UVIS TEAM MEETING OPERATIONS UPDATE 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 1 Instrument Status • On/Off Cycle: 28. – None since last meeting. • Hours On: ~94,500 hours. – Longest continuous operations: 9/11/2007 – 11/1/2010. • HDAC Filament Modulation: – – – – Filament 1: 141.28 hours (H cell), 117.28 (D cell). Filament 2: 12.22 hours both H cell and D cell Last: In S68 during T77 (H cell and D cell). Next: In S70 during T78 (H cell and D cell). 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 2 Significant Data Issues S66 UVIS_145SA_COMPSIT006_CIRS Data return: 56% - DSS14 problem S67 UVIS_146SA_EUVFUV003_PRIME Data return: 72% - Station problem S68 No significant data issue except for some IPHSURVEY As of last week 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 3 First Time Events • No First Time Event • Upcoming: The XXM opmode starting S71. – UVIS opmode are now • • • • • 06/27/11 OFF SLEEP (6.6 W) DOWNLINK (new, 7.1 W) NO_HDAC (new, 9.4 W) ON (14.6 W) UVIS TEAM MEETING OPERATIONS UPDATE 4 Rbot: Workload Impact • The impact of Rbot on the ops team workload is highly variable: – S68: 0 out of 10 designs – S69: 1 out of 14 designs – S70: 0 out of 19 designs – S71: Don’t know yet. • The up-front job done by SP and the lowering of the keep-out values (to +/300 rpm starting S67) helps a lot. 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 5 Major Local Issues • Uplink side: None • Downlink side: – Problem processing large files generated by long (32 hours) system scans. • We have a workaround 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 6 XM Data Utilization Summary S64 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 7 XM Data Utilization Summary S65 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 8 Action Items from Last Meeting 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 9 Action Item #1: E15 Setup 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 10 Action Item #1: E15 Setup • We have the same geometry in s69 doy 213 (Rhea occultation) – First taking one full detector image – Then taking data with best guess 2 6pixels window around the stars – Data should on the ground doy 214 late or doy 217 early am. – S70 IEBs are due doy 217 – Gives us an opportunity to tweak the setup. 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 11 Action Item #2: Spectral Resolution in Aurora Scan • Issue: The spectral binning is 32 when we scan for UVIS (rate is 0.06 mllrd/s. Integration time is 8 sec. Wayne wants no spatial binning) • If the Z axis is perpendicular to the equator (scan W-E) we generally can limit the spatial window to cover the +/55 deg lat to limb region. 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 12 Action Item #2: Spectral Resolution in Aurora Scan • If the Z axis is parallel to the equator (scan N-S) it is generally not possible to reduce the spatial window size unless we design the pointing with multiple overlapping scans. – More complex design – Issue with scan duration – We have not try that yet. 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 13 Action Item #3: HSP maintenance • At Bill’s request we are now turning on the HSP HVPS for 24 hours every 3 months or so (if dark sky pointing available) – S67 – doy 113 – S68 - doy 182 – S69 - doy 240 – S70 - scheduled for doy 318 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 14 Notes and Reminders • Use UVIS_SOLAR_OFF to Sun in CIMS for all solar occultation instead of ISS_NAC to Sun (-20.0, 0.0, -0.11 deg) offset. • Before requesting sponge bits let us know what you want as we may have a good understanding of instrument SSR loading. • The list of ring occultations that contain an atmospheric occultation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf • The list of all the tour calibrations is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/UVIS_Tour_Calibration.pdf • The UVIS PEFs are on the team web site at http://lasp.colorado.edu/cassini/team-site/operations_planning/planning_info/ 06/27/11 UVIS TEAM MEETING OPERATIONS UPDATE 15