NJDOT 2009 Design Summit Traffic Operations How Do We Maintain Mobility? Dennis Motiani, Director Statewide Traffic Operations Statewide Traffic Operations Traffic Management Center Emergency Service Patrol Work Zone Management Advance Traveler Information System ITS Engineering ITS Maintenance Centralized Traffic Signal Systems Incident Management Statewide Traffic Management Center Statewide Traffic Operations Traffic Management Center Emergency Service Patrol Work Zone Management Advance Traveler Information System ITS Engineering ITS Maintenance Centralized Traffic Signal Systems Incident Management Advance Traveler Information System Advance Traveler Information System www.nj511.info www.nj511.info Advance Traveler Information System Statewide Traffic Operations Traffic Management Center Emergency Service Patrol Work Zone Management Advance Traveler Information System ITS Engineering ITS Maintenance Centralized Traffic Signal Systems Incident Management ITS Engineering SCOPE PRELIMINARY DESIGN SUBMISSION FINAL DESIGN SUBMISSION Use ITS web site for guideline updates. CAN 073-1/7/09 ITS Engineering SCOPE • COP/Need for Proposed Devices. • Coordination with TOC’s • Non-programmatic detail • Communication Alternates. • Possible utility for DSL/Cable/Wireless • Network will always go beyond project limits • Coordination for NJTA connections (feasibility check) • Early Staging /Temporary Measures. • General Impacts to Existing ITS. • Any unusual system needs. ITS Engineering PRELIMINARY DESIGN • Existing ITS Impact Requirements. • TOC space availability. • Network Requirements (even beyond project). • Utility confirmation for DSL/Cable/WL. • NJTA confirmation if connection. • Non-Standard Requirements. • Specs, Details, Test Protocols. • Obtain Latest Standards from ITS Engineering. • Pre-FDS approvals by ITS Engn if no PDS. ITS Engineering FINAL DESIGN • Complete Fiber Diagrams. • IP and other input from DOT-IT. • Upgrades outside project limits. • New and Modified ITS Details. • Complete Material Specifications. • Coordination with Roadway & Structural Plans. ITS Engineering FINAL DESIGN (continued) • • • • • Estimate should separate DMS purchase $$$. Schedules to Reflect Lead Times and Testing. Temporary /Interim Use Requirements. Document Systems Engineering Compliance. Existing ITS Impact Requirements. • Legacy or upgrade software. • TOC block diagrams. • Work time allowances. While Scoping/Designing… • CCTV and DMS viewability. • Context Sensitive Design. • Consideration must always be given to maintenance. ITS Engineering POST FINAL DESIGN • ITS Engineering signoff of System Engineering Compliance. • Provide for Construction Engineering and Construction Inspection. Statewide Traffic Operations Traffic Management Center Emergency Service Patrol Work Zone Management Advance Traveler Information System ITS Engineering ITS Maintenance Centralized Traffic Signal Systems Incident Management Work Zone Management Final Rule Work Zone Safety and Mobility Rule Implementation of Updates to 23 CFR Section 630, Subpart J Overview of the Updated Rule Establishes requirements and provides guidance for: - Systematically addressing WZ safety and mobility impacts. - Developing strategies to help manage these impacts. On all FederalFederal-aid Highway Projects Why TMPs? Has affects on - Safety - Mobility - Constructability TMPs = more comprehensive approach to managing WZ impacts TMP Contents Transportation Management Plans (TMP) •Required on all projects •Temporary Traffic Control Plan (TTCP) •Transportation Operations Plan (TOP) •Public Information Plan (PIP) Significant Project •TTCP, TOP and PIP Required Non-Significant Project •TTCP Required •TOP and PIP Recommended NJDOT Response Policy No. 815 Work Zone Safety and Mobility TMP during Planning TMP development begins in the project planning and scoping phase •Involves planning and design staff •Incorporates big picture issues •Further details as project progresses •Allows more accurate programming and budgets New Jersey Department of Transportation Traffic Mitigation Guidelines New Jersey Department of Transportation Traffic Mitigation Guidelines Section 1 – Introduction 1.1 Purpose and Benefits of Traffic Mitigation Actions The Department is committed to providing a network of transportation facilities that enables New Jersey residents, workers, and visitors to move efficiently within and through the State. Developing and maintaining a Statewide transportation network requires that the Department periodically upgrade and improve these facilities through construction