Aeronautics Division Investment description 16 bond cap

advertisement
Aeronautics Division
Investment description
16 bond cap
Flight Level (Aircraft Storage & Maintenance)
35,000
KOBO Utilities (Navigational Aid Maintenance)
Lawrence - Conduct Local Permitting & Design for RW 5-23 Runway Safety
Area
Mansfield - Obstruction Removal
25,000
32,840
Martha's Vineyard - Construct Airport Rescue & Fire Fighting- Snow Removal
New Bedford - EA & Permitting for Taxiway A, Phase I Terminal Apron &
North Adams - Reconstruct Main Apron and Taxilane
North Shore 2-W ay (Navigational Aid Maintenance)
Pittsfield - Runway 8-26 Extension - Phase II
Provincetown - Conduct Airport Master Plan Update
Southbridge - Construct New Admin Building & Hangar
Statewide - Administration Building Program (Group 1 Airports)
Statewide - Airfield Markings Program
Statewide - Security Camera Systems Installation Program
Statewide - Vegetation Management - YOP Implementation
To Be Programmed - AIP New Grants
VOLPE-Carbon Neutral Project Phase 2
Westfield - Residential Acquisition and Sound Insulation Program
Westover - Land Acquisition/Noise Mitigation
Westover - Land Acquisition/Noise Mitigation
$
FAA funds
16 total
17 + beyond
35,000
-
591,120
25,000
623,960
-
29,784
536,112
565,896
-
18,000
38,200
154,650
27,200
226,623
45,257
38,889
10,450,000
800,000
1,500,000
500,000
2,328,293
204,443
116,889
113,524
138,889
684,000
687,600
2,783,700
39,758
814,613
77,778
2,104,002
2,043,486
2,500,000
702,000
725,800
2,938,350
27,200
266,381
859,870
116,667
10,450,000
800,000
1,500,000
500,000
2,328,293
204,443
2,220,891
2,157,010
2,638,889
16,823,481
-
$
12,862,169
$
29,685,650
118,750
1,472,872
-
$
1,591,622
28
Commonwealth Projects
Investment description
16
Massport- Boston Harbor Dredging
Road and Transportation Improvements at Umass Boston
17 + beyond
35,000,000
50,000,000
35,000,000
25,000,000
$
60,000,000
$
85,000,000
29
Highway Division
16
ACTON- CARLISLE- WESTFORD- BRUCE FREEMAN RAIL TRAIL EXTENSION, INCLUDING 6 RAILROAD
BRIDGES & 1 NEW BRIDGE OVER ROUTE 2A/119 (PHASE II-A)
ACTON- CONCORD- BOXBOROUGH- LITTLETON- RESURFACING & RELATED WORK ON ROUTE 2
ACTON- MAYNARD- ASSABET RIVER RAIL TRAIL CONSTRUCTION, INCLUDES BRIDGES, A-02-042 & M-10-012,
A-02-034 & MPB WALL
ADAMS- ASHUWILLTICOOK RAIL TRAIL EXTENSION
ADAMS- ROUNDABOUT CONSTRUCTION AT ROUTE 8 & FRIEND STREET
AGAWAM- CONSTRUCTION OF BIKEWAY LOOP CONNECTING CONNECTICUT RIVERWALK WITH MAIN
STREET (1.7 MILES)
AMESBURY- BRIDGE REPLACEMENT, A-07-026, ROUTE I-495 (NB & SB) OVER THE BIKEWAY (ABANDONED
B&M RR LINE)
AMESBURY- NEWBURYPORT- SALISBURY- BRIDGE REPLACEMENT ON ROUTE I-95, A-07-016=N-11-007, OVER
MERRIMACK RIVER (WHITTIER BRIDGE) & A-07-017 OVER EVANS PLACE
AMESBURY- POWWOW RIVERWALK CONSTRUCTION, MAIN STREET TO WATER STREET, INCLUDES PED
BRIDGE OVER THE BACK RIVER & PED BRIDGE OVER THE POWWOW RIVER
AMESBURY- RECONSTRUCTION OF ROUTE 150
AMHERST- HADLEY- NORTHAMPTON- NORWOTTUCK RAIL TRAIL IMPROVEMENTS, FROM DAMON ROAD TO
STATIONS ROAD (8.5 MILES)
AMHERST- NORTHAMPTON- SOUTHAMPTON- SIDEWALK & WHEELCHAIR RAMP CONSTRUCTION ON ROUTES
5, 9, & 10
AMHERST- PELHAM- RECONSTRUCTION OF AMHERST ROAD, FROM 800 FEET EAST OF ENFIELD ROAD TO
ROUTE 202 (2.5 MILES - PHASE II)
ANDOVER- BRIDGE REPLACEMENT, A-09-011, STATE ROUTE 28 (NORTH MAIN STREET) OVER MBTA RR
ANDOVER- TEWKSBURY- INTERSECTION & SIGNAL IMPROVEMENTS AT DASCOMB ROAD, EAST STREET &
SHAWSHEEN STREET
ARLINGTON- BIKEWAY CONNECTION AT INTERSECTION ROUTE 3 & ROUTE 60, MASSACHUSETTS AVENUE,
PLEASANT STREET & MYSTIC STREET
ARLINGTON- CAMBRIDGE- IMPROVEMENTS AT ROUTE 2 & ROUTE 16
ARLINGTON- RECONSTRUCTION OF MASSACHUSETTS AVENUE, FROM POND LANE TO THE CAMBRIDGE C.L.
ATHOL- PHILLIPSTON- RESURFACING & RELATED WORK ON ROUTE 2A, FROM ROUTE 32 TO ROUTES 2/202
(MM 36.7 - MM 40.7: 4 MILES)
ATHOL- SCENIC BYWAY ACCESS & OVERLOOK CONSTRUCTION
ATTLEBORO- BRIDGE REPLACEMENT, A-16-053, I-95 (NB & SB) OVER NORTH AVENUE
ATTLEBORO- RAMP RECONSTRUCTION & REALIGNMENT, FROM ROUTE I-95 (SB) TO ROUTE I-295 (SB)
17 + beyond
700,000
10,450,875
200,000
813,590
6,101,924
397,762
1,300,000
641,000
2,983,215
-
851,973
8,945,716
70,000,000
4,000,000
200,037
2,000,373
4,078,276
49,990
-
507,000
-
2,088,448
2,088,448
1,853,091
6,671,126
278,000
-
1,172,951
-
2,930,892
2,006,374
-
772,000
-
50,539
2,917,342
2,535,000
20,421,395
2,535,000
30
Highway Division
16
ATTLEBORO- RECONSTRUCTION & GEOMETRIC IMPROVEMENTS ON TIFFANY STREET, FROM ROUTE 123 TO
NEW ROAD (PHASE II), INCLUDES CULVERT RECONSTRUCTION OF A-16-077
AUBURN- OXFORD- RECONSTRUCTION & IMPROVEMENTS ON ROUTE 12/20 OVERLAP, FROM THE ROUTE
12/20 INTERSECTION (OXFORD) TO ROUTE 12/20 INTERSECTION (AUBURN)
AUBURN- ROOF REPLACEMENT AT THE AUBURN I-90 (EB) MAINTENANCE FACILITY
AUBURN TO BOSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-90 (MASSPIKE)
AUBURN, FITCHBURG & MARLBOROUGH - FAP # HSI-002S(751)X - HIGH FRICTION SURFACE TREATMENT,
PAVEMENT REPAIRS AND RELATED WORK ALONG SECTIONS OF ROUTE 2, INTERSTATES 290 AND 495.
(608032)
BARNSTABLE- INTERSECTION IMPROVEMENTS AT FALMOUTH ROAD (ROUTE 28) AND BEARSES WAY
BARRE- TOWN COMMON IMPROVEMENTS
BEDFORD- BILLERICA- BURLINGTON- MIDDLESEX TURNPIKE/MITRE EXTENSION FROM ROUTE 62 TO NORTH
OF PLANK STREET (PHASE II)
BELCHERTOWN- PAVEMENT REHABILITATION & RELATED WORK ON ROUTE 181, FROM MAPLE ST TO
BELCHERTOWN/PALMER TOWN LINE (5.5 MILES)
BELLINGHAM- BRIDGE DEMOLITION, B-06-011, ROUTE 126 OVER CSX RAILROAD (ABANDONED) &
INSTALLATION OF BIKE PATH CULVERT
BELLINGHAM- MEDWAY- MILFORD- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
BERKLEY- DIGHTON- BRIDGE REPLACEMENT, B-08-001=D-08-011, ELM STREET (BERKLEY) CENTER STREET
(DIGHTON) OVER THE TAUNTON RIVER
BERNARDSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91, FROM MM 50.4 TO MM 54.9 (4.5
MILES)
BEVERLY- RECONSTRUCTION & SIGNAL IMPROVEMENTS ON ROUTE 1A (RANTOUL STREET & CABOT
STREET), FROM CABOT STREET (SOUTH) TO 440 FEET NORTH OF BLAINE AVENUE, INCLUDES CULVERT
REPAIR OF B-11-008
BEVERLY- RESURFACING AND RELATED WORK ON ROUTE 128
BEVERLY- SALEM- HARBORFRONT WALKWAY & CAUSEWAY PARK CONSTRUCTION
BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK ROAD (5,400 FEET)
17 + beyond
1,851,000
-
1,450,000
-
581,924
755,201
2,136,185
6,041,610
-
535,030
4,815,268
2,008,000
1,070,100
1,667,749
-
6,749,818
2,454,479
1,878,019
707,290
1,715,288
1,427,463
-
5,310,000
-
22,029,571
-
6,071,733
1,953,346
2,737,626
4,790,846
BLACKSTONE- BRIDGE REHABILITATION, B-13-004, ROUTE 122 (MAIN STREET) OVER THE BLACKSTONE
RIVER
BLANDFORD- CULVERT REPLACEMENT, B-14-029, I-90 OVER UNNAMED TRIBUTARY TO PEEBLES BROOK
500,000
-
4,110,000
-
BOSTON- BOAT WALL REHABILITATION & MISCELLANEOUS REPAIRS IN I-93/I-90 CA/T (CRC 9)
BOSTON- BRIDGE PAINTING, B-16-272, SOUTHAMPTON STREET OVER I-93/US1/ST RTE 3
1,932,045
504,980
4,140,097
-
31
Highway Division
16
BOSTON- BRIDGE REHABILITATION, B-16-058 & B-16-059, MARKET STREET, OVER I-90 & MBTA/CSX &
EVERETT STREET, OVER COMBINED LINCOLN STREET, I-90, CSX, MBTA & BRAINTREE STREET
BOSTON- BRIDGE REMOVAL, B-16-367, CASEY OVERPASS OVER WASHINGTON STREET WITH AT-GRADE
INTERSECTIONS
BOSTON- BRIDGE REPLACEMENT, B-16-163, MORTON STREET OVER THE MBTA RAILROAD
BOSTON- BROOKLINE- IMPROVEMENTS TO COMMONWEALTH AVENUE, FROM ARMORY STREET TO ALCORN
STREET
BOSTON- BROOKLINE- SUPERSTRUCTURE REPLACEMENT, B-16-055, COMMONWEALTH AVENUE OVER I-90
