Breakthroughs happen here. TM Facility Master Plan June 10, 2013 Cabrillo College Facilities Master Plan // Letter From The President Letter From The President In 2012, the college community recognized the need to plan for the next phase of renovation, remodeling and possible construction for future state or bond-funded building projects. To be effective, these facilities plans must be guided by a thoughtful, quantitative and qualitative Educational Master Plan that is also informed by a respect for the future and an appreciation for the present needs of our community. The planning began almost one year ago with a thorough review of our programs and departments, assessment of external needs and trends that resulted in projections of the curriculum and program development required to achieve the future we envision. This information was in turn used to project the facilities needed to house relevant educational programs and services. The result is an Educational and Facilities Master Plan in which form follows function. It provides a proactive plan that will enable Cabrillo College to continue meeting the community’s expectations and to offer higher education in a positive institutional environment while preserving the natural beauty of the campus. I wish to thank the many faculty, staff, and administrators who devoted hours of service to provide critical information and insights to produce this strategic document. The Cabrillo College Educational and Facilities Master Plan will allow us to actualize our vision of the future, meet our mission and goals, and serve our increasingly diverse community with quality, relevance, and commitment as we move into the next decade. Respectfully, John E. Hendrickson Interim Super Intendant / President Cabrillo College // 2 Cabrillo College Facilities Master Plan // Mission Statement Vision Mission Statement Cabrillo College is passionate about developing critical thinking, honing oral and written communication and enhancing global awareness while cultivating personal and professional responsibility in our Cabrillo College is a dynamic, and students. Exploration, innovation, creativity and implementation of a variety of teaching methods, responsive educational community skill levels achieve their potential, and consider everyone in the college part of a community of learners dedicated to helping all students achieve their academic, career, and personal development goals. including technology literacy, are hallmarks of our approach to learning. We help students of varying who are treated with dignity and respect. Cabrillo College supports a climate of diversity, self-empowerment and sustainability, with a strong sense of social justice. As an integral part of Santa Cruz County, Cabrillo College is an accessible gateway to prosperity that provides education for all, supporting the local economy, and improving economic vitality. We serve students who have goals of transfer, career preparation, basic skills, personal fulfillment and retraining through an inclusive and effective learning environment. Students will leave with greater knowledge and a richer expectation of themselves. // 3 Cabrillo College Facilities Master Plan // Table of Contents Table of Contents Letter From The President 2 Vision Statement 3 Mission Statement 3 Introduction & Methodology Introduction Purpose Objectives Of The Plan Planning Criteria Methodology Planning Process Nomenclature 5 5 5 5 5 6 6 6 Overview & Existing Conditions Summary 7 Overview Master Plan Scope Historical Perspective Milestones Core Educational Programs Secondary Effects Existing Conditions Transportation Parking Accessibility Security and Safety Maintenance Facility Conditions Grounds & Approaches Buildings Exterior Buildings Interior Roofs Mechanical Systems Electrical Systems Plumbing Systems Fire Protection Communication Signage and Way Finding Information Technology Facilities Scheduling 7 7 7 8 9 9 10 10 10 10 11 11 11 11 12 12 12 13 14 14 14 14 14 15 15 Physical Capacities Facilities Utilization Inactive Spaces 15 16 16 Master Plan Recommendations 17 Overview 17 Aptos Campus 17 Watsonville Center 17 Goals & Objectives 17 Design Criteria 17 Planning / Design / Construction Process18 Maintenance 18 Secondary Effects19 Funding 19 Health & Wellness Modernization 19 Miscellaneous Projects20 Opinion of Probable Costs 20 Phasing Plan 21 Systems & Controls Total Cost of Ownership Definition Purpose Objectives Format Appendices Plans Aptos Campus Plan Watsonville Center Tables Building Utilization Summaries Building Conditions Matrices Space Allocation Summaries Space Allocation Forecast Maintenance Schedules Total Cost of Ownership Models Terminology Source Material Acknowledgements 22 22 22 22 22 22 23 23 23 24 25 25 29 32 43 46 47 49 52 52 // 4 Cabrillo College Facilities Master Plan // Introduction & Methodology Introduction & Methodology Introduction Purpose Planning Criteria The purpose of the Facilities Master Plan (FMP) is to provide a guide for future The fundamental requirement of this Facilities Master Plan is to validate and campus development. The Plan describes a path for the District to improve support the findings of the 2013 Educational Master Plan. The planning criteria existing facilities to meet their educational goals and objectives. was developed from a thorough data collection process that included reviewing The Plan should be viewed as a flexible and dynamic document being reviewed on a periodic basis as the economy changes, student needs evolve and new educational trends emerge. The Plan, above all, must reflect the courses of action described in the Educational substantial amounts of qualitative and quantitative data. The goal of the analysis was to determine present and future facility needs, wants and desires for the college. This evaluation is not limited to space needs but encompasses the quality of the environment and maintainability and sustainability of the physical plant. Master Plan. The success of the Plan will be measured by the commitment to adherence and implementation from all stakeholders of the college. Objectives of the Plan The objectives of the Facilities Master Plan are as follows: §§ Evaluate, on a macro level, existing facilities qualitatively for the purpose of identifying the extent of renovation required to provide cost efficient and serviceable space to meet educational needs. §§ Evaluate existing facilities quantitatively for the purpose of evaluating the efficient utilization of space to meet educational needs. §§ Develop a plan that addresses facilities modifications and renovations that supports the goals of the Cabrillo College’s 2013 Educational Master Plan. // 5 Cabrillo College Facilities Master Plan // Introduction & Methodology Methodology Planning Process Once the Scope of the Plan was clearly defined, the process involved the execution of a systematic series of tasks: §§ Data was gathered through examination of archival records and documents, interviews with key personnel and a field survey. §§ Data in the form of existing documentation was gathered and reviewed with the specific purpose of identifying previously established goals and objectives. These documents include: »» »» »» »» »» §§ 2009 Cabrillo College Space Plan Concept 2013 