} THE RIGHT PRODUCT } The RIGHT QUALITY } The RIGHT QUANTITY } THE RIGHT TIME } THE RIGHT PRICE } } CPD responsible for procurement but will relies on client ministries to provide detailed specifications, terms of reference, scope of works, etc… Critical to ensuring that the right product is procured For Example: procurement of gabion baskets: - Dimensions: 3’W x 3’H x 6’L - Steel with zinc coating - 2 cells per basket - To be supplied with lacing wire } Importance of wellprepared cost estimates used to: ◦ Estimate quantities ◦ Determine qualification criteria, bid security, etc. ◦ Determine the procurement method which influences the TIME Expenditure Contract Value Procurement Category (Thresholds) US$ thousands Method >1,500 ICB 150 – 1,500 NCB All st 1 three <150 Shopping None Regardless of value Direct Contracting All >150 25-150 ICB NCB All 1st three <25 Regardless of value Shopping Direct Contracting None All Works Goods Consulting Services Firms Individuals >100 Contracts Subject to Prior Review QCBS, QBS, FBS, All LCS st ≤100 QCBS, QBS, FBS, 1 three LCS, and CQS Regardless of value Single Source All Regardless of value Comparison of 3 CVs TORs by TTL PRETENDER ACTIVITIES 1-4 weeks NoObjection to contract award 2 weeks Contract Signature 4-6 weeks Bid document 1-2 weeks BID EVALUATION & LOCAL APPROVAL 6-8 weeks 4.SUPER VISION WB NoObjection Call for Bids 2 weeks 1 week Bid Opening PRE-BID MEETING BIDDERS’ QUERIES 4-6 weeks Delivery } Completion of the Bid Document: ◦ Site investigations and completion of Engineer’s Report ◦ Drawings ◦ Preparation of Specifications ◦ Preparation of bills of quantities (also priced) Determination of bid security Post-qualification criteria - E.g. minimum annual average turnover and previous experience } Preparation of: ◦ Engineer’s Report/designs/drawings/BoQs ◦ Terms of Reference/deliverables/supervision arrangements ◦ Technical specifications for goods ◦ Preparation of cost estimate CALL FOR BIDS / BID OPENING } Pre-tender meeting } Addressing bidders’ queries in a timely manner } CLIENT MINISTRY: ◦ Confirm technical responsiveness } CENTRAL PLANNING DIVISION ◦ Prepare evaluation report ◦ Secure CSTB approval & WB no-objection ◦ Contract award } Client Ministry: ◦ Prompt certification of payments to contractors, suppliers and consultants ◦ Contract monitoring ……to ensure the RIGHT PRODUCT is delivered at the RIGHT QUALITY at the RIGHT TIME } Central Planning Division ◦ Prompt payments ◦ Contract monitoring Important aspect of Project Cycle Management } Care thought to procurement planning due to time factor } Consensus on deadlines } Awareness of what is required at each stage } Bank CPD client MINISTRI ES RDVRP All parts have to work together to ensure successful implementation Importance of TIMELY & EFFECTIVE COMMUNICATION between the CPD and the Client Ministry