602,080 $7,766,951 2016 $1,082,440 $0 $0 $0 $0 $270,610 $0 $1,353,050 2014, 2015 $1,220,377 $313,120 $0 $0 $0 $0 $0 $1,561,120 STIP Action #9 2016 $863,782 $0 $0 $0 $0 $863,782 $0 $1,727,564 STIP Action #9 Rehab/Renovation: 116402 Communications Systems $0 $900,000 $0 $0 $0 $0 $0 $900,000 STIP Action #9 Rehab/Renovation: Shop 114406 Equipment $0 $25,000 $0 $0 $0 $0 $0 $25,000 STIP Action #9 Greater Attleboro‐Taunton 5307 Regional Transit Authority Other Non‐ Greater Attleboro‐Taunton Federal Regional Transit Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Martha’s Vineyard 5311 Regional Transit Authority Other Non‐ Martha’s Vineyard Federal Regional Transit Authority Other Non‐ Martha’s Vineyard Federal Regional Transit Authority SHORT RANGE TRANSIT 442400 PLANNING CONSTRUCT ‐ EAST 114302 MAINTENANCE FACILITY Year 1 111240 Purchase ‐ Capital Spare Parts SHORT RANGE TRANSIT 442400 PLANNING 2017 300901 Operating Assistance 2017 PREVENTIVE MAINTENANCE 117A00 2017 BUY REPLACEMENT 30‐FT 111203 DIESEL BUSES (4) 300901 UP TO 50% FEDERAL SHARE FFY 2017 Other Non‐ Martha’s Vineyard Federal Regional Transit Authority Massachusetts Bay Transportation Authority 5307 (MBTA) Massachusetts Bay Transportation Authority 5307 (MBTA) Massachusetts Bay Transportation Authority 5309 (MBTA) Massachusetts Bay Transportation Authority 5337 (MBTA) Massachusetts Bay Transportation Authority 5337 (MBTA) Massachusetts Bay Transportation Authority 5339 (MBTA) Other Massachusetts Bay Non‐ Transportation Authority Federal (MBTA) 111403 Rehab/Rebuild: Buses $0 $350,000 $0 $0 $0 $0 $0 $350,000 STIP Action #9 117A00 PREVENTIVE MAINTENANCE $12,000,000 $0 $0 $0 $0 $0 $3,000,000 $15,000,000 STIP Action #9 119400 Systems Upgrades $26,685,516 $0 $0 $0 $0 $0 $6,671,379 $33,356,895 STIP Action #9 GREEN LINE EXTENSION: 132303 COLLEGE AVE/UNION SQ SPUR $150,000,000 $0 $0 $0 $0 $0 $225,454,000 $375,454,000 STIP Action #1* 122404 Bridge & Tunnel Program $100,000,000 $0 $0 $0 $0 $0 119400 Systems Upgrades $21,190,546 $0 $0 $0 $0 $0 $5,297,637 $26,488,183 STIP Action #9 119400 Systems Upgrades $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 STIP Action #9 $0 $0 $0 $0 $0 $0 $148,559,943 $148,559,943 STIP Action #9 HEAVY RAIL CARS ‐ Red/Orange 111221 Lines $25,000,000 $125,000,000 STIP Action #9 Merrimack Valley Regional 5307 Transit Authority Rehab/Renovation: Refurbish Engine/Transmission 8 Model Year 2011 Buses 2015 $192,000 $48,000 $0 $0 $0 $0 $0 $240,000 Merrimack Valley Regional 5307 Transit Authority Purchase 3 New Model 2017 35' Transit Buses 2016 $1,008,000 $252,000 $0 $0 $0 $0 $0 $1,260,000 Merrimack Valley Regional 5307 Transit Authority ADA Operating Expense 2015 $1,134,775 $0 $0 $0 $0 $283,695 $0 $1,418,470 Merrimack Valley Regional 5307 Transit Authority Preventive Maintenance Expense 2015, 2016 $1,833,570 $0 $0 $0 $0 $645,935 $0 $3,229,680 STIP Action #9 Merrimack Valley Regional 5307 Transit Authority MVPC Technical Support to 400000 MVRTA 2016 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 Merrimack Valley Regional 5307 Transit Authority MetroWest Regional Transit 5307 Authority Continue Short RangeTransit 440000 Planning 2016 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 119208 PURCHASE SIGNAGE 2016 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority TERMINAL, INTERMODAL 113303 (TRANSIT): Facil. Improvements ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2016 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 2016 $65,000 $16,250 $0 $0 $0 $0 $0 $81,250 STIP Action #9 2016 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 FFY 2017 MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Montachusett Regional 5307 Transit Authority Nantucket Regional Transit 5311 Authority Other Non‐ Nantucket Regional Transit Federal Authority Other Non‐ Nantucket Regional Transit Federal Authority Other Non‐ Nantucket Regional Transit Federal Authority Other Non‐ Nantucket Regional Transit Federal Authority Other Non‐ Nantucket Regional Transit Federal Authority Other Non‐ Nantucket Regional Transit Federal Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority ACQUIRE ‐ MOBILE 114209 SURV/SECURITY EQUIP NON FIXED ROUTE ADA PARA 117C00 SERV 2016 $50,000 $12,500 $0 $0 $0 $0 $0 $62,500 2016 $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000 TERMINAL, INTERMODAL 113403 (TRANSIT): Facil. Improvements 2016 $471,356 $117,840 $0 $0 $0 $0 $0 $589,196 $800,000 $0 $0 $0 $0 $200,000 $0 $1,000,000 $1,310,000 $0 $0 $0 $0 $1,310,000 $0 $2,620,000 $220,000 $55,000 $0 $0 $0 $0 $0 $275,000 $96,000 $24,000 $0 $0 $0 $0 $0 $120,000 $32,000 $14,000 $0 $0 $0 $0 $0 $70,000 $400,000 $100,000 $0 $0 $0 $0 $0 $500,000 $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 $543,287 $0 $0 $0 $0 $394,651 $148,636 $1,086,574 $0 $750,000 $0 $0 $0 $0 $0 $750,000 CONSTRUCT ‐ SUPPORT 114311 VEHICLES (3) $0 $150,000 $0 $0 $0 $0 $0 $150,000 CONSTRUCTION ‐ BUS 119302 SHELTERS $0 $130,000 $0 $0 $0 $0 $0 $130,000 CONSTRUCT ‐ MISC. 114320 EQUIPMENT $0 $35,000 $0 $0 $0 $0 $0 $35,000 REHAB/RENOVATE ‐ BUS 113410 PASSENGER SHELTERS $0 $10,000 $0 $0 $0 $0 $0 $10,000 ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $0 $35,000 $0 $0 $0 $0 $0 $35,000 2016 $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 2016 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 2016 $2,694,890 $775,192 $0 $0 $0 $0 $0 $3,470,082 2016 $600,000 $150,000 $0 $0 $0 $0 $0 $750,000 442301 Planning 2016 $220,000 $0 $0 $0 $0 $55,000 $0 $275,000 117C00 ADA Operating Projects 2016 $1,204,928 $0 $0 $0 $0 $301,232 $0 $1,506,160 117A00 PREVENTIVE MAINTENANCE 300901 UP TO 50% FEDERAL SHARE REHAB/RENOV PED ACCESS / 129405 WALKWAYS REHAB/RENOVATE ‐ 114403 ADMIN/MAINT FACILITY ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT 111215 BUY REPLACEMENT VAN (8) ACQUIRE ‐ MISC BUS STATION 113220 EQUIP 300900 OPERATING ASSISTANCE 2016 Purchase ‐ Replacement: Buses (3) 119302 Transit Enhancements: Shelters Transit Enhancements: 119308 Signs/Lighting Rehab/Renovation: Misc. 116220 Communications Rehab/Renovations: 114402 Northampton, Year 2 FFY 2017 Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5339 Authority Other Non‐ Pioneer Valley Transit Federal Authority Other Non‐ Pioneer Valley Transit Federal Authority Other Non‐ Pioneer Valley Transit Federal Authority Other Non‐ Pioneer Valley Transit Federal Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5307 Transit Authority Southeastern Regional 5339 Transit Authority 117A00 Preventive Maintenance Rehab/Renovations: UMASS, 114402 Year 1 2016 $3,500,000 $0 $0 $0 $0 $875,000 $0 $4,375,000 2016 $800,000 $200,000 $0 $0 $0 $0 $0 $1,000,000 111215 BUY REPLACEMENT VAN, (4) BUY REPL SEDAN/STATION 111216 WAGON, (8) 2016 $89,600 $22,400 $0 $0 $0 $0 $0 $112,000 2016 $192,000 $48,000 $0 $0 $0 $0 $0 $240,000 2016 $6,400 $1,600 $0 $0 $0 $0 $0 $8,000 2016 $480,000 $120,000 $0 $0 $0 $0 $0 $600,000 TERMINAL, INTERMODAL 113303 (TRANSIT), Northampton, YR 1 2016 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 