Cabrillo College Educational Master Plan 2013 Space Inventory Five Year Construction Plan Selected Archival Record Documents The data was compiled in a format that facilitated the development of analysis, assessments and conclusions. §§ The site and existing facilities were physically surveyed at a macro level for the purpose of establishing a baseline for future renovation or modernization. Nomenclature As a matter of convenience and for purposes of this discussion the Aptos Campus will be characterized as the Aptos-Hillside (the facilities located North of Soquel Avenue), and Aptos Campus–Oceanside (the facilities located to the South of Soquel Avenue). // 6 Cabrillo College Facilities Master Plan // Overview & Existing Conditions Overview & Existing Conditions Overview Master Plan Scope The initial student body, in 1959, consisted of 800 freshman students at Watsonville High School. In 1960 a sophomore class was added. Cabrillo College provides courses of instruction at three locations, Aptos, Construction of college facilities falls into 3 major segments, all related to 4 Bond Watsonville and Scotts Valley. The facilities located in Aptos and Watsonville Measures. are owned and maintained by the College and are part of the Space Inventory on file with the State Chancellor’s Office. The facilities located in Scotts Valley are leased while the district determines a more permanent facility and therefore are not maintained by the College. Consequently, Scotts Valley is not part of the Space Inventory. As a result, the scope of this Facilities Master Plan focuses on the Aptos Campus and Watsonville Center. Historical Perspective The first Bond Measure, in the amount of $6.5 million, passed in 1960 funded the acquisition of the initial campus land and constructed the first 9 buildings. With the exception of the Gymnasium, all of these buildings were sited on the Hillside of Soquel Drive. The second Bond Measure, in the amount of $1.1 million, passed in 1965, funded 3 additional buildings, all of which are sited on the Hillside of Soquel Drive. The third Bond Measure, in the amount of $3 million, passed in 1972. These Cabrillo College is one of the 112 community colleges in the California community funds were coupled with matching funds from the State Community College college system. The formation of a community college for Santa Cruz County Construction Fund and were used to purchase 20 acres on the Oceanside of was approved in 1958. The college’s Governing Board was elected in 1959 and Soquel Drive and 5 buildings were constructed. approved the name of the institution of Cabrillo College. The fourth Bond Measure, in the amount of $85 million, passed in 1998. These funds were used primarily for renovation and included such projects as the construction of Watsonville (3 story bldg. now bldg. A), Horticulture, parking structure A/B, swimming pool, road re-alignment, resurfacing existing roads and parking lots, 21 KV phase I & II electrical upgrades, infrastructure and multiple small project work . The fifth Bond Measure, (Measure D) in the amount of $118.5 million, passed in 2004. Funds from this Bond Measure were supplemented by an array of matching funds from Federal, State and Private sources in the amount of $41.4 million. These funds were used to construct the Visual and Performing Arts (VAPA) Complex, Health & Wellness Center, Student Activities Center as well as complete a variety of infrastructure and building improvements and upgrades. Also included were funding the growth of the Watsonville Center, and instituting programs in Scotts Valley. // 7 Cabrillo College Facilities Master Plan Milestones 1960 Funding Source: Land Acquisition: 1961 Construction (Phases 1, 2 & 3): // Overview & Existing Conditions Purpose: §§ Watsonville Center Expansion §§ Create Scotts Valley Presence §§ Aptos Campus Expansion §§ Classroom Improvements §§ $6.5 million Bond §§ Aptos site purchased (Hillside of Soquel Avenue) §§ Building Nos. 100, 200, 300, 500, 600, 700, 900, 1000 & 1100 1965 Funding Source §§ $1.1 million Bond 1966 Construction (Phase 4): §§ Building Nos. 400,450 & 800 1972 Funding Sources: §§ $3 million State Community College Construction Funds §§ $3 million matching Bond Land Acquisition: §§ 20 acres at Aptos purchase (Oceanside of Soquel Avenue) Construction: §§ Building Nos. 1300, 1400, 1500/1550 & 1600 1987 Watsonville Center opened 1990’sConstruction §§ Remodel of Building Nos.: »» 350 (Photo Lab), 900 (Cafeteria Kitchen), 1000 (LRC Expansion), 1700 (Baskin Childcare), 1800 (Sesnon House Restoration) 1993 Watsonville Post Office remodeled 1998 Funding Source: §§ $85 million Measure C Bond Construction: §§ Miscellaneous Campus repairs, renovations & expansion §§ 2 story parking structure & road realignment (accommodation for Student Activities Center and the Visual and Performing Arts Complex) 2002 Environmental Horticulture Center & Botanic Garden opened 2004 Funding Sources: §§ $118.5 Measure D Bond §§ $41.4 Matching Funds 2005Acquisition: §§ Watsonville Library Construction: §§ Health & Wellness Center §§ Student Activities Center 2008Construction: §§ VAPA Complex §§ VAPA 2000 (2D Art) §§ VAPA 3000 (3D Art) 2009Construction: §§ VAPA Complex §§ VAPA 4000 (Crocker Theater) §§ VAPA 5000 (Spangler Hall) 2011Construction: §§ Remodel of 300 Building 2012Construction: §§ Solari Green Technology Center §§ Arts Education Classrooms §§ Campus-Wide Signage §§ Campus-Wide Fire Alarm Improvements §§ Campus-Wide Handicap Accessibility §§ Campus-Wide Safety §§ Parking Improvements §§ Classroom & Laboratory Renovations §§ Infrastructure §§ Watsonville Classroom Expansion §§ North County (Scotts Valley) Center 2013Construction: §§ Remodel of Building Nos.: »» 800 (Stern Center), 600 (Bio/Chem Lab) // 8 Cabrillo College Facilities Master Plan Core Educational Program Cabrillo College provides educational opportunities in 5 major programs. §§ §§ §§ §§ §§ Business, English & Language Arts (BELA) Human Arts & Social Science (HASS) Natural & Applied Science (NAS) Health, Athletics, Wellness & Kinesiology (HAWK) Visual & Performing Arts (VAPA) From the perspective of the facilities master plan, the desired goal is to consolidate component programs within core areas. The construction of // Overview & Existing Conditions As a result of the consolidation, a significant amount of space was made available for other uses. This collection of vacant space is commonly identified as Secondary Effects. The objective is to remodel and modernize these spaces to provide additional Classroom, Laboratory and Office space. A significant benefit to the newly available spaces is that it provides the opportunity for the other divisions to consolidate their operations into logical clusters. To date, some of these goals are in process while others have already been achieved: §§ modernization of the 800 Building for classrooms and laboratories for use the Health & Wellness Center and the Visual and Performing Arts Complex of NAS related programs. The 800 Building is scheduled to come on-line represent a major step in that direction. With the completion of those projects, a fall 2013 and has had generous donations from the Peggy and Jack Baskin number of component elements were relocated to the new facilities. The