& MBTA & DECK REPAIR, B-27-018, CARLTON STREET OVER I-90 & MBTA
BOSTON- CAMBRIDGE- BRIDGE REHABILITATION OF ANDERSON MEMORIAL BRIDGE, B-16-011=C-01-007,
NORTH HARVARD STREET OVER CHARLES RIVER
BOSTON- CAMBRIDGE- BRIDGE REHABILITATION, B-16-009=C-01-002, CAMBRIDGE STREET OVER THE
CHARLES RIVER (MEMORIAL DRIVE & STORROW DRIVE) (AKA - LONGFELLOW BRIDGE)
BOSTON- CHELSEA- STRUCTURAL STEEL REPAIRS ON THE TOBIN BRIDGE, INCLUDES CHELSEA'S CROSS
GIRDERS
BOSTON- CHELSEA- TOBIN BRIDGE TOLL PLAZA AND ADMINISTRATION BUILDING DEMOLITION
BOSTON- CONSTRUCTION OF NEW PARKING FACILITY, LOT 5 LOCATED UNDER I-93, BETWEEN ALBANY
STREET, TRAVELER STREET, AND FRONTAGE ROAD
BOSTON- DATA CENTER & HVAC EXPANSION & UPGRADES AT HQ
BOSTON- EZ PASS SERVICE CENTER MAAB/ADA COMPLIANCE IMPROVEMENTS (145 HAVRE STREET, EAST
BOSTON)
BOSTON- FIRE STANDPIPE SUPPORT REPAIRS ON I-90 & ASSOCIATED RAMPS (CRC 31)
BOSTON- FIREPROOFING REPAIRS IN I-93/TIP O'NEILL TUNNEL
BOSTON- HVAC CONTROLS UPGRADE WITHIN 8 BUILDINGS, ALONG I-90 CONNECTOR TUNNEL & TED
WILLIAMS TUNNEL
BOSTON- IMPROVEMENTS ALONG GAINSBOROUGH AND ST. BOTOLPH STREETS
BOSTON- INSTALLATION OR REPLACEMENT OF FIREPROOFING IN SELECTED AREAS IN I-93 TIP O'NEILL
TUNNEL
BOSTON- INTERIM IMPROVEMENTS AT CAMBRIDGE STREET & RIVER STREET
BOSTON- LEAK SEALING, FIREPROOFING & MISCELLANEOUS REPAIRS IN I-93, TIP O'NEILL TUNNEL (CRC 1E)
BOSTON- MBTA DUCT BANK RELOCATION
BOSTON- MEDIAN REPAIR ON I-90, FROM COMMONWEALTH AVENUE TO DALTON STREET (APPROX. 1.5
MILES), INCLUDES SUBSTRUCTURE IMPROVEMENTS TO B-16-005, COMM AVE. OVER I-90
BOSTON- MILTON- SYSTEMATIC MAINTENANCE & STRUCTURAL REPAIRS TO 7 BRIDGES ALONG THE I-93/ US
1/ST 3
BOSTON- MISCELLANEOUS RAMPS MICROSILICA OVERLAY REPLACEMENT ON I-90 & I-93 (CRC 28)
17 + beyond
947,633
2,274,319
40,600,000
26,000,000
714,733
2,698,283
12,142,274
35,375,000
76,291,666
11,776,302
-
50,000,000
106,969,365
367,800
3,678,000
3,143,518
8,000,000
391,354
1,000,000
1,012,092
1,214,510
125,510
92,064
824,976
1,317,855
613,760
-
1,437,645
523,210
1,725,174
-
2,128,078
6,782,321
851,231
4,909,573
538,065
14,797,416
1,434,839
-
1,885,147
248,043
5,456,957
32
Highway Division
16
BOSTON- PARTIAL DECK REPLACEMENT & SUPERSTRUCTURE REPAIRS, B-16-365, BOWKER OVERPASS
OVER BEACON STREET, COMMONWEALTH AVE & MUDDY RIVER
BOSTON- PLUMBING REPAIRS AT VARIOUS LOCATIONS
BOSTON- RENOVATIONS AND UPGRADES TO ELEVATORS AT 185 KNEELAND STREET
BOSTON- REPAIRS TO FAN ROOMS 1, 2, 3 & 4 (PRUDENTIAL PASSAGEWAY)
BOSTON- ROOF REPLACEMENT AT ERS/SUBSTATION BUILDINGS ADJACENT TO TOLL PLAZAS 31 AND 37
BOSTON- ROOF REPLACEMENT AT VENTILATION BUILDING #7
BOSTON- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS ON THE TOBIN BRIDGE
BOSTON- SOMERVILLE- CONDUIT SUPPORT REPLACEMENT & FIRE PROTECTION STANDPIPE MODIFICATION
ALONG I-93 VIADUCT (CRC 18)
BOSTON- SOMERVILLE- INTERSTATE MAINTENANCE & RELATED WORK ON I-93, INCLUDES WORK ON S-17029, S-17-031 & B-16-281
BOSTON- SUMNER & CALLAHAN TUNNEL VENT BUILDING AND CALLAHAN PUMP STATION MECHANICAL AND
ELECTRICAL UPGRADES
BOSTON- SUPERPLUG REHABILITATION IN I-90 CONNECTOR TUNNEL (PHASE III) (CRC 4C)
BOSTON- SYMPHONY AREA STREETSCAPE (MASS AVENUE) IMPROVEMENTS INCLUDES REPAIR OF B-16-238
6,231,739
17 + beyond
-
145,720
405,574
61,300
464,775
709,754
245,200
174,291
556,797
601,124
12,917,497
668,156
-
5,000,000
-
1,516,261
9,097,567
99,838
2,452,500
2,196,425
-
BOSTON- TRAFFIC SIGNAL IMPROVEMENTS ON BLUE HILL AVENUE AND WARREN STREET
BOSTON- UPGRADES TO THE HVAC SYSTEMS AT THE HOC
BOSTON- UPS SYSTEM REPLACEMENTS IN TED WILLIAMS TUNNEL, CANA TUNNEL FACILITIES & HOC
340,793
1,000,000
598,117
3,407,928
2,691,527
BOSTON- VARIABLE MESSAGE SIGN (VMS) UPGRADES IN TED WILLIAMS TUNNEL/I-90 CONNECTOR TUNNEL
1,740,550
BOSTON- WATER QUALITY CONTROL STRUCTURES (WQCS) CLEAN OUT & REPAIR IN I-90 & I-93 TUNNELS
-
422,965
300,000
BOURNE- RESURFACING & RELATED WORK ON ROUTE 28
BRAINTREE- MILTON- BOSTON- WEYMOUTH- STORMWATER RETROFITS ON I-93, ROUTE 3 & ROUTE 53
8,126,306
691,205
829,447
BRAINTREE- SAFE ROUTES TO SCHOOL (ROSS ELEMENTARY SCHOOL)
BRAINTREE- WEYMOUTH- BRIDGE PRESERVATION TO 10 BRIDGES ALONG ROUTE 3
BREWSTER- RESURFACING & RELATED WORK ON ROUTE 6A
BRIDGEWATER- CONSTRUCTION OF A PRE-ENGINEERED MECHANIC'S SERVICE FACILITY AT THE DEPOT
119,139
2,450,000
6,332,460
105,000
-
BRIDGEWATER- TRAFFIC SIGNAL & INTERSECTION IMPROVEMENTS AT BROAD STREET (ROUTE 18) AND
HIGH STREET
1,025,000
-
33
Highway Division
16
BRIMFIELD- PALMER- WARREN- GUARDRAIL UPGRADES & RELATED WORK ON SECTIONS OF I-90
(BETWEEN MM63.3 & MM69.6)
BROCKTON - ROADWAY RECONSTRUCTION & RELATED WORK (INCLUDING SIGNALS) ON A SECTION OF
WEST ELM STREET
BROCKTON- CORRIDOR IMPROVEMENTS ON ROUTE 123 (BELMONT STREET), INCLUDING TRAFFIC SIGNALS
UPGRADING AT MANLEY STREET AND THE V.A. HOSPITAL
BROCKTON- DOWNTOWN ROADWAY AND STREETSCAPE IMPROVEMENTS (PHASE I)
BROCKTON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 27 (PLEASANT STREET &
CRESCENT STREET)
BROOKFIELD- BRIDGE REPLACEMENT, B-26-002, SR 148 (FISKDALE ROAD) OVER THE QUABOAG RIVER
BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3
CALLAHAN TUNNEL VENT BUILDING 13 BRICK FACADE RENOVATION AND REPAIRS AT LONDON AND
DECATUR STREETS
CAMBRIDGE- COMMON IMPROVEMENTS AT WATERHOUSE STREET, MASS AVE & GARDEN STREET
CARVER: FAP# STP-002S(743)X ROADWAY RECONSTRUCTION AND RELATED WORK (INCLUDING SIGNALS)
ALONG A SECTION OF ROUTE 58 (MAIN STREET) (606007)
CHARLTON- BRIDGE REHABILITATION, C-06-038, STAFFORD STREET OVER I-90
CHARLTON- SOUTHBRIDGE- RESURFACING & RELATED WORK ON ROUTE 169, FROM ROUTE 20 TO 400
FEET SOUTH OF VINTON STREET
CHATHAM- BRIDGE REPLACEMENT, C-07-001, BRIDGE STREET OVER THE MITCHELL RIVER
CHELMSFORD- BRIDGE SUPERSTRUCTURE REPLACEMENT, C-08-048 (2LP), HUNT ROAD OVER I-495
CHELMSFORD- TEWKSBURY- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
CHELSEA- REVERE- MALDEN- SAUGUS- RESURFACING & RELATED WORK ON ROUTE 1
CHELSEA- SILVERLINE/BRT CONSTRUCTION INCLUDES BRIDGE REPLACEMENT, C-09-001, WASHINGTON
AVENUE OVER THE MBTA AND B&M RAILROAD
CHESTER- BRIDGE REPLACEMENT, C-11-020, GEORGE MILLER ROAD OVER THE MIDDLE BRANCH OF THE
WESTFIELD RIVER
CHESTERFIELD- RESURFACING & RELATED WORK ON ROUTE 143, FROM WORTHINGTON T.L. TO
WILLIAMSBURG T.L. (7.7 MI)
CHICOPEE- HOLYOKE- BRIDGE REHABILITATION, C-13-012=H-21-030, ROUTE 116 (CHICOPEE/CABOT ST)
OVER CONNECTICUT RIVER & PV RR (AKA WILLIMANSETT BRIDGE)
CHICOPEE- SIGNAL & INTERSECTION IMPROVEMENTS AT MEMORIAL DRIVE (ROUTE 33) & BROADWAY
CHICOPEE- WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-023=W-21-022, I-90 OVER THE
CONNECTICUT RIVER
17 + beyond
1,146,513
4,601,295
1,777,372
859,885
2,132,846
238,252
200,000
-
615,000
-
4,950,000
9,378,176
-
1,916,339
4,973,707
-
915,889
1,200,000
1,717,291
-
7,741,571
562,157
8,994,514
9,355,000
8,183,757
23,979,468
3,507,325
11,614,239
45,475
-
611,534
-
99,993
-
1,519,000
1,444,000
505,000
-
34
Highway Division
16
CLINTON- RECONSTRUCTION & RELATED WORK ON WATER STREET AND BOLTON ROAD (1.2 MILES)
800,000
COLRAIN- BRIDGE REPLACEMENT, C-18-028 & NEW CULVERT, C-18-048, ST 112 (JACKSONVILLE ROAD)
OVER EAST BRANCH OF NORTH RIVER
CONCORD- LINCOLN- LIMITED ACCESS HIGHWAY IMPROVEMENTS AT ROUTE 2 & 2A, BETWEEN CROSBY'S
CORNER & BEDFORD ROAD, INCLUDES C-19-024
CONWAY- RETAINING WALL REPLACEMENT ON ROUTE 116 ALONG THE SOUTH RIVER
CUMMINGTON- RESURFACING & RELATED WORK ON ROUTE 9, FROM WINDSOR T.L. TO GOSHEN T.L.
