TO: ... DATE FROM:

advertisement
199
AGENDA ITEM BACKGROUND
TO:
GOVERNING BOARD
FROM:
PRESIDENT
DATE
June 10, 2013
SUBJECT:
ENCLOSURE(S)
Priorities Resulting from Program Planning Processes
REASON FOR BOARD CONSIDERATION
ITEM NUMBER
Page 1 of 3
INFORMATION
G.6
BACKGROUND:
Instruction implemented planning processes during the 2012-2013 academic year. The priorities from each
program are included in this agenda item for review.
Instruction
The purpose of Instructional Planning is to recognize quality and assist in the continuous strengthening and
improvement of the college academic programs in the instructional component. The process is designed to:
Provide a rigorous examination of programs and their outcomes
Develop new insights into program effectiveness
Engage departments in planning program improvements that are responsive to student and community
needs
Provide information for resource allocation within departments and within the college.
All programs and services are reviewed every six years. The Council for Instructional Planning (CIP) determines
the order in which programs will be reviewed.
The goals of Instructional Planning are to:
Improve programs and services consistent with the College Master Plan and the California Community
College Mission
Determine department direction and goals for the next six years
Foster cooperation among college departments
Develop information to assist in the allocation of resources
Increase responsiveness to student and community needs
Improve response to external and demographic changes
Respond to state and federal mandates for accountability
Each spring semester the Council for Instructional Planning receives and reviews the Instructional Plans begun in
the prior academic year. These plans, based on a thorough review of internal and external data relative to the
individual program, determine and prioritize program directions for the next six years. Members of the CIP
critically read each of the plans and question the authors regarding the intent and clarity of the directions. Many
plans are revised based on CIP discussions. At the culmination of its study, the council establishes Instruction
Component priorities from among the directions contained in the plans. This spring semester, the CIP conducted
its review and set the priorities for the top third of all recommendations, which were forwarded to CPC. The
following priorities will be among several criteria for determining the budget allocations within the Instructional
component in future years.
Administrator Initiating Item:
Kathie Welch, Vice President Instruction
Academic and Professional Matter
If yes, Faculty Senate Agreement
Senate President Signature
 Yes  No
 Yes  No
Final Disposition
200
Program Directions and Resources Requested in Instructional Plans Completed in 2012-13
27
Rank
ESL 1 of 7
1
Description
Establish written assessment for all incoming students
Cost
$4,000
7
2
CAHM 1 of 4
Hire one full time replacement Instructor
$39,062
8
3
CAHM 2 of 4
New Cooperative Work Experience requirement for degrees
and certificates
$3,470
58
4
SPED 1 of 4
Support for Program Coordinator.
Increase by 10-20% each
year x 6 years. Cost is
$7,500 for each 10%.
48
5
RT 3 of 12
Ongoing maintenance and repair of laboratory equipment calculated at 10% of
original cost per year; biannual x-ray tube registration fees (CDPH-RHB)
$10,000.00 annually
(Maintenance of programs);
$1,544.00 biannually
10
6
CAHM 4 of 4
Purchase chairs and build a storage shed
$7,000
initial cost, positive
cash flow after six months
13
6
DMCP 1 of 4
Priority 1: Staffing for Guided Enrollment and Student Intake
352 staff hours/annual for seasonal staff position to lead DMCP guided
enrollment and student Intake months. *Classified hourly Program Specialist:
352 hrs/7 months = 50 hrs/month = 32% FTES, 7 months = $5,700/year
$5,700*
37
6
MUS 4 of 12
Certificated Instructor: Replacement Position: Choral/Vocal/Technology
$78000.00 one time
$39,062.00/ry
28
9
ESL 2 of 7
Increase the number of Laboratory Instructional Aids (LIA) in both the Writing
Lab on main campus and the Integrated Learning Center in Watsonville
$33,937
11
10
DH 1 of 2
Investigate and develop a FELI for incoming DH students
Cost: TBD (Major growth);
22 students would generate
FTES
17
11
ECE 1 of 10
Instruction/Staffing – Hiring 1 Bilingual Contract faculty members: … to serve
the diverse needs of the 54.1% ECE students enrolled in our Spanish-to-English
program we must make the efforts to attract and hire qualified faculty who are
bilingual ( See page 26 for additional details)
$39,062
25
11
ECE 9 of 10
Facilities and Equipment - Weather/Rodent Proofing Sheds: The ECE
department has storage sheds that are used for storing materials for various
classes (e.g.: ECE 53, ECE163, ECE 59, ECE 156’s) and Children’s Center
classroom storage. (See page 32 for additional details)
$460 to $600
1
13
AP 1 of 4
Maximize student success and retention by providing access to optimally
functioning facilities and a sufficient stock of properly functioning camera,
traditional lab, and lighting equipment for student use.
$8,300 - one time
$1,500/year - ongoing
5
13
BUS 1 of 2
Upgrade the Business Classroom laptops. New laptops to be purchased to
replace current laptops in the portable cart.
$15,000-$20,000
To be determined by
Campus IT/Department
47
13
RT 2 of 12
Add 1 Adjunct Faculty assignment for RT175, Advanced Patient Care:
Venipuncture
$1,735.00
(1 TU)
59
13
SPED 2 of 4
Restore program to 4 days per week by increasing faculty to 62.5%
assignments. Over time, consider increasing faculty assignments to 75% and
consider hiring contract counselor.
$35,000/year
for 3 facutly to increase
from 50% to 62.5%.
Additional cost for further
augmentation
19
17
ECE 3 of 10
Instruction/Staffing – Hiring part-time adjunct faculty including some who are
bilingual ($1,735/TU) - Need for adjunct who are Spanish speakers and who
have specialized knowledge and experience
( See page 28 for additional details)
$1,735/TU
with total based on any
additional units
29
17
ESL 3 of 7
Outfit more classes with Elmo document projectors
$5600
$700/unit(8 units)
201
36
17
MUS 3 of 12
Instruments (6: bass trombone, oboe , contra bass clarinet, trombone, soprano
sax, clarinet)=$30,000.00Piano Lab Pianos: 10 @ $1800=$18,000Practice
Room Pianos: 5 @ $6,000.00 =$30,000.00
$78,000.00 one time
39
17
MUS 6 of 12
Professional Services: Piano Tuning/Repair 24 pianos 2x/year @ 115.00 to
$5,520/year. Current budget :$80/tuning = $3840/year
$1,680.00/year increase
46
17
RT 1 of 12
Add 1 laboratory section to RT50L, RT51L, RT60L, RT70L, and RT71L
$16,500.00
(9.44 TU)
Download