spaces vacated by the relocation provide the opportunity to consolidate and centralize components of other core programs. Future facilities related projects will be Foundation. §§ The funds provided by Bond Measure D and related matching funds initiated a number of major projects, specifically: §§ §§ §§ on-line for spring 2014 classes. §§ §§ The 300 Building was renovated as a portion of the Measure D Bond funding. A portion of the 450 Building has been renovated as classrooms for use by BELA programs. The most significant challenge generated by Secondary Effects is the disposition Health & Wellness Center of the 200 Building. The building previously housed the Theater and Performing Student Affairs Center Arts programs. It is a 34,870 GSF building containing 18,353 ASF, which Visual and Performing Arts Complex translates to a utilization factor of 52.6% which is far below the 68.8% campus The completion of the projects allowed for the consolidation of the constituent programs for each center. For example: §§ A portion of the 600 Building is being remodeled and modernized for chemistry and biology laboratories. These spaces are scheduled to come geared to accomplishing this objective. Secondary Effects STEM, a 2011 Federal Title III grant funded the realignment and average. The existing HVAC System needs replacement. The Assignable Square Footage for this building is currently designated as inactive space. Arts related programs previously located in Building Nos. 200, 300, 350, & 450 have relocated to the VAPA Complex. §§ Health related programs previously located in Building Nos. 600, 1100, 1500, 1550 & 1600 have relocated to the Health & Wellness Center. §§ Student Services related programs previously located in Building Nos. 800, 900 & 1000 have relocated to the Student Activities Center. §§ Relocation of academic programs from The 400 & 700 Buildings will necessitate some realignment, as well as provide the opportunity to modernize classrooms and laboratories. // 9 Cabrillo College Facilities Master Plan // Overview & Existing Conditions Existing Conditions Transportation Most students drive to campus and the existing traffic patterns make it challenging to access the Aptos Campus and the Watsonville Center. Aptos Campus: The Aptos Campus is served directly by public transportation with two bus stops on each side of Soquel Avenue. Recent budget constraints have reduced the number of daily stops. Watsonville Center: The transit stop nearest to the Watsonville Center is located on East Lake Street approximately two blocks from the facility. Parking Aptos Campus: A number of parking lots are scattered throughout the campus, including two parking structures, one each at the East and West ends of the Hillside campus. As a general statement, there is a parking deficiency as a number of cars park roadside along the perimeter roads. Additionally, parking becomes more challenging for classes scheduled later in the day. Watsonville Center: There is an east-to-west corridor which allows for ease of travel and is identified on strategically placed kiosk and campus maps. There are sections of the upper campus that have not yet been addressed beginning at the west end of the quad through parking lot D and challenges exist when traversing north/south. Signage identifying accessible paths of travel is minimal and consideration should be given to expanding on that program so that they are clearly identified throughout the campus (see signage program below). As a general statement, restroom facilities that were constructed prior to 1990, Watsonville Center, being an urban site, has very limited parking. On-site parking are not fully compliant with current accessibility requirements. Over time, many of is limited to staff parking. There are two public parking lots located on Union these existing facilities have been refurbished in an attempt to meet the intent of Street which are within walking distance of the Watsonville facilities. the standards. Coupled with the aging condition of the plumbing infrastructure, and “wear and tear” of the existing finishes and fixtures, these facilities need Accessibility Aptos Campus: Given the hillside siting of the campus, accessible paths of travel present a to be renovated and in some cases reconfigured to meet all regulatory and accessibility requirements. Watsonville Center: challenge. There are numerous elevators throughout the campus to provide The Watsonville Center consists of relatively new facilities, having been renovated access to the various levels and grades. However, in some instances it is or constructed within the last ten years. There are no apparent accessibility necessary to take more than one elevator to arrive at a desired destination. issues related to this facility. // 10 Cabrillo College Facilities Master Plan // Overview & Existing Conditions Security and Safety Facility Conditions Burglar alarm systems are installed throughout the District. Video surveillance The Building Conditions Matrix, found in the Appendices of this Plan, provides systems are also in operation in some locations and additional systems have a general rating of facilities located on campus. The discussion that follows been identified on new construction. provides a narrative overview of the general conditions observed. Aptos Campus: The Aptos Campus has on-site security personnel. The campus security system Grounds & Approaches has been recently upgraded. Future campus modernization includes expansion Aptos Campus: of the security camera system, which was part of the 300 and 800 Building This campus is divided approximately in half by a major thoroughfare, Soquel projects. Consideration is being given to expanding the card access system. Avenue. Watsonville Center: The original campus is located on the Hillside to the North of Soquel Avenue. The The Watsonville Center does not have on-site security personnel. The college grade differentials make pedestrian and vehicular traffic challenging. A number recently entered into an agreement with the Watsonville Police Department to of elevators are placed around this area of the campus to accommodate vertical provide security services at the Watsonville center. The campus is equipped transportation, especially for the physically disabled. with security cameras, but could use additional equipment. Campus expansion, initiated in 1972, is located on the Oceanside to the South of Maintenance Soquel Avenue. The terrain on this side of the campus is much gentler and does not require elevators for the disabled to traverse the campus grounds. Maintenance & Operations maintains a Schedule of Critical Needs Maintenance, The campus landscaping is abundant and given the coastal environs is projected out 5 years, that prioritizes and quantifies a list of identified maintenance considered vibrant. There are a substantial number of mature trees, including issues. With the recent expansion of the Aptos Campus, routine maintenance is pine, redwood, eucalyptus and oak. The entire campus presents a pleasant and a significant challenge given the added square footage and budget constraints inviting environment. for Maintenance and Operations services. Watsonville Center: The Watsonville Center is in an urban setting being