Appendix A – Guidance Documents Guidance Documents The purpose of the Federal Regional Targets documents is to provide a Fiscally Constrained federal aid budget for each year of the STIP. To maintain this Fiscal Constraint, the federal funding categories (NHPP, STP, HSIP, etc.) must be carefully balanced against each other in each year to ensure that sufficient funding is available to support Statewide and Regional Priorities. These documents must be re-evaluated every year. After reserving funding for Grant Anticipatory Note (GANS) debt service payments, the remaining funds are budgeted to support state and regional priorities. For the Statewide Items, Regional Major Infrastructure Projects, and the Bridge Program, the figures presented are maximum budgets which cannot be exceeded. For the MPO Regions, there are two types of figures. The figures presented for CMAQ and HSIP are minimum amounts of funding that the regions are requested to program. The TAP and Non-CMAQ/HSIP Targets are maximum budgets which cannot be exceeded. Appendix A - 1 TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2015 FEDERAL REGIONAL TARGETS February 24, 2014 Obligation Authority Base Obligation Authority Obl. Auth. Matching Total Funding Based On $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 First ABP Gans ABP GANS Repayment 30,795,000 Total Non-Earmarked Available Statewide - (Including State Match) 569,205,000 131,600,711 700,805,711 $2,000,000 $16,800,000 $4,992,364 $7,153,600 $6,708,565 $800,000 $10,240,000 $47,250,000 $19,676,374 $800,000 $5,800,000 $0 $122,220,903 $500,000 $1,866,667 $832,274 $1,788,400 $1,677,141 $200,000 $2,560,000 $5,250,000 $4,919,094 $200,000 $1,450,000 $0 $21,243,575 $2,500,000 $18,666,667 $5,824,638 $8,942,000 $8,385,706 $1,000,000 $12,800,000 $52,500,000 $24,595,468 $1,000,000 $7,250,000 $0 $143,464,478 $33,833,700 $24,800,000 $800,000 $59,433,700 $8,458,425 $6,200,000 $200,000 $14,858,425 $42,292,125 $31,000,000 $1,000,000 $74,292,125 Regional Major Infrastructure Projects: $138,618,067 $34,654,517 $173,272,584 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $8,000,000 $107,800,000 $5,000,000 $120,800,000 $2,000,000 $26,950,000 $1,250,000 $30,200,000 $10,000,000 $134,750,000 $6,250,000 $151,000,000 Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Regional TAP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target $30,000,000 $10,000,000 $3,985,003 $84,147,327 $128,132,330 $7,500,000 $1,111,111 $996,251 $21,036,832 $30,644,194 $37,500,000 $11,111,111 $4,981,254 $105,184,159 $158,776,524 Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide RR Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum HSIP Component With State Match $395,516 $4,774,123 $509,460 $965,570 $282,194 $34,441 $492,173 $495,506 $24,442 $434,401 $506,616 $1,201,102 $995,567 $11,111,111 Regional Minimum CMAQ Component With State Match $1,334,867 $16,112,664 $1,719,428 $3,258,799 $952,405 $116,238 $1,661,084 $1,672,333 $82,492 $1,466,103 $1,709,829 $4,053,720 $3,360,039 $37,500,000 Regional TAP Component With State Match $0 $2,548,719 $178,764 $426,039 $0 $0 $305,423 $74,990 $0 $245,303 $300,009 $473,939 $428,067 $4,981,254 Total Regional Target With State Match $5,651,879 $68,221,673 $7,280,128 $13,797,888 $4,032,520 $492,158 $7,033,097 $7,080,725 $349,273 $6,207,541 $7,239,485 $17,163,614 $14,226,542 $158,776,524 NonCMAQ/ HSIP/TAP with State Match $3,921,497 $44,786,168 $4,872,476 $9,147,480 $2,797,922 $341,479 $4,574,417 $4,837,896 $242,340 $4,061,733 $4,723,031 $11,434,853 $9,442,869 $105,184,159 Appendix A - 2 Federal Aid and Programming Office TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2016 FEDERAL REGIONAL TARGETS February 24, 2014 Obligation Authority Base Obligation Authority Obl. Auth. Matching Total Funding Based On $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 ABP GANS Repayment 66,103,864 Total Non-Earmarked Available Statewide - (Including State Match) 533,896,136 122,676,030 656,572,166 $14,000,000 $22,500,000 $4,651,829 $33,924,910 $4,355,954 $800,000 $10,480,000 $45,990,000 $21,360,000 $800,000 $4,000,000 $3,200,000 $166,062,693 $3,500,000 $2,500,000 $1,127,454 $8,481,228 $1,088,988 $200,000 $2,620,000 $5,110,000 $5,340,000 $200,000 $1,000,000 $800,000 $31,967,670 $17,500,000 $25,000,000 $5,779,283 $42,406,138 $5,444,942 $1,000,000 $13,100,000 $51,100,000 $26,700,000 $1,000,000 $5,000,000 $4,000,000 $198,030,363 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $35,020,469 $24,800,000 $800,000 $60,620,469 $8,755,117 $6,200,000 $200,000 $15,155,117 $43,775,586 $31,000,000 $1,000,000 $75,775,586 Regional Major Infrastructure Projects: $81,195,000 $20,298,750 $101,493,750 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $8,000,000 $72,357,974 $5,000,000 $85,357,974 $2,000,000 $18,089,494 $1,250,000 $21,339,494 $10,000,000 $90,447,468 $6,250,000 $106,697,468 $25,000,000 $9,000,000 $7,970,006 $98,689,994 $140,660,000 $6,250,000 $1,000,000 $1,992,501 $24,672,498 $33,915,000 $31,250,000 $10,000,000 $9,962,507 $123,362,492 $174,575,000 Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Transportation Enhancements Statewide Recreational Trails Statewide ITS Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide RR Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Regional TAP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum HSIP Component With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 Regional Minimum CMAQ Component With State Match $1,112,389 $13,427,220 $1,432,857 $2,715,666 $793,671 $96,865 $1,384,237 $1,393,611 $68,743 $1,221,753 $1,424,858 $3,378,100 $2,800,033 $31,250,000 Regional TAP Component With State Match $0 $4,346,838 $305,425 $727,774 $0 $0 $520,893 $127,980 $0 $418,360 $511,704 $809,741 $730,779 $9,962,507 Total Regional Target With State Match $6,214,248 $75,009,821 $8,004,511 $15,170,796 $4,433,762 $541,128 $7,732,899 $7,785,266 $384,027 $6,825,200 $7,959,824 $18,871,416 $15,642,102 $174,575,000 NonCMAQ/ HSIP/TAP with State Match $4,745,895 $52,939,052 $5,807,715 $10,858,343 $3,386,116 $413,266 $5,384,814 $5,817,721 $293,286 $4,794,126 $5,567,308 $13,602,583 $11,215,279 $124,825,504 Appendix A - 3 Federal Aid and Programming Office TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2017 FEDERAL REGIONAL TARGETS February 24, 2014 Obligation Authority Obl. Auth. Matching Total Funding Based On 495,078,386 113,392,097 608,470,483 $5,600,000 $18,000,000 $5,000,000 $28,500,000 $800,000 $14,400,000 $47,718,000 $19,932,000 $4,000,000 $4,000,000 $3,200,000 $151,150,000 $1,400,000 $2,000,000 $1,250,000 $7,125,000 $200,000 $3,600,000 $5,302,000 $4,983,000 $1,000,000 $1,000,000 $800,000 $28,660,000 $7,000,000 $20,000,000 $6,250,000 $35,625,000 $1,000,000 $18,000,000 $53,020,000 $24,915,000 $5,000,000 $5,000,000 $4,000,000 $179,810,000 Other Statewide Items: Award Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $31,530,000 $25,800,000 $800,000 $58,130,000 $7,882,500 $6,450,000 $200,000 $14,532,500 $39,412,500 $32,250,000 $1,000,000 $72,662,500 Regional Major Infrastructure Projects: $32,800,000 $8,200,000 $41,000,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $8,000,000 $99,338,386 $5,000,000 $112,338,386 $2,000,000 $24,834,597 $1,250,000 $28,084,597 $10,000,000 $124,172,983 $6,250,000 $140,422,983 Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Regional TAP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target $25,000,000 $9,000,000 $5,178,555 $101,481,445 $140,660,000 $6,250,000 $1,000,000 $1,294,639 $25,370,361 $33,915,000 $31,250,000 $10,000,000 $6,473,194 $126,851,806 $174,575,000 Base Obligation Authority $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 ABP GANS Repayment 104,921,614 Total Non-Earmarked Available Statewide - (Including State Match) Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Recreational Trails Statewide ITS Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide RR Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum HSIP Component With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 Regional Minimum CMAQ Component With State Match $1,112,389 $13,427,220 $1,432,857 $2,715,666 $793,671 $96,865 $1,384,237 $1,393,611 $68,743 $1,221,753 $1,424,858 $3,378,100 $2,800,033 $31,250,000 Regional TAP Component With State Match $0 $2,824,382 $198,452 $472,875 $0 $0 $338,453 $83,156 $0 $271,832 $332,483 $526,134 $474,828 $6,473,194 Total Regional Target With State Match $6,214,249 $75,009,821 $8,004,511 $15,170,796 $4,433,762 $541,128 $7,732,899 $7,785,266 $384,027 $6,825,200 $7,959,824 $18,871,416 $15,642,102 $174,575,000 NonCMAQ/ HSIP/TAP with State Match $4,745,895 $54,461,509 $5,914,688 $11,113,242 $3,386,116 $413,266 $5,567,254 $5,862,545 $293,286 $4,940,654 $5,746,529 $13,886,191 $11,471,231 $127,802,406 Appendix A - 4 Federal Aid and Programming Office TITLE 23 - TRANSPORTATION FUNDING FEDERAL FISCAL YEAR 2018 FEDERAL REGIONAL TARGETS 24-Feb-14 Obligation Authority Obl. Auth. Matching Total Funding Based On 493,763,386 112,326,958 606,090,344 $5,600,000 $18,000,000 $5,000,000 $30,000,000 $800,000 $11,920,000 $53,020,000 $25,000,000 $800,000 $4,000,000 $3,200,000 $157,340,000 $1,400,000 $2,000,000 $1,250,000 $7,500,000 $200,000 $2,980,000 $5,891,111 $6,250,000 $200,000 $1,000,000 $800,000 $29,471,111 $7,000,000 $20,000,000 $6,250,000 $37,500,000 $1,000,000 $14,900,000 $58,911,111 $31,250,000 $1,000,000 $5,000,000 $4,000,000 $186,811,111 Other Statewide Items: Aw ard Adjustments, Change Orders, Project Value Changes, Etc. Planning DBEs, FAPO, Pavement Lab Retrofits, and Misc. Programs Subtotal Other Statewide Items: $30,900,000 $24,800,000 $800,000 $56,500,000 $7,725,000 $6,200,000 $200,000 $14,125,000 $38,625,000 $31,000,000 $1,000,000 $70,625,000 Regional Major Infrastructure Projects: $32,800,000 $8,200,000 $41,000,000 Bridge Program: Statewide Bridge Maintenance Program Statewide Bridge Repl. / Rehab Program Statewide Bridge Inspection Program Subtotal Federal Aid Bridge Program: $8,000,000 $93,463,386 $5,000,000 $106,463,386 $2,000,000 $23,365,847 $1,250,000 $26,615,847 $10,000,000 $116,829,233 $6,250,000 $133,079,233 Total Regional Targets: Minimum Regional CMAQ Component: Minimum Regional HSIP Component: Regional TAP Component: Maximum Regional Non-CMAQ / HSIP Component: Total Regional Target $25,000,000 $9,000,000 $5,178,555 $101,481,445 $140,660,000 $6,250,000 $1,000,000 $1,294,639 $25,370,361 $33,915,000 $31,250,000 $10,000,000 $6,473,194 $126,851,806 $174,575,000 Base Obligation Authority $550,000,000 Redistribution, as Estimated by FHWA $50,000,000 Total Estimated Obligation Authority Available: $600,000,000 ABP GANS Repayment 106,236,614 Total Non-Earmarked Available Statewide - (Including State Match) Statewide Infrastructure Items: Statewide Infrastructure Program Statewide HSIP Program Statewide Safe Routes to Schools Program Statewide CMAQ Statewide Recreational Trails Statewide ITS Statewide Interstate Maintenance Program Statewide NHS Preservation Program Statewide RR Grade Crossings Statewide Stormwater Retrofits Statewide ADA Implementation Plan Subtotal Statewide Infrastructure Items: Regional Share (%) Region 3.5596 42.9671 4.5851 8.6901 2.5397 0.3100 4.4296 4.4596 0.2200 3.9096 4.5595 10.8099 8.9601 Berkshire Region Boston Region Cape Cod Central Mass Franklin Region Martha's Vineyard Merrimack Valley Montachusett Nantucket Northern Middlesex Old Colony Pioneer Valley Southeastern Mass Total: 100.00 Regional Minimum HSIP Component With State Match $355,964 $4,296,710 $458,514 $869,013 $253,975 $30,997 $442,956 $445,955 $21,998 $390,961 $455,954 $1,080,992 $896,010 $10,000,000 Regional Minimum CMAQ Component With State Match $1,112,389 $13,427,220 $1,432,857 $2,715,666 $793,671 $96,865 $1,384,237 $1,393,611 $68,743 $1,221,753 $1,424,858 $3,378,100 $2,800,033 $31,250,000 Regional TAP Component With State Match $0 $2,824,382 $198,452 $472,875 $0 $0 $338,453 $83,156 $0 $271,832 $332,483 $526,134 $474,828 $6,473,194 Total Regional Target With State Match NonCMAQ/ HSIP/TAP with State Match $6,214,248 $75,009,821 $8,004,511 $15,170,796 $4,433,762 $541,128 $7,732,899 $7,785,266 $384,027 $6,825,200 $7,959,824 $18,871,416 $15,642,102 $174,575,000 Appendix A - 5 Federal Aid and Programming Office $4,745,895 $54,461,508 $5,914,688 $11,113,242 $3,386,116 $413,266 $5,567,254 $5,862,545 $293,286 $4,940,654 $5,746,529 $13,886,191 $11,471,231 $127,802,405 u.s. Department of Transportation Fe d era l Highway Administration Office of the Administrator April 23 , 2014 1200 New Jersey Ave., SE Washington , D.C. 20590 Federal Transit Administration In Reply Refer To: HEPP-I TPE-l Attention: Executive Directors of Metropolitan Planning Organizations With the renewed focus on transportation planning brought about by the MAP-2l , Transportation Secretary Foxx, and the pending issuance of proposed transportation planning regulations, Federal Highway Administration (FHWA) and Federal Transit Administration ' s (FT A) Offices of Planning are jointly issuing Planning Emphasis Areas (PEAs). The PEAs are planning topical areas that we want to place emphasis on as the Metropolitan Planning Organizations (MPOs) and the State DOTs develop their respective planning work programs. We are asking our FHW A and FTA field offices to meet with their MPO and State DOT counterparts to discuss these emphasis areas and encourage the MPOs and the States to develop and identify work tasks associated with the planning emphasis areas for inclusion in their upcoming unified planning work programs and statewide planning and research work programs for Federal FY-20IS. The planning emphasis areas for Federal FY-20l5 include: MAP-2I Implemelltatioll • Transition to Pelfo rmance Based Planning and Programming. The development and implementation of a performance management approach to transportation planning and programming that supports the achievement of transportation system performance outcomes. Models of Regional Plallllillg Cooperatioll • Promote cooperation and coordination across MPO boundaries and across State boundaries where appropriate to ensure a regional approach to transportation planning. This is particularly important where more than one MPO or State serves an urbani zed area or adjacent urbanized areas. This cooperation could occur through the metropolitan planning agreements that identify how the planning process and planning products will be coordinated, through the development of joint planning products, and/or by other locally determined means. Coordination across MPO and across State boundaries includes the coordination of transportation plans and programs, corridor studies, and projects across adjacent MPO and State boundaries. It also includes collaboration among State DOT(s), MPOs, and operators of public transportation on activities such as: data collection, data storage and analysis, analytical tool s, and performance based planning. Appendix A - 6 2 Ladders o/Opportul/ity • Access to essential services - as part a/the transportat ion planning process, identifY transportation connectivity gaps in access to essential services. Essential services include housing, employment, health care, schools/education, and recreation. This emphasis area could include MPO and State identification of performance measures and analytical methods to measure the transportation system's connectivity to essential services and the use of this information to identify gaps in transportation system connectivity that preclude access of the public, including traditionally underserved populations, to essential services. It could also involve the identification of solutions to address those gaps. Sincerely yours, Gregory G. Nadeau Deputy Administrator Federal Highway Administration Therese W. McMillan Deputy Administrator Federal Transit Administration Appendix A - 7 us. Department of Transportation th Massachusetts Division March 28,2014 55 Broadway, 10 Floor Cambridge, MA 02142 617.494-3657 617.494.3355 (fax) www.fhwa.dot.gov/madiv Federal Highway AdmInIstration In Reply Refer To: HDA-MA Mr. Clinton Bench Deputy Executive Director Office of Transportation Planning Massachusetts Department of Transportatioh 10 Park Plaza, Room 4150 Boston, MA 02116-3969 Subject: Financial Guidance/or the FY 2015-2018 TIPs/STIP Dear Mr. Bench: The purpose of this letter is to provide the financial guidance for developing the Fiscal Year 2015-2018 Transportation Improvement Programs (TIPs) and the Statewide Transportation Improvement Program (STIP). As you are aware, the estimate of Federal funds to be considered for programming is contingent on the annual highway appropriations that provides the obligation limitation. As previously communicated to your staff, for the core Federal-Aid Highway Programs, the estimated obligation authority (OA) for FY 2015,2016,2017 and 2018 is $600 million per year and includes $50 million per year for August Redistribution. In addition, any remaining High Priority Program projects, congressionally designated projects in highway authorization and appropriation legislation, and other discretionary projects may be considered for programming as appropriate. In the development of the STIP, it is recommended that the State consult with the Environmental Protection Agency, Federal Transit Administration, and the Federal Highway Administration, so that only projects in the Metropolitan Planning Organization (MPO) Transportation Plan financial plans are included in the transportation model. To ensure adequate public review, please include the air quality conformity determination in the Draft MPO TIPs. Consistent with FHWA's guidance on the planning requirements and their relationship to the National Environmental Policy Act of 1969 each entire project described in a Record of Decision, Finding of No Significant Impact or Categorical Exclusion should be consistent with the TIP and the MTP prior to the FHWA approval of the environmental document. The Environmental Services section is encouraged to work closely with the Regional Planning Agencies to ensure that environmental documents that are being prepared for projects have the support and endorsement of the MPOs. I As you are aware, Moving Ahead for Progress in the 21 5t Century (MAP-21) requires MPOs and States to establish performance targets that address national performance measures established Appendix A - 8 2 by the U.S. DOT Secretary that are based on the national goals outlined in the legislation. The seven national goals identified by MAP-21 are Safety, Infrastructure Conditions, Congestion Reduction, System Reliability, Freight Movement and Economic Vitality, Environmental Sustainability and Reducing Project Delivery Delays. MassDOT and the MPOs are encouraged to begin incorporating these goals into the project development and selection process. The FHWA and our Federal partners look forward to working with you on the development of the FY 2015-2018 STIP. Please contact us if you have any questions. Sincerely, Planning & Environment Manager Attachment TIPs/STIP Programming Guidelines for Massachusetts cc: FTA Region 1 EPA Region 1 Appendix A - 9 , I TIPs/STIP Programming· Guidelines for Massachusetts June 8,2011 Year of Expenditure (YOE) Revenue and Cost Estimates [23 CFR 4S0.216(1) and 23 CFR 4S0324(h)] The revenue and cost estimates for the TIPs/STIP must use an inflation rate to reflect "year of expenditure dollars". The inflation rate of 4% per annum must be added to the cost estimates for all projects from the second to the fourth year in the TIPs/STIP. Also it is suggested that the TIPs/STIP include a brief statement or footnote stating that the inflation rate was accounted for in the cost estimates. Full Funding [23 CFR 4S0.324(i) and 23 CFR 4S0.216(m)] Projects that are programmed on the TIPs/STIP must be fully funded to cover the entire cost ofthe project, with all sources of funding explicitly identified. Whether the project appears in one or several TIPs/STIP years, it should be relatively easy for r~aders to be able t'o review a project's total estimated cost, as well as its.funding source(s). Programming Earmarks Congressional earmarks should be programmed in the TIPs/STIP only when full funding is available to cover the entire cost of the project, and the project is ready to be advanced. The design phase for earmarked projects should only be programmed if the construction funds are programmed in either the TIP or the RTP. The scope of work developed for a project must be consistent with the legislative description, whether the description comes from an annual appropriations bill or an authorizing legislation such as SAFETEA-LU. Earmarks such as Ferry Boat Discretionary projects, may be programmed beyond the second year of the TIPs/STIP, if an earmark is anticipated in an appropriations bill or an application is under review by the implementing federal agency.' The phases for the use of earmarks should be clearly identified (right-of-way, design, construction). Also, the TIPs/STIP must show the appropriate "Demo ID" or relevant section number to enable FHWAlFTA to identifY the earmark. This includes the "HPP section number" (HPP 2367 for example) or a "Demo ID" such as "MA 091"·. Advanced Construction Consistent with the policy approved on March IS, 200S, AC will be used only ifproject construction, due to engineering decisions, would be scheduled to span the years for which funding is programmed. AC method will not be used solely as a means to fund a project. AC will be used only for projects that exceed an MPO annual target; projects that can be programmed in one year will not use AC funding. In the Boston Region MPO region, because targets are significantly greater than in other ·MPOs, it may be possible, on a case by case basis to use AC on projects that are less than the target (over $2S million). " Appendix A - 10 It is suggested that clear information be provided for projects that are advance . constructed, so as to detenmne the timeframe of the AC. For example, if a project is advance constructed over two years, a note should be included in the project description as AC year 112 and and AC year 2/2 etc. Regionally Significant Projects [23 CFR 450.324(d) and 23 CFR 450.216(h)] The TIPs/STIP should contain all regionally significant projects requiring an action by the FHWAlFTA whether or not the projects are to be funded under title 23 U.S.C. or are 100% State or privately funded. For public information and conformity purposes, the TIPs/STIP shall include all regionally significant projects proposed to be funded with Federal and non-Federal funds. Regionally significant projects programmed in the TIPsiSTIP must also be included in the list of financially constrained recommended projects in the RTP. Project Descriptions and Phases of Work [23 CFR 450.~24(e) and 23 CFR 450.216(i)] Each project in the TIPs/STIP must include sufficient descriptive (detailed) material to clarify the scope/location ofthe project, and phase (right-of-way acquisition, design, or construction) rather than a general description. For example: Oakham Main St. / Old Turnpike Rd. Intersection Improvements (Construction), STP, $800,000 (Fed), $200,000 (State), $1 ,000,000 (Total) For projects that will receive federal funds for design, construction costs and acquisition cost, if applicable, must be programmed in subsequent years in the TIPs/STIP. If construction costs are unknown, estimate the cost to be 10 times the design cost. Sequential Project Programming When a project is programmed on th~ TIPs/STIP, it should be sequentially programmed until completion. If federal funds are to be used for design, the construction phase must be programmed within the timeframe of the TIPs/STIP, once the design phase has been completed. For example, if the design phase for a project is programmed in FY 2008, and it is anticipated that the design will be completed by FY 2010, then the construction phase must be programmed in FY 2010. If the construction cost is unknown, estimate the cost to be 10 times the design cost. Other Considerations . (a) The TIPs/8TIP should be financially constrained by year. (b) Include operations and maintenance expenditures. (c) Explicitly identify all federal aid and non-federal aid air quality regionally significant projects (project that is on a facility which serves regional transportation needs and would normally be included in the modeling ofthe metropolitan area's transportation network). (d) Include a summary of projects obligated in the prior fiscal year. Appendix A - 11