UVIS TEAM MEETING OPERATIONS UPDATE 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 1 Instrument Status • On/Off Cycle: 29. – No change • Hours On: ~116,500 hours. – Longest continuous operations: 9/11/2007 – 11/1/2010 • HDAC Filament Modulation: – – – – Filament 1: 308 hours (H cell), 148 hours (D cell). Filament 2: 12 hours both H cell and D cell. Last: In S82 during T97 (H cell). Next: • In S82 during T98 (H cell). • In S83 during T100 and T101 (H cell) 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 2 Significant Data Issues S79 UVIS_191SA_SREGMOVI001_VIMS DSN problem. Data good after 158T21:41:03 S79 UVIS_194SW_IPHSURVEY012_RIDER UVIS_194SA_EUVFUV002_PRIME DSN problem. 5 steps lost out of 46 steps S80 UVIS_197SW_IPHSURVEY014_RIDER UVIS_197RI_FMOVIE002_ISS Heavy rain. Data good after 258T14:26:30 S81 UVIS_199RI_SPOKEMOV002_ISS DSN problem. Data missing from 315T05:05:00 to 315T12:10 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 3 First Time Events • Not really a first time event: SteFFl calibration – UVIS_196IC_SPICARAST001_PRIME (2013/230) • also includes a regular calibration • Also includes an HDAC FOV scan along the X-axis (rotation around Z) 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 4 Rbot: Workload Impact • The impact of Rbot on the ops team workload has been VERY light: – S81: 0 out of 1 design – S82: 0 out of 8 designs – S83: 0 out of 25 designs 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 5 Major Local Issues • Uplink side: None • Downlink side: None 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 6 S78 Data Utilization Summary 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 7 S79 Data Utilization Summary 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 8 XXM Data Utilization Summary (up to S79) 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 9 S80 to S83 Data Utilization • Estimated unused allocation (after the fact SP numbers are about 1% higher) – S80: 4% – S81: 5% – S82: 8% – S83: 7% • Sponge bit in S82: Used to increase the spectral resolution in – UVIS_201RI_SP90L70S022_CIRS – UVIS_201RI_PROPRETRG001_ISS – UVIS_201RI_SHDSCANU001_VIMS 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 10 OPS Team Status • Darren is full time – QuikScat, Ops group interface with IT and OpsSw group, MMS and UVIS • Crystal is back at 100% since 11/1 – UVIS and Kepler • Alain is part time (75%) – UVIS, QuikScat and OASIS software 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 11 Notes and Reminders • The list of ring occultations that contain an atmospheric occultation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf • The list of all the tour calibrations is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf • The UVIS PEFs are on the team web site at http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/ 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE 12