located across the street from the Watsonville Plaza, which, in turn is the approximate center of the commercial district. // 11 Cabrillo College Facilities Master Plan // Overview & Existing Conditions to predate the campus and a variety of modular structures that have been assembled at intermittent points in time. Watsonville Center: The Watsonville Center consists of three buildings. Two of these buildings, the Post Office and the Library, were remodeled to suit educational purposes. The third building is the new Solari Green Technology Center. All of these buildings have recently been refurbished or constructed and are constructed of durable materials which should require minimal maintenance for the foreseeable future. Buildings Interior Aptos Campus: Buildings Exterior Aptos Campus: The architectural vernacular for buildings constructed prior to 1972 consisted The buildings constructed prior to 1972 are in various states of condition. As classrooms and laboratories have been renovated or remodeled, they have been upgraded to accommodate the current technology. As funding allows, the remaining classrooms will be updated and modernized. of buildings that had pitched roofs and covered walkways, which for the most Watsonville Center: part encompass the entire building. Access to classrooms, laboratories, offices The Watsonville Center, being of relatively new construction or renovation, and other spaces was generally from the buildings exterior, thereby minimizing provides currently accepted technologies and serviceable interiors. the need for interior hallways. Finishes for these buildings were selected from durable materials requiring minimal maintenance and upkeep. In general, all building exteriors are in good, serviceable condition. The architectural vernacular for buildings constructed after 2005 is best described as early 21st century modern, which can be characterized as a random arrangement of simple geometric shapes. The siding of these buildings is metal cladding which is consistent with this style of building. It is important to note that the lower sections of the VAPA siding are cement panels that are Roofs Aptos Campus: The roofing systems of all of the buildings that predate 2000 have been replaced and are considered to be in good condition with an expected remaining life of at least 20 years. The buildings that post date 2000 are considered to be in good condition and are not expected to require any significant repair or replacement subject to vandalism and will require constant repair and/or replacement. There for the foreseeable future. are no covered walkways associated with the newer buildings. The exterior Watsonville Center: materials used for these buildings are durable and given their new construction should require minimal maintenance for the foreseeable future. The remaining structures on campus consist of two structures that appear Watsonville Center, being of relatively new construction or renovation have roofing systems that are in good condition and should require minimal routine maintenance for the foreseeable future. // 12 Cabrillo College Facilities Master Plan // Overview & Existing Conditions Mechanical Systems Aptos Campus: All buildings, campus-wide, are served by “stand-alone” Heating Ventilating and The Oceanside Buildings, with the exception of the 1100 Building and the VAPA Air Conditioning (HVAC) Systems; that is to say that the equipment is dedicated Complex, consist of “permanent” (non-modular) buildings that are, for the most to the building it serves. There is no allowance for redundancy or backup in the part, over forty years old and have had no major alteration from the original event of equipment failure. The Buildings that predate 2000 fall into two general system. It can be expected that, in the near term, these buildings will require categories, the Hillside Buildings (100-1100) and the Oceanside Buildings (1200– substantial upgrades, including equipment and controls replacement. 2600). The HVAC systems that serve Health & Wellness, Student Activities Center, The Hillside Buildings, not including the Health & Wellness Center, Student Horticulture and the VAPA Complex are all relatively new and have been Affairs Center and Horticulture, are for the most part over fifty years old. With designed for operating efficiency and can be expected to be serviceable for the the exception of the 200 & 1000 Buildings, all of these systems have had foreseeable future. relatively recent attention. These upgrades include repair, replacement and/or Watsonville Center: reconditioning including upgrades to system controls and are not expected to pose any significant capital expense for the foreseeable future. The 100 Building is set to receive a new, and greatly needed, heating system. Additionally the 900 Building is in need of a new system. The 200 Building requires replacement of the existing system and the 1000 Building has an aging chiller that is approaching the end of its useful life that will need attention in the near term. The HVAC system serving Building B (Post Office) consists of old units and needs replacing. The equipment serving Building A (Expansion) had major service two years ago and is in relatively good condition. The units serving Buildings C & D (Solari Green Technology Center) are new and can be expected to be serviceable for the foreseeable future. // 13 Cabrillo College Facilities Master Plan // Overview & Existing Conditions Electrical Systems Aptos Campus: There are no immediate concerns with the electrical systems as they are functional and serviceable. Transformers require routine inspection and servicing and need periodic replacement. The switchgear for the older buildings (pre 1972) is approaching an age where replacement parts will become problematic. For facilities that undergo a major upgrade, this equipment should be replaced as part of those projects. Watsonville Center: Watsonville Center: Other than routine maintenance, there are no major issues related to the The buildings are protected with an automatic fire sprinkler system as well as a electrical systems. monitored fire alarm system. Plumbing Systems Communication Aptos Campus: Aptos Campus: The plumbing infrastructure that serves buildings that predate 1972 is aging The communications system runs throughout the campus and is adequate. The and, in some instances, requires replacement, particularly wastewater piping. current system has the capacity to handle campus needs for the foreseeable Many of the valves controlling supply piping are no longer operable and require future. replacement. Watsonville Center: Signage and Way Finding Other than replacement of fixtures, there are no major issues related to plumbing Signage, campus-wide, requires updating to reflect new facilities as well as to at the Watsonville Center. comply with accessibility requirements. A comprehensive signage program should be developed that addresses: Fire Protection §§ location of emergency telephones, elevators, etc. Directories should also Aptos Campus: identify paths of travel that comply with the accessibility requirements of the Where required by code, buildings are protected with an automatic fire sprinkler American with Disabilities Act and Title 24 of the California