Instrument Status
• On/Off Cycle: 29.
– Off in S75 for 10 days (10/19/12 -10/29/12) for PG Test
• Hours On: ~108,000 hours.
– Longest continuous operations: 9/11/2007 – 11/1/2010.
• HDAC Filament Modulation:
–
–
–
–
Filament 1: 227 hours (H cell), 143 (D cell).
Filament 2: 12 hours both H cell and D cell
Last: In S76 during T88 (H cell and D cell).
Next: In S78 during T90 (H cell).
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
2
Significant Data Issues
S74
UVIS_168RI_SPOKEMOV001_ISS
UVIS_168RI_FMOVIE001_ISS
“DSS 14 going to brake”. Up to 40%
data lost
S74
UVIS_168SA_AURSLEW006_PRIME
Rain at DSS 43. About 90% lost on a
36 hours observation
S74
UVIS_168SA_AURSLEW003_PRIME
DSN problem. About 40% data lost. All
in the scan portion of the observation
S74
UVIS_170SW_IPHSURVEY012_RIDER – 100% data lost
UVIS_170SA_EUVFUV002_PRIME - 100 % data lost
UVIS_170SA_COMPSIT003_CIRS - partial lost
DSS 14 problem
S75
UVIS_172TI_FIRLMBT001_CIRS - 60% data lost
UVIS_172TI_FIRLMBAER002_CIRS - 100% data lost
UVIS_172TI_FIRLMBINT002_CIRS - 100% data lost
UVIS_172TI_EUVFUV002_PRIME - 90% data lost
UVIS_172TI_FIRNADCMP002_CIRS - 10% data lost
DSS 43 & 63 (rain and “glitches”). T86
S75
UVIS_173ST_URALPVIR001_PIE
DSS 45 issue. 10% data lost. All over
the place.
S76
UVIS_176SA_AURSLEW003_PRIME
DSN problem. About 60% data lost
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
3
Other Data Issue
• UVIS_169DI_ICYEXO001_PIE
– Reported by Miodrag
– Unusual HSP high count (> 2300 per 2
mllsec vs 200 expected)
– Consistent with housekeeping HSP TMrate
monitor (700 vs 250 expected)
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
4
First Time Events
• No First Time Event
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
5
Rbot: Workload Impact
• The impact of Rbot on the ops team
workload has been light:
– S76: 0 out of 16 designs
– S77: 2 out of 11 designs
• UVIS_184SA_AURSLEW001_PRIME
– 68 deg rotation for the last scan
• UVIS_184SA_AURSLEW002_PRIME
– 30 deg rotation
– S78: 1 out of 29 designs
• UVIS_189MI_ICYLON001_PRIME
– 38 deg rotation
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
6
Major Local Issues
• Uplink side: None
• Downlink side: E15 data processing issue
– See next presentation
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
7
XM Data Utilization Summary
S72
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
8
XM Data Utilization Summary
S73
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
9
XM Data Utilization
Summary
S74
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
10
XM Data Utilization
Summary
S75
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
11
OPS Team Status
• Darren is a dad
– Primary responsibility is QuikScat
• Crystal is a mom
– Back at work beginning February at 50% (some
on Kepler)
• Alain will go part time (75%) probably in April
– Back on the QuikScat rotation
– A lot of work on the OASIS software
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
12
Liam James
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
13
Notes and Reminders
• The list of ring occultations that contain an atmospheric
occultation is on the team web site at
http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf
• The list of all the tour calibrations is on the team web site at
http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf
• The UVIS PEFs are on the team web site at
http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/
01/07/13
UVIS TEAM MEETING OPERATIONS UPDATE
14
Download