936,671
CUMMINGTON- RETAINING WALL REPLACEMENT ON ROUTE 9 ADJACENT TO C-21-023 OVER WESTFIELD
BROOK
DALTON- RECONSTRUCTION OF HOUSATONIC STREET, FROM ROUTE 8 & 9 TO ROUTE 8
DANVERS- BRIDGE REPLACEMENT, D-03-013, ROUTE 35 (WATER STREET) OVER WATERS RIVER
DANVERS- MEDFORD- STORMWATER IMPROVEMENTS ALONG ROUTE 1/I-95/I-93
DANVERS- RECONSTRUCTION OF LIBERTY STREET, FROM WATER/HIGH STREET INTERSECTION TO
PAULINE ROAD, INCLUDES D-03-004 & D-03-014 CULVERTS
DARTMOUTH- IMPROVEMENTS ON GRAND ARMY OF THE REPUBLIC HIGHW AY (U.S. ROUTE 6) AND FAUNCE
CORNER ROAD
DARTMOUTH- PADANARAM BRIDGE CAUSEWAY RECONSTRUCTION, D-04-002, BRIDGE STREET OVER
APPONAGANSETT RIVER
DARTMOUTH- RECONSTRUCTION OF FAUNCE CORNER ROAD & IMPROVEMENTS TO I-195 RAMPS &
INTERSECTIONS, INCLUDES REPLACEMENT OF D-04-016 OVER I-195
DCR- BRIDGE PRESERVATION AT VARIOUS LOCATIONS
DEDHAM- BRIDGE REPLACEMENT, D-05-003 (33K), NEEDHAM STREET OVER GREAT DITCH
DEDHAM- BRIDGE REPLACEMENT, D-05-033, PROVIDENCE HIGHWAY OVER MOTHER BROOK; FAP NO. NHP002S(749)X
DEDHAM- NEEDHAM- BRIDGE REPLACEMENT ON ROUTE 128 (ADD-A-LANE BRIDGES) D-05-042, D-05-043, D05-040, D-05-041, D-05-038=N-04-030, D-05-039, N-04-029 (BRIDGE IV)
DEERFIELD- BRIDGE REHABILITATION, D-06-044 & D-06-045, ROUTE I-91 (NB & SB) OVER THE DEERFIELD
RIVER (STILLWATER ROAD AND LOWER ROAD)
DENNIS- YARMOUTH- CAPE COD RAIL TRAIL EXTENSION, INCLUDES REPLACING D-07-015, CCRT OVER
ROUTE 134 & Y-01-009, CCRT OVER STATION AVENUE
DENNIS- YARMOUTH- CONSTRUCTION OF A MULTI-USE PATH OVER THE BASS RIVER, INCLUDES NEW
PEDESTRIAN BRIDGE D-07-007=Y-01-010
DISTRICT 1 - RESURFACING & RELATED WORK AT VARIOUS LOCATIONS ON I-90
DISTRICT 1- ADA RETROFITS AT VARIOUS LOCATIONS
17 + beyond
9,835,049
16,940,506
-
1,078,085
2,922,779
-
1,200,000
-
2,000,000
1,662,859
622,969
3,030,000
5,000,000
2,803,362
2,100,000
765,013
3,570,061
1,310,584
5,897,629
9,530,000
7,030,000
3,785,480
1,301,383
2,525,000
37,854,804
2,114,748
3,068,000
14,185,000
-
6,635,000
-
5,320,558
2,364,692
105,010
2,310,214
4,703,022
260,000
1,410,907
-
35
Highway Division
16
17 + beyond
DISTRICT 1- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 1- BRIDGE STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 1- BRIDGE SUBSTRUCTURE, DECK & JOINT REPAIRS AT VARIOUS LOCATIONS ON I-90
DISTRICT 1- CATCH BASIN CLEANING AT VARIOUS LOCATIONS
DISTRICT 1- CRACK SEALING AT VARIOUS LOCATIONS
DISTRICT 1- CULVERT AND DRAINAGE REPAIRS ON I-90 AT VARIOUS LOCATIONS
DISTRICT 1- DISTRICT 2- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS
(PHASE II)
DISTRICT 1- DRAINAGE REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 1- FABRICATION AND INSTALLATION OF OVERHEAD & GROUND MOUNTED GUIDE SIGNS
DISTRICT 1- FACILITIES REPAIR AT VARIOUS LOCATIONS
DISTRICT 1- GUARD RAIL REPAIRS AND UPGRADES AT VARIOUS LOCATIONS
DISTRICT 1- RESURFACING AT VARIOUS LOCATIONS
DISTRICT 1- ROADWAY REPAIRS AT VARIOUS LOCATIONS
DISTRICT 1- SCHEDULED & EMERGENCY BRIDGE DECK AND JOINT REPAIRS AT VARIOUS LOCATIONS
451,596
100,000
1,199,340
337,000
260,000
726,091
202,000
100,527
2,098,845
5,303
19,353
1,270,659
202,000
722,000
225,345
405,000
245,000
4,600,000
445,064
398,950
150,000
150,000
2,500,000
911
698,163
DISTRICT 1– SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 1- SCHEDULED & EMERGENCY SUPERSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 1- SCHEDULED AND EMERGENCY BRIDGE DECK AND JOINT REPAIRS AT VARIOUS LOCATIONS
1,088,962
814,500
950,000
340,277
626,576
1,382,527
DISTRICT 1- SIDEWALK REPAIRS AT VARIOUS LOCATIONS
DISTRICT 1- TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 1- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS
DISTRICT 1- TREE TRIMMING & SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS
DISTRICT 1- VEGETATION SPRAYING AT VARIOUS LOCATIONS ON I-90
DISTRICT 2- ADA RETROFITS AT VARIOUS LOCATIONS
236,056
189,874
370,000
370,000
142,227
570,000
DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 2- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 2- BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- BRIDGE SHIELDING INSTALLATION AND SHORING (CRIBBING) TOWER AT VARIOUS LOCATIONS
21,064
138,000
605,000
100
DISTRICT 2- BRIDGE SHIELDING INSTALLATION AND SHORING (CRIBBING) TOWER AT VARIOUS LOCATIONS
168,000
56,397
477,000
105,942
1,238,000
69,870
-
DISTRICT 2- CATCH BASIN CLEANING AT VARIOUS LOCATIONS
DISTRICT 2- CONSTRUCTION OF A STORAGE BUILDING AT THE DEERFIELD DEPOT
DISTRICT 2- DRAINAGE BETTERMENT & CULVERT REPAIR AT VARIOUS LOCATIONS
232,074
210,035
44,445
(75,663)
-
36
Highway Division
16
17 + beyond
DISTRICT 2- EMERGENCY REPAIRS TO TRAFFIC SIGNALS AT VARIOUS LOCATIONS
DISTRICT 2- FACILITY REPAIR AT VARIOUS LOCATIONS
DISTRICT 2- FENCE REPAIRS & UPGRADES AT VARIOUS LOCATIONS
DISTRICT 2- GUARDRAIL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- HIGHWAY LIGHTING REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- HOT MIX ASPHALT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- INSTALLATION OF OVERHEAD & GROUND MOUNTED GUIDE SIGNS
DISTRICT 2- ITS EQUIPMENT MAINTENANCE AT VARIOUS LOCATIONS
DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- NON-ROUTINE & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 2- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 2- SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS
DISTRICT 2- SYSTEMATIC BRIDGE MAINTENANCE ON I-391, ROUTE 2, ROUTE 5, ROUTE 9 AND ROUTE 57
CORRIDOR; NHP-002S(788)X
DISTRICT 2- TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 2- TREE REMOVAL & SIGHT DISTANCE CLEARANCE AT VARIOUS LOCATIONS
DISTRICT 2- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 3- ADA RETROFITS AT VARIOUS LOCATIONS
10,000
360,000
80,000
148,000
150,000
625
300,000
54,986
14,000
1,543,000
357,000
337,691
2,857,867
393,000
2,656,725
1,458,381
157,896
137,201
7,673,288
23,274
265,160
919,000
535,000
70,000
477,235
13,120
-
DISTRICT 3- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 3- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 3- CLEAN & PAINT STRUCTURAL STEEL BRIDGES ALONG I-90
DISTRICT 3- CLEANING & PAINTING OF STRUCTURAL STEEL BRIDGES ON I-90
DISTRICT 3- DISTRICT 4- DISTRICT 5- WORK ZONE PORTABLE CAMERA SYSTEMS INSTALLATION (ITS)
18,861
1,125,000
2,188,886
1,180,331
25,000
575,000
-
DISTRICT 3- DRAINAGE AND CULVERT REPAIRS AND IMPROVEMENTS
DISTRICT 3- DRAINAGE STRUCTURE AND PIPE CLEANING AT VARIOUS LOCATIONS
DISTRICT 3- DRAINAGE SYSTEM REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 3- DRAINAGE SYSTEM REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 3- ELASTOMERIC PROTECTIVE COATING APPLICATION TO CONCRETE SURFACES
DISTRICT 3- EMERGENCY & SCHEDULED SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT
VARIOUS LOCATIONS
DISTRICT 3- FACILITY REPAIRS AT VARIOUS LOCATIONS
675,000
1,000,000
32,367
1,050,000
1,585,843
444,214
15,000
425,000
650,000
625,000
-
345,000
225,000
37
Highway Division
16
17 + beyond
DISTRICT 3- FENCE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- GUARDRAIL & END TREATMENT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- HIGHWAY LIGHTING AT VARIOUS LOCATIONS
DISTRICT 3- HOT MIX ASPHALT & BERM REPAIR AT VARIOUS LOCATIONS
DISTRICT 3- HOT MIX ASPHALT PAVEMENT & BERM REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- IMPROVEMENT AND REFURBISHMENT OF CRASH CUSHIONS AT VARIOUS LOCATIONS
DISTRICT 3- INSTALLATION OF CCTV CAMERAS AND VMS ON I-290, BETWEEN I-495 AND I-90
DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (AREA B)
DISTRICT 3- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (AREA C)
DISTRICT 3- RESURFACING & RELATED WORK ON I-90
DISTRICT 3- RESURFACING & RELATED WORK ON I-90 (EB & WB) IN GRAFTON
DISTRICT 3- RESURFACING & RELATED WORK ON I-90 (EB & WB) IN MILLBURY
DISTRICT 3- RESURFACING, RETAINING WALL REPLACEMENT & RELATED WORK AT VARIOUS LOCATIONS
430,000
525,000
163,000
22,270
650,000
200,000
557,958
225,000
777,880
1,043,110
409,131
1,424,250
1,740,750
100,000
20,000
70,000
50,000
154,676
2,510,811
777,880
521,555
9,969,750
12,185,250
-
DISTRICT 3- SALT SHED REPAIRS AND IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIR AT VARIOUS LOCATIONS
260,000
1,587,339
145,000
-
DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS ALONG I-90
1,268,153
951,000
184,536
315,159
DISTRICT 3- SCHEDULED & EMERGENCY FACILITY REPAIRS & IMPROVEMENTS AT VARIOUS LOCATIONS
88,000
DISTRICT 3- SCHEDULED & EMERGENCY STRUCTURAL & SUBSTRUCTURE REPAIRS AT VARIOUS
LOCATIONS
DISTRICT 3- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 3- SCHEDULED & EMERGENCY TRAFFIC MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 3- SIGNAL BETTERMENT & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 3- SIGNAL BETTERMENT AT VARIOUS LOCATIONS
DISTRICT 3- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II)
1,187,500
625,000
1,000,000
100,000
926,000
516,000
331,895
121,955
849,000
105,482
DISTRICT 3- SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS ALONG I-90
DISTRICT 3- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIAL PURCHASE &
INSTALLATION
DISTRICT 3- TRAFFIC SIGNAL UPGRADES AT 6 LOCATIONS
DISTRICT 3- TREE CLEARING AND TRIMMING AT VARIOUS LOCATIONS
783,028
-
-
1,088,000
998,000
951,408
850,000
600,000
38
Highway Division
16
DISTRICT 3- TREE TRIMMING & TREE REMOVAL AT VARIOUS LOCATIONS
DISTRICT 3- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 3- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 4- ADA RETROFITS AT VARIOUS LOCATIONS
DISTRICT 4- APPLICATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 4- BRIDGE CLEANING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 4- BRIDGE SUBSTRUCTURE REPAIRS AND RELATED WORK AT VARIOUS LOCATIONS ALONG
INTERSTATES 93, 95 AND 495;
NHP-002S(780)X
DISTRICT 4- DRAINAGE REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS
DISTRICT 4- DRAINAGE STRUCTURE & SYSTEMS CLEANING AT VARIOUS LOCATIONS
DISTRICT 4- DRAINAGE STRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 4- FABRICATION & INSTALLATION OF OVERHEAD & GROUND MOUNTED SIGNS AT VARIOUS
LOCATIONS
DISTRICT 4- FACILITY REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS
DISTRICT 4- GUARDRAIL & FENCE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 4- HIGH FRICTION SURFACE TREATMENT AND RELATED WORK AT 3 LOCATIONS
DISTRICT 4- HIGHWAY LIGHTING AT VARIOUS LOCATIONS
DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING, FROM SIX (6) LIGHTING LOAD CENTERS
ALONG ROUTE I-95 (128), FROM LEXINGTON TO WOBURN
DISTRICT 4- HIGHWAY SWEEPING AT VARIOUS LOCATIONS
DISTRICT 4- IMPACT ATTENUATOR REPAIR AT VARIOUS LOCATIONS
DISTRICT 4- PAVEMENT REPAIRS AND CRACK SEALING AT VARIOUS LOCATIONS
DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 4- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS
DISTRICT 4- ROADWAY REPAIR AT VARIOUS LOCATIONS
DISTRICT 4- ROOF & SIDING REPAIR & UPGRADES AT VARIOUS LOCATIONS
DISTRICT 4- SALT SHED IMPROVEMENTS & REPAIR AT VARIOUS LOCATIONS
DISTRICT 4- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 4- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 4- SCHEDULED & EMERGENCY DRAWBRIDGE OPERATION AND MAINTENANCE AT VARIOUS
LOCATIONS
DISTRICT 4- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 4- SCHEDULED & EMERGENCY TRAFFIC CONTROL AT VARIOUS LOCATIONS