Administrative system. The Measure D Bond funded in part, a campus-wide upgrade to the fire alarm Campus directories that identify not only building locations, but also the Code. §§ Building Signage that is uniform throughout the campus and clearly identifies system. This system, as it is now configured, is compartmentalized and not each building. A campus-wide building numbering system should be centrally monitored. developed as an element of the signage program. // 14 Cabrillo College Facilities Master Plan Information Technology The Information Technology Department manages the college’s network, data // Overview & Existing Conditions using proprietary Ad Astra v.6 software. The current operating system has been characterized as “running on outdated hardware with outdated software”. centers and Voice Over Internet Protocol (VOIP) including the infrastructures for An upgrade to v.7 on a new virtual server has been recommended to Aptos, Watsonville Center and Scotts Valley. This department is also responsible incorporate new functions and features that will enable the application to be for all associated hardware for all staff, faculty, classrooms and laboratories as the single definitive source for space utilization. well as the management of all Colleague and Softdocs. The primary beneficiaries of the upgrade are Instruction and CEED. Secondary The college recently completed the “Technology Plan & Program Review”, in beneficiaries include all other departments concerned with space utilization. Spring 2012, that was designed to align with the college’s planning process, The projected costs for the upgrade are: address accreditation standards and integrate with the college’s Facilities Plan. From an infrastructure perspective, the IT department has been heavily involved in many of the construction projects on campus. These projects include: §§ §§ §§ $15,000 (One time purchase) $14,000 (Annual Maintenance) $2,000 (After Hours IT staff to deploy) §§ Upgrades to the 300, 1200 and 1300 Buildings §§ Data Center consolidation §§ Watsonville GTC addition §§ 800 Building STEM redesign §§ 600 Building classroom upgrade This campus presently has the capacity to meet the 2025 space allocation for §§ 100 Building data center upgrade academic purposes. Future qualifications focus on additional space for AV/TV §§ Safety and Security Video Surveillance System and Merchandising space. The 2025 forecast identifies a number of functions Each of these projects significantly impacts the College Network and delivers substantial value to the college. In some instances hardware and equipment upgrades have also been included. Allowances for continuing to upgrade the Physical Capacities Aptos Campus: that exceed Title 5 Allowances, and could potentially be realigned to fulfill future requirements. Additionally, The 200 Building presently accounts for 18,353 ASF of Inactive Space, providing an opportunity to accommodate future needs. Information Technology for the college should be included in the funding of all Watsonville Center: future capital improvement projects. The campus presently has the capacity to meet the 2025 space allocation for academic purposes. The Space Allocation Forecast identifies qualifications for Facilities Scheduling space in the following categories: The college is currently operating at near academic capacity. It is important to classroom and laboratory usage. §§ §§ §§ §§ §§ Utilization of instructional and non-instructional space is currently scheduled Although the college may qualify for space in a particular category based on clarify that the college does report a surplus of overall space for the campus. However, the specific categories of classroom and laboratory are reporting a very minimal amount of surplus space thus requiring diligent scheduling of Office/Conference Library Physical Education (Indoor) AV/TV Assembly/Exhibition // 15 Cabrillo College Facilities Master Plan // Overview & Existing Conditions the California Code of Regulations, Title 5, it is up to the college to determine The 2013 Space Inventory identifies a total of 27,885 ASF of Inactive Space, if there is in fact a need for space in that particular category. The same space which is itemized as follows: allocation formulas are utilized across the California Community College system and because each campus is unique, it is essential that each college evaluate the actual need for space by taking into consideration both the quantitative and qualitative information available. There may be space categories where the college shows a qualification for space but there may not be a need to build space in that specific category. 200 Building 18,533 ASF 350 Building 1,675 ASF Alteration/Conversion 600 Building 3,757 ASF Alteration/Conversion S.A.C. 3,320 ASF Inactive 1600 Building 798 ASF Inactive Alteration/Conversion 27,885 ASF Facilities Utilization Facilities Utilization is a measure of the Assignable Square Footage (ASF) as a percentage of Gross Square Footage (GSF). The fundamental purpose is to provide an oversight measure to ensure that the space being utilized for the direct benefit of the educational process falls within accepted norms. The campus-wide average for Aptos is 68.8%. The average for Watsonville Center is 69.5% Refer to the Building Utilization Matrices, Tables BUS-1 through BUS-5 (Appendices pgs. 25-28), for a detailed breakdown relative to facilities utilization. Inactive Spaces Inactive Spaces fall into 2 categories: §§ Inactive Space is space for which there is no presently planned use or purpose. §§ Alteration/Conversion Space is space for which there is a planned use or purpose and designated for renovation/modernization. Generally, these spaces await funding sources. // 16 Cabrillo College Facilities Master Plan // Master Plan Recommendations Master Plan Recommendations Overview Goals & Objectives Future capital projects for the campus should focus on servicing and maintaining The Facilities Master Plan for Cabrillo College presents an overall vision of the the infrastructure, modernizing classroom and laboratory spaces and expanding future developed campus through the year 2025. The final design for each project on technological improvements. The primary objective is to strengthen Aptos, will occur as projects are funded and detailed programming and design occurs. Watsonville & Scotts Valley with the underlying concern for the renovation and The Recommended Master Plan addresses the primary goals identified during the maintenance of existing structures. planning process. Aptos Campus In accordance with the findings of the 2013 Educational Master Plan, the Aptos Campus is well positioned to meet the facility needs for academic spaces (classrooms and laboratories) for the foreseeable future. The Space Allocation Forecast (Tbl. SAF-1, Appendices pg. 43) indicates the only significant qualification for space is in the category of AV/TV. This function can easily be absorbed by the reassignment and reconfiguration of surplus spaces. §§ Renovate or modernize aging facilities to address current educational needs and technological advances §§ §§ Address and resolve deferred maintenance issues Provide additional instructional and support spaces identified in the 2013 Educational Master Plan §§ §§ §§ Provide safe and accessible vehicular and pedestrian paths of travel Develop a preventative maintenance program Consider the 2013 Facility Master Plan to be a “living document” by annually updating relevant data and reflecting facility and maintenance modifications on The Forecast also indicates surplus space in a number of areas, the most notable campus of which is the 27,885 ASF of Inactive Space. The majority (18,353 ASF) of this space is generated by the relocation of the 200 Building functions. 