111306 Purchase ‐ Expansion: Buses (4) 2016 $1,984,000 $496,000 $0 $0 $0 $0 $0 $2,480,000 111215 BUY REPLACEMENT VAN (2) Purchase ‐ Replacement: Vans 111215 (20) 2016 $109,462 $27,366 $0 $0 $0 $0 $0 $136,828 2016 $818,538 $204,635 $0 $0 $0 $0 $0 $1,023,173 Rehab/Renovation: Shop 114406 Equipment $0 $100,000 $0 $0 $0 $0 $0 $100,000 Rehab/Renovation: 114220 Communications Systems (ITS) $0 $1,330,980 $0 $0 $0 $0 $0 $1,330,980 REHAB/RENOVATE ‐ 114402 Environmental Compliance $0 $150,000 $0 $0 $0 $0 $0 $150,000 CONSTRUCT ‐ MAINT FACILITY, 114302 Spfld.O&M, Yr 4 $0 $12,000,000 $0 $0 $0 $0 $0 2016 $4,302,361 $0 $0 $0 $0 $4,468,513 $0 $8,770,874 2016 $96,000 $0 $0 $0 $0 $24,000 $0 $120,000 Preventive Maintenance SHORT RANGE TRANSIT 442400 PLANNING Rehab/Renovation: 114409 Surveillance/Security 2016 $640,000 $10,000 $0 $0 $0 $150,000 $0 $800,000 2016 $96,000 $0 $0 $0 $0 $0 $24,000 $120,000 2016 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 111215 BUY REPLACEMENT VAN (3) Purchase ‐ Replacement: Buses(5) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT BUY REPLACEMENTS ‐ CAPITOL 111200 BUS (1) 2016 $168,000 $42,000 $0 $0 $0 $0 $0 $210,000 2015, 2016 $195,480 $318,337 $0 $0 $0 $0 $0 $1,591,684 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 $128,053 $32,013 $0 $0 $0 $0 $0 $160,066 CONSTRUCT BICYCLE ACCESS, 119306 FACIL & EQUIP ON BUSES REHAB/RENOVATE ‐ MAINTENANCE FACILITY, 114402 SATCO, Yr 1 300901 UP TO 50% FEDERAL SHARE ADA Operating Projects 2016 $12,000,000 STIP Action #9 FFY 2017 Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5337 Authority Massachusetts Bay 5307 Transportation Authority Massachusetts Bay 5307 Transportation Authority Massachusetts Bay 5307 Transportation Authority Cape Ann Transportation 5307 Authority Lowell Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Martha's Vineyard Transit 5311 Authority Massachusetts Bay 5337 Transportation Authority Massachusetts Bay 5337 Transportation Authority Miscellaneous Equipment NON FIXED ROUTE ADA PARA 117C00 SERV $39,200 $9,800 $0 $0 $0 $0 $0 $49,000 STIP Action #9 $938,657 $0 $0 $0 $0 $234,664 $0 $1,173,321 Preventive Maintenance 2016 $3,733,660 $0 $0 $0 $0 $933,415 $0 $4,667,075 Project Administration 2016 $54,595 $0 $0 $0 $0 $13,649 $0 $68,244 Transportation Planning 2016 $285,927 $0 $0 $0 $0 $71,482 $0 $357,409 $26,000 $6,500 $0 $0 $0 $0 $0 $32,500 STIP Action #2* $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 $205,868 $51,467 $0 $0 $0 $0 $0 $257,335 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 Purchase ‐ Support Vehicle (1) Purchase ‐ Miscellaneous Support Equipment Spare Parts / Associated Capital Maintenance Purchase Shop Equipment Computer Technologies ‐ Software Computer Technologies ‐ Hardware $77,576 $19,394 $0 $0 $0 $0 $0 $96,970 $381,344 $95,336 $0 $0 $0 $0 $0 $476,680 Enhancements ‐ Shelters $30,000 $7,500 $0 $0 $0 $0 $0 $37,500 Enhancements ‐ Signage $48,800 $12,200 $0 $0 $0 $0 $0 $61,000 $1,890,000 $0 $0 $0 $378,000 $0 $0 $53,040 $13,260 $0 $0 $0 $0 $0 $2,397,250 $0 $0 $0 $0 $0 $599,313 $2,996,563 STIP Action #9 117A00 PREVENTIVE MAINTENANCE HEAVY RAIL CARS ‐ Red/Orange 111221 Lines $12,000,000 $0 $0 $0 $0 $3,000,000 $15,000,000 STIP Action #9 $96,000,000 $0 $0 $0 $0 119400 Systems Upgrades $26,685,516 $0 $0 $0 $0 $6,671,379 $33,356,895 STIP Action #9 $320,000 $80,000 $0 $0 $0 $0 $400,000 STIP Action #9 $84,000 $21,000 $0 $0 $0 $0 $105,000 STIP Action #9 $39,200 $9,800 $0 $0 $0 $0 $49,000 STIP Action #9 $103,488 $25,872 $0 $0 $0 $0 $129,360 STIP Action #9 $863,782 $0 $0 $0 $863,782 $0 $1,727,564 STIP Action #9 $21,190,546 $0 $0 $0 $0 $5,297,637 $26,488,183 STIP Action #9 $100,000,000 $0 $0 $0 $0 Purchase ‐ Expansion: Buses (3) TERMINAL, INTERMODAL 113403 (TRANSIT) TERMINAL, INTERMODAL 113403 (TRANSIT) 111203 BUY REPLACEMENT 30‐FT BUS BUY REPLACEMENT FIXED 111215 ROUTE VAN (1) 2012, 2015 Purchase ‐ Replacement: Vans Purchase ‐ Replacement: Buses (1) 300901 UP TO 50% FEDERAL SHARE 119400 Systems Upgrades 122404 Bridge & Tunnel Program 2016 $1,890,000 STIP Action #2* $66,300 $24,000,000 $120,000,000 STIP Action #9 $25,000,000 $125,000,000 STIP Action #9 FFY 2017 Cape Ann Transportation 5339 Authority Massachusetts Bay 5339 Transportation Authority Other Non‐ Martha's Vineyard Transit Federal Authority Other Non‐ Martha's Vineyard Transit Federal Authority Other Non‐ Martha's Vineyard Transit Federal Authority REHAB/RENOVATE BUS 114400 SUPPORT FACIL/EQUIP $0 $0 $0 $0 $0 $0 $5,287,027 $0 $0 $0 $0 $1,321,757 $6,608,784 STIP Action #9 Rehab/Renovation: 116402 Communications Systems $0 $900,000 $0 $0 $0 $0 $900,000 STIP Action #9 Rehab/Renovation: Shop 114406 Equipment $0 $25,000 $0 $0 $0 $0 $25,000 STIP Action #9 111403 Rehab/Rebuild: Buses $0 $350,000 $0 $0 $0 $0 $350,000 STIP Action #9 119400 Systems Upgrades $19,436 STIP Action #1* FFY 2018 FTA Program Transit Agency Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Berkshire Regional Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit 5307 Authority Brockton Area Transit Other Non‐Federal Authority Brockton Area Transit Other Non‐Federal Authority Brockton Area Transit Other Non‐Federal Authority Brockton Area Transit Other Non‐Federal Authority Cape Ann Transportation 5307 Authority Cape Ann Transportation 5307 Authority Cape Ann Transportation 5307 Authority Cape Ann Transportation Other Non‐Federal Authority Cape Ann Transportation 5339 Authority Cape Ann Transportation Other Non‐Federal Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority FTA Activity Line Item Project Description 111215 BUY REPLACEMENT VAN (5) Carryover or Earmark Federal Funds Detail 2017 MAP ICB TDC SCA LocalFunds Total Cost $485,192 $134,534 $0 $0 $0 $0 $0 $672,670 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 114403 Transit Enhancements $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 114406 Rehab/Renovation: Shop Equipment $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 $22,500 $0 $0 $0 $0 $22,500 $0 $45,000 111215 BUY REPLACEMENT VAN (5) $300,000 $75,000 $0 $0 $0 $0 $0 111203 BUY REPLACEMENT 30‐FT BUS (2) $880,000 $220,000 $0 $0 $0 $0 $0 $1,100,000 111315 Purchase ‐ Expansion: Vans (3) $333,000 $82,650 $0 $0 $0 $0 $0 $415,650 Preventive Maintenance 117C00 RTACAP ADA Operating Projects $375,000 STIP Action #9 119202 PURCHASE BUS SHELTERS 2016 $32,000 $8,000 $0 $0 $0 $0 $0 $40,000 114210 ACQUIRE ‐ MOBILE FARE COLL EQUIP REHAB/RENOV‐COMMUNICATIONS 116400 EQ ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT 2016 $76,000 $19,000 $0 $0 $0 $0 $0 $95,000 2016 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 2017 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 111240 BUY ASSOC CAP MAINT ITEMS 2017 $140,000 $35,000 $0 $0 $0 $0 $0 $175,000 114211 ACQUIRE ‐ SUPPORT VEHICLE (1) REHAB/RENOVATE ‐ MOBILE 114409 SURVEILL/SECURITY EQUIP 2017 $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 2017 $240,000 $60,000 $0 $0 $0 $0 $0 $300,000 $2,750,000 $0 $0 $0 $0 $0 $2,750,000 $5,500,000 111204 BUY REPLACEMENT <30 FT BUS (7) $0 $0 $0 $0 $0 $0 $515,000 $515,000 111215 BUY REPLACEMENT VAN COA (3) $0 $0 $0 $0 $0 $0 $195,000 $195,000 111202 BUY REPLACEMENT 35‐FT BUS (9‐11) $0 $720,000 $0 $0 $0 $0 $2,880,000 $3,600,000 111201 BUY REPLACEMENT 40‐FT BUS (6‐7) $0 $540,000 $0 $0 $0 $0 $2,160,000 $2,700,000 117A00 PREVENTIVE MAINTENANCE $193,391 $0 $0 $0 $0 $0 $48,347 $241,738 111203 BUY REPLACEMENT 30‐FT BUS (1) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $320,000 $80,000 $0 $0 $0 $0 $0 $32,763 $8,192 $0 $0 $0 $0 $0 $0 $0 $0 $0 300900 Operating/PM/ADA Notes $400,000 STIP Action #1* $40,955 111204 BUY REPLACEMENT <30 FT BUS (1) REHAB/RENOVATE BUS SUPPORT 114400 FACIL/EQUIP $0 $117,808 $0 $0 $0 $0 $0 $0 $0 111204 BUY REPLACEMENT <30 FT BUS $0 $117,808 $0 $0 $0 $0 $117,808 STIP Action #9 $463,316 $115,829 $0 $0 $0 $0 $0 $579,145 $21,162 $5,291 $0 $0 $0 $0 $0 $26,453 113400 REHAB/RENOVATE BUS STATIONS CONSTRUCT PED ACCESS / 119305 WALKWAYS 2015 $117,808 STIP Action #9 $19,631 STIP Action #1* FFY 2018 Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority Cape Cod Regional Transit 5307 Authority 117C00 Cape Cod Regional Transit 5307 Authority 117A00 Cape Cod Regional Transit 5307 Authority 117L00 Cape Cod Regional Transit 5307 Authority Franklin Regional Transit 5311 Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Franklin Regional Transit Other Non‐Federal Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority 117C00 Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority 117A00 Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5307 Regional Transit Authority Greater Attleboro‐Taunton 5337 Regional Transit Authority Greater Attleboro‐Taunton Other Non‐Federal Regional Transit Authority Greater Attleboro‐Taunton Other Non‐Federal Regional Transit Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority Lowell Regional Transit 5307 Authority 117A00 Martha’s Vineyard Regional 5311 Transit Authority ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 2015, 2017 $671,036 $225,102 $0 $0 $0 $0 $0 $1,125,509 114207 ACQUIRE ‐ ADP HARDWARE 2016 $2,391 $14,000 $0 $0 $0 $0 $0 $70,000 111203 BUY REPLACEMENT 30‐FT BUS (5) 2016 $1,699,500 $424,875 $0 $0 $0 $0 $0 $2,124,375 119302 CONSTRUCTION ‐ BUS SHELTERS 2016 $48,000 $12,000 $0 $0 $0 $0 $0 $60,000 2016 $542,612 $0 $0 $0 $0 $135,653 $0 $678,265 $1,472,183 $0 $0 $0 $0 $565,843 $0 $2,829,216 2016 $132,186 $0 $0 $0 $0 $306,940 $0 $1,534,700 300900 OPERATING ASSISTANCE 2017 $100,000 $0 $0 $0 $0 $1,000,000 $0 $2,000,000 300900 OPERATING ASSISTANCE Rehab/Renovation: Terminal, 113403 Intermodal Rehab/Renovation: Communications 116402 Systems Rehab/Renovation: 114409 Surveillance/Security 2017 $1,126,321 $0 $0 $0 $0 $775,233 $351,088 $2,252,642 $0 $200,000 $0 $0 $0 $0 $0 $200,000 $0 $20,000 $0 $0 $0 $0 $0 $20,000 $0 $75,000 $0 $0 $0 $0 $0 $75,000 $0 $10,000 $0 $0 $0 $0 $0 $10,000 $0 $25,000 $0 $0 $0 $0 $0 $25,000 2017 $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 2017 $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000 2017 $500,000 $0 $0 $0 $0 $500,000 $0 $1,000,000 2017 $1,183,565 $0 $0 $0 $0 $700,000 $0 $3,500,000 111203 BUY REPLACEMENT 30‐FT BUS ‐ 4 2017 $768,000 $192,000 $0 $0 $0 $0 $0 $960,000 111215 BUY REPLACEMENT VAN ‐ 9 PURCHASE LANDSCAPING / SCENIC 119203 BEAUTIFICATION 2017 $560,000 $0 $0 $0 $0 $0 $140,000 $700,000 2017 $32,000 $8,000 $0 $0 $0 $0 $0 $40,000 442400 SHORT RANGE TRANSIT PLANNING REHAB/RENOV ‐ RAIL GARAGE 123402 STATION CONSTRUCT ‐ EAST MAINTENANCE 114302 