Project Summary Report The Faculty Portfolio Project Summary Report displays summary level General Ledger (GL) and projections data for the Project chartfield. The report can be run for a single Project or for multiple Projects. What can I learn from the Project Summary Report? • • • • Offers a Project-based view View Sponsored Balances with Budget, Expenses and Other Changes View Non-Sponsored Current Net Position with Beginning Net Position, Revenues, Expenses, and Other Changes View multiple Projects in one report, however Sponsored and NonSponsored Projects cannot be run in the same report Report Date Filters The Project Summary Report requires users to specify: 1. Actuals Through Date: displays cumulative actuals through the selected month (default is the most recent closed month) 2. Projections Through Date: displays cumulative projections through the selected month, or all projections (default is all projections) 4. Choose the Account Level to display or Do Not Display Account Detail - Default is Account Level D - You can also change the Account Level displayed directly in the report view Note: projections are entered at Account Level D. 5. Select the Project-Activity Period-Dept ID. Enter search terms in any of the available fields (Award/Parent ID, Project, Dept ID, or PI/Manager) When you begin entering the search term, valid choices display using typeahead functionality. Select a value from the list by clicking it, then proceed to step 6. 6. Add the results of the selected search term a. Click the Add button to enter all results based on the search term into the Project-Activity Period-Dept ID box (e.g. if you enter a PI and click the Add button, all Projects related to that PI which match the criteria set in the date range and Report Specific Filters 1 and 2 are entered in the filter box). Report Specific Filters 1. Choose to include Sponsored Projects or Non-Sponsored Projects (you cannot choose both Sponsored and NonSponsored Projects in one report) 2. Choose additional options for Project-Activity Period (optional) a. Check the box to Include Inactive Project-Activity Periods *Note: Active/inactive is based on the current status of the Project-Activity Period, not on the Report Dates selected b. Check the box to Include Pending Project-Activity Periods c. Check both boxes to include both inactive and pending 3. Choose whether you want to see both Direct and Indirect Costs (default) or Direct Costs Only Rev. 5/29/2015 b. Since all results based on the filter are entered into the ProjectActivity Period-Dept ID box, you may need to remove any unwanted Projects to complete your programmatic grouping. To do this, click on the item(s) (CTRL/command + Click to select multiple) and then click the Remove button. Repeat this step as necessary to remove all unwanted Projects prior to running the report. • Repeat steps 5 and 6a to add results from multiple searches. When complete, use step 6b to remove unwanted results from the list. MyReports Job Aid Page 1 of 3 Project Summary Report Report Output Selection In addition to the report output selections of On Screen HTML (default), PDF, and Excel ( ), you can choose Unformatted Data ( ). Selecting the Unformatted Data output returns a data only Excel file that has no special formatting and a single row for column headings making it the best source for pivot tables and other advanced spreadsheet analysis. Select your desired report output and click the Run Report button: The second sheet/tab ( ) displays the data and differs depending on whether you chose the Standard Excel download or the Unformatted Data download. Sample second tab-Standard Excel download (“Project Summary_2”): In both Excel report outputs (Excel and Unformatted Data), the workbook will contain two or more tabs. The first sheet/tab ( ) always displays the entered filter criteria: • Sample second tab-Unformatted Data download (“Data_2”): Standard Excel Unformatted Data Working in the Report View • You can change the Account Level (default if Level D) displayed using the drop down menu located in the upper, left of the report header • You can choose to hide or Show Projections & Liens using the checkbox in the right of the header. To hide Projections & Liens, uncheck the box and click Update. Sample first tab (“Parameters_1”) – same on both downloads Rev. 5/29/2015 MyReports Job Aid Page 2 of 3 Project Summary Report • Tips & Tricks • If you intend to create a pivot table with the data you are downloading, do not choose Open from the File Download dialog box. Instead, choose Save and open the saved file to create the table: • Active/Inactive Project-Activity Periods are displayed based on the current status of the Project-Activity Periods selected, not on the Report Date Filter values entered. For example, if you run a report today for an Actuals Through Date of a year ago, the Project-Activity Periods included will be based on their status today not on their status one year ago. You can run reports for either Sponsored or Non-Sponsored Projects however you cannot run a single report combining Sponsored and Non-Sponsored Projects. A Project is considered to be “Sponsored” based on the Fund. All Funds under the Fund tree node 400C and Funds 4900 and 1810 are considered to be “Sponsored.” All other Funds are “NonSponsored.” This report can be run for single or multiple Projects. To run a report for an Award/Parent ID instead of a Project, run the Award/Parent ID Summary Report. This report does not display Function or Flexfield Note that within MyReports, positive and negative signs have been “normalized”. Figures within brackets, e.g. (6,088) are considered unfavorable results (subtract from balance), and those not in brackets are considered favorable results (add to balance). UPlan (Hyperion) data is not available in Faculty Portfolio reports For easier navigation, close your browser tabs (usually the result of drilling through to another report) when you have completed reviewing and/or exporting the information Sponsored Projects with a zero balance as of June 30, 2013 were not converted to our current chart of accounts, and are therefore not available in the Faculty Portfolio reports. Use WebLinks to view information related to these projects. • • • • • • • • Rev. 5/29/2015 Click an underlined blue link to see additional detail. Linked actuals display in a Transaction Detail Report (TDR) in a new tab/window Additional Information & Assistance • Additional information about MyReports including how to request access, training and contact information can be found on the Controller’s Office Website (http://controller.ucsf.edu/fin_reports/) • If you require help with a technical problem, or have a question about a specific report, please contact the Controller’s Office Solution Center at COSolutioncenter@ucsf.edu or 415.476.2126 • To stay informed about MyReports news, be sure to join the MyReports ListServ by following the directions on the MyReports Contacts page of the Controller’s Office Website (http://controller.ucsf.edu/fin_reports/contact.asp) MyReports Job Aid Page 3 of 3