Cabrillo Community College District Citizens’ Measure D Bond Oversight Committee Annual Report Letter from the Committee Chair It is my pleasure to share with you the Cabrillo College Citizens’ Measure D Bond Oversight Committee’s tenth report to the community. This has been an exciting year for Cabrillo College having completed the majority of the Facilities Master Plan projects. I encourage you to visit the campus and see Tenth Report the accomplishments made possible by your investto the Community ment in our community college. In 1996, the college developed a comprehensive Faon Measure D cilities Master Plan which identified the educational March 2005 programs that require expanded or upgraded facilities to support instruction. Measure C was approved through by the voters in 1998 at $85 million and Measure D June 2014 was passed in 2004 at $118.5 million. In addition, the college has been extremely successful in securing matching funds of $6.5 million from the Federal EcoINSIDE nomic Development Administration and $40 million from the state in order to maximize the benefit to our Committee local community. The results: Members2 About Prop. 39 2 Expenditures3-4 Projects5 Issues & Conclusions6 • The Solari Green Technology Center (GTC) opened in 2012. This Platinum Level LEED certified “green” building provides a unique learning environment focusing on career technical education at the former Watsonville Library site, as part of Cabrillo’s Watsonville Center. • State-of-the-art teaching facilities in the completely renovated Building 300 have been open for Business, English and Language Arts classes since spring 2011. The new Chemistry/Biology lab in Building 600 will allow the College to offer more high-demand science courses and opened spring semester 2014. The Dental Hygiene Program, previously in building 600, relocated to the new Health & Wellness Building in 2010. • Two Health & Wellness Buildings now house the Allied Health programs (Dental Hygiene, Radiologic Technology, Nursing, Medical Assisting, and the Stroke and Acquired Disability Center). The Wellness Center opened in September 2010. This is a joint use building that serves both instructional and revenue needs of the college. • Three Arts Education Classrooms for visual, applied, and performing arts have been open for classes since fall of 2008, and the Crocker Theater, Theatre Arts classrooms, visual and applied arts classrooms, Samper Music Recital Hall, and music classrooms opened in fall 2009 for everyone to enjoy. • The new Barbara Samper Student Activities Center opened in 2007 and is a hub of activity with the considerably expanded campus bookstore, student assessment and orientation services, and expanded workspace for student government and clubs as well as related student services programs and services. • Bond funds have dramatically improved campus accessibility. New kiosks with campus maps as well as wayfinding signs have been installed to show building locations and wheelchair accessible routes. In addition, new seating in the football stadium has been installed to provide better access for individuals using wheelchairs. • The “Tech Refresh” and “Smart Classrooms Upgrades” projects of various buildings, college-wide have improved the learning environment for students through technology improvements as well as creating more accessible and user friendly facilities. The annual audit for 2013-14 was performed by Vavrinek, Trine, Day and Co., LLP, and disclosed no instances of non-compliance with the terms of Proposition 39 nor Measure D. The 2013-14 audit report was completed in December, 2014. Based on this report, the members of the Citizens’ Oversight Committee (COC) conclude that Measure D Bond expenditures have been made in accordance with California Education Code 15278 and exclusively for projects identified in the Bond Measure. The $118.5 million General Obligation Bond approved by more than 62 percent of the voters in March, 2004 has certainly upgraded and improved the campus facilities to better serve our students and community. The Citizens’ Oversight Committee looks forward to continuing to work with the Cabrillo staff in 2014-15 to assure compliance with Measure D and the completion of these projects which are a valuable resource for the Santa Cruz County community. Blaine Brokaw, Chair Measure D Bond Oversight Committee About a Proposition 39 Bond Measure Supporters approved Cabrillo College Measure D under the provisions of Proposition 39, which requires a minimum 55 percent approval by the electorate. Proposition 39 bonds also call for the appointment of an independent Citizens’ Oversight Committee within 60 days of election results certification. By statute, the committee must include: l l l l l From left: Carter Frost, Blaine Brokaw, Georgia Acosta, Kathy Blackwood, Ceil Cirillo, Brian Mathias, Victoria Lewis, Joe Nugent. Not pictured: Sharon Gray, Ronald Kaplan Members of the Citizens’ Oversight Committee l A member of the business community An active member of a senior citizens organization A member of a taxpayers association An enrolled student active in a community college group A member of a college support organization Two members representing the community at large Committee members serve in an uncompensated capacity for terms of two years and may not exceed two consecutive terms. No District employee nor vendor, contractor, nor consultant to the District may serve on the committee. 