FACILITY YEAR 2 Construct Plymouth TERMINAL, 113303 INTERMODAL Yr. 2 SHORT RANGE TRANSIT PLANNING 442400 2018 2017 $80,000 $0 $0 $0 $0 $20,000 $0 $100,000 2015 $700,000 $0 $0 $0 $0 $0 $175,000 $875,000 $0 $2,000,000 $0 $0 $0 $0 $0 $2,000,000 $0 $0 $0 $0 $0 $0 $19,500,000 $19,500,000 2016 $80,000 $0 $0 $0 $0 $0 $20,000 $100,000 2016 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 $1,356,937 $0 $0 $0 $0 $3,601,594 $0 $5,265,280 2017 $1,078,440 $0 $0 $0 $0 $269,610 $0 $1,348,050 2017 $872,933 $0 $0 $0 $0 $872,933 $0 $1,745,866 NON FIXED ROUTE ADA PARA SERV PREVENTIVE MAINTENANCE MOBILITY MANAGEMENT 114406 Rehab/Renovation: Shop Equipment Rehab/Renovation: Admin/Maint 114403 Facility ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT NON FIXED ROUTE ADA PARA SERV 300901 Operating Assistance PREVENTIVE MAINTENANCE 111240 Purchase ‐ Capital Spare Parts 300901 Operating Assistance 2018 PREVENTIVE MAINTENANCE 2018 300901 UP TO 50% FEDERAL SHARE 2016, 2017 2016, 2017 FFY 2018 Other Non‐Federal Other Non‐Federal Other Non‐Federal Other Non‐Federal 5307 5307 5307 5337 5337 5339 5307 5307 5309 5337 5337 5339 Other Non‐Federal Martha’s Vineyard Regional Transit Authority Martha’s Vineyard Regional Transit Authority Martha’s Vineyard Regional Transit Authority Martha’s Vineyard Regional Transit Authority Massachusetts Bay Transportation Authority 117A00 Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority Massachusetts Bay Transportation Authority (MBTA) 117A00 Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Massachusetts Bay Transportation Authority (MBTA) Merrimack Valley Regional 5307 Transit Authority Merrimack Valley Regional 5307 Transit Authority Merrimack Valley Regional 5307 Transit Authority Merrimack Valley Regional 5307 Transit Authority Merrimack Valley Regional 5307 Transit Authority Merrimack Valley Regional 5307 Transit Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority 111215 BUY REPLACEMENT VAN (2) Rehab/Renovation: 114409 Surveillance/Security $0 $60,000 $0 $0 $0 $0 $0 $60,000 $0 $50,000 $0 $0 $0 $0 $0 $50,000 114406 Rehab/Renovation: Shop Equipment $0 $50,000 $0 $0 $0 $0 $0 $50,000 111403 Rehab/Rebuild: Buses $0 $500,000 $0 $0 $0 $0 $0 $500,000 PREVENTIVE MAINTENANCE $12,000,000 $0 $0 $0 $0 $3,000,000 121221 HEAVY RAIL CARS ‐ Red/Orange Lines $96,000,000 $0 $0 $0 $0 119400 Systems Upgrades $26,685,516 $0 $0 $0 $0 $6,671,379 $33,356,895 STIP Action #9 122404 Bridge & Tunnel Program $60,000,000 $0 $0 $0 $0 $15,000,000 $75,000,000 STIP Action #9 119400 Systems Upgrades $61,190,546 $0 $0 $0 $0 $15,297,637 $76,488,183 STIP Action #9 119400 Systems Upgrades $5,287,027 $0 $0 $0 $0 $1,321,757 $6,608,784 STIP Action #9 $12,000,000 $0 $0 $0 $0 $0 $3,000,000 $15,000,000 STIP Action #9 $26,685,516 $0 $0 $0 $0 $0 $6,671,379 $33,356,895 STIP Action #9 $150,000,000 $0 $0 $0 $0 $0 $196,101,000 $346,101,000 STIP Action #1* 122404 Bridge & Tunnel Program $60,000,000 $0 $0 $0 $0 $0 $15,000,000 $75,000,000 STIP Action #9 119400 Systems Upgrades $61,190,546 $0 $0 $0 $0 $0 $15,297,637 $76,488,183 STIP Action #9 119400 Systems Upgrades $5,287,027 $0 $0 $0 $0 $0 $1,321,757 $6,608,784 STIP Action #9 $0 $0 $0 $0 $0 $0 $52,682,528 $52,682,528 STIP Action #9 2016 $192,000 $48,000 $0 $0 $0 $0 $0 $240,000 2016 $1,168,820 $0 $0 $0 $0 $292,205 $0 $1,461,025 2017 $192,000 $48,000 $0 $0 $0 $0 $0 $240,000 $2,180,005 $0 $0 $0 $0 $665,315 $0 $3,326,570 PREVENTIVE MAINTENANCE 119400 Systems Upgrades GREEN LINE EXTENSION: COLLEGE 132303 AVE/UNION