DISTRICT 4- SIDEWALK REPAIR & IMPROVEMENT AT VARIOUS LOCATIONS
17 + beyond
25,391
4,197
300,000
225,000
300,000
-
595,744
393,750
1,101,143
3,232
56,250
1,104,000
614,208
170,000
300,000
375,000
68,479
14,193
53,178
504,949
405,535
416,480
438,928
1,637,148
48,188
1,874,160
127,671
-
350,480
100,000
317,628
410,610
2,452,615
1,751,953
160,000
319,200
220,000
1,900,000
713,000
2,354,764
50,000
6,655
1,341,006
1,055,859
25,000
283,600
10,000
538,161
192,762
1,850,653
2,900,000
93,906
310,975
475,970
20,000
39
Highway Division
16
17 + beyond
DISTRICT 4- SIDEWALK REPAIR & IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 4- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS (PHASE II)
10,000
454,500
454,047
DISTRICT 4- TRAFFIC SIGNAL BETTERMENT AT VARIOUS LOCATIONS
DISTRICT 4- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIALS PURCHASE &
INSTALLATION
DISTRICT 4- TREE REMOVAL, TRIMMING & SIGHT DISTANCE CLEARING AT VARIOUS LOCATIONS
DISTRICT 4- TREE TRIMMING, TREE REMOVAL & SAFETY SIGHT DISTANCE CLEARING AT VARIOUS
LOCATIONS
DISTRICT 4- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 5- ADA RETROFITS AT VARIOUS LOCATIONS
DISTRICT 5- APPLICATION OF REFELCTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 5- BRIDGE PAINTING AT VARIOUS LOCATIONS
DISTRICT 5- BRIDGE STRUCTURAL REPAIRS AND RELATED WORK ALONG INTERSTATE 495 AND ROUTE 6,
ROUTE 25 AND ROUTE 28
DISTRICT 5- CATCH BASIN AND PIPE CLEANING AT VARIOUS LOCATIONS
DISTRICT 5- DISTRICT 6- SIGNAL UPGRADES WITH FLASHING YELLOW ARROWS AT VARIOUS LOCATIONS
(PHASE II)
DISTRICT 5- DRAINAGE & EROSION REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- DRAINAGE REPAIR & INSTALLATION AT VARIOUS LOCATIONS IN AREAS A, B, C & D
DISTRICT 5- DRAINAGE REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIR & SYSTEMATIC PRESERVATION AT VARIOUS LOCATIONS
400,000
804,000
44,471
52,202
297,077
500,000
39,278
158,876
389,885
1,610,522
810,296
545,000
1,660,186
368,450
415,047
403,580
304,000
250,000
203,000
260,000
250,062
604,998
3,130,747
74,620
345,713
2,276,907
DISTRICT 5- DRAWBRIDGE OPERATION, REPAIRS AND SYSTEMATIC PRESERVATION AT VARIOUS
LOCATIONS
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- EMERGENCY & NON-ROUTINE STEEL BEAM REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- EMERGENCY & SCHEDULED INSTALLATION OF BRIDGE SHIELDING
DISTRICT 5- FABRICATION AND INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS AT
VARIOUS LOCATIONS
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREA D)
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (AREAS A, B & C)
DISTRICT 5- HAZARDOUS TREE REMOVAL & TRIMMING (MARTHA'S VINEYARD)
DISTRICT 5- HAZARDOUS TREE REMOVAL AND TRIMMING AT VARIOUS LOCATIONS (AREA A,B,&C)
DISTRICT 5- HAZARDOUS TREE REMOVAL AND TRIMMING AT VARIOUS LOCATIONS (AREA D)
DISTRICT 5- HIGHWAY LIGHTING REPAIRS & UPGRADES VARIOUS LOCATIONS
DISTRICT 5- INSTALLATION OF REFLECTORIZED PAVEMENT MARKINGS AT VARIOUS LOCATIONS
539,910
-
958,900
2,069,112
126,427
300,900
1,379,408
306,487
81,665
340,000
31,336
1,390,487
288,352
60,000
5,000
926,992
192,234
-
40
Highway Division
16
DISTRICT 5- ITS CAMERA & VMS CONSTRUCTION ON ROUTE 24, FROM RANDOLPH TO FALL RIVER (39 MILES)
17 + beyond
2,541,989
3,050,386
DISTRICT 5- LITTER REMOVAL AT VARIOUS LOCATIONS (AREA D)
DISTRICT 5- LITTER REMOVAL SERVICES AT VARIOUS LOCATIONS (AREAS A, B, & C)
DISTRICT 5- MAINTENANCE OF STATE ROADWAYS ON MARTHA'S VINEYARD
DISTRICT 5- MEDIAN DELINEATION REPLACEMENT ON ROUTE 6, FROM DENNIS T.L. TO ORLEANS T.L.
87,000
240,000
497,256
4,500
52,191
96,760
221,388
-
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREA D)
DISTRICT 5- PAVEMENT REPAIRS & CRACK SEALING AT VARIOUS LOCATIONS (AREAS A, B & C)
DISTRICT 5- PAVEMENT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- REMOVAL & REPLACEMENT OF HIGHWAY DELINEATOR POSTS AT VARIOUS LOCATIONS
35,797
200,000
900,000
93,679
200,000
444,976
DISTRICT 5- REPAIRS & UPGRADES TO CHAIN LINK & LAYOUT FENCE SYSTEMS AT VARIOUS LOCATIONS
66,887
-
DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS LOCATIONS
50,465
-
DISTRICT 5- REPAIRS & UPGRADES TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS
DISTRICT 5- REPAIRS & UPGRADES TO SALT SHED FACILITIES AT VARIOUS LOCATIONS
DISTRICT 5- REPAIRS AND INSTALLATION OF SIDEWALKS AT VARIOUS LOCATIONS
DISTRICT 5- REPAIRS AND UPGRADES TO GUARDRAIL, CABLE & BARRIER SYSTEMS AT VARIOUS
LOCATIONS
DISTRICT 5- REPAIRS, UPGRADES & CONSTRUCTION OF SIDEWALKS AND ACCESS RAMPS AT VARIOUS
LOCATIONS
DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREA D)
DISTRICT 5- ROADSIDE VEGETATION REMOVAL AT VARIOUS LOCATIONS (AREAS A,B, & C)
DISTRICT 5- ROUTINE MAINTENANCE & STRUCTURAL REPAIRS TO ROUTE 3 CORRIDOR BRIDGES
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE DECK REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY BRIDGE JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY FACILITY REPAIRS AND UPGRADES AT VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS (SAND BARRELS) AT VARIOUS
LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY REPAIRS TO IMPACT ATTENUATORS AT VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
79,000
468,262
461,589
270,000
125,000
384,657
36,000
-
400,000
900,000
1,075,232
1,160,000
1,474,413
375,207
43,245
211,996
212,801
5,456
250,138
113,740
75,827
108,228
72,152
2,132,879
1,200,000
826,475
972,979
41
Highway Division
16
DISTRICT 5- SCHEDULED & EMERGENCY TEMPORARY TRAFFIC CONTROL DEVICE INSTALLATION AT
VARIOUS LOCATIONS
DISTRICT 5- SCHEDULED AND EMERGENCY STRUCTURAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 5- STREET SWEEPING AT VARIOUS LOCATIONS
DISTRICT 5- TRAFFIC SIGNAL CONTROLLER CABINET & MISCELLANEOUS MATERIALS PURCHASE &
INSTALLATION
DISTRICT 5- TRAFFIC SIGNAL REPAIRS & UPGRADES AT VARIOUS LOCATIONS
DISTRICT 5- TREE TRIMMING, SIGHT DISTANCE CLEARING & HAZARDOUS TREE REMOVAL IN MARTHA'S
VINEYARD
DISTRICT 5- VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 6 - MISCELLANEOUS OVERHEAD SIGN REPAIRS IN TUNNELS (2014)
DISTRICT 6 - STANDPIPE & FIRE SAFETY INSPECTION & TESTING
DISTRICT 6- ADA RETROFITS AT VARIOUS LOCATIONS
DISTRICT 6- APPLICATION OF PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 6- APPLICATION OF PAVEMENT MARKINGS AT VARIOUS LOCATIONS
DISTRICT 6- BRIDGE WASHING AND CLEANING AT VARIOUS LOCATIONS
DISTRICT 6- DRAINAGE RECONSTRUCTION AT VARIOUS LOCATIONS
DISTRICT 6- ELECTRICAL SYSTEM UPGRADES AT VARIOUS LOCATIONS
DISTRICT 6- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS
DISTRICT 6- FABRICATION & INSTALLATION OF OVERHEAD AND GROUND MOUNTED GUIDE SIGNS
DISTRICT 6- GENERATOR MAINTENANCE AND TESTING AT VARIOUS LOCATIONS
DISTRICT 6- HIGHWAY LIGHTING REPLACEMENT OR REPAIRS AND ELECTRICAL MAINTENANCE AT VARIOUS
LOCATIONS
DISTRICT 6- HOPKINTON- INSPECT, SERVICE, AND REPAIR ELEVATORS AT VARIOUS FACILITIES
DISTRICT 6- INSPECTION, TESTING, MAINTENANCE & REPAIRS OF FIRE DETECTION SYSTEMS AT VARIOUS
LOCATIONS
DISTRICT 6- INSTALLATION & REFURBISHMENT OF CRASH CUSHION SYSTEMS AT VARIOUS LOCATIONS
DISTRICT 6- INSTALLATION & REFURBISHMENT OF PAVEMENT MARKERS AT VARIOUS LOCATIONS
DISTRICT 6- INSTALLATION OR REHABILITATION OF BRIDGE DRAINAGE SYSTEMS AT VARIOUS LOCATIONS
DISTRICT 6- MAINTENANCE OF MHS COMMUNICATIONS SYSTEMS AT VARIOUS LOCATIONS
DISTRICT 6- OVERHEAD DOORS, MAINTENANCE AND REPAIR
DISTRICT 6- RESURFACING & RELATED WORK AT VARIOUS LOCATIONS (HMA)
DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS
17 + beyond
353,912
190,000
4,097,568
324,080
758,000
2,277,082
70,164
265,000
199,000
219,855
9,000
70,000
600,519
377,530
1,100,000
10,025
-
223,536
236,560
457,000
400,000
236,000
266,118
160,000
100,000
215,000
170,000
736,718
1,000,000
170,000
884,061
53,515
118,313
216,000
72,000
400,000
81,235
285,334
475,368
84,300
281,585
3,480,000
72,118
2,350,000
1,153,882
42
Highway Division
16
17 + beyond
DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS
DISTRICT 6- ROADSIDE BARRIER RECONSTRUCTION & REPAIR AT VARIOUS LOCATIONS
DISTRICT 6- ROADSIDE VEGETATION MANAGEMENT AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY BRIDGE DECK & JOINT REPAIRS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY CLEANING OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS
90,000
590,000
500,000
227,299
7,181,174
320,000
60,000
1,992
9,969,814
104,838
DISTRICT 6- SCHEDULED & EMERGENCY CLEANING OF DRAINAGE STRUCTURES AT VARIOUS LOCATIONS
29,765
572,980
DISTRICT 6- SCHEDULED & EMERGENCY DRAWBRIDGE MAINTENANCE, REPAIR, AND OPERATION AT
VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY FACILITIES REPAIR AND IMPROVEMENT AT VARIOUS LOCATIONS
1,462,028
365,507
315,000
140,000
DISTRICT 6- SCHEDULED & EMERGENCY FACILITIES REPAIR AND IMPROVEMENT AT VARIOUS LOCATIONS
18,632
195,636
DISTRICT 6- SCHEDULED & EMERGENCY FIRE LINE, STANDPIPE, AND HYDRANT REPAIRS AND
IMPROVEMENTS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY GUARDRAIL & FENCE REFURBISHMENT & SNOW FENCE
INSTALLATION AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY GUARDRAIL & FENCE REFURBISHMENT & SNOW FENCE
INSTALLATION AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY STRUCTURAL & SUBSTRUCTURE REPAIRS AT VARIOUS
LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC CONTROL & SETUPS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC SIGNAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED & EMERGENCY TRAFFIC SIGNAL REPAIRS AT VARIOUS LOCATIONS
DISTRICT 6- SCHEDULED AND EMERGENCY MECHANICAL AND MILLWRIGHT SERVICES AT VARIOUS
LOCATIONS
DISTRICT 6- STANDPIPE & FIRE SAFETY INSPECTION & TESTING
DISTRICT 6- STORMW ATER RETROFITS AT VARIOUS LOCATIONS
DISTRICT 6- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT AT VARIOUS LOCATIONS
DISTRICT 6- TREE TRIMMING & SIGHT DISTANCE IMPROVEMENT AT VARIOUS LOCATIONS
DRACUT- RECONSTRUCTION OF ARLINGTON STREET, FROM BROADWAY ROAD (ROUTE 113) TO METHUEN
STREET (APPROX. 7500 FT)
DUDLEY- ROADWAY RECONSTRUCTION AND RELATED WORK ALONG A SECTION OF CENTER ROAD; FAP
NO. STP-002S(718)X
DUXBURY- INTERSECTION IMPROVEMENTS @ KINGSTOWN WAY (ROUTE 53) & WINTER STREET
421,612
281,075
155,000
4,970,000
2,717,808
266,055
-
5,472
292,897
47,652
824,454
1,109,771
471,117
479,635
117,000
312,976
320,000
846,000
2,158,357
50,000
-
1,165,000
1,165,000
705,947
-
43
Highway Division
16
EASTHAMPTON- NORTHAMPTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 FROM MM 21.2 TO
MM 26.9 IN BOTH DIRECTIONS (6.1 MILES)
EASTON- SIGNAL & INTERSECTION IMPROVEMENTS @ ROUTE 138 (TURNPIKE STREET) AND ROUTE 106
(FOUNDRY STREET)
EDGARTOWN- OAK BLUFFS- TISBURY- DRAINAGE IMPROVEMENTS & RELATED WORK ON
EDGARTOWN/VINEYARD HAVEN ROAD
ERVING- CONSTRUCTION OF A PRE-ENGINEERED STEEL STORAGE BUILDING AT MAINTENANCE DEPOT
17 + beyond
7,967,000
1,499,949
130,967
504,000
EVERETT- MEDFORD- BRIDGE REPLACEMENTS, REVERE BEACH PARKWAY (ROUTE 16), E-12-004=M-12-018
OVER THE MALDEN RIVER (WOODS MEMORIAL BRIDGE) & M-12-017 OVER MBTA AND RIVERS EDGE DRIVE
40,342,860
FAIRHAVEN- NEW BEDFORD- BRIDGE PRESERVATION, F-01-002=N-06-001 (EAST & WEST BRIDGES) ROUTE 6
OVER ACUSHNET RIVER & N-06-025, HATHAWAY ROAD OVER ROUTE I-195
FAIRHAVEN- RESURFACING & RELATED WORK ON ROUTE 6 (HUTTLESTON AVENUE), FROM EAST OF ADAMS
STREET TO EAST OF SHAW ROAD AT FAIRHAVEN/MATTAPOISETT T.L.
