ACTION ITEMS - UW BLACKBODY CDR 9 MARCH 2004 Action Item Number ACTION TO ACTION REQUESTED BY BB-CDR-1 UW SDL Coordinate with SDL before burning flight level part on EM2 – hold off until at least mid-April. BB-CDR-2 UW SDL Change terminology for “spare 1, 2, 3” Blackbody Controller Data Channels to say “configurable 1, 2, 3” BB-CDR-3 SDL UW Resolve low temp acceptance testing for BBC using SDL Bus Simulator. BB-CDR-4 UW (Doug Adler) SDL Share mechanical drawings and information on properties of Noryl. BB-CDR-5 UW SDL Check impact of a 2-3 K increase in temperature (above the nominal 220 K) of the blackbody mounting platform. BB-CDR-6 UW SDL Consider 1350 Aluminum (over 6061 Aluminum) to improve conductivity in thermal cavity. BB-CDR-7 UW (Doug Adler) SDL Consider conducting thermal sensitivity analysis to further define design margin. BB-CDR-8 UW SDL Add dates and review with respective parties the Assembly, Integration, Test Flow diagram. BB-CDR-9 UW SDL Add EM2 Board delivery date to schedule for EMI tests. BB-CDR-10 SDL UW Discuss board fabrication vendor options. BB-CDR-11 SDL UW Discuss plans for thermal vacuum testing. BB-CDR-12 SDL UW Work on Product Assurance Implementation Plan. BB-CDR-13 SDL UW Check if it is appropriate to identify a Payload Hazard in the “Temperature” category related to an overheat condition in the blackbody that could lead to paint contamination on-orbit. The mitigation plan can be the existing over-temperature feature of the blackbody controller design. BB-CDR-14 UW SDL Add Temperature Hazard defined in BB-CDR-13, if it is deemed appropriate. BB-CDR-15 SDL UW Talk to colleagues about non-contacting tools to measure paint thickness. DESCRIPTION OF ACTION