SQ SPUR 121221 HEAVY RAIL CARS ‐ Red/Orange Lines Purchase Replacement Supervsiory and Maintenance Vehicles 4 ADA Operating Expense Refurbish Engine/trans 8 model year 2011 buses Preventive Maintenance Expense 2016, 2017 $15,000,000 STIP Action #9 $24,000,000 $120,000,000 STIP Action #9 440000 Continue Short RangeTransit Planning 2017 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 440000 MVPC Technical Support to MVRTA 2017 $40,000 $0 $0 $0 $0 $0 $10,000 $50,000 STIP Action #9 113403 TERMINAL, INTERMODAL (TRANSIT) 2017 $351,357 $87,840 $0 $0 $0 $0 $0 $439,197 119202 PURCHASE BUS SHELTERS ACQUIRE ‐ MOBILE SURV/SECURITY 114209 EQUIP 2017 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 2017 $50,000 $12,500 $0 $0 $0 $0 $0 $62,500 FFY 2018 MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority MetroWest Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Montachusett Regional Transit 5307 Authority Nantucket Regional Transit 5311 Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Nantucket Regional Transit Other Non‐Federal Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 117C00 117A00 2017 $200,000 $50,000 $0 $0 $0 $0 $0 $250,000 2017 $1,000,000 $0 $0 $0 $0 $250,000 $0 $1,250,000 2017 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 2017 $65,000 $16,250 $0 $0 $0 $0 $0 $81,250 STIP Action #9 300901 UP TO 50% FEDERAL SHARE $400,000 $0 $0 $0 $0 $1,200,000 $0 $2,400,000 PREVENTIVE MAINTENANCE REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT $800,000 $0 $0 $0 $0 $200,000 $0 $1,000,000 $280,000 $70,000 $0 $0 $0 $0 $0 $350,000 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 119202 PURCHASE BUS SHELTERS $160,000 $40,000 $0 $0 $0 $0 $0 $200,000 113209 ACQUIRE ‐ BUS ROUTE SIGNING $300,000 $75,000 $0 $0 $0 $0 $0 $375,000 111215 Purchase ‐ Replacement Vans (8) $400,000 $100,000 $0 $0 $0 $0 $0 $500,000 $549,043 $0 $0 $0 $0 $394,651 $154,392 $1,098,086 111204 Purchase ‐ Replacement: Buses (3) $0 $750,000 $0 $0 $0 $0 $0 $750,000 119405 Transit Enhancements: Bike Facilities Rehab/Renovation: Communications Systems $0 $75,000 $0 $0 $0 $0 $0 $75,000 $0 $50,000 $0 $0 $0 $0 $0 $50,000 114406 Rehab/Renovation: Shop Equipment $0 $30,000 $0 $0 $0 $0 $0 $30,000 119306 Transit Enhancements: Bike Facilities Construction: Communications 116302 Systems $0 $25,000 $0 $0 $0 $0 $0 $25,000 $0 $160,000 $0 $0 $0 $0 $0 $160,000 114309 Construction: Surveillance/Security $0 $40,000 $0 $0 $0 $0 $0 $40,000 114306 Construction: Shop Equipment $0 $15,000 $0 $0 $0 $0 $0 $15,000 NON FIXED ROUTE ADA PARA SERV TERMINAL, INTERMODAL (TRANSIT): 113303 Facil. Improvements ACQUISITION OF BUS SUPPORT 114200 EQUIP/FACILITIES 300900 OPERATING ASSISTANCE 2017 117A00 Preventive Maintenance 2017 $3,500,000 $0 $0 $0 $0 $875,000 $0 $4,375,000 117C00 ADA Operating Projects 2017 $1,216,977 $0 $0 $0 $0 $304,244 $0 $1,521,221 442301 Planning 2017 $240,000 $0 $0 $0 $0 $60,000 $0 $300,000 111216 Purchase ‐ Replacement: Vans (4) 2017 $696,000 $174,000 $0 $0 $0 $0 $0 $870,000 119302 Transit Enhancements: Shelters 2017 $40,000 $10,000 $0 $0 $0 $0 $0 $50,000 119308 Transit Enhancements: Signs/Lighting Rehab/Renovation: Misc. 116220 Communications 2017 $12,000 $3,000 $0 $0 $0 $0 $0 $15,000 2017 $1,658,962 $414,741 $0 $0 $0 $0 $0 $2,073,703 114402 Rehab/Renovations: Northampton 2017 $200,000 $50,000 $0 $0 $0 $0 $0 $250,000 114402 Rehab/Renovations:Holyoke Rehab/Renovation: Communications 114220 Systems (ITS) 2017 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 