FALL RIVER- INTERCHANGE IMPROVEMENTS AT ROUTE I-195/ROUTE 79/ROUTE 138 INCLUDING BRAGA
BRIDGE PHASE 2 CLEANING/PAINTING AND STRUCTURAL REPAIRS
FALL RIVER- INTERSTATE MAINTENANCE & RELATED WORK ON I-195, FROM ROUTE 24 TO THE BRAGA
BRIDGE
FALL RIVER- MULTI-USE PATH CONSTRUCTION, FROM BRAYTON AVENUE TO QUEQUECHAN STREET,
INCLUDES REHAB OF F-02-106 & F-02-107 (QUEQUECHAN RAILTRAIL - PHASE III)
FALL RIVER- NEW BEDFORD- BRIDGE REPLACEMENTS, F-02-091, COUNTRY CLUB ROAD OVER MAC RR, F-02029, MAC RR OVER BROWNELL STREET, F-02-030, MAC RR OVER PRESIDENT AVENUE, & N-06-024, MAC RR
OVER ROUTE 18 & WAMSUTTA STREET
FALL RIVER- RECONSTRUCTION & TRAFFIC SIGNAL IMPROVEMENTS ON PLYMOUTH AVENUE, FROM
WORDELL STREET TO RHODE ISLAND AVENUE AT SLADE STREET/LAUREL STREET
FALL RIVER- RESURFACING & RELATED WORK ON ROUTE 24 (FROM MILEMARKER 0.0 TO 1.7)
FALL RIVER- SOMERSET- BRIDGE PRESERVATION, F-02-058, I-195 OVER THE COMB SR 79 & TAUNTON RIVER
(BRAGA BRIDGE)
FALL RIVER- SUPERSTRUCTURE REPLACEMENT, F-02-052, HERMAN STREET OVER ROUTE 79
FALMOUTH- INTERSECTION IMPROVEMENTS AT EAST FALMOUTH HIGHWAY (ROUTE 28), DAVISVILLE ROAD
& OLD MEETINGHOUSE ROAD AND INTERSECTION IMPROVEMENTS AT TEATICKET HIGHWAY (ROUTE 28)
AND JONES ROAD/WORCESTER COURT
FOXBORO- PLAINVILLE- BRIDGE PAINTING ON I-495 (NB & SB)
FOXBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-001, ROUTE 9 (WORCESTER ROAD) OVER RESERVOIR OUTLET
13,700,000
4,580,797
873,113
44,825,400
-
3,878,771
1,000
61,812,683
16,649,304
24,896
-
1,377,880
1,000
33,876,859
5,978,442
178,286
-
1,000
104,686
-
972,128
1,455,000
-
1,174,707
20,000
4,435,500
1,696,800
-
44
Highway Division
16
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-009, CENTRAL STREET OVER SUDBURY RIVER, INCLUDES
REHAB OF WICKFORD ROAD BRIDGE, F-07-064
FRAMINGHAM- BRIDGE REPLACEMENT, F-07-015, WINTER STREET OVER MBTA, AMTRAK & CSX RAILROAD
FRAMINGHAM- DECK, JOINT & SUBSTRUCTURE REPAIRS ON F-07-018, MOUNT WAYTE AVENUE OVER
MBTA/CSX
FRAMINGHAM- RECONSTRUCTION OF ROUTE 126 (CONCORD STREET)
FRANKLIN- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
FRANKLIN- PEDESTRIAN BRIDGE CONSTRUCTION, F-08-005, OLD SR 140 OVER MBTA/CSX
FRANKLIN- RECONSTRUCTION OF ROUTE 140, MAIN STREET & EMMONS STREET (DOWNTOWN
ENHANCEMENTS) INCLUDES REHAB OF F-08-007 OVER MBTA
FREETOWN- LAKEVILLE- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 140
GARDNER- BIKE PATH CONSTRUCTION, NORTH CENTRAL PATHWAY (PHASE VI)
GEORGETOWN- NEWBURY- WEST NEWBURY- NEWBURYPORT- INTERSTATE MAINTENANCE & RELATED
WORK ON I-95
GILL- MONTAGUE- BRIDGE REHABILITATION, G-04-010=M-28-031, AVENUE A OVER CONNECTICUT RIVER &
REPAIR OF G-12-020=M-28-001, MONTAGUE CITY ROAD OVER THE CONNECTICUT RIVER
GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II)
GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-005, SR 183 (PARK STREET) OVER HOUSATONIC RIVER
GREAT BARRINGTON- RECONSTRUCTION OF MAIN STREET (ROUTE 7)
GREENFIELD- INTERSECTION IMPROVEMENTS AND RELATED WORK (INCLUDING SIGNALS) AT ROUTE 2A
(MOHAWK TRAIL) AND SHELBURNE ROAD/RIVER STREET
GREENFIELD- INTERSECTION IMPROVEMENTS AT ROUTE 5/10 & CHEAPSIDE STREET
GREENFIELD- RESURFACING & RELATED WORK ON ROUTE 2, FROM INTERSTATE 91 TO WEST OF THE
GREENFIELD GILL T.L. (2.6 MILES)
GROVELAND- REHABILITATION OF ROUTE 97 (SCHOOL STREET & SALEM STREET)
HADLEY- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 9 (RUSSELL STREET) & ROUTE 47 (MIDDLE
STREET)
HANOVER- RECONSTRUCTION OF WASHINGTON STREET (ROUTE 53) & RELATED WORK, FROM THE ROUTE
3 (NB) RAMP TO WEBSTER STREET (ROUTE 123)
HAVERHILL- BRIDGE MAINTENANCE ON H-12-041, RIVER STREET OVER I-495
HAVERHILL- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
HAVERHILL- PEABODY- BRIDGE STEEL PAINTING AND REPAIRS OF SUBSTRUCTURE ELEMENTS, H-12-057
(2RR & 2RT) & P-03-037 (31T)
HAVERHILL- RIVERWALK CONSTRUCTION (BRADFORD SECTION), FROM ROUTE 125 TO COUNTY ROAD
1,820,000
3,172,000
1,111,527
17 + beyond
2,785,000
-
4,084,689
2,069,415
44,735
3,370,000
2,197,850
984,179
925,492
35,000
61,289
20,367,043
980,631
1,851,549
2,000,000
4,193,447
205,006
2,209,200
1,128,157
3,280,088
-
212,708
1,147,000
372,239
-
1,805,117
541,968
4,813,645
2,438,858
1,645,599
-
1,679,120
2,018,474
1,079,000
995,725
2,195,561
399,193
45
Highway Division
16
17 + beyond
HAWLEY- BRIDGE REPLACEMENT, H-13-003, SAVOY ROAD OVER THE CHICKLEY RIVER
HIGHWAY LIGHTING UPGRADES AND IMPROVEMENT ALONG INTERSTATE 495 AT 4 INTERCHANGES WITH
ROUTES 117, 111, 9 AND INTERSTATE 290 –
FA # STP-495-5(082)X
59,327
1,832,343
HOLDEN- BRIDGE REPLACEMENT, H-18-008, ROUTE 31 (WACHUSETT STREET) OVER THE QUINAPOXET
RIVER
HOLDEN- BRIDGE REPLACEMENT, H-18-020, RIVER STREET OVER QUINAPOXET RIVER
HOLYOKE- CANAL WALK EXTENSION (2ND LEVEL CANAL), FROM APPLETON STREET TO DWIGHT STREET
(PHASE II), INCLUDES REHAB OF H-21-062
HOLYOKE- SIGNAL INSTALLATION & IMPROVEMENTS ON CHERRY STREET @ I-91 (INTERCHANGE 16)
662,079
100,044
1,560,000
371,000
-
HOLYOKE- WEST SPRINGFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-91 (MM10.5 TO 15.0)
3,500,000
-
HOPKINTON- CONSTRUCTION & RELOCATION OF RESEARCH AND MATERIAL LABORATORY FROM SOUTH
BOSTON
HUBBARDSTON- RESURFACING AND RELATED WORK ON BURNSHIRT ROAD
HUBBARDSTON- SUPERSTRUCTURE REPLACEMENT, H-24-004, BURNSHIRT ROAD OVER BURNSHIRT RIVER
HUDSON- BRIDGE REPLACEMENT, H-25-003, STATE ROUTE 85 (WASHINGTON STREET) OVER THE ASSABET
RIVER
HUDSON- BRIDGE REPLACEMENT, H-25-004, HOUGHTON STREET OVER ASSABET RIVER
HUNTINGTON- BRIDGE REPLACEMENT, BRIDGE RAMP, H-27-006, FREIGHT YARD ROAD (INTERSECTS MAIN
BRIDGE STRUCTURE ON SOUTH SIDE OF SPAN 4) OVER THE MASSDOT MAINTENANCE FACILITY
LANCASTER- BRIDGE REPLACEMENT, L-02-018, JACKSON ROAD OVER ROUTE 2
LAWRENCE- INTERSECTION IMPROVEMENTS AT LAWRENCE STREET AND PARK STREET
LAWRENCE- NORTH ANDOVER- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
LAWRENCE- UNION CROSSING PEDESTRIAN IMPROVEMENTS; TCS-002S(753)X
LEE- RECONSTRUCTION OF TYRINGHAM ROAD, FROM THE TYRINGHAM T.L. TO ROUTE 102 (2.0 MILES)
LENOX- INTERSECTION & SIGNAL IMPROVEMENTS AT US 7 & US 20 (VETERAN'S MEMORIAL HIGHWAY) @ SR
183 (WALKER STREET)
LENOX- PITTSFIELD- RESURFACING AND RELATED WORK ON ROUTE 7/20
LEOMINSTER- BRIDGE REPLACEMENT, L-08-014, WHITNEY STREET OVER THE MONOOSNOC BROOK
17,239,807
79,017
279,037
105,000
1,304,389
1,305,205
(80,179)
2,200,962
-
20,687,768
4,520,176
-
1,400,000
205,893
7,809,800
624,307
1,064,000
4,081,188
926,519
-
38,112
381,118
2,900,000
930,000
-
46
Highway Division
16
LEOMINSTER- RECONSTRUCTION OF MECHANIC STREET, FROM LAUREL STREET TO THE LEOMINSTER
CONNECTOR
LEXINGTON- BRIDGE REPLACEMENT, L-10-009, ROUTE 2 (EB & WB) OVER ROUTE I-95/ROUTE 128 (DESIGNBUILD)
LEXINGTON- BURLINGTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