projects. The Department’s first priority is to complete these projects in a timely and cost-efficient manner. The Department recognizes, however, that construction projects inconvenience motorists traveling through the construction corridors and disrupt businesses located nearby, in some cases resulting in substantial user costs. New Jersey Department of Transportation Traffic Mitigation Guidelines •Low impact projects - traffic demands is < work zone capacities during any time of the 24 hour day. •Moderate impact projects - traffic demands is > than work zone capacities for a period of 0-6 hrs per 24 hour day. •High impact projects - traffic demands is > work zone capacities for 6+ hours per 24 hour day. Low impact projects The TM needs for low impact projects generally can be adequately addressed by minimal and “standard” traffic controls used routinely in construction areas. These could include, for example: •Fixed signs to alert motorists to the presence of construction activity ahead. •Traffic cones and temporary barriers to guide motorists through the construction area. Moderate impact projects Augment TM strategies used in low impact projects with strategies such as•Construction area screening, •Variable Message Signs, •Reduced Travel Speeds •Temporary Parking and Turn Restrictions •Pavement Markings. •Detours without additional upgrades to alternate routes. •Modest TDM strategies such as rideshare marketing. Moderate impact projects •Modest public outreach targeted to residents, businesses, and community centers in the local area affected by the construction: for example, postings on web sites, and fax network for employers and others. •Construction activity restrictions/nonconstruction increases in capacity (e.g., narrow lanes) to minimize peak period delays. •Development of incident management plan to reduce delays caused by accidents. High impact projects •Most aggressive TM strategies. •More costly strategies could be appropriate due to the high cumulative cost of delay and disruption. •Temporary capital improvements might be warranted to maintain capacity. •Deliver information to the public-at-large and to motorists traveling through the construction area, and to support the needs of businesses for employees and customer access. High impact projects •Advanced traffic operations and control strategies, such as ramp metering, signal adjustments, reversible lanes, lane closure restrictions, and truck restrictions. •Extensive public outreach to the public-at-large and to targeted groups, including public information meetings, brochures, news releases, media advertising, appearances at community events, a public information center, and a telephone hotline. •Detours that require capital improvements to alternate routes. High impact projects •Temporary capital improvements, such as crossovers, temporary roadways, and temporary use of shoulders and median areas to maintain capacity. •Contracting strategies, such as A+B bidding, contractor incentive/disincentive provisions, lane rental provisions, and project consolidation. •Expanded TDM strategies such as temporary transit service, free bus service, Park & Ride lots, TDM information, and assistance to employers. WORK ZONE MOBILITY AND SAFETY STRATEGIES Traffic Management • Demand Management • Design Alternatives to Minimize Congestion Cost • Alternative Project Scheduling and Phasing • Alternative Contracting and Delivery Strategies to Accelerate Project Completion. Traffic Management Strategies Smart Work Zones Reversible lanes Dynamic Message Signs Travel Time and Delay Estimation System Traffic Conditions Displayed on Internet 511 Traveler Information Increased Incident Management Capabilities Demand Management Strategies Alternative Route Improvements Alternate Mode Mass Transit Improvements Improved Pre-Construction Traveler Information Design Alternatives to Minimize Congestion Cost Strategies • Temporary Pavement • Crossovers Alternative Project Scheduling and Phasing Strategies • Nighttime Construction Schedules • Full Road Closures and Detour Routes Alternative Contracting and Delivery Strategies to Accelerate Project Completion Lane Rental A+B and A+B+C Contracting Incentives/Disincentives Interim Completion Dates and Liquidated Damages Design/build Designing Same Old Same Old is Getting “Old” I-295 Rancocas Rancocas--Mt Holly Rd to RT 130 Rt. 440 over Ramp WI/WK in Edison Rt. 9 over Main St in Woodbridge Pavement Rehab on Rt. 42 Pavement Markings for Better Guidance VMS Messages DESIGN VMS MESSAGES DEPLOYED DURING CONSTRUCTION IN PRELIMENARY AND FINAL DESIGN