2017 $1,065,424 $266,356 $0 $0 $0 $0 $0 $1,331,780 FFY 2018 Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority BUY REPL SEDAN/STATION WAGON, 111216 (6) 114211 ACQUIRE ‐ SUPPORT VEHICLES, (1) REHAB/RENOVATE ‐ Environmental 114402 Compliance CONSTRUCT BICYCLE ACCESS, FACIL & 119306 EQUIP ON BUSES Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority Pioneer Valley Transit 5307 Authority REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY, SATCO, YR 2 REHAB/RENOVATE ‐ ADMIN/MAINT 114403 FACILITY TERMINAL, INTERMODAL (TRANSIT), 113303 Northampton, Yr 2 Pioneer Valley Transit 5339 Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Pioneer Valley Transit Other Non‐Federal Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5307 Authority Southeastern Regional Transit 5339 Authority Worcester Regional Transit 5307 Authority 117C00 Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority REHAB/RENOVATE ‐ MAINTENANCE 114402 FACILITY: SATCO, YR 2 2017 $144,000 $36,000 $0 $0 $0 $0 $0 $180,000 2017 $53,531 $13,383 $0 $0 $0 $0 $0 $66,914 2017 $120,000 $30,000 $0 $0 $0 $0 $0 $150,000 2017 $9,600 $2,400 $0 $0 $0 $0 $0 $12,000 2017 $2,373,277 $593,319 $0 $0 $0 $0 $0 $2,966,596 2017 $80,000 $20,000 $0 $0 $0 $0 $0 $100,000 2017 $640,000 $160,000 $0 $0 $0 $0 $0 $800,000 2017 $826,723 $206,681 $0 $0 $0 $0 $0 $1,033,404 114406 Rehab/Renovation: Shop Equipment $0 $750,000 $0 $0 $0 $0 $0 $750,000 114211 ACQUIRE ‐ SUPPORT VEHICLES, (4) TERMINAL, INTERMODAL (TRANSIT), 113303 UMTS, YR 1 CONSTUCT: MAINT FACILITY, 114302 Spfld.O&M, Yr 4 $0 $353,086 $0 $0 $0 $0 $0 $353,086 $0 $1,500,000 $0 $0 $0 $0 $0 $1,500,000 $0 $60,000,000 $0 $0 $0 $0 $0 300901 UP TO 50% FEDERAL SHARE $60,000,000 STIP Action #9 2017 $4,302,361 $0 $0 $0 $0 $4,452,513 $0 $8,754,874 ADA Operating Projects 2017 $160,000 $0 $0 $0 $0 $40,000 $0 $200,000 Preventive Maintenance 2017 $640,000 $10,000 $0 $0 $0 $150,000 $0 $800,000 $96,000 $0 $0 $0 $0 $24,000 $0 $120,000 442400 SHORT RANGE TRANSIT PLANNING Transit Enhancements Rehab/Renovation: 114409 Surveillance/Security 2017 $20,000 $5,000 $0 $0 $0 $0 $0 $25,000 2017 $60,000 $15,000 $0 $0 $0 $0 $0 $75,000 111215 BUY REPLACEMENT VAN (3) 2017 $168,000 $42,000 $0 $0 $0 $0 $0 $210,000 $16,284 $247,946 $0 $0 $0 $0 $0 $1,239,732 $8,000 $2,000 $0 $0 $0 $0 $0 $10,000 $129,334 $32,334 $0 $0 $0 $0 $0 $161,668 $957,430 $0 $0 $0 $0 $239,358 $0 $1,196,788 Purchase ‐ Replacement: Buses (4) ACQUIRE ‐ MISC SUPPORT 114220 EQUIPMENT BUY REPLACEMENTS ‐ CAPITOL BUS 111200 (1) 2016, 2017 2017 NON FIXED ROUTE ADA PARA SERV Preventive Maintenance 2017 $3,808,333 $0 $0 $0 $0 $952,083 $0 $4,760,416 Project Administration 2017 $55,687 $0 $0 $0 $0 $13,922 $0 $69,609 Transportation Planning 2017 $291,645 $0 $0 $0 $0 $72,911 $0 $364,556 $100,000 $25,000 $0 $0 $0 $0 $0 $125,000 STIP Action #9 $181,972 $45,493 $0 $0 $0 $0 $0 $227,465 $82,412 $20,603 $0 $0 $0 $0 $0 $103,015 Purchase ‐ Support Vehicle (3) Spare Parts / Associated Capital Maintenance Computer Technologies ‐ Software FFY 2018 Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5307 Authority Worcester Regional Transit 5337 Authority Computer Technologies ‐ Hardware Enhancements ‐ Shelters Enhancements ‐ Signage TERMINAL, INTERMODAL (TRANSIT): 113403 FACIL. IMPROVEMENT 113403 TERMINAL, INTERMODAL (TRANSIT) $377,928 $94,482 $0 $0 $0 $0 $0 $472,410 $30,000 $7,500 $0 $0 $0 $0 $0 $37,500 $42,160 $10,540 $0 $0 $0 $0 $0 $52,700 $51,480 $12,870 $0 $0 $0 $0 $0 $64,350 $2,421,222 $0 $0 $0 $0 $0 $605,306 $3,026,528