LEXINGTON- BURLINGTON- WOBURN- STONEHAM- READING- WAKEFIELD- LYNNFIELD- EXPANSION OF
FIBER & CCTV ON I-95
LITTLETON- BRIDGE REPLACEMENT, L-13-021, TAYLOR STREET OVER I-495 (NB & SB), L-13-022, I-495 (NB &
SB) OVER ROUTE 2 & L-13-023, I-495 (NB & SB) OVER RAILROAD BRIDGE
LONGMEADOW- BERNARDSTON- INSTALLATION OF ADVANCED TRAFFIC MANAGEMENT SYSTEM ON I-91
CORRIDOR (DESIGN-BUILD)
LONGMEADOW- SPRINGFIELD- TEMPLETON- WESTFIELD- STORMW ATER RETROFITS ON I-91, ROUTE 5,
ROUTE 2 & ROUTE 20
LOWELL- BRIDGE REPLACEMENT, L-15-045, MARKET STREET OVER THE WESTERN CANAL
LOWELL- BRIDGE REPLACEMENT, L-15-058, VFW HIGHWAY OVER BEAVER BROOK
LOWELL- METHUEN- TRAFFIC SIGN REPLACEMENT & RELATED WORK ON I-495
LOWELL- SIGNAL & INTERSECTION IMPROVEMENTS AT VFW HIGHWAY, BRIDGE STREET & LAKEVIEW
AVENUE
LYNN- RECONSTRUCTION OF ROUTE 129 (BROADWAY), FROM LYNNFIELD STREET TO CHESTNUT STREET
LYNNFIELD- WAKEFIELD- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
MANCHESTER BY THE SEA- SAFE ROUTES TO SCHOOL (MEMORIAL ELEMENTARY)
MANSFIELD- NORTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-495
MANSFIELD- SIDEWALK CONSTRUCTION & RELATED WORK ON EAST STREET AT THE JORDAN-JACKSON
ELEMENTARY SCHOOL (SRTS)
MANSFIELD- SWANSEA- SOMERSET- NEW BEDFORD- STORMW ATER IMPROVEMENTS ALONG I-495 AND I195
MARLBOROUGH- NORTHBOROUGH- INTERSTATE MAINTENANCE & RELATED WORK ON I-290
MEDFORD- BRIDGE REHABILITATION, M-12-002, MAIN STREET (STATE ROUTE 38 S) OVER MYSTIC RIVER
(AKA - CRADOCK BRIDGE)
MEDFORD- CLIPPERSHIP DRIVE PARK CONSTRUCTION
MEDFORD- STONEHAM- WOBURN- READING- HIGHWAY LIGHTING REHABILITATION ON I-93 (PHASE II)
MEDWAY- RECONSTRUCTION ON ROUTE 109, FROM HOLLISTON STREET TO 100 FT. WEST OF HIGHLAND
STREET, INCLUDES REHAB OF M-13-012
MELROSE- INTERSECTION & SIGNAL IMPROVEMENT TO LEBANON STREET, FROM LYNDE STREET TO MAIN
STREET
17 + beyond
609,162
2,741,230
18,858,742
13,350,000
14,958,000
2,366,494
2,500,000
11,874,295
1,402,261
372,002
-
495,477
353,912
150,797
954,443
2,500,000
2,098,044
3,317,545
20,997,757
970,000
2,127,397
-
2,500,004
443,417
93,000
83,322
874,882
348,061
1,566,275
9,481,951
3,983,078
2,844,585
7,022,564
464,456
1,595,694
15,956,936
3,656,726
9,751,268
2,395,000
-
47
Highway Division
16
MERRIMAC- RECONSTRUCTION OF ROUTE 110 (WEST MAIN STREET/EAST MAIN STREET), FROM 400 FEET
WEST OF ORCHARD STREET TO BROAD STREET
METHUEN- INTERCHANGE RECONSTRUCTION ON I-93 AT ROUTE 110/113 ROTARY, INCLUDING REMOVAL OF
M-17-017 & M-17-018, REHAB OF M-17-007 & NEW BRIDGE CONSTRUCTION OF M-17-040
17 + beyond
2,486,607
-
21,390,286
17,564,245
MIDDLEBOROUGH- ROCHESTER- RESURFACING OF ROUTE 28 (EAST GROVE, WEST GROVE, WAREHAM
STREET) FROM THE MIDDLEBOROUGH ROTARY TO THE MIDDLEBOROUGH/ROCHESTER T.L.
3,807,336
1,853,668
MILLBURY- BRIDGE REPLACEMENT, M-22-020, ROUTE 146 (NB & SB) OVER WEST MAIN STREET &
IMPROVEMENTS ON ROUTE 146 @ ELM STREET, ELMWOOD STREET & WEST MAIN STREET (ROUNDABOUT)
8,570,639
16,069,948
MILLBURY- SUTTON- MEDIAN BARRIER REPLACEMENT ON ROUTE 146, FROM ROUTE 122A TO BOSTON
ROAD
MILLBURY- WORCESTER- RESURFACING & RELATED WORK ON ROUTE 146
MILTON- IMPROVEMENTS AT GLOVER ELEMENTARY SCHOOL IN THE VICINITY OF CANTON AVENUE,
BROOKS ROAD AND VOSES LANE (SRTS)
MONSON- PALMER- RESURFACING & RELATED WORK ON ROUTE 32, FROM MM 5.69 TO MM 6.88 AND FROM
MM 8.24 TO MM 8.80 AT ROUTE 20 (1.69 MILES)
MONTAGUE- CANALSIDE BIKE PATH & PEDESTRIAN CROSSING IMPROVEMENTS, MONTAGUE CITY ROAD AT
SOLAR AVENUE & DEPOT STREET (850 FEET)
MONTAGUE- RECONSTRUCTION ON GREENFIELD ROAD, FROM 195' SOUTH OF SHERMAN DRIVE TO
HATCHERY RD (2.0 MILES)
MONTAGUE- REHABILITATION OF HATCHERY ROAD & GREENFIELD ROAD PEDESTRIAN BRIDGE, M-28-009,
FROM GREENFIELD ROAD NORTHEASTERLY TO THE INTERSECTION OF TURNERS FALLS RD (.41 MILES)
1,734,553
4,625,474
650,000
189,044
5,761,898
850,697
MONTAGUE- RESURFACING & RELATED WORK ON GREENFIELD ROAD, FROM TURNERS FALLS ROAD TO
THE FUTURE BIKE/PED BRIDGE OVER THE B&M RAILROAD (1.75 MILES)
MONTEREY- RESURFACING & RELATED WORK ON ROUTE 23, FROM GREAT BARRINGTON T.L. TO OTIS T.L.
MONTGOMERY- BRIDGE PRESERVATION, M-30-008 (4GT), I-90 OVER US 20, WESTFIELD RIVER, & CSX RR.
PROJECT INCLUDES MISC. STEEL REPAIRS, DECK REPAIRS, SUBSTRUCTURE REPAIRS AND BARRIER
REPLACEMENT.
NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET
NANTUCKET- RESURFACING & RELATED WORK ON POLPIS ROAD, FROM EAST OF NORTH PASTURE LANE
TO FULLING MILL ROAD
1,007,845
-
397,045
397,045
3,060,000
1,379,319
3,517,038
-
50,000
-
3,490,000
-
2,785,882
9,054,118
130,153
976,151
20,000
-
48
Highway Division
16
NATICK- BRIDGE REPLACEMENT BR. NO. N-03-003 (STEEL) MARION STREET OVER THE MBTA RAILROAD
NATICK- WELLESLEY- INTERSECTION IMPROVEMENTS @ ROUTE 9 (WORCESTER STREET) & OAK STREET,
FROM 1500' WEST OF OAK STREET TO 300' EAST OF OVERBROOK DRIVE
NEEDHAM- WELLESLEY- REHAB/REPLACEMENT OF 6 BRIDGES ON I-95/ROUTE 128: N-04-020, N-04-021, N-04022, N-04-026, N-04-027, N-04-037 & W-13-023 (ADD-A-LANE - CONTRACT V)
NEW BEDFORD- FAIRHAVEN- INTERSTATE MAINTENANCE & RELATED WORK ON I-195
NEW BEDFORD- INTERSECTION IMPROVEMENTS AT ROUTE 140/ROUTE 6 (KEMPTON STREET) AND
BROWNELL AVENUE
NEWBURY- NEWBURYPORT- CLIPPER CITY RAIL TRAIL ALONG THE CITY BRANCH (PHASE II)
NEW TON- CLEANING AND PAINTING 5 BRIDGES, N-12-015, N-12-029, N-12-030 & N-12-031, WOODLAND ROAD,
AUBURN STREET, ROUTE 30 & PUTNAM STREET OVER I-90
NEW TON- WESTON- STORMW ATER RETROFITS ON I-90
NORTH ADAMS- TRAFFIC SIGNAL REPLACEMENT AT ASHLAND STREET (ROUTE 8A) & AMERICAN LEGION
DRIVE
NORTH ATTLEBOROUGH- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT EAST WASHINGTON
STREET (ROUTE 1), SOUTH WASHINGTON STREET AND HOPPIN HILL ROAD (ROUTE 120)
NORTHAMPTON- INTERSECTION IMPROVEMENTS AT ROUTE 5 (PLEASANT STREET) AND CONZ STREET
NORTHBOROUGH- RESURFACING & RELATED WORK ON ROUTE 20, FROM 20 FEET NORTH OF TOMBLIN HILL
ROAD TO THE MARLBOROUGH TOWN LINE.
NORTHBRIDGE- RECONSTRUCTION OF SUTTON STREET, FROM SUTTON T.L. TO ROUTE 122 (APPROX. 2.2
MILES)
NORTON- BRIDGE REPLACEMENT, N-23-017, PLAIN STREET OVER THE CANOE RIVER
OAK BLUFFS- TISBURY- BRIDGE REPLACEMENT, O-01-001=T-04-001, BEACH ROAD OVER LAGOON POND
DRAWBRIDGE
OAKHAM- RUTLAND- RESURFACING & RELATED WORK ON ROUTE 122, FROM ROUTE 122A IN RUTLAND TO
THE OAKHAM/BARRE T.L.
ORLEANS- INTERSECTION IMPROVEMENTS (ROUNDABOUT) AT CHATHAM ROAD (ROUTE 28) & CRANBERRY
HIGHWAY (ROUTE 6A)
OXFORD- STURBRIDGE- CLEANING & PAINTING STRUCTURAL STEEL ON S-30-029 & O-06-052 ON I-90 (EB &
WB)
PALMER- BRIDGE PRESERVATION. P-01-046, I-90 OVER QUABOAG RIVER, P-01-047, I-90 OVER NECRR &
MCRR & P-01-049, I-90 OVER ROUTE 181 (SYKES STREET)
PAXTON- RESURFACING AND RELATED WORK ON ROUTE 122, FROM ROUTE 31 TO THE RUTLAND T.L.