2013-14 Kathy Blackwood Blaine Brokaw Carter Frost Ceil Cirillo Sharon Gray Ron Kaplan Brian Mathias Member at Large (Two-year term expires 8/14) College Support Organization (Two-year term expires 8/15) Student (Two-year term expires 8/15) Business Representative (Two-year term expires 8/14) Senior Citizens Organization (Two-year term expires 8/15) Member at Large (Two-year term expires 8/14) Taxpayers Association (Two-year term expires 8/14) Previous Members Jack Baskin Member At Large 2004-06 Michael Bethke Taxpayer Association 2010-12 Rodney Brooks Member At Large 2004-08 Bobby Buckter, Student 2013-14 Oleksii Chuiko Student 2011-12 Diane Craddock College Support Organization 2007-11 Leflora Cunningham Student 2007-08 Robert Dills Member At Large 2009-12 Harriett Duzet Senior Citizens Organization 2004-07 John U. Fry Business Representative 2008-12 Tila Guerrero College Support Organization 2004-07 Chloe LaFortune Student 2004-05 Leigh Ann Lively Student 2010-11 Nicole Moreno Student 2005-06 Gary Meyer Student 2008-09 Helen Palmer Member At Large 2008-09 Bob Petersen Member At Large 2006-10 Kris Reyes Business Representative 2004-08 Mike Siegel Student2006-07 Lou Tuosto Taxpayers Association 2004-08 Jeff Vella Student 2009-10 Bud Winslow Senior Citizens Organization 2007-11 2 Committee Meetings The COC met twice in the 2013-14 fiscal year. Meeting dates and minutes of prior meetings are available at the bond oversight web page at: http://www.cabrillo.edu/internal/facilities/measured/bond oversight/bondoversightDocs.html. For questions or comments about the committee and its activities, please call (831)479-6406. All meetings are open to the public. Measure D Bond Issuance and Expenditures through June 2014 The Cabrillo Community College District issued the first series of Measure D Bonds, Series A, in the amount of $60 million, in May 2004. The District issued the second and final Series B in April 2007 in the amount of $58.5 million for a total Bond Offering of $118.5 million. Facilities projects are publicly bid as required by Contract Code and the District has endeavored to make qualified local contractors aware of the projects and to assist them with the public bidding process to facilitate work for local residents. Included in this Report are the Measure D funded projects that have been completed or were in progress as of June 30, 2014. Measure D Funded Facilities Master Plan Projects 1, 2 As of June 30, 2014 Measure D Bond Sales Interest Through 6/30/14 Total Measure D Funding $118,743,795 $9,340,602 $128,084,398 Measure D Funding summary Schedule Total Budget Measure D Projects in Progress Total Budget Measure D Projects in Planning Total Budget Measure D Projects In Future Total Budget Measure D Projects Completed Unallocated Total Measure D Funding (Schedule A) (Schedule B) (Schedule C) (Schedule D) Totals $8,368,267 $492,991 $0 $118,438,015 785,125 $128,084,398 S chedu l e A Projects in Process Measure D Funding Category Amount Budgeted Paid to Date (thru 6/30/14) Building 800 Moves/Secondary Effects Building Upgrades $413,283 $399,965 Building 800 Renovation Building Upgrades $3,293,172 $2,680,651 Building 600 Renovation Building Upgrades $1,420,000 $1,268,920 Building 100 Renovation Building Upgrades $1,638,075 $1,457,945 Technology Refresh Project Building Upgrades $257,901 $232,083 Smart Classroom Equipment 13-14 Equipment $337,000 $322,899 Building 1550,1600 HVAC Building Upgrades $1,008,836 $8,836 $8,368,267 $6,371,299 Total in Progress Schedule A S chedu l e B Projects in Planning Measure D Funding Category Amount Budgeted Paid to Date (thru 6/30/14) Building 1400,1550 HVAC Building Upgrades $100,000 $0 Building 600 Cadaver Lab Renovation Building Upgrades $250,000 $0 Watsonville Bldg. A Repairs Building Upgrades $50,000 $0 $92,991 $0 $492,991 $0 I.T. Identity Mgmt & Astra Total in Planning Schedule B S chedu l e C Future Projects in Planning Schedule Reserve for Pending Projects None at this time Total Future Projects 1 2 Only Measure D funding is shown. Figures have been audited. Paid to Date $0 $0 $0 3 Measure D Funded Facilities Master Plan Projects (cont.) 1, 2 As of June 30, 2014 S chedu l e D Measure D Funding Category Completed Projects (thru 6/30/14) Enrollment Center Faculty Offices Smart Classrooms Staff Offices Allied Health Equipment Building 300 Watsonville Expansion Carpet Cleaner-Truck-mounted Equipment Utility Relocation Project Southwest Power and Communication Southeast Perimeter Road Parking Lot R New Fire Water Line