6,212 ASF of this space has been designated as Alteration/Conversion and identified for future Design Criteria modernization. The design of all new structures and renovation of existing structures should: Watsonville Center §§ §§ additional space to the Watsonville Center as it currently has the space it needs to offer the projected program of instruction through the year 2025. Respond to criteria for Leadership in Energy and Environmental Design (LEED) with respect to building design, energy conservation and renewable materials of As with the Aptos Campus, the Watsonville Center is well positioned to meet the facility needs for academic spaces. At this time there are no plans to add any Respect the existing architectural vernacular construction §§ Demonstrate an understanding and respect for the limited resources the college has available for the maintenance of their facilities (The more complex the design, the more difficult to maintain; therefore the less likely it will be preserved it in a suitable state) // 17 Cabrillo College Facilities Master Plan // Master Plan Recommendations Planning/Design/Construction Process From inception, and depending on the funding source(s), it can be reasonably expected to take from 5 to 7 years to bring a new building on-line and ready for occupancy. Once the “need” has been identified, the process proceeds as follows: §§ §§ §§ Project scope development Submittal of Initial Project Proposal (IPP) to State Chancellor’s Office Upon acceptance, the project design process begins, including Project Program, Concept Design, Concept Scheduling and Cost Estimating §§ §§ §§ Submittal of Final Project Proposal (FPP) to State Chancellor’s Office Upon approval, Construction Contract Documents are Completed Completed Construction Contract Documents are submitted to the Division of the State Architect (DSA) for document review and approval §§ §§ Bids are solicited for project construction At completion of construction, project is closed out and turned over for occupancy Maintenance The College currently has a “Summary of 2014 - 2015 Scheduled Maintenance” on file in the FUSION Database maintained by the State Chancellor’s Office. This schedule consists of 16 line item maintenance needs for a total of $3,553,569. In addition, Maintenance & Operations has developed a Schedule of Critical Needs Maintenance which is a dynamic document that presents a more comprehensive analysis of ongoing and deferred maintenance needs which should be addressed over a five year period. At this point in time the estimated cost of Critical Maintenance Items is $12,555,350. Refer to Table M-1 (Appendices pg. 46) for a summary of this schedule. The Summary of 2014 - 2015 Scheduled Maintenance is included in the Schedule of Critical Needs Maintenance. // 18 Cabrillo College Facilities Master Plan // Master Plan Recommendations Secondary Effects Health & Wellness Modernization The spaces vacated as the result of the Health & Wellness and Visual and A number of spaces vacated as the result of the Health & Wellness Center Performing Arts projects provide the opportunity to create clusters for the other consolidation require renovation and/or modernization. These projects have core educational programs. The 2009 Space Allocation Concept serves as the been consolidated under the title of Health & Wellness Modernization Project, established guideline for any such realignment. Secondarily, the realignment will and included in the 5 Year Plan. The Initial Project Proposal (IPP) for this project provide the opportunity to upgrade and modernize educational spaces. has been approved by the State Chancellor’s Office and awaits approval Portions of the realignment have either been implemented, or are in progress. of the Final Project Proposal (FPP). This project will modernize classrooms, For example: §§ §§ §§ laboratories, offices and support spaces in portions of the following buildings: 500 Building Building 300 was renovated as an element of the 5 Year Plan. 5,529 ASF (42% of 500 Building ASF) STEM grant to renovate and upgrade Building 800, scheduled to come on- 1500 Building 1,692 ASF (14% of 1500 Building ASF) line for fall 2013 classes. 1550 Building 1,600 ASF (103% of 1550 Building ASF) Renovation and upgrade of a portion of Building 600, scheduled to come on- 1600 Building 1,016 ASF (23% of 1600 Building ASF) 9,358 ASF line for spring 2014 classes. It is recommended that the college develop a prioritized list of secondary effects Each project segment affects only a portion of the respective buildings. Two projects for the campus. These future projects will advance the goals and critical elements must be considered during construction activities: objectives of this plan. §§ Funding §§ Utilization of some of the affected spaces may require temporary relocation of current users Going forward, a substantial number of the capital improvement and maintenance projects discussed require, yet unidentified, funding sources. In addition to seeking the more traditional Federal and State grants, private sources should be seriously explored and considered, such as: §§ §§ §§ Public-Private partnerships Charitable Trusts and Foundations Alumni Gift Giving, including Estate Planning Construction activities, must be planned in such a manner that it will have minimal effect for the remaining spaces, including: »» »» Temporary measures to accommodate building access Scheduling of utility shutdowns By inspection, it would appear that the most logical approach for implementation is to treat the projects as two distinct areas; the 500 Building being one area and the conglomeration of the 1500, 1550 and 1600 Buildings being the other area. By using this approach, the two areas could be constructed either concurrently or sequentially. The determining factor is the requirement for, and the availability of, swing space to accommodate the temporary relocations. The 500 Building has a total of 5,529 ASF while the combination of the 1500, 1550 and 1600 Buildings has a total of 4,308 ASF. // 19 Cabrillo College Facilities Master Plan // Master Plan Recommendations Miscellaneous Projects Opinion of Probable Costs There are other spaces that have been identified for realignment and modernization. The following breakdown presents a preliminary estimate of the probable costs These projects require funding sources to implement them. associated with projects described above. These estimates are based on broad, 200 Building: The existing 18,353 ASF in 200 Building is presently designated as Inactive Space. general assumptions and will be affected by the development of detailed needs assessments. It currently provides swing space for the 800 Building (Stem Grant) renovation, and State Requested Scheduled