17 + beyond
-
1,350,000
3,392,137
-
49,146,000
96,731,173
4,830,000
771,000
419,035
-
511,427
782,664
3,579,989
-
1,200,000
205,000
100,000
-
572,527
2,576,369
392,188
1,830,209
43,000
-
2,100,000
-
161,207
15,726,724
1,692,672
-
1,978,280
-
25,000
-
985,174
-
4,271,498
800,000
1,830,642
-
49
Highway Division
16
PEABODY- BRIDGE REPLACEMENT, P-03-013, HOWLEY STREET OVER NORTH RIVER
PELHAM- BRIDGE REPLACEMENTS, P-04-006, MEETINGHOUSE ROAD OVER AMETHYST BROOK & P-04-007,
MEETINGHOUSE ROAD OVER HARRIS BROOK
PEMBROKE- RECONSTRUCTION ON ROUTE 14, FROM THE HANSON T.L. TO WASHINGTON STREET (ROUTE
53)
PITTSFIELD- BRIDGE REPLACEMENT, P-10-010, WOODLAWN AVENUE OVER CSX RR
PITTSFIELD- TRAFFIC SIGNAL AND INTERSECTION IMPROVEMENTS AT CENTER STREET AND WEST
HOUSATONIC STREET (ROUTE 20)
PLYMOUTH- RECONSTRUCTION OF ROUTE 44 (SAMOSET STREET) FROM ROUTE 3 (NB RAMP) EASTERLY TO
WATER STREET
QUINCY- ADAMS GREEN TRANSPORTATION IMPROVEMENTS
QUINCY- INTERSECTION & SIGNAL IMPROVEMENTS AT HANCOCK STREET & EAST/WEST SQUANTUM
STREETS
QUINCY- WEYMOUTH- BRIDGE REPLACEMENT, Q-01-001=W-32-001, STATE ROUTE 3A (WASHINGTON
STREET) OVER THE FORE RIVER
RAYNHAM- BRIDGE DECK REPLACEMENT, R-02-025, ROUTE 138 OVER I-495
RAYNHAM- SIGNAL & INTERSECTION IMPROVEMENT @ ROUTE 44 (NEW STATE HIGHWAY), ORCHARD
STREET & ROUTE 24 (NB) OFF-RAMP
RAYNHAM- TAUNTON- BRIDGE REPLACEMENT, R-02-012=T-01-049 (3MR), SR 24 OVER THE TAUNTON RIVER
RAYNHAM- TAUNTON- RESURFACING & RELATED WORK ON ROUTE 138
READING- RECONSTRUCTION OF WEST STREET, FROM WOBURN C.L. TO SUMMER AVENUE/WILLOW
STREET
REHOBOTH- EMERGENCY REPAIR OF CULVERT R-04-002 ON WHEELER STREET
REVERE- BRIDGE REPLACEMENT, R-05-001, REVERE BEACH PARKWAY OVER MBTA (WINTHROP AVENUE)
ROYALSTON- BRIDGE REPLACEMENT, R-12-006, NORTH FITZWILLIAM ROAD OVER LAWRENCE BROOK
SALEM- RECONSTRUCTION ON CANAL STREET, FROM WASHINGTON STREET & MILL STREET TO LORING
AVENUE & JEFFERSON AVENUE
SANDISFIELD- BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (SOUTH MAIN STREET) OVER W. BRANCH
FARMINGTON RIVER (PHASE II)
SANDISFIELD- BRIDGE MAINTENANCE, S-03-033, ROUTE 8 (SOUTH MAIN STREET) OVER WEST BRANCH
FARMINGTON RIVER (PHASE I)
SANDWICH- DUMPING GROUND CLOSURE AT ROUTE 130 MAINTENANCE FACILITY
SAVOY- RESURFACING & RELATED WORK ON ROUTE 116, FROM CHESHIRE T.L. TO PLAINFIELD T.L.
17 + beyond
1,783,091
1,134,620
305,094
1,031,473
1,458,121
6,561,544
3,661,200
139,773
1,397,725
2,010,700
-
4,323,500
2,908,019
-
56,000,000
22,500,000
3,168,721
1,819,404
1,249,900
397,251
6,792,066
-
117,800
3,160,000
2,140,000
802,725
6,797,415
802,725
1,000,000
915,000
-
2,205,544
5,881,451
356,650
297,208
52,000
404,527
50,738
151,698
-
50
Highway Division
16
SAVOY- SUPERSTRUCTURE REPLACEMENT, S-06-004, RIVER ROAD OVER THE WESTFIELD RIVER
SEEKONK- DARTMOUTH- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-195 & SR 24
SEEKONK- INTERSECTION IMPROVEMENTS AT ROUTE 114A, ARCADE AVENUE & MILL ROAD, INCLUDES
REHAB OF CULVERT S-08-004 OVER RUNNINS RIVER
SHARON- INTERSTATE MAINTENANCE & RELATED WORK ON I-95
SHEFFIELD- GREAT BARRINGTON- RESURFACING & RELATED WORK ON ROUTE 7 (MM 0.0 TO MM 9.38)
SHIRLEY- UXBRIDGE- WORCESTER- STORMW ATER RETROFITS ON ROUTE 2, ROUTE 2A, ROUTE 146 AND
ROUTE 122
SHREWSBURY- WORCESTER- BRIDGE REHABILITATION, S-14-001=W-44-018, STATE ROUTE 9 (BELMONT
STREET) OVER LAKE QUINSIGAMOND (AKA - KENNETH F. BURNS BRIDGE)
SOMERSET- PARK & RIDE EXPANSION ON ROUTE 103
SOMERSET- RESURFACING & RELATED WORK ON ROUTE 103
SOMERVILLE- BRIDGE REPLACEMENT, S-17-025, ROUTE 28 (MCGRATH HIGHWAY) OVER GILMAN STREET
(AKA - GILMAN STREET BRIDGE)
SOMERVILLE- CAMBRIDGE- RECONSTRUCTION OF BEACON STREET, FROM OXFORD STREET TO
CAMBRIDGE C.L.
SOMERVILLE- IMPROVEMENTS AT HEALEY SCHOOL (SRTS)
SOMERVILLE- MULTI-USE PATH CONSTRUCTION, FROM CEDAR STREET TO LOWELL STREET (PHASE I)
SOUTHBRIDGE- BRIDGE PRESERVATION, S-21-002, ROUTE 131 (MAIN STREET) OVER QUINEBAUG RIVER
SPRINGFIELD- BRIDGE PRESERVATION, S-24-077, ROUTE I-291 OVER PAGE BOULEVARD
SPRINGFIELD- NORTH END & BRIGHTWOOD INFRASTRUCTURE IMPROVEMENTS, FROM OSGOOD STREET
TO THE CHICOPEE C.L. (NORTHERLY SEGMENT)
SPRINGFIELD- SIGNAL & INTERSECTION IMPROVEMENTS AT SUMNER AVENUE, ALLEN STREET, ABBOTT
STREET & HARKNESS AVENUE
SPRINGFIELD- VIADUCT DECK REPLACEMENT OF S-24-061 ON I-91 (EARLY ACTION)
STATEWIDE - REAL TIME TRAVEL MONITORING SYSTEM (RTTM)
STATEWIDE- ALL-ELECTRONIC TOLLING SYSTEM (AETS) ON I-90 & THE HARBOR CROSSINGS (DESIGNBUILD)
STATEWIDE- CONVERSION OF INTERSTATE AND FREEWAY EXIT NUMBERS TO MILEPOST-BASED
STATEWIDE- IMPLEMENTATION (PHASE III) OF THE FLASHING YELLOW ARROW AT SIGNALIZED
INTERSECTIONS--ONE OF THE "FHWA NINE PROVEN COUNTERMEASURES"
STATEWIDE- INTERCHANGE RAMP SIGN & PAVEMENT MARKING UPGRADES
STATEWIDE– MANUFACTURE & INSTALLATION OF TOLL MODULAR BUILDINGS IN SUPPORT OF THE ALLELECTRONIC TOLLING SYSTEM
17 + beyond
321,095
1,951,000
1,387,749
1,498,445
1,055,000
4,790,200
5,363,000
274,000
-
260,645
695,053
10,800,000
-
356,750
2,381,187
7,330,000
-
1,913,666
6,697,832
82,605
60,000
826,052
-
798,281
3,725,310
2,098,000
594,379
726,638
5,943,793
75,000
-
60,550,000
12,100,000
60,000,000
115,028,015
1,503,472
34,585,000
1,138,473
328,800
5,123,127
1,479,600
834,382
1,215,928
-
51
Highway Division
16
STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS)
STERLING- BRIDGE JOINTS REPAIRS AND BEAM-END REPAIRS AT 5 BRIDGES ON I-190
STONEHAM- WINCHESTER- WOBURN- TRI-COMMUNITY BIKEWAY INCLUDING NEW BRIDGE, W-43-029, OVER
THE ABERJONA RIVER
STURBRIDGE- CLEAN & PAINT BRIDGES ALONG I-84 CORRIDOR
STURBRIDGE- RESURFACING AND RELATED WORK ON ROUTE 20, FROM ROUTE 49 TO I-84
SUTTON- INTERSECTION IMPROVEMENTS @ ROUTE 146 & BOSTON ROAD
SWANSEA- SUPERSTRUCTURE REPLACEMENT, S-35-018, I-195 (EB/WB) OVER THE COLE RIVER
TAUNTON- BRIDGE REPLACEMENT, T-01-015, WASHINGTON STREET (SR 140) OVER THE MILL RIVER
17 + beyond
127,972
6,500,000
560,724
4,351,063
168,167
4,766,156
6,000
1,031,974
1,800,000
2,610,345
2,356,787
1,805,954
219,375
TAUNTON- RECONSTRUCTION ON COUNTY STREET (ROUTE 140), FROM THE ROUTE 24 (SB OFF-RAMP)
NORTHERLY TO MOZZONE BOULEVARD
TEWKSBURY- RESURFACING & RELATED WORK ON ROUTE 38
UXBRIDGE- SUPERSTRUCTURE REPLACEMENT, U-02-024, ST 122 (MILLVILLE ROAD) OVER PWRR
WAREHAM- BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER
WAREHAM- ROCHESTER- RESURFACING & RELATED WORK ON ROUTE 28, FROM ROUTE 6 TO ROUTE 58
428,332
1,927,494
1,865,205
680,640
161,532
4,997,361
1,276,201
1,696,081
154,382
WARREN- RESURFACING & INTERSECTION IMPROVEMENTS AT ROUTE 67 & ROUTE 19 (TOWN CENTER)
347,519
1,563,835
WARREN- RESURFACING & RELATED WORK ON ROUTE 67 @ WEST WARREN & WARREN TOWN CENTERS
111,302
1,113,018
WASHINGTON- RECONSTRUCTION OF WASHINGTON MOUNTAIN ROAD, FROM BECKET T.L. TO THE DALTON
T.L.