Building 100 Road and Utilities $1,350,053 Building 100 Enrollment Center Building 400 Improvements Exterior Painting Buildings 100, 900,1000, 1500, 1550, 1300, 1400, & 1600 HVAC Buildings 400, 450, 500, 700 Building 900 Restrooms Building 400 Boiler Pipe Replacement 15 Smart Classrooms Building 2100 Upgrades Stadium Bathroom ADA Upgrades VAPA Remediation H&W Secondary Effects Study Smart Classrooms (2011-2013) Building Upgrades and Classroom and Lab Upgrades $3,975,366 Building 100, 900, 1100 ADA Access Stair Replacement Parking Lots E, F, and G Upper Campus Land Bridge Safety Phones Parking Structure Building 100 Plaza Campus Wide Signage ADA Access and Safety $1,411,707 Allied Health Parking Structure Sheriff’s Office Relocation Allied Health Project Closed Portion $11,092,120 SAC Student Services Student Services Project Now Closed $20,840,156 Arts Education Classrooms AEC Project $51,893,312 Arts Education Equipment AEC Project $1,126,453 Stadium Bathroom Renovation ADA Accessibility Allied Health Classroom Buildings Health and Wellness Building 300 Renovation Building Upgrades $1,116,963 Watsonville Expansion Building $7,180,110 Bond Fee, Audits Fees Total Completed Schedule D 4 Paid to Date 1 Only Measure D funding is shown. $2,872,913 $225,359 $15,072,637 $280,867 $118,438,015 2 Figures have been audited. 100 Bldg. HVAC Upgrade Project The 100 Building has been home to various administrative functions over the years and has had considerable redistribution of activities. Very few areas of the building floor plan resemble the original construction layout except for the more than 50-year-old HVAC system. The project, addressing the much needed reconfiguration of the existing duct work and heating needs of the main floor, was bid in October 2013 and the work was substantially complete in June 2014. New carpet, paint, door hardware, and electrical upgrades were also accomplished. The total project budget is $1,274,685, with final completion pending DSA certification. energy management, solar, and green building programs. The District purchased the library from the City of Watsonville in July 2008 and was awarded $3.4 million in grant funds from the Economic Development Agency to augment Measure D Bond funds specifically to build to the model Platinum Level LEED certified “green” building standard. The District also received a generous donation of $500,000 from the Richard and Mary Solari Charitable Trust and $100,000 from the Les and Jeane Ley Family Fund for construction that allowed the District to add back some of the items that were deferred due to budgetary constraints. Building 300 Renovation Twelve new smart classrooms and ten offices in Building 300 for Busi- 100 Bldg. ness, English, & Language Arts (BELA) and Human Arts and Social Sciences (HASS) classes opened in spring 2011. In addition to Measure IT Equipment Relocation Project D funds, state bond funds supported the renovation. The 100 Building also houses the main switch gear and information technology equipment for a majority of functions on the upper campus. Untenable conditions required corrective measures in order to ensure that expensive equipment was protected and functional. Repairs to floor drainage systems and deteriorated walls were part of the corrective work as well as upgrades to temperature controls and air conditioning systems. The total project budget for this work was $247,720 and was completed in the fall of 2013. Tech Refresh Project & Smart Classrooms In addition to the implementation of numerous “Smart Classroom” upgrades, a comprehensive look at the aging computer labs throughout the College identified the need for replacement of technology infrastructure as well as desktop computers to improve student access. This included replacement of faculty and staff desktops, Virtual Desktop Infrastructure for student computer labs, network and software upgrades. A total of $232,083 in bond funds were combined with $478,480 in District funds for a total project budget of $710,563. Green Technology Center (Watsonville Library Acquisition) The new 14,000 square foot Green Technology Center (GTC) opened in 2012. This Platinum Level LEED certified “green” building at the former Watsonville Library site provides a unique learning environment focusing on career technical education in construction, Building 800 Renovation The new state of the art Jack and Peggy Baskin Technology Center for Engineering, Computing and Physics now offers classroom, laboratory, and office space for Science, Technology, Engineering, and Mathematics (STEM) programs, and opened for classes in the 2013 fall semester. Cabrillo College was awarded a five-year Federal Title III grant for the STEM fields in 2011 to increase the number of Latinos in the STEM fields. The Cabrillo College Foundation received $250,000 from the Monterey Peninsula Foundation to provide support for the construction costs to renovate the 800 Building and this also reduced the need for bond funds. In addition to the classroom renovation, the heating and ventilation systems and restrooms were repaired utilizing Measure D bond funds and funding from the Peggy and Jack Baskin Foundation to accomplish the renovation work not covered by the Federal STEM grant. Building 600 Biology/Chemistry Classroom Renovation Project Building 600 has been renovated for Biology and Chemistry classroom and laboratory space. The Dental Hygiene program previously occupied the west end of the building prior to relocating to the new Health and Wellness Building in 2010. This project was completed in time for spring semester classes, 2014. 