UVIS TEAM MEETING OPERATIONS UPDATE 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE Instrument Status • On/Off Cycle: 27 – No change since last meeting • Hours On: ~77,500 hours – Continuous operations since 9/11/2007 – Longest continuous operations was from 1/15/2005 (probe relay) to 9/11/2007 (S/C safing) • HDAC Filament Modulation: – Filament 1: 100.28 hours – Filament 2: 12.22 hours – Last: 2006/255 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE AI from last meeting #1 • Can we run HSP at 0.5 mlls? • Closed (1/16/09) • The answer is NO: – As documented in logic design document. – As tested on the EM. 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE AI from last meeting #2 • Off axis Titan occultation under RCS • Closed (1/27/09) – Unfortunately I put the offset on the wrong axis in my email to Bob • Proposed pointing and instrument setup – UVIS_FUV to star with (-1.375, 0.0,0.0) offset – HDAC.ON=NO, HSP.ON=NO, FUV.ON=YES, FUV.COMP=SQRT9, FUV.INT=1.75, FUV.SLIT=OCCULT, FUV.N_OF_WIN=1, FUV.WIN1=1,1024,1,54,58,1, EUV.ON=YES, EUV.COMP=SQRT9, EUV.INT=5.0, EUV.OCCULT=CLOSE, EUV.SLIT=OCCULT, EUV.N_OF_WIN=1, EUV.WIN1=1,1024,1,55,59,1 – We have a test of this configuration scheduled in S54 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE Significant Issues 6/8/09 S47 UVIS_102RI_ALPARAOCC001_VIMS UVIS_102RI_VENCUNMP001_CIRS Data loss due to weather S48 Sequence de-activated during thruster branch swap activity (071T02:10 to 077T03:05) No data during this period S49 UVIS_109TI_FIRNADCMP001_CIRS UVIS_110SW_IPHSURVEY002_RIDER UVIS_110EN_ICYATM00 & UVIS_110SW_IPHSURVEY003_RIDER Data loss due DSS 14 red S50 UVIS_110SA_MOS110APO003_PRIME Data loss due to weather UVIS TEAM MEETING OPERATIONS UPDATE Titan Occultation under RCS • S49 (T53) UVIS_107ST_ALPERITI001_PRIME – 0.5 mrd deadband – Tightening of the walking deadband • • – • 3 steps of .12 mrad Max deviation is .86 mrd per axis. First part (no shown) has star in/out of the slit S50 (T56) UVIS_112ST_ETAUMATI001_PRINE – 0.5 mrd deadband – Tightening of the walking deadband • • – 6/8/09 Not on the ground yet 3 steps of .12 mrad Max deviation is .86 mrd per axis. During transition from RCS UVIS TEAM MEETING OPERATIONS UPDATE RBOT Process • UVIS Statistics: – S50: 5 out of 18 – S51: 7 out of 21 – S52: 0 out of 3 – S53: 2 out of 3 • The process is improving at each sequence. 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE Planning/Scheduling Notes • We are starting to flight sequences without a final DSN allocation. • Use UVIS_SOLAR_OFF to Sun in CIMS for all solar occulation (starting S54) instead of ISS_NAC to Sun (-20.0, 0.0, -0.11 deg) offset. • The list of ring occultations that contain an atmospheric occulation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE Concerns • What do we have to do in order to still have a usable instrument in 2017? – HSP is degrading – The burn area in the FUV is getting deeper and wider • Turn off HVPS when FUV and EUV not in used for more than ??? hours? • Switch to the HI_RES slit if FUV and EUV not in used for more that ??? Hours? 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE Ops team status for reminder of 09 • Getting better now that KEPLER commissioning has concluded. • Still one instrument launch this year: EVE on SDO (November). • The launch of the TIM instrument on Glory has been delayed (2010, 2011?). • So we are breathing a little better. 6/8/09 UVIS TEAM MEETING OPERATIONS UPDATE