WAYLAND- SIGNAL & INTERSECTION IMPROVEMENTS AT ROUTE 27 (MAIN STREET) AND ROUTE 30
(COMMONWEALTH ROAD)
WEST BRIDGEWATER- BRIDGE REPLACEMENT, W-18-012, ROUTE 106 (WEST CENTER STREET) OVER THE
HOCKOMOCK RIVER
WEST BRIDGEWATER- INTERSECTION IMPROVEMENTS AT ROUTE 106 & ROUTE 28 (CENTRAL SQUARE)
WEST SPRINGFIELD- CONNECTICUT RIVERWALK & BIKEWAY EXTENSION, FROM ELM STREET TO ASHLEY
AVENUE
WEST SPRINGFIELD- HOLYOKE- EASTHAMPTON- NORTHAMPTON- HATFIELD- WHATELY- DEERFIELDGREENFIELD- BERNARDSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-91
WEST SPRINGFIELD- SUPERSTRUCTURE REPLACEMENT, W-21-025, SR 147 (WB/EB) (MEMORIAL AVENUE)
OVER (US 5) RIVERDALE STREET (DESIGN-BUILD)
WEST SPRINGFIELD- WESTFIELD- GUARDRAIL UPGRADES & RELATED WORK ON SECTIONS OF I-90,
BETWEEN MM 40.0 AND MM 46.0
6,900,000
-
197,499
1,974,989
401,885
4,219,793
1,333,463
272,264
816,791
4,038,136
-
4,900,000
-
2,764,015
-
52
Highway Division
16
WEST STOCKBRIDGE- BRIDGE REPLACEMENT, W-22-004, ROUTE 41 (GREAT BARRINGTON ROAD) OVER
WILLIAMS RIVER
WEST STOCKBRIDGE TO AUBURN- GUIDE & TRAFFIC SIGN REPLACEMENT ON I-90 (MASSPIKE)
WEST TISBURY- INTERSECTION IMPROVEMENTS AT STATE ROAD (VINEYARD HAVEN ROAD) AND OLD
COUNTY ROAD
WESTBOROUGH- SOUTHBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 9
WESTFIELD- BRIDGE DECK & JOINT REPAIRS ON 8 BRIDGES ON I-90, BETWEEN WEST RD & SOUTHAMPTON
RD (ROUTES 10/202)
WESTFIELD- RECONSTRUCTION OF ROUTE 187 (FEEDING HILLS ROAD), FROM 400 METERS EAST OF OLD
FEEDING HILLS ROAD TO AGAWAM T.L. (.73 MILES) INCLUDES REHAB OF W-25-054 & W-25055 CULVERTS
17 + beyond
1,570,000
612,887
5,135,441
15,000
2,934,538
-
5,600,000
743,129
1,150,000
2,415,169
1,105,000
-
WESTFORD- RECONSTRUCTION OF ROUTE 110 AT BOSTON ROAD AND CARLISLE ROAD (MINOT'S CORNER)
35,999
-
WESTMINSTER- DECK REPLACEMENT, W-28-023, ROUTE 2A/140 OVER ROUTE 2
WESTON- BRIDGE PRESERVATION ALONG I-90
WESTON- STATE POLICE STATION REPLACEMENT ON I-90
WESTON TO BRAINTREE- BRIDGE RECONSTRUCTION OF W-29-018 & DECK, JOINT & STRUCTURAL REPAIRS
& RELATED WORK OF 7 BRIDGES ALONG I-93/US 1 & I-95/ST 128
WESTPORT- RESURFACING & RELATED WORK ON ROUTE 88
WESTWOOD- SAFE ROUTES TO SCHOOL (DOWNEY SCHOOL)
WEYMOUTH- ABINGTON- RECONSTRUCTION & WIDENING ON ROUTE 18 (MAIN STREET) FROM HIGHLAND
PLACE TO ROUTE 139 (4.0 MILES) INCLUDES REPLACING W-32-013, ROUTE 18 OVER THE OLD COLONY
RAILROAD (MBTA)
WEYMOUTH- BRAINTREE- RESURFACING & RELATED WORK ON ROUTE 3
WEYMOUTH- NEW ROADWAY CONNECTION BETWEEN TROTTER ROAD AND EAST WEST PARKWAY
WILBRAHAM- RECONSTRUCTION OF BOSTON ROAD (ROUTE 20), FROM DUDLEY STREET TO 400 FT. EAST
OF DUMAINE STREET (0.28 MILES)
WILLIAMSTOWN- BRIDGE REPLACEMENT, W-37-009, HOPPER ROAD OVER GREEN RIVER
WILMINGTON- INTERSECTION IMPROVEMENTS ON ROUTE 62 (MIDDLESEX AVENUE) @ GLENN ROAD AND
WILDWOOD STREET
WILMINGTON- WOBURN- INTERSTATE MAINTENANCE & RELATED WORK ON ROUTE I-93
WINCHENDON- BRIDGE REPLACEMENT, W-39-001, HARRIS ROAD OVER TARBELL BROOK
WINCHENDON- MULTI-USE TRAIL CONSTRUCTION (NORTH CENTRAL PATHWAY - PHASE V) INCLUDES W-39023, W-39-024 & W-39-028
WINCHESTER- SIGNAL & IMPROVEMENTS AT 4 LOCATIONS ON CHURCH STREET & ROUTE 3 (CAMBRIDGE
STREET)
WOBURN- BRIDGE REPLACEMENT, W-43-003, SALEM STREET OVER MBTA
1,031,742
1,190,307
1,900,000
801,360
2,210,876
510,132
-
3,979,489
393,598
3,409,589
56,258,213
8,250,000
2,000,000
81,198
300,000
1,136,771
1,425,000
917,041
1,000,000
100,500
4,110,000
134,250
1,291,000
2,953,507
-
2,354,608
213,072
4,687,591
53
Highway Division
16
WORCESTER- BIKE PATH CONSTRUCTION, FROM TAINTER STREET TO KILBY STREET AND RESURFACING
KILBY AND GARDNER STREETS
WORCESTER- BLACKSTONE VISITOR CENTER & BIKEWAY (EARLY ACTION SITE WORK - PHASE I)
WORCESTER- BLACKSTONE VISITOR CENTER (PHASE II)
WORCESTER- BRIDGE RECONSTRUCTION, W-44-094, (SR 9) BELMONT STREET OVER I-290, INCLUDES
PEDESTRIAN BRIDGE
WORCESTER- CONSTRUCTION AND RELOCATION OF DISTRICT 3 ADMINISTRATION BUILDING ON
PLANTATION PARKWAY
WORCESTER- MAIN STREET BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS
WORCESTER- MARLBOROUGH- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK AT I-290 & ROUTE
85 CONNECTOR
WORCESTER- RECONSTRUCTION OF LINCOLN STREET (ROUTE 70), FROM MARSH AVENUE TO PLANTATION
STREET (PHASE II)
WORCESTER- STRUCTURAL REPAIRS & PAINTING ON I-290, INCLUDES W-44-108, W-44-107, W-44-106, W-44105, W-44-104, W-44-103
WORCESTER- WEST BOYLSTON- INTERSTATE MAINTENANCE & RELATED WORK ON I-190, INCLUDING W-44124, I-190 OVER ROUTE 12 & RAMP B
WRENTHAM- BRIDGE PAINTING ON I-495 (NB & SB)
WRENTHAM- RESURFACING & RELATED WORK ON ROUTE 140, FROM THE FRANKLIN/WRENTHAM T.L. TO
THE FOXBOROUGH/WRENTHAM T.L.
17 + beyond
2,010,000
-
1,095,685
550,996
6,250,000
3,287,054
8,815,934
3,400,000
5,141,991
11,684,258
335,178
1,800,000
7,373,908
-
1,300,000
5,790,303
-
3,900,000
$
14,044,734
5,266,775
1,241,750
10,000
1,793,639
-
1,628,096,700
$
1,329,012,519
Notes:
1: It should be noted that this list includes all projects managed by the Highway Division. Some elements of these projects impact MBTA or Rail and Transit
property. The total value of Highway work is $ 1,560,867,427
2: These totals reflect construction spending only. Overhead cost for design, right-of-way acquisition, environmental permitting etc. are not included in these
figures.
54
Planning and Enterprise Services
Investment description
General Services
ISA Spending
Office of Security and Emergency Management
Office of Transportation Planning
GIS support services
Long-range transit plans
South Station Expansion FEIR
Research initiatives
Healthy transportation
Management of corridor studies
Assistance on corridor studies
Technical oversight and assistance
Massachusetts Technical Assistance Program (MTAP)
Local Technical Assistance Program (LTAP)
IT
Queuing System Replacement
IT Infrastructure and Facilities Lifecycle Management
Highway Transportation Asset Management Program (TAM)
Highway Call Center
New Security Identification System
Information security / Payment card industry compliance
Permits
Licensing System Integration
Crash Report Replacement
FHWA Funding
16
3,000,000
3,000,000
1,500,000
26,000,000
1,055,680
785,324
9,046,000
2,019,698
603,052
1,604,948
1,050,151
671,460
602,181
1,039,928
17,500,000
400,000
4,200,000
3,400,000
200,000
500,000
1,100,000
2,000,000
3,600,000
2,100,000
Examples of planning activities
$
51,000,000
$
22,800,000
55
Registry of Motor Vehicles
Investment description
16
ALARS
Design study at the CCRTA to move Cape Branch
Electronic Filenet Doc Storage
Kiosks-Branch check in and Transactions
17 + beyond
41,800,000
-
34,450,000
300,000
3,500,000
400,000
$
38,650,000
$
41,800,000
56
Rail and Transit Division / Rail
16 bond cap
17 + beyond
Acquire & Fit Out SE Mass Maintenance Facility (Rochester)
Ballast Cars -- Lease
Ballast Cars -- Purchase
Berkshire Line - Basic Track Rehabilitation (37 miles)
Berkshire Line - Emergency Bridge Repairs & Bridge Monitoring
Cape Cod & Southeast Mass Rail Lines Additional Track / ROW & Grade Crossing Improvements
Capital Repairs/improvements So Deerfield Maint. Depot
Engineering Task Order Contracts
Investment description
16
150,000
108,000
100,000
1,000,000
2,000,000
150,000
250,000
750,000
150,000
108,000
100,000
1,000,000
2,000,000
150,000
250,000
750,000
109,000
3,100,000
6,500,000
3,500,000
17,500,000
Fall River - Limited Track Rehabiitation
Fall River - Wharf Yard and Runaround (South Extension)
Falmouth Depot
Field Inspection and Design Task Order Contract
Framingham Secondary - Rebuild Track Walpole to Foxboro
Framingham Secondary - Track Rehab Framingham to Walpole (18 miles)
Framingham Secondary Walpole Interlocking Modifications
Freight Rail Inspection and Heavy Repair - Framingham Secondary
Freight Rail Inspection and Heavy Repair - Middleboro Secondary
Grade Crossings - FHWA Section 130 Crossing Safety funds
Industrial Rail Access Program
Marine Transporation Capital Reinvestment
PRIA: Springfield
PRIA: Vermonter
Rail Asset Management / Oversight Support Task Order Contract
Ware River Secondary Line - Palmer - Barre Track Safety and Rehabilitation
Watuppa Line (Dartmouth) Track Rehabilitation (MP 0.20 - MP 10.66)
750,000
1,000,000
1,000,000
250,000
1,000,000
2,000,000
500,000
500,000
500,000
9,000,000
2,500,000
500,000
4,000,000
1,000,000
250,000
300,000
900,000
750,000
1,000,000
1,000,000
250,000
1,000,000
2,000,000
500,000
500,000
500,000
2,500,000
500,000
4,000,000
1,000,000
250,000
300,000
900,000
1,500,000
4,000,000
1,500,000
1,500,000
6,500,000
750,000
12,500,000
4,150,000
250,000
500,000
$ 30,458,000 $ 21,458,000
$ 63,859,000
57
Rail and Transit Division / Transit
Outstanding capital funding requests
16 RTA
Berkshire Regional Transit Authority
Brockton Area Transit Authority
Cape Ann Transportation Authority
Cape Cod Regional Transit Authority
Franklin Regional Transit Authority
Greater Attleboro-Taunton Regional Transit Authority
Lowell Regional Transit Authority
Martha's Vineyard Regional Transit Authority
Merrimack Valley Regional Transit Authority
MetroWest Regional Transit Authority
Montachusett Regional Transit Authority
Nantucket Regional Transit Authority
Newburyport Parking Garage
Pioneer Valley Transit Authority
Southeastern Regional Transit Authority
Worcester Regional Transit Authority
Statewide discretionary
Total FTA funds
507,200
204,600
829,776
403,686
247,386
358,500
2,048,341
1,655,000
1,519,800
2,578,265
814,500
677,500
5,000,000
9,565,162
2,231,694
246,139
-
$
28,887,549 $
906,800
530,089
3,748,186
4,837,872
4,295,352
10,807,065
433,056
846,000
384,855
1,917,586
11,138,276
8,248,988
48,094,125 $
16 MAP
16 Intercity
-
-
4,592,739
4,592,739
2,160,000
$
2,160,000
58
MBTA
Investment description
16
Beverly Garage
Casey Overpass - Highway
Chelsea Silver Line BRT - Phase I Highway
Commonwealth Ave. Bridge
DMU Implementation (planning)
Energy Conservation
Fitchburg Line - Wachusett Extension
GLX Mitigation Costs
Green Line Extension
Green Line Extension to Route 16
Green Line Real - Time Tracking System
Knowledge Corridor
Map Replacement
Red & Orange Line Infrastructure Improvements
Red & Orange Line Vehicle Procurement
Salem Parking Garage
South Coast Rail - Highway
South Coast Rail - MBTA
South Station
Worcester - Framingham
$
17 + beyond
601,139
7,939,220
23,228,478
1,000,000
300,000
11,500,000
5,412,423
12,757,400
151,788,470
8,100,000
7,408,843
3,900,000
902,442
23,905,391
79,230,000
7,156,383
28,076,859
16,113,591
664,465
12,153,104
5,084,229
11,614,239
1,454,176
2,785,948
55,204,479
632,065,812
182,000,000
31,450,000
250,473,645
5,171,418
97,870,140
-
402,138,208
$ 1,275,174,086
59
Download