5 Smart Classrooms Student Activities Center In an effort to provide state of the art educational facilities, classrooms throughout the District were identified in need of technology, furniture, carpet, and paint upgrades. Smart classrooms are utilized in each of the Instructional Divisions. Measure D funds were used for the following classroom upgrades this year: 429, 506, 509, 510, 513, 517, 714, 913, 1302, 1303, 2501, and 2502. The Barbara Samper Student Activities Center, a 50,000-square foot, two-level building located in the very center of the Aptos campus on Soquel Drive, opened in fall 2007. The new center provides a gateway to the Aptos campus and houses the campus bookstore, student assessment and orientation services, student government, student activities and club space, and related student services programs and offices. The project includes three new elevators which significantly improve accessibility on campus to and from Soquel Drive. Covered parking on the ground level provides access to the bookstore and to enrollment services. The college received a certificate of completion from the Division of the State Architect (DSA) in March 2011. Health and Wellness Classrooms and Parking The 55,000 square foot Health and Wellness classroom facility opened in fall 2010. This new facility brought together healthrelated disciplines that include Nursing, Dental Hygiene, Medical Assistant, Radiologic Technology, the Stroke and Acquired Disabilities Learning Center, Health Science, and a new Wellness Center. The adjacent Health and Wellness Facility parking structure opened in fall 2008. The parking structure provides 510 parking spaces in the northeast corner of the campus for those students attending classes on the upper campus. Arts Education Classrooms The Arts Education Classrooms project consists of five buildings totaling 122,300 square feet, includes a 581-seat theater, a 369seat music classroom and recital hall, a building dedicated to twodimensional art, one building for three-dimensional art and one building for general instruction and offices. The space also allows for community participation, partnership and events. Fifteen music practice rooms are available for students, four music rehearsal spaces, an acting studio, five drawing and design studios, and an experimental theater classroom. Three of the buildings opened for classes in fall 2008; the Crocker Theater and the Music Recital Hall were opened in August 2009. Some aspects of the construction contracts between the trade contractors and the District were disputed by the parties which resulted in mediation. The mediation process resulted in a settlement of outstanding issues. The settlement in the amount of $1.6 million was reached in March 2011 and finalized in August 2011. 6 Aptos Campus Signage A signage plan for the Aptos campus, prepared by Kate Keating Associates of San Francisco, has been completed. Handicap accessible routes are now clearly identified, and updated map kiosks and wayfinding signs have been installed on campus to assist new students, staff, and visitors. Replacement building identification signs have also been installed and will continue to be updated as construction projects in progress become finalized. Examination of Expenditures Cabrillo College staff provides the Citizens’ Oversight Committee with the monthly Facilities Master Plan Status Reports which are submitted to the Cabrillo College Governing Board for review. A comprehensive semi-annual update is provided to the Citizens’ Oversight Committee and is formally approved by the Governing Board. Overcoming Challenges The Citizens’ Oversight Committee continues to observe the California Division of the State Architect (DSA) required approval process delay design and construction schedules resulting in potential additional project costs. The Citizens’ Oversight Committee strongly supports any changes which would streamline the construction approval process and reduce overall project costs. The COC also encourages District personnel to continue to evaluate College projects using the industry best practices in construction and design-bid cost alignment to ensure maximum utilization of Measure D bond funds. Conclusions The Citizens’ Oversight Committee finds that Cabrillo College has complied with requirements of state law in accounting for and expending public bond funds.