Maintenance $3,553,000 would logically continue to provide temporary classroom space as needed. There All Other Critical Needs Maintenance $9,000,000 is no planned long term use for the former Theater and Performing Arts Building. Health & Wellness Modernization $3,590,000 It requires realignment, modernization and HVAC replacement. The 200 Building 200 Building Renovation $7,000,000 is 34,870 GSF in size, and in a reconfigured state, utilizing a 65% utilization factor, 350 Building Renovation $250,000 would provide 22,665 ASF. 400 Building Realignment and Upgrade $625,000 700 Building Realignment and Upgrade $675,000 350 Building: The Southwest quadrant (1,657 ASF) of this building requires realignment and modernization for use as classroom space for the BELA program. This project is a high priority for the college, but requires a funding source for implementation. The west half of the 350 Building (3,028 ASF) is currently leased to the County for their $24,693,400 It should be noted that in this breakdown, the sum of the Scheduled Maintenance funding request and Critical Needs Maintenance equals $12,553,600, which approximates the total estimate of $12,555,350 for total maintenance needs. OASIS program. At some point in time, it may be desirable to relocate that program and use the space for additional classroom space for the BELA program. 400 Building: It is recommended that this building be realigned to eliminate small, inefficient spaces as well as modernize the classrooms. 700 Building: It is recommended that this building be realigned to provide additional classroom and office space as well as modernize the classrooms. The spaces in consideration represent a laboratory (450 ASF) and offices (150 ASF). In addition to the above projects, it is recommended to continue the protocol of upgrading and modernizing classroom and laboratories as “Smart” facilities. // 20 Cabrillo College Facilities Master Plan // Master Plan Recommendations Phasing Plan At this point, the requirement to implement projects in phases does not appear to The Health & Wellness Modernization Project, described above, is potentially the be a critical issue. most complex. The discussion above describes but one strategic approach to Future facility capital improvement projects depend on funding sources. As funds implement the project. become available, projects can be scheduled, coordinated and implemented. The other projects, described in the Miscellaneous Projects discussion above, are Issues relative to phasing will be determined by the following: more of a “stand-alone” category, and phasing or sequencing should not be a §§ significant issue. The need for the project. Projects of an urgent or critical need receive the highest priority. §§ Sequencing. For projects involving multiple spaces or buildings, construction activities should follow a logical sequence of events that will support timely completion and minimal disruption. §§ The timing and scheduling of the project. To the greatest extent possible, construction activities causing the most disruption, should be timed or scheduled during periods in which there is the least campus activity (i.e. between academic periods) §§ The impact of the project relative to adjacent functions or operations. §§ Requirements relative to temporary relocation of ongoing activities. // 21 Cabrillo College Facilities Master Plan // Systems & Controls Systems & Controls Total Cost of Ownership Objectives A systematic, college-wide approach for all planning and budgeting activities The objectives to be achieved by implementation of the Total Cost of Ownership should be implemented as part of a comprehensive master planning process. are: The college uses a protocol of on-going assessment of all current functions §§ and activities as well as assessing future programs, services and facilities. To enhance the strength of the integrated planning process and the allocation of college facilities. §§ resources, a Total Cost of Ownership model may be included to add a critical dimension to the proactive planning and budgeting process. Establish a systematic procedure for the evaluation of existing and proposed Develop a process for the evaluation of facilities that can be integrated into an overall program. §§ Develop a procedure for the assessment of existing and proposed facilities that utilizes existing data from college archives as well as information from the Definition Total Cost of Ownership (TCO), as used for college facilities, is defined as the California Community College Chancellor’s Office. §§ current state reporting systems, such as Facilities Utilization Space Inventory systematic quantification of all costs generated over the useful lifespan of the facility. Typically this will encompass a life span of 30–50 years. The purpose of the TCO is to determine a value that will accurately reflect the true, effective cost of the facility including planning, design, constructing and equipping the facility. Also included are the recurring costs of facility operation, including staffing, institutional support services, replaceable equipment supplies, maintenance, Ensure that the database developed for the procedure is compatible with Option Net (FUSION). §§ Develop the prototype system in a manner that allows the college to routinely update the information in the system and add additional data elements that may be needed as part of the institutional planning & budgeting process. custodial services, technological services, utilities and related routine operating Format expenses for the facility. Table TCO-1 (Appendices pg. 48), Total Cost of Ownership Model in the Appendices, puts forth an example of a suggested template to be utilized in Purpose To implement the TCO process, the District must establish a standardized procedure for determining the Total Cost of Ownership for existing facilities as well as for future construction, remodeling or renovation projects. This process may also be considered for satellite facilities. The purpose of the TCO is to provide an institutionally agreed upon, systematic procedure by which each existing facility in the District is evaluated. At the same time it is essential to establish a quantitative database that will assist the the assessment of a facility project, either new construction or renovation. Costs itemized in the analysis are derived from the general operating fund for the District from the prior fiscal year. It should be noted that a pro-rata share of costs associated with major infrastructure projects should be allocated to any given analysis. Table TCO-2 (Appendices pg. 49), Total Cost of Ownership Procedure – Fiscal Analysis in the Appendices, provides a template to fold in on-going fixed costs to the evaluation process. college in determining the viability of existing facilities as well as the feasibility of constructing, remodeling or renovating future facilities. // 22 Cabrillo College Facilities Master Plan // Appendices Appendices Plans Aptos Campus Plan // 23 Cabrillo College Facilities Master Plan // Appendices Watsonville Center Site Plan // 24 Cabrillo College Facilities Master Plan // Appendices Tables BUS-1: Building Utilization Summary, Aptos Campus (Hillside) // 25 Cabrillo College Facilities Master Plan // Appendices BUS-2: Building Utilization Summary, Aptos Campus (Oceanside) // 26 Cabrillo College Facilities Master Plan // Appendices BUS-3: Building Utilization Summary, Miscellaneous // 27 Cabrillo College Facilities Master Plan // Appendices BUS-4: Building Utilization Summary, Recap BUS-5: Building Utilization Summary, Watsonville Center // 28 Cabrillo College Facilities Master Plan // Appendices BCM-1: Buildings Condition Matrix, Aptos Campus (Hillside), Buildings 100 - Health & Wellness // 29 Cabrillo College Facilities Master Plan // Appendices BCM-2: Buildings Condition Matrix, Aptos Campus (Oceanside & Hillside), Buildings 1100 - VAPA // 30 Cabrillo College Facilities Master Plan // Appendices BCM-3: Buildings Condition Matrix, Aptos Campus (Miscellaneous), Buildings 2000 - Foundry BCM-4: Buildings Condition Matrix, Watsonville Center, Buildings Post Office - Building D // 31 Cabrillo College Facilities Master Plan // Appendices SAS-1: Space Allocation Summary, Aptos Campus (Hillside), Buildings 100 - 450 // 32 Cabrillo College Facilities Master Plan // Appendices SAS-2: Space Allocation Summary, Aptos Campus (Hillside), Buildings 500 - 1000 // 33 Cabrillo College Facilities Master Plan // Appendices SAS-3: Space Allocation Summary, Aptos Campus (Hillside), Buildings SAC - 5300 // 34 Cabrillo College Facilities Master Plan // Appendices SAS-4: Space Allocation Summary, Aptos Campus (Hillside), Buildings 5510 - 5560 // 35 Cabrillo College Facilities Master Plan // Appendices SAS-5: Space Allocation Summary, Aptos Campus (Oceanside), Buildings 1100 - 1300 // 36 Cabrillo College Facilities Master Plan // Appendices SAS-6: Space Allocation Summary, Aptos Campus (Oceanside), Buildings 1400 - 1800 // 37 Cabrillo College Facilities Master Plan // Appendices SAS-7: Space Allocation Summary, Aptos Campus (Oceanside), Buildings 2100 - VAPA // 38 Cabrillo College Facilities Master Plan // Appendices SAS-8: Space Allocation Summary, Aptos Campus (Miscellaneous), Buildings 200 - 2800 // 39 Cabrillo College Facilities Master Plan // Appendices SAS-9: Space Allocation Summary, Aptos Campus (Miscellaneous), Buildings Concession - Maintenance // 40 Cabrillo College Facilities Master Plan // Appendices SAS-10: Space Allocation Summary, Aptos Campus (Miscellaneous), Buildings Grounds - Foundry // 41 Cabrillo College Facilities Master Plan // Appendices SAS-11: Space Allocation Summary, Watsonville Center // 42 Cabrillo College Facilities Master Plan // Appendices SAF-1: Space Allocation Forecast, Aptos Campus // 43 Cabrillo College Facilities Master Plan // Appendices SAF-2: Space Allocation Forecast, Watsonville Center // 44 Cabrillo College Facilities Master Plan // Appendices SAF-3: Academic Space Allocation Forecast // 45 Cabrillo College Facilities Master Plan M-1: Critical Maintenance Schedule // Appendices Legend CC Cabrillo College WC Watsonville Center // 46 Cabrillo College Facilities Master Plan // Appendices TCO-1: Total Cost of Ownership Model // 47 Cabrillo College Facilities Master Plan // Appendices TCO-2: Total Cost of Ownership Procedure - Fiscal Analysis // 48 Cabrillo College Facilities Master Plan // Appendices Terminology The following definitions are intended to describe terms as they apply to the content of this document: A design and oversight of construction inspection. ADA DSPS Americans with Disabilities Act Disabled Student Programs and Services AFS E Automatic Fire Sprinkler ASF Educational Master Plan The portion of the college’s Master Plan that defines the educational goals of the college. Assignable Square Feet. ASF is a quantification of space directly attributable to the educational process. EMP Accessibility F The ability to provide barrier-free access to persons with disabilities. Educational Master Plan B FMP BELA FPP Business, English and Language Arts Final Project Proposal. Document that identifies the project justification, final scope and estimated costs of all acquisitions, plus all infrastructure, facility and systems costs. C CEED Facilities Master Plan G Career Education & Economic Development GSF D Gross Square Feet DSA Division of the State Architect. This is the regulatory agency for the approval of building // 49 Cabrillo College Facilities Master Plan // Appendices H P HASS Path of Travel Human Arts and Social Science The route a person would normally take to get from one point to another. It’s relevance to facility planning is most commonly used to address accessibility issues. HAWK Health, Athletics, Wellness and Kinesiology Program I Educational course of instruction. IPP Initial Project Proposal L Program Document A published document that establishes the purpose, goals, objectives and baseline criteria used in the design process. LEED Project Program Leadership in Energy and Environmental Design Same as a Program Document M R Maintainability Relocatable Modular Building The ability to preserve a facility in a serviceable, usable condition, free from failure or defect. Relocatable Modular Buildings are DSA pre-approved structures, which are intended to be temporary in nature. These structures are 24’ x 40’ modules that can be constructed as a stand-alone building or joined to provide a more spacious facility. Modernization Facility modification to update functional features to meet contemporary standards. N NAS Renovation Facility modification to refurbish the fit and finish of the space. Realignment Rearrangement or reorganization of the functional utilization of a space. Natural & Applied Science // 50 Cabrillo College Facilities Master Plan S // Appendices W Wayfinding STEM Science, Technology, Engineering and Mathematics Sustainability The act of providing a cohesive and comprehensive signage program that directs a person from any given point to a desired destination. The critical feature of this program is to clearly describe the accessible path of travel for disabled persons. 1. Utilization of products and materials that are considered to be renewable resources. 2. Utilization of an energy source that is generated by means of renewable resources, such as solar, wind or hydroelectricity. Swing Space Space that is utilized for the temporary relocation of classrooms, labs and offices that have been displaced due to construction activities. Space Inventory Annual facility survey to establish an inventory of Assignable Square Feet for the campus. T TCO Total Cost of Ownership V VAPA Visual and Performing Arts // 51 Cabrillo College Facilities Master Plan // Appendices Source Material Information collected in compiling the data cited in this Plan was gathered from the following sources: §§ §§ §§ §§ §§ Cabrillo College 2009 Space Allocation Concept Cabrillo College 2013 Educational Master Plan Cabrillo College 2013 Space Inventory Cabrillo College Five Year Plan Cabrillo College 2012 Technology Plan & Program Review Acknowledgements Cabrillo College »» »» »» »» »» John Hendrickson, Interim Superintendent & President Victoria Lewis, Vice President of Administrative Services Kathie Welch, Vice President of Instruction David Bailey-Fougnier, Vice President of Student Services Joe Nugent, Director, Facilities, Planning & Plant Operations MAAS Companies Inc. »» »» »» »» Steven Hubbard Jeff Kellogg Bo Ralston Lori O’Keefe // 52