UVIS TEAM MEETING OPERATIONS UPDATE 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE Instrument Status • On/Off Cycle: 27 – No change since last meeting • Hours On: ~73,300 hours – Continuous operations since 9/11/2007 – Longest continuous operations was from 1/15/2005 (probe relay) to 9/11/2007 (S/C safing) • HDAC Filament Modulation: – Filament 1: 100.28 hours – Filament 2: 12.22 hours – Last: 2006/255 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE Significant Issues • • S41: None S42: UVIS_075SA_AURORA001_PRIME – Significant data loss (DSN problem) • S43: None • S44: UVIS_086IC_ALPVIR001_PRIME – • Data loss (DSN problem) S45: UVIS_091IC_ALPVIR001_PRIME – • Data loss (DSN problem) S46: UVIS_097RH_ICYLON001_ISS , UVIS_097SA_SPOLEDYN001_RIDER – 1/6/09 Significant data loss (weather & DSN problem) UVIS TEAM MEETING OPERATIONS UPDATE Titan Star Occultation under RCS • S45 (T46) UVIS_093ST_ETAUMATI001_PRIME & UVIS_093ST_BETCMATI001_PRIME – 0.5 mrd deadband – During transition to or from RCS • S46 (T48) UVIS_097ST_BETCMATI001_PRIME – 0.5 mrd deadband – Tightening of the walking deadband • • – 1/6/09 3 steps of .12 mrad Max deviation is .86 mrd per axis. During transition from RCS UVIS TEAM MEETING OPERATIONS UPDATE Titan Star Occultation under RCS • Shall we consider using the FUV occultation slit? – Need to offset by as much as 25 mrd to avoid the lens and the lens holder. – Cannot do that if an ORS instrument is riding. 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE RBOT Process • Since S46: No more than 5 wheel biases per orbit. • Since S49: SP is suggesting “rbotfriendly” secondary axis. • UVIS Statistics: – – – – – S46: 2 out of 16 S47: 2 out of 15 S48: 2 out of 7 S49: 0 out of 7 S50: 5 out of 18 • Preliminary (from SOP port 1) • All 5 requests used “rbot-friendly” secondary axis… 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE Planning/Scheduling Notes • Not too much to complaint about this time. – Don’t call a request xxxx_PRIME if it is not a prime request. • The list of ring occultations that contain an atmospheric occulation is on the team web site at http://lasp.colorado.edu/cassini/team-site/archive/docs/pdf/Atmospheric_Occ.pdf 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE Upcoming Change • Addition of a UVIS solar port entry in the BVT (ECR 108546):108546 • Currently we use ISS_NAC to Sun with (-20.0, 0.0, -0.11 deg) offset • An equivalent boresight will be used in CIMS, PDT and loaded to the S/C BVT table: UVIS_SOL_OFF • The reason for the addition is to simplify the RBOT solution for Solar observations. 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE XXM Upcoming Changes • New opmodes – 3 UVIS standard modes: OFF, SLEEP, ON • ON is currently 14.6 Watts, will be 9.4 Watts • New ON does not allow HDAC filament modulation – 1 non-standard mode: HDAC_Mod (14.6 Watts) • New SSR library allocation (ECR 108786) – Allocation changed from 128 ALFs to 640 ALFS – Will allow us to keep a complete IEB library on board the S/C and lower our uplink needs at the start of every sequence. 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE Ops team status for 09 • In addition of controlling 4 S/C the LASP ops team will be launching one new S/C (Kepler 3/5/09) and two instruments (EVE on SDO 10/8/09) and TIM (on Glory 06/15/09). • Crystal is on the Kepler flight team. • During Kepler commissioning a small team including Alain & Darren will be taking care of QUIKScat and ICESat, two aging birds. • In addition Alain supports Kepler S/W and has to do S/W development (OASIS-CC) 1/6/09 UVIS TEAM MEETING OPERