Part II – FY 2015 – 2018 Highway and Transit Projects FFY 2015 Highway Projects STATE TRANSPORTATION IMPROVEMENT PROGRAM FOR FFY 2015 2015 YR MassDOT Project ID MPO Municipality Name MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds Non-Federal Additional Information Funds SECTION 1A / FEDERAL AID TARGET PROJECTS CMAQ - Congestion Mitigation and Air Quality Improvement Program 2015 602280 BERKSHIRE DALTON DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 CMAQ $260,383 $208,306 $52,077 2015 607900 BERKSHIRE PITTSFIELD PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 CMAQ $1,074,484 $859,587 $214,897 2015 605657 BOSTON MEDWAY MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 CMAQ $5,000,000 $4,000,000 $1,000,000 2015 604652 BOSTON MULTIPLE STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY 4 CMAQ $5,429,110 $4,343,288 $1,085,822 2015 605146 BOSTON SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 CMAQ $2,000,000 $1,600,000 $400,000 2015 606284 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 CMAQ $5,000,000 $4,000,000 $1,000,000 2015 1559 BOSTON NA CMAQ $400,000 $320,000 $80,000 2015 201501 CAPE COD MULTIPLE CCNS- NEW TRANSIT SERVICE DEMONSTRATION OUTER CAPE BIKE SHUTTLE 5 CMAQ $87,610 $87,610 $29,753 2015 606461 CAPE COD ORLEANS ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. 5 CMAQ $3,203,376 $2,562,701 $640,675 2015 607484 CENTRAL MASSACHUSETTS DISTRICT 3 - INSTALLATION OF CCTV CAMERAS AND VMS ON I290 BETWEEN I-295 AND I-90 3 CMAQ $1,300,000 $1,040,000 $260,000 2015 605964 CENTRAL MASSACHUSETTS MILLBURY MILLBURY - BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET AND IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROTARY) 3 CMAQ $2,317,000 $1,853,600 $463,400 2015 607239 FRANKLIN MONTAGUE MONTAGUE- CANALSIDE BIKE PATH & PEDESTRIAN CROSSING IMPROVEMENTS, MONTAGUE CITY ROAD AT SOLAR AVENUE & DEPOT STREET (850 FEET) 2 CMAQ $590,000 $472,000 $118,000 INTERSECTION IMPROVEMENT PROGRAM AC - Year 1 of 3; STP + CMAQ; Total Cost = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 STP+HSIP+CMAQ Total Cost = $7,867,762 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Transfer to FTA for CCNS, $87,610 CMAQ with $29,753 TDC match for a total project cost of $87,610. (100% federal funds) Year 3 of 3, 100% design CONSTRUCTION Total cost $3,382,140 [$3,203,376 CMAQ + $178,764 TAP]. 25% design submitted to MassDOT., CMAQ analysis completed. Construction / Design Status = TBD / Total Project Cost = $1,300,000 Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/NFA Funding = $13,647,354 / See also NFA Bridge Project under Section 2B Design Public Hearing held 2/28/2014. Design Status - 75%. TEC = 9.6 Tuesday, September 30, 2014 Part II - 1 2015 YR MassDOT Project ID MPO 2015 604585 MERRIMACK VALLEY 2015 606669 MERRIMACK VALLEY AMESBURY 2015 604928 MONTACHUSETT 2015 606433 2015 District Funding Source Total Programmed Funds Federal Funds Flex to FTA for MVRTAl new bus upgrade tol cleaner fuel buses 4 CMAQ $450,000 $360,000 $90,000 (M) Amesbury- Powwow Rriverwalk Construction,from Main Street to Water Street, Includes ped Bridge A-07-034 (Phase I) 4 CMAQ $1,625,603 $1,300,482 $325,121 LEOMINSTER LEOMINSTER- RECONSTRUCTION OF MECHANIC STREET, FROM LAUREL STREET TO THE LEOMINSTER CONNECTOR 3 CMAQ $1,672,333 $1,337,866 $334,467 Total Project Cost = $1,931,026 FY 2015 CMAQ + FY 2015 TAP (Construction) TEC = 6.47 out of 18. (C) STP/CMAQ; Non Adjusted Total Cost = $3,750,000 as of 4/9/14; 25% Design on 12/2011; Construction; TEC 28 of 100; NANTUCKET NANTUCKET NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET 5 CMAQ $82,492 $65,994 $16,498 601426 NORTHERN MIDDLESEX BILLERICA BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 CMAQ $1,789,585 $1,431,668 $357,917 2015 604957 OLD COLONY PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 CMAQ $1,709,829 $1,367,863 $341,966 2015 604035 PIONEER VALLEY HADLEY HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) 2 CMAQ $1,836,958 $1,469,566 $367,392 PIONEER VALLEY SPRINGFIELD SPRINGFIELD - UNION STATION REDEVELOPMENT 2 CMAQ $315,970 $252,776 $63,194 2015 Municipality Name MassDOT Project Description Non-Federal Additional Information Funds 2015 605222 PIONEER VALLEY SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) 2 CMAQ $1,900,792 $1,520,634 $380,158 2015 605848 SOUTHEASTERN MASSACHUSETTS DARTMOUTH IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 CMAQ $2,308,045 $1,846,436 $461,609 2015 605368 SOUTHEASTERN MASSACHUSETTS NORTH ATTLEBOROUGH TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120) 5 CMAQ $1,843,146 $1,474,517 $368,629 $42,196,716 $33,774,894 $8,451,575 CMAQ - CONGESTION MITIGATION AND AIR QUALITY IMPROVEMENT PROGRAM Subtotal AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources STP, CMAQ, TAP) TEC = 5.52 CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 8.02 TEC 25% $3,038,060 HSIP, CMAQ, Design Public Hearing scheduled for June 9, 2014 $1.7M CMAQ commitment over 3 years toward Phase I of project $65.7 total 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $4,402,320 CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $2,736,112; Construction; EC Score 59 Of 93; Status Pre 25% Plans Received 05-18-12, Comments to DE 04-1213 Total Cost = $1,843,146; Construction; EC Score 43 Of 93; Status 25% - Design Public Hearing 11-0713 Eligible for HSIP & CMAQ HSIP - Highway Safety Improvement Program 2015 607900 BERKSHIRE PITTSFIELD PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST HOUSATONIC STREET (ROUTE 20) 1 HSIP $395,516 $355,964 $39,552 2015 605657 BOSTON MEDWAY MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 HSIP $3,000,000 $2,700,000 $300,000 CMAQ + HSIP; Total Cost = 1,470,000; MPO evaluation score 6 of 7; Design Status: <25% STP+HSIP+CMAQ+TAP Total Cost = $12,062,567; HSIP pending Road Safety Audit Tuesday, September 30, 2014 Part II - 2 2015 YR MassDOT Project ID MPO 2015 605146 BOSTON 2015 606394 2015 MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 HSIP $2,000,000 $1,800,000 $200,000 STP+HSIP+CMAQ Total Cost = $7,867,762 CAPE COD BARNSTABLE BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY 5 HSIP $3,637,130 $3,273,417 $363,713 606485 CENTRAL MASSACHUSETTS MILLBURY MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 HSIP $1,000,000 $900,000 $100,000 2015 606347 CENTRAL MASSACHUSETTS STURBRIDGE STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 3 HSIP $1,000,000 $900,000 $100,000 2015 607222 FRANKLIN GREENFIELD GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 HSIP $282,194 $253,975 $28,219 2015 607586 MARTHA'S VINEYARD MULTIPLE EDGARTOWN-OAK BLUFFS-TISBURY Resurfacing & related work on Edgartown/Vineyard Haven Road 5 HSIP $34,441 $30,997 $3,444 2015 605181 MERRIMACK VALLEY METHUEN Methuen- Interchange reconstruction on I-93 at Route 110/113 ROTARY, including removal of M-17-017 & M-17-018, Rehab of M-17-007 & New Bridge Construction of M-17-040 4 HSIP $492,173 $442,956 $49,217 2015 604035 PIONEER VALLEY HADLEY HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE STREET) 2 HSIP $1,201,102 $1,080,992 $120,110 2015 606729 SOUTHEASTERN MASSACHUSETTS TAUNTON COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA 5 HSIP $1,560,000 $1,404,000 $156,000 CONSTRUCTION Total Cost $4,237,130 [$3,637,130 HSIP + $600,000 Statewide HSIP] 25% plans under review by MassDOT. Upon completion a DPH will be scheduled (estimated Fall 2014)., CMAQ analysis completed Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $2,700,000 This project will be funded with a combination of STP, HSIP, and Statewide HSIP funds. Total project cost = $318,195. Design Status - 25%. TEC = 10.3. Road Safety Audit completed Nov. 2011. Total estimated cost $1,000,000; multiyear construction programmed in 20152016 AC Year 3 of 4. Total Project Cost = $77,236,601 = FY 2013, 2014,& 2015 Regional Major Infrastructure (CMAQ) & Statewide STP-TE & TAP (2015) + FY 2016 Regional Major Infrastructure (CMAQ) + FY 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary)+ FY 2 8.02 TEC 25% $3,038,060 HSIP, CMAQ, Design Public Hearing scheduled for June 9, 2014 HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 $14,602,556 $13,142,301 $1,460,255 $2,782,193 $2,225,754 $556,439 Municipality Name HSIP - HIGHWAY SAFETY IMPROVEMENT PROGRAM Subtotal Non-Federal Additional Information Funds Non-CMAQ/HSIP/TAP (Other) 2015 602280 BERKSHIRE DALTON DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8 1 STP AC - Year 1 of 3; STP + CMAQ; Total Cost = 9,681,141; MPO evaluation score 4 of 7; Design Status: 100% Tuesday, September 30, 2014 Part II - 3 2015 YR MassDOT Project ID MPO 2015 601320 BERKSHIRE LEE 2015 605657 BOSTON 2015 605146 2015 District Funding Source Total Programmed Funds Federal Funds LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES) 1 STP $1,139,304 $911,443 $227,861 MEDWAY MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 STP $1,513,848 $1,211,078 $302,770 BOSTON SALEM SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING AVENUE & JEFFERSON AVENUE 4 STP $3,867,762 $3,094,210 $773,552 STP+HSIP+CMAQ Total Cost = $7,867,762 606284 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STP $7,446,852 $5,957,482 $1,489,370 2015 603711 BOSTON MULTIPLE NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04-022, N-04-026, N-04-027 & W-13-023 (ADD-A-LANE - CONTRACT V) 6 NHPP $30,000,000 $24,000,000 $6,000,000 2015 605559 CENTRAL MASSACHUSETTS WARREN WARREN - RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (WARREN TOWN CENTER) 2 STP $1,398,000 $1,118,400 $279,600 2015 606686 CENTRAL MASSACHUSETTS WARREN WARREN - RESURFACING AND RELATED WORK ON ROUTE 67 @ WEST WARREN AND WARREN TOWN CENTERS 2 STP $1,530,000 $1,224,000 $306,000 2015 606485 CENTRAL MASSACHUSETTS MILLBURY MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 STP $3,100,000 $2,480,000 $620,000 2015 606347 CENTRAL MASSACHUSETTS STURBRIDGE STURBRIDGE - RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84 3 STP $1,700,000 $1,360,000 $340,000 2015 607222 FRANKLIN GREENFIELD GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 STP $17,746 $14,197 $3,549 2015 601657 FRANKLIN MONTAGUE MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF SHERMAN DRIVE TO HATCHERY RD (2.0 MILES) 2 STP $2,780,175 $2,224,140 $556,035 2015 607586 MARTHA'S VINEYARD MULTIPLE EDGARTOWN-OAK BLUFFS-TISBURY Resurfacing & related work on Edgartown/Vineyard Haven Road 5 STP $457,717 $366,174 $91,543 2015 605114 MERRIMACK VALLEY GROVELAND Groveland -Rehabilitation of Route 97 (School Street & Salem Street) 4 STP $4,159,898 $3,327,918 $831,980 STP+CMAQ+Earmarks (SAFETEA-LU, Section 125 and 129, STPP, TCSP) Total Cost = $16,866,250 AC Yr 2 of 5; NHPP+BR+Statewide Infrastructure Total Cost = $164,919,140 ($87,768,183 programmed within FFYs 2015-18 TIP) Construction / Design Status = 75% / TEC Score = 4.57 / Total Project Cost = $1,398,000 Construction / Design Status = 25% / TEC Score = 1.7 / Total Project Cost = $1,530,000 Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 Construction / Design Status = Book Job / TEC Score = 3.3 / STP + HSIP Total Project Cost = $2,700,000 This project will be funded with a combination of STP, HSIP, and Statewide HSIP funds.Total project cost = $318,195. Design Status - 25%. TEC = 10.3. Project will be funded AC over three years. Project advertised for construction 4/26/2014. AC year 2/3. Total project cost is $5,904,070. $574,180 was programmed in 2014. Total estimated cost $1,000,000; multiyear construction programmed in 20152016 AC Year 1 of 2. Total Project Cost = $6,341,761 to be converted to FA STP FY 2015 + FY 2016 (Construction) TEC = 6.72 out of 18. (M) Municipality Name MassDOT Project Description Non-Federal Additional Information Funds AC - Year 3 of 3; Total Project Cost = 5,900,000; MPO evaluation score 3 of 7; Design Status: 100% STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 Tuesday, September 30, 2014 Part II - 4 2015 YR MassDOT Project ID MPO 2015 604960 MONTACHUSETT CLINTON 2015 604928 MONTACHUSETT 2015 606433 2015 District Funding Source Total Programmed Funds Federal Funds CLINTON- RESURFACING & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES) 3 STP $2,760,229 $2,208,183 $552,046 LEOMINSTER LEOMINSTER- RECONSTRUCTION OF MECHANIC STREET, FROM LAUREL STREET TO THE LEOMINSTER CONNECTOR 3 STP $2,077,667 $1,662,134 $415,533 NANTUCKET NANTUCKET NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET 5 STP $242,340 $193,872 $48,468 601426 NORTHERN MIDDLESEX BILLERICA BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 STP $1,677,251 $1,341,801 $335,450 2015 606238 NORTHERN MIDDLESEX TEWKSBURY TEWKSBURY - RESURFACING & RELATED WORK ON ROUTE 38 4 STP $2,061,000 $1,648,800 $412,200 2015 604957 OLD COLONY PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 STP $4,723,031 $3,778,425 $944,606 2015 606417 PIONEER VALLEY CUMMINGTON CUMMINGTON- RETAINING WALL REPLACEMENT ON ROUTE 9 ADJACENT TO C-21-023 OVER WESTFIELD BROOK 1 STP $1,500,000 $1,200,000 $300,000 4.60 TEC Score PSE $1,500,000 STP 2015 606663 PIONEER VALLEY MULTIPLE MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES) 2 STP $1,800,000 $1,440,000 $360,000 3.52 TEC Score PSE $1,800,000 STP 2015 607207 PIONEER VALLEY PELHAM PELHAM- RECONSTRUCTION OF AMHERST ROAD, FROM 800 FEET EAST OF ENFIELD ROAD TO ROUTE 202 (2.5 MILES PHASE II) 2 STP $4,200,000 $3,360,000 $840,000 5.55 TEC 100% $4,200,000 STP 2015 605222 PIONEER VALLEY SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) 2 STP $2,027,589 $1,622,071 $405,518 2015 607869 PIONEER VALLEY WILBRAHAM WILBRAHAM- RECONSTRUCTION OF BOSTON ROAD (ROUTE 20) FROM DUDLEY STREET TO 400FT. EAST OF DUMAINE STREET (0.28MILES) 2 STP $1,903,482 $1,522,786 $380,696 10.50 TEC 75% STP, CMAQ, TAP , Update Cost from $4,233,000 to $4,402,320 7.27 TEC Score 75% $1,903,482 STP 2015 603893 SOUTHEASTERN MASSACHUSETTS DARTMOUTH PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 STP $5,851,116 $4,680,893 $1,170,223 $92,717,200 $74,173,761 $18,543,439 Municipality Name MassDOT Project Description NON-CMAQ/HSIP/TAP (OTHER) Subtotal Non-Federal Additional Information Funds STP/TAP; Non Adjusted Total Cost = $5,551,000 as of 4/9/14; Construction; TEC 43 of 100; 75% Design returned on 10/11/13; CMAQ eligible; AC Yr 1 of 2 STP/CMAQ; Non Adjusted Total Cost = $3,750,000 as of 4/9/14; 25% Design on 12/2011; Construction; TEC 28 of 100; AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources STP, CMAQ, TAP) TEC = 5.52 Total Estimated Cost at 75% Design is $2,061,000. TEC = 4.77. CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 STP ($5,851,116) / § 330 (2003) ($342,125) / FY2002 SAA - BDP ($1,308,114) Total Cost = $7,501,355; Construction; EC Score 12 Of 93; Status Pre 25% - Plans Received 04-05-11, Comments to DE 10-19-12 TAP - Transportation Alternatives Program 2015 605657 BOSTON MEDWAY MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND STREET, INCLUDES REHAB OF M-13-012 3 TAP $2,548,719 $2,038,975 $509,744 STP+HSIP+CMAQ+TAP Total Cost = $12,062,567 2015 606461 CAPE COD ORLEANS ORLEANS- INTERSECTION IMPROVEMENTS AT 2 LOCATIONS: CRANBERRY HIGHWAY (ROUTE 6A) AND MAIN STREET; CHATHAM ROAD (ROUTE 28) AND MAIN STREET. 5 TAP $178,764 $143,011 $35,753 CONSTRUCTION Total cost $3,382,140 [$3,203,376 CMAQ + $178,764 TAP]. 25% design submitted to MassDOT., CMAQ analysis completed. Tuesday, September 30, 2014 Part II - 5 2015 YR MassDOT Project ID MPO 2015 TAP01 CENTRAL MASSACHUSETTS 2015 TAP02 CENTRAL MASSACHUSETTS 2015 606629 2015 District Funding Source Total Programmed Funds Federal Funds CMRPC REGION - BIKE RACKS INTALLATION 3 TAP $100,000 $80,000 $20,000 WORCESTER WORCESTER - INSTALLION OF INFORMATIONAL KIOSK AT UNION STATION 3 TAP $100,000 $80,000 $20,000 CENTRAL MASSACHUSETTS WORCESTER WORCESTER - BLACKSTONE VISITOR CENTER 3 TAP $226,039 $180,831 $45,208 606669 MERRIMACK VALLEY AMESBURY Amesbury- Powwow Rriverwalk Construction,from Main Street to Water Street, Includes ped Bridge A-07-034 (Phase I) 4 TAP $305,423 $244,338 $61,085 2015 604960 MONTACHUSETT CLINTON CLINTON- RESURFACING & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES) 3 TAP $74,990 $59,992 $14,998 2015 601426 NORTHERN MIDDLESEX BILLERICA BILLERICA - RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET) 4 TAP $245,303 $196,242 $49,061 2015 604957 OLD COLONY PEMBROKE PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE 53) AC PHASE 1 OF 2 5 TAP $300,009 $240,007 $60,002 2015 605222 PIONEER VALLEY SPRINGFIELD SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET TO THE CHICOPEE CITY LINE (NORTHERLY SEGMENT) 2 TAP $473,939 $379,151 $94,788 10.50 TEC 75% $4,233,000 STP, CMAQ, TAP 2015 605848 SOUTHEASTERN MASSACHUSETTS DARTMOUTH IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHWAY (U.S. ROUTE 6) AND FAUNCE CORNER ROAD (PHASE 1) 5 TAP $428,067 $342,454 $85,613 CMAQ ($2,308,045) / TAP ($428,067) Total Cost = $2,736,112; Construction; EC Score 59 Of 93; Status Pre 25% Plans Received 05-18-12, Comments to DE 04-1213 $4,981,253 $3,985,001 $996,252 $154,497,725 $125,075,957 $29,451,521 $6,250,000 $5,000,000 $1,250,000 $6,250,000 $5,000,000 $1,250,000 Municipality Name MassDOT Project Description TAP - TRANSPORTATION ALTERNATIVES PROGRAM Subtotal SECTION 1A / FEDERAL AID TARGET PROJECTS TOTALS Non-Federal Additional Information Funds Construction / TEC Score = 1.03 / Total Project Cost = $100,000 Construction / TEC Score = 1.23 / Design Status = Pre 25% / Total Project Cost = $100,000 Construction / TEC Score = 2.43 / Design Status = Pre 25% / Total Project Cost = $226,039 Total Project Cost = $1,931,026 FY 2015 CMAQ + FY 2015 TAP (Construction) TEC = 6.47 out of 18. (C) STP/TAP; Non Adjusted Total Cost = $5,551,000 as of 4/9/14; Construction; TEC 43 of 100; 75% Design returned on 10/11/13; CMAQ eligible; AC Yr 1 of 2 AC Year 1 of 2. Total project cost at 100% design $7,024,778 (Funding Sources STP, CMAQ, TAP) TEC = 5.52 CMAQ/ TAP/ STP; YOE is $6,732,869; 100 Percent Design; TEC Score is 7 SECTION 1B / FEDERAL AID BRIDGE PROJECTS Statewide Bridge Inspection Program 2015 BRI STATEWIDE Bridge Inspection NHPP STATEWIDE BRIDGE INSPECTION PROGRAM Subtotal Tuesday, September 30, 2014 Part II - 6 2015 YR MassDOT Project ID MPO Municipality Name MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds Non-Federal Additional Information Funds Statewide Bridge Maintenance Program 2015 607510 BERKSHIRE SANDISFIELD SANDISFIELD- SYSTEMATIC BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (S.MAIN ST.) OVER W. BRANCH FARMINGTON RIVER (PHASE II) 1 NHPP $309,920 $247,936 $61,984 2015 607518 CENTRAL MASSACHUSETTS WORCESTER WORCESTER - FEDERAL AID SYSTEMATIC MAINTENANCE; BRIDGE JOINTS, DECK REPAIRS, PRESSURE WASHING AND RELATED WORK; I-190 OVER RT 12 AND RAMP B; BRIDGE NO. W-44-124 (1XF) NORTHBOUND 3 NHPP $1,521,624 $1,217,299 $304,325 2015 607515 PIONEER VALLEY MULTIPLE DISTRICT 2 - SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS 2 NHPP $1,849,536 $1,479,629 $369,907 2015 607505 STATEWIDE SUB-STRUCTURE REPAIRS ON I-93 AND I-495 CORRIDOR BRIDGES IN DISTRICT 4 4 NHPP $2,469,792 $1,975,834 $493,958 2015 607509 STATEWIDE BRIDGE CLEANING ALONG I-495, RTE. 25, RTE. 6 AND RTE. 28 5 NHPP $1,899,976 $1,519,981 $379,995 2015 607497 STATEWIDE DISTRICT 6- SYSTEMATIC BRIDGE MAINTENANCE ON I-93/US1/ST 3 6 NHPP $1,863,701 $1,490,961 $372,740 $9,914,549 $7,931,640 $1,982,909 STATEWIDE BRIDGE MAINTENANCE PROGRAM Subtotal Construction / Design Status = TBD / Total Project Cost = $1,521,624 Statewide Off-System Bridge Program 2015 607121 BERKSHIRE SAVOY SAVOY- BRIDGE REPLACEMENT, S-06-004, RIVER ROAD OVER THE WESTFIELD RIVER 1 STP-BR-OFF $2,589,860 $2,071,888 $517,972 2015 604675 CENTRAL MASSACHUSETTS HOLDEN HOLDEN - BRIDGE REHABILITATION, H-18-020, RIVER STREET OVER QUINAPOXET STREET 3 STP-BR-OFF $4,806,620 $3,845,296 $961,324 2015 607117 FRANKLIN HAWLEY HAWLEY - BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER 1 STP-BR-OFF $2,692,422 $2,153,938 $538,484 2015 604838 MONTACHUSETT WINCHENDON WINCHENDON - BRIDGE REPLACEMENT, W-39-001, HARRIS ROAD OVER TARBELL BROOK 2 STP-BR-OFF $3,279,640 $2,623,712 $655,928 2015 607114 MONTACHUSETT LANCASTER LANCASTER - FULL BRIDGE REPLACEMENT, L-02-018, JACKSON ROAD OVER ROUTE 2. 3 STP-BR-OFF $3,432,000 $2,745,600 $686,400 2015 607123 NORTHERN MIDDLESEX CHELMSFORD CHELMSFORD - HUNT RD OVER I-495 (BR-OFF) 4 STP-BR-OFF $10,404,940 $8,323,952 $2,080,988 2015 604589 SOUTHEASTERN MASSACHUSETTS NORTON BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE CANOE RIVER 5 STP-BR-OFF $2,005,055 $1,604,044 $401,011 Status Pre 25% - Plans Received 01-22-14 2015 606372 SOUTHEASTERN MASSACHUSETTS WAREHAM BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER 5 STP-BR-OFF $2,039,319 $1,631,455 $407,864 Status Pre 25% STATEWIDE OFF-SYSTEM BRIDGE PROGRAM Subtotal $31,249,856 $24,999,885 $6,249,971 Construction / Design Status = 25% / Total Project Cost = $4,806,620 Design Status - 25% Cost Est as of 4/30/14; Non Adjusted Total Cost = $3,279,640; Bridge Off System AC Yr 2 of 2; Cost Est as of 4/23/13; Construction; Total Cost = $7,576,608; Bridge Off System; $4,144,608 programmed in FFY 2014 Year of Estimate 2014. Statewide On System Bridge Program 2015 605299 BERKSHIRE 2015 607273 BOSTON GREAT BARRINGTON GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER FRANKLIN FRANKLIN- BRIDGE DEMOLITION, F-08-005, OLD STATE ROUTE 140 OVER MBTA/CSX & NEW PEDESTRIAN BRIDGE CONSTRUCTION 1 NHPP $5,904,802 $4,723,842 $1,180,960 3 NHPP $1,780,272 $1,424,218 $356,054 Tuesday, September 30, 2014 Part II - 7 2015 YR MassDOT Project ID MPO 2015 607338 BOSTON 2015 600703 2015 MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds GLOUCESTER GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II) 4 NHPP $5,506,585 $4,405,268 $1,101,317 AC Yr 2 of 2; Total Cost = $13,956,585 BOSTON LEXINGTON LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95 (ROUTE 128) 4 NHPP $14,886,555 $11,909,244 $2,977,311 AC Yr 3 of 4; Total Cost = $35,108,000 603008 BOSTON WOBURN WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA 4 NHPP $5,018,477 $4,014,782 $1,003,695 2015 608019 BOSTON BOSTON BOSTON- ADVANCED UTILITY RELOCATIONS FOR BRIDGE B-16237, MASSACHUSETTS AVENUE (ROUTE 2A) OVER COMMONWEALTH AVENUE 6 NHPP $6,000,000 $4,800,000 $1,200,000 AC Yr 1 of 3; Total Cost = $15,100,020 2015 604796 BOSTON DEDHAM DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK 6 NHPP $1,192,805 $954,244 $238,561 AC Yr 2 of 2; Total Cost = $7,051,805 2015 605883 BOSTON DEDHAM DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH 6 NHPP $3,029,032 $2,423,226 $605,806 2015 605972 CENTRAL MASSACHUSETTS SOUTHBRIDGE SOUTHBRIDGE - BRIDGE PRESERVATION, S-21-002, SR 131 (MAIN STREET) OVER QUINEBAUG RIVER 3 NHPP $4,168,395 $3,334,716 $833,679 2015 606551 FRANKLIN COLRAIN COLRAIN- BRIDGE REPLACEMENT, C-18-028, ST 112 (JACKSONVILLE ROAD) OVER EAST BRANCH OF NORTH RIVER 1 NHPP $10,604,205 $8,483,364 $2,120,841 2015 604029 MARTHA'S VINEYARD MULTIPLE OAK BLUFFS / TISBURY - BRIDGE REPLACEMENT: BEACH ROAD OVER LAGOON POND DRAWBRIDGE 5 NHPP $7,000,000 $5,600,000 $1,400,000 2015 603682 MERRIMACK VALLEY AMESBURY Amesbury - Bridge Replacement, A-07-026, Route I-495 (NB & SB) Over the bikeway (Abandoned B&M RR line) 4 NHPP $11,288,692 $9,030,954 $2,257,738 2015 604537 NORTHERN MIDDLESEX LOWELL LOWELL-BRIDGE REPLACEMENT, L-15-045, MARKET STREET OVER THE WESTERN CANAL (BR-ON) 4 NHPP $3,792,941 $3,034,353 $758,588 2015 602932 NORTHERN MIDDLESEX LOWELL LOWELL-BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK (BR-ON) 4 NHPP $14,017,076 $11,213,661 $2,803,415 AC Year 3 of 5. Total estimated project cost $38,277,479 Total Project Cost = $11,288,692. (Construction) (M) Total project cost estimate for FY 2015 $3,792,941 Revised Cost Estimate 3/26/14 2015 606525 SOUTHEASTERN MASSACHUSETTS ATTLEBORO BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE 5 NHPP $2,710,161 $2,168,129 $542,032 AC Year 1 of 2; Total Cost $12,075,000 2015 605223 SOUTHEASTERN MASSACHUSETTS FALL RIVER INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 5 NHPP $6,600,000 $5,280,000 $1,320,000 $103,499,998 $82,800,001 $20,699,997 $150,914,403 $120,731,526 $30,182,877 $1,114,501 $891,601 $222,900 Municipality Name STATEWIDE ON SYSTEM BRIDGE PROGRAM Subtotal SECTION 1B / FEDERAL AID BRIDGE PROJECTS TOTALS Non-Federal Additional Information Funds Construction / Design Status = TBD / Total Project Cost = $4,168,395 Design Status - 25%. This project was combined with 606354 for a total construction cost of $270,626,756. - $171,911,637 is for the I-195/Route 79/Route 138 Interchange Improvements (Spaghetti Ramps) of which $167,600,637 is identified as GANS funding (federal & state match SECTION 1C / FEDERAL AID NON-TARGET PROJECTS Other Federal Aid 2015 606284 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 HPP Construction; HPP 682; STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Tuesday, September 30, 2014 Part II - 8 2015 YR MassDOT Project ID MPO 2015 606134 BOSTON BOSTON 2015 606284 BOSTON 2015 606284 2015 District Funding Source Total Programmed Funds Federal Funds BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET 6 HPP $2,377,900 $1,902,320 $475,580 BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 SEC 125 $475,000 $475,000 $0 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 SEC 129 $980,000 $980,000 $0 606284 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 STPP $599,897 $599,897 $0 2015 606284 BOSTON BOSTON BOSTON- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM AMORY STREET TO ALCORN STREET 6 TCSP $1,250,000 $1,000,000 $250,000 2015 607571 CAPE COD MULTIPLE DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW PEDESTRIAN BRIDGE D07-007=Y-01-010 5 TI (2005) TI173 $2,096,080 $2,096,080 $0 2015 608018 CENTRAL MASSACHUSETTS WORCESTER WORCESTER - BLACKSTONE VISITOR CENTER AND BIKEWAY EARLY ACTION SITE WORK 3 HPP $1,500,000 $1,200,000 $300,000 2015 604892 CENTRAL MASSACHUSETTS WORCESTER WORCESTER - BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND ROAD RESURFACING OF GARDNER AND KILBY STREET. 3 HPP $2,918,510 $2,334,808 $583,702 2015 607347 MONTACHUSETT GARDNER GARDNER- BIKE PATH CONSTRUCTION, NORTH CENTRAL PATHWAY (PHASE VI) 3 HPP $1,000,000 $0 $1,000,000 2015 603893 SOUTHEASTERN MASSACHUSETTS DARTMOUTH PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 OTHER FA $342,125 $273,700 $68,425 2015 603893 SOUTHEASTERN MASSACHUSETTS DARTMOUTH PADANARAM BRIDGE CAUSEWAY PROJECT, D-04-002, BRIDGE STREET OVER APPONAGANSETT RIVER 5 OTHER FA $1,308,114 $1,046,491 $261,623 $15,962,127 $12,799,897 $3,162,230 $15,962,127 $12,799,897 $3,162,230 Municipality Name MassDOT Project Description OTHER FEDERAL AID Subtotal SECTION 1C / FEDERAL AID NON-TARGET PROJECTS TOTALS Non-Federal Additional Information Funds Construction; HPP 2129 (MA155) Construction; Section 125 (MA252); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; Section 129 (MA246); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; STPP (MA267); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Construction; TCSP (11MA008); STP+CMAQ+Earmarks (SAFETEA-LU, Sections 125 and 129, STPP, TCSP) Total Cost = $16,866,250 Earmark to cover Bass River Bridge portion of CCRT extension ($2,096,080 from TI 173 MA 209), Entire CCRT extension project TIP funding (2014+2015) = $9,508,979. Concerns regarding permit timing from Coast Guard. Construction / HPP#2351 - MA158, HPP#4283 - MA202, HPP#2218 - MA157, HPP#2509 - MA165 / Design Status = Pre 25% / Total Project Cost = $1,500,000 Construction / HPP#918 - MA136 & HPP#4288 - MA207 / Design Status = 75100% / Total Project Cost = $2,918,510 HPP #1798 MA 148 Earmark: Non Adjusted Total Cost = $1,000,000 (as of 4/9/14); Total Design = $112,000 included in FFY 2013 TIP Amendment No. 2 MPO Endorsed 6/12/13; Total Estimated Design & Construction = $1,112,000 Non Adjusted. Tuesday, September 30, 2014 Part II - 9 2015 YR MassDOT Project ID MPO Municipality Name MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds Non-Federal Additional Information Funds SECTION 1D / FEDERAL AID MAJOR & STATE CATEGORY PROJECTS Other Statewide Items 2015 ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE NHPP $24,587,494 $24,587,494 $0 2015 ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE STP-BR-OFF $3,207,506 $3,207,506 $0 2015 ABPGAN STATEWIDE ACCELERATED BRIDGE PROGRAM- GANS DEBT SERVICE STP-TE $3,000,000 $3,000,000 $0 2015 SPL STATEWIDE STATEWIDE PLANNING PL $31,000,000 $24,800,000 $6,200,000 2015 SRT STATEWIDE STATEWIDE RECREATIONAL TRAILS REC $1,000,000 $800,000 $200,000 2015 MSC STATEWIDE STATEWIDE DBES, MISC PROGRAMS STP $1,000,000 $800,000 $200,000 2015 EWO STATEWIDE STATEWIDE AWARD ADJUSTMENTS, CHANGE ORDERS, ETC STP $44,378,495 $35,502,796 $8,875,699 $108,173,495 $92,697,796 $15,475,699 OTHER STATEWIDE ITEMS Subtotal Accelerated Bridge Program (ABP) GANs payments begin in FFY 2015. Accelerated Bridge Program (ABP) GANs payments begin in FFY 2015. Accelerated Bridge Program (ABP) GANs payments begin in FFY 2015. Regional Major Infrastructure Program 2015 605181 MERRIMACK VALLEY METHUEN METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 4 CMAQ $23,808,000 $19,046,400 $4,761,600 2015 607731 PIONEER VALLEY SPRINGFIELD SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION) 2 NHPP $149,006,250 $119,205,000 $29,801,250 $172,814,250 $138,251,400 $34,562,850 REGIONAL MAJOR INFRASTRUCTURE PROGRAM Subtotal AC Year 3 of 4. Total Project Cost = $77,236,601 = FY 2013, 2014,& 2015 Regional Major Infrastructure (CMAQ) & Statewide STP-TE & TAP (2015) + FY 2016 Regional Major Infrastructure (CMAQ) + FY 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary)+FY 2013 STP & HSIP + FY 2014 CMAQ & HSIP+ FY 2015 HSIP + FY 2016 STP (Construction) TEC = 9.63 out of 18. ( C ) 100% Design, Funds will be disbursed from FFY 2014 through FFY 2017 Statewide CMAQ 2015 604531 BOSTON MULTIPLE 2015 605066 PIONEER VALLEY NORTHAMPTON ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL 3 CMAQ $4,042,873 $3,234,298 $808,575 NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET - Roundabout 2 CMAQ $1,592,248 $1,273,798 $318,450 2015 VANPOL STATEWIDE Vanpools CMAQ $562,000 $449,600 $112,400 2015 STATEWIDE MassRides -- Travel Options Program CMAQ $2,689,512 $2,151,610 $537,902 $8,886,633 $7,109,306 $1,777,327 82865 STATEWIDE CMAQ Subtotal Statewide TE+Statewide CMAQ Total Cost = $4,575,977 SW-CMAQ 25% Design Public Hearing Held on April 24, 2013 Programmed in FFY15 of the FFY14-17 STIP. AC Yr 1 of 5 Tuesday, September 30, 2014 2015 YR MassDOT Project ID MPO District Funding Source Total Programmed Funds Federal Funds BARNSTABLE - ROUTE 28/BEARSES WAY 5 HSIP $600,000 $540,000 $60,000 MILLBURY - SUTTON - MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON ROAD 3 HSIP $1,250,000 $1,125,000 $125,000 GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET 2 HSIP $18,255 $16,430 $1,826 WEST SPRINGFIELD TO ERN!RDSTON – TR!FFI SIGN REPLACEMENT ON INTERSTATE 91 2 HSIP $4,064,580 $3,658,122 $406,458 Municipality Name MassDOT Project Description Non-Federal Additional Information Funds Statewide HSIP Program 2015 606394 CAPE COD BARNSTABLE 2015 606485 CENTRAL MASSACHUSETTS MILLBURY 2015 607222 FRANKLIN GREENFIELD 2015 605833 PIONEER VALLEY MULTIPLE 2015 607072 STATEWIDE STATEWIDE- IMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED INTERSECTIONS--ONE OF THE FHWA NINE PROVEN COUNTERMEASURES HSIP $1,500,000 $1,350,000 $150,000 2015 608024 STATEWIDE STATEWIDE - CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED HSIP $4,000,000 $3,600,000 $400,000 2015 SHSP STATEWIDE STATEWIDE- VARIOUS SAFETY STRATEGIES TO BE DETERMINED BASED ON 2013 SHSP AND UPDATES HSIP $7,252,087 $6,526,878 $725,209 $18,684,922 $16,816,430 $1,868,493 $2,500,000 $2,000,000 $500,000 $2,500,000 $2,000,000 $500,000 STATEWIDE HSIP PROGRAM Subtotal CONSTRUCTION Total Cost $4,237,130 [$3,637,130 HSIP + $600,000 Statewide HSIP] 25% plans under review by MassDOT. Upon completion a DPH will be scheduled (estimated Fall 2014)., CMAQ analysis completed Construction / Design Status = 25% / TEC Score = 2.3 / STP + HSIP+ SW HSIP Total Project Cost = $5,350,000 This project will be funded with a combination of STP, HSIP, and Statewide HSIP funds. Total project cost = $318,195. Design Status - 25%. TEC = 10.3. Road Safety Audit completed Nov. 2011. AC Yr 2 of 2. Total TFPC = $7,175,180 AC Yr 1 of 2. Total TFPC = $6,000,000 Statewide Infrastructure Program 2015 607700 BOSTON MULTIPLE DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RECABLING FROM SIX (6) LIGHTING LOAD CENTERS ALONG ROUTE I-95 (128) LEXINGTON-WOBURN 4 STP STATEWIDE INFRASTRUCTURE PROGRAM Subtotal Statewide Intelligent Transportation System 2015 607483 STATEWIDE DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES) CMAQ $500,000 $400,000 $100,000 2015 607484 STATEWIDE DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I290 BETWEEN I-495 AND I-90 CMAQ $2,500,000 $2,000,000 $500,000 2015 606916 STATEWIDE STATEWIDE- HOC OPERATIONS AND MAINTENANCE SUPPORT ITS CONTRACT STP $613,600 $490,880 $122,720 2015 608031 STATEWIDE STATEWIDE ITS DESIGN CONSULTANT SERVICES STP $1,000,000 $800,000 $200,000 2015 606927 STATEWIDE STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS) STP $1,728,800 $1,383,040 $345,760 2015 606432 STATEWIDE BURLINGTON- WOBURN- READING- EXPANSION OF FIBER, CCTV, VMS & TRAFFIC SENSOR NETWORK ON I-95 CMAQ $500,000 $400,000 $100,000 BURLINGTON AC Year 1 of 2 Total Project Cost $6,500,000. AC Year 1 of 2. Total Project Cost $5,500,000 AC Year 1 of 2. Total Cost = $1,313,600 AC Year 1 of 2 Total Project Cost $2,228,800 AC Year 2 of 2 Total Project Cost $5,407,070 Tuesday, September 30, 2014 Part II - 11 2015 YR MassDOT Project ID MPO 2015 607424 STATEWIDE STATEWIDE 2015 607422 STATEWIDE 2015 606930 2015 606931 Funding Source Total Programmed Funds Federal Funds STATEWIDE- ITS ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS) SOFTWARE CMAQ $2,000,000 $1,600,000 $400,000 STATEWIDE DISTRICT 1- DISTRICT 2- DISTRICT 3- DISTRICT 4- DISTRICT 5DISTRICT 6- REAL TIME TRAVEL MONITORING SYSTEM (RTTM) CMAQ $3,500,000 $2,800,000 $700,000 STATEWIDE BRAINTREE BRAINTREE- QUINCY- BOSTON- HOV LANE TOW TRUCK SERVICES & BTV OPERATOR CONTRACT 6 STP $228,800 $183,040 $45,760 AC Year 1 of 2. Total Project Cost $3,000,000. AC Year 2 of 2. CMAQ Project Cost = $10,346,666 + Tolls: WT $1,216,910 ; MHS $353,431. Also includes RFR for backoffice plus 3 years O&M - office estimate at $1.8 million AC Year 1 of 2. Total Cost = $578,800 STATEWIDE BRAINTREE BRAINTREE- QUINCY- BOSTON- HOV LANE TOW TRUCK SERVICES & BTV OPERATOR CONTRACT 6 STP $228,800 $183,040 $45,760 AC Year 1 of 2. Total Cost = $1,028,800 $12,800,000 $10,240,000 $2,560,000 Municipality Name MassDOT Project Description District STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM Subtotal Non-Federal Additional Information Funds Statewide Interstate Maintenance Program 2015 607181 CENTRAL MASSACHUSETTS NORTHBOROUGH NORTHBOROUGH - MARLBOROUGH - INTERSTATE MAINTENANCE & RELATED WORK ON I-290 3 NHPP $8,365,728 $7,529,155 $836,573 2015 605588 CENTRAL MASSACHUSETTS WORCESTER WORCESTER - INTERSTATE MAINTENANCE & RELATED WORK ON I-190 (NB) 3 NHPP $14,910,480 $13,419,432 $1,491,048 2015 607985 MERRIMACK VALLEY MULTIPLE Lawrence - North Andover - Interstate Maintenance and Related Work on I-495 4 NHPP $7,788,000 $7,009,200 $778,800 2015 606549 MERRIMACK VALLEY MULTIPLE Georgetown- Newbury- West Newbury- NewburyportAmesbury- Salisbury- Interstate Maintanence & related work on I-95 4 NHPP $21,240,000 $19,116,000 $2,124,000 $52,304,208 $47,073,787 $5,230,421 STATEWIDE INTERSTATE MAINTENANCE PROGRAM Subtotal Construction / Design Status = TBD / Total Project Cost = $8,365,728 Construction / Design Status = Pre 25% / Total Project Cost = $14,910,480 Total Project Cost = $7,788,000 (Construction) (M) Total Project Cost = $21,240,000 (Construction) (M) Statewide NHS Preservation Program 2015 606544 BERKSHIRE MULTIPLE LENOX- PITTSFIELD RESURFACING AND RELATED WORK ROUTE 7 1 NHPP $3,422,162 $2,737,730 $684,432 2015 605887 BERKSHIRE MULTIPLE SHEFFIELD - GREAT BARRINGTON - RESURFACING AND RELATED WORK ROUTE 7 1 NHPP $6,641,040 $5,312,832 $1,328,208 2015 607891 BOSTON BEVERLY BEVERLY - RESURFACING & RELATED WORK ON ROUTE 128 4 NHPP $5,805,600 $4,644,480 $1,161,120 2015 607174 BOSTON MULTIPLE CHELSEA- REVERE- RESURFACING & RELATED WORK ON ROUTE 1 4 NHPP $8,663,824 $6,931,059 $1,732,765 $24,532,626 $19,626,101 $4,906,525 STATEWIDE NHS PRESERVATION PROGRAM Subtotal Statewide RR Grade Crossings 2015 RRC STATEWIDE STATEWIDE RAILROAD CROSSING HAZARD ELIMINATION CONTRACTS RRHE $500,000 $400,000 $100,000 2015 RRC STATEWIDE STATEWIDE RAILROAD CROSSING PROTECTIVE DEVICES CONTRACTS RRPD $500,000 $400,000 $100,000 $1,000,000 $800,000 $200,000 $700,000 $560,000 $140,000 STATEWIDE RR GRADE CROSSINGS Subtotal Statewide Safe Routes to Schools Program 2015 607892 BOSTON SOMERVILLE SOMERVILLE- SAFE ROUTES TO SCHOOL (HEALEY SCHOOL) 4 TAP 80% Federal + 20% Non-Federal Tuesday, September 30, 2014 Part II - 12 2015 YR MassDOT Project ID MPO 2015 607920 BOSTON MILTON 2015 607716 SOUTHEASTERN MASSACHUSETTS MANSFIELD 2015 SRTS STATEWIDE 2015 SRTS STATEWIDE Municipality Name District Funding Source Total Programmed Funds Federal Funds MILTON- SAFE ROUTES TO SCHOOL (GLOVER ELEMENTARY SCHOOL) 6 TAP $725,000 $580,000 $145,000 80% Federal + 20% Non-Federal SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDAN-JACKSON ELEMENTARY SCHOOL (SRTS) 5 TAP $900,000 $720,000 $180,000 80% Federal + 20% Non-Federal SRTS - Planning & Design NA SRTS $600,000 $600,000 $0 SRTS - Education NA SRTS $863,268 $863,268 $0 $3,788,268 $3,323,268 $465,000 MassDOT Project Description STATEWIDE SAFE ROUTES TO SCHOOLS PROGRAM Subtotal Non-Federal Additional Information Funds Statewide Stormwater Retrofits 2015 606997 BOSTON 2015 607002 CENTRAL MASSACHUSETTS 2015 607001 STATEWIDE 2015 606999 STATEWIDE MULTIPLE BRAINTREE-MANSFIELD-MILTON-WEYMOUTH-STORMWATER MULTIPLE RETROFITS ON I-93, I-495, I-195, ROUTE 3/18 STP-TE $2,500,000 $2,000,000 $500,000 SHIRLEY-UXBRIDGE-WORCESTER- STORMWATER RETROFITS ON ROUTE 2A, ROUTE 146 AND ROUTE 122 3 STP-TE $750,000 $600,000 $150,000 LONGMEADOW/SPRINGFIELD-TEMPLETON-WESTFIELDSTORMWATER RETROFITS ON I-91/ROUTE 5, ROUTE 2, AND ROUTE 20 2 STP $700,000 $560,000 $140,000 MULTIPLE STP-TE $3,300,000 $2,640,000 $660,000 $7,250,000 $5,800,000 $1,450,000 STATEWIDE- STORMWATER RETROFITS AT VARIOUS LOCATIONS (IM/NHS) STATEWIDE STORMWATER RETROFITS Subtotal Statewide Transportation Enhancements 2015 604531 BOSTON MULTIPLE 2015 606434 CENTRAL MASSACHUSETTS WORCESTER 2015 605181 MERRIMACK VALLEY METHUEN ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL 3 STP-TE $533,104 $426,483 $106,621 WORCESTER - CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENT 3 STP-TE $1,652,015 $1,321,612 $330,403 METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 4 STP-TE $458,334 $366,667 $91,667 Statewide TE+Statewide CMAQ Total Cost = $4,575,977 Design & Construction / Design Status = Pre 25% / STP-TE+HPP Total Project Cost = $7,277,015 AC Year 3 of 4. Total Project Cost = $77,236,601 = FY 2013, 2014,& 2015 Regional Major Infrastructure (CMAQ) & Statewide STP-TE & TAP (2015) + FY 2016 Regional Major Infrastructure (CMAQ) +FY 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary)+FY 2013 STP & HSIP + FY 2014 CMAQ & HSIP+ FY 2015 HSIP + FY 2016 STP (Construction) TEC = 9.63 out of 18. ( C ) Tuesday, September 30, 2014 Part II - 13 2015 YR MassDOT Project ID MPO 2015 605181 MERRIMACK VALLEY METHUEN 2015 606503 MERRIMACK VALLEY NEWBURYPORT 2015 603730 PIONEER VALLEY 2015 606729 SOUTHEASTERN MASSACHUSETTS Municipality Name MassDOT Project Description District Funding Source Total Programmed Funds Federal Funds METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040 4 STP-TE $458,334 $366,667 $91,667 Newburyport - Clipper City Rail Trail along the City Branch (Phase II) 4 STP-TE $3,120,000 $2,496,000 $624,000 AC Year 3 of 4. Total Project Cost = $77,236,601 = FY 2013, 2014,& 2015 Regional Major Infrastructure (CMAQ) & Statewide STP-TE & TAP (2015) + FY 2016 Regional Major Infrastructure (CMAQ) + FY 2013 HPP #2434 (2005) + 2013 IM (2010 Discretionary)+FY 2013 STP & HSIP + FY 2014 CMAQ & HSIP+ FY 2015 HSIP + FY 2016 STP (Construction) TEC = 9.63 out of 18. ( C ) (Construction) TEC = 5.75 ( C ) 2 STP-TE $1,640,736 $1,312,589 $328,147 5.12 TEC Score 100% ($1,640,736) 5 STP-TE $843,066 $674,453 $168,613 HSIP ($1,560,000) / Statewide TE ($843,066) Total Cost = $2,403,066; Construction; EC Score 26 Of 93; Status Pre 25% - Plans Received 01-23-14, Comments to DE 03-04-14 $8,705,589 $6,964,471 $1,741,118 $421,439,991 $350,702,559 $70,737,433 NFA $38,000,000 $0 $38,000,000 Non-federal aid Lists cash flows (based on state fiscal year) for Fairmount Improvements MassDOT made a formal request on Aug. 1, 2011, to remove this project from the State Implementation Plan regulation. The MPO is continuing to reference this project in the document until the process is complete. WEST SPRINGFIELD WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO DOTY CIRCLE, INCLUDES PEDESTRIAN BRIDGE W-21-020 TAUNTON COUNTY ST (RTE 140) RECONSTRUCTION FROM RTE 24 TO MOZZONE BLVD TO WIDEN RR TRACKS AREA STATEWIDE TRANSPORTATION ENHANCEMENTS Subtotal SECTION 1D / FEDERAL AID MAJOR & STATE CATEGORY PROJECTS TOTALS Non-Federal Additional Information Funds SECTION 2A / NON-FEDERAL PROJECTS Non Federal Aid 2015 606146 BOSTON MULTIPLE CANTON- NORWOOD- WESTWOOD- RAMP CONSTRUCTION ON I-95 (NB) & IMPROVEMENTS ON CANTON STREET/DEDHAM STREET, INCLUDES REPLACEMENT OF C-02034, REHAB OF C-02-024, C-02-002=N-25-016=W-31-002 & 5 SIGNALIZED INTERSECTIONS 2015 1568 BOSTON FAIRMOUNT IMPROVEMENTS NA NFA $4,863,082 $0 $4,863,082 2015 1572 BOSTON RED LINE-BLUE LINE CONNECTOR DESIGN NA NFA $10,000,000 $0 $10,000,000 $52,863,082 $0 $52,863,082 $52,863,082 $0 $52,863,082 NON FEDERAL AID Subtotal SECTION 2A / NON-FEDERAL PROJECTS TOTALS Tuesday, September 30, 2014 2015 YR MassDOT Project ID MPO Municipality Name Funding Source Total Programmed Funds Federal Funds NFA $11,330,354 $0 $11,330,354 SECTION 2B / NON-FEDERAL BRIDGE PROJECTS Subtotal $11,330,354 $0 $11,330,354 SECTION 2B / NON-FEDERAL BRIDGE PROJECTS TOTALS $11,330,354 $0 $11,330,354 $807,007,682 $609,309,939 $197,727,497 MassDOT Project Description District Non-Federal Additional Information Funds SECTION 2B / NON-FEDERAL BRIDGE PROJECTS Section 2B / Non-Federal Bridge Projects 2015 605964 TOTALS CENTRAL MASSACHUSETTS YEAR 2015 MILLBURY MILLBURY - BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET Construction / Design Status = 25% / TEC Score = 6.90 / Total Project Cost w/CMAQ Funding = $13,647,354 Tuesday, September 30, 2014 2015 YR MassDOT Project ID MPO Municipality Name MassDOT Project Description Total Federal Funds $609,309,939.20 District Funding Source Total Programmed Funds Federal Funds Non-Federal Additional Information Funds Total Non-Federal Fund Total Programmed Funds $197,727,496.80 $807,007,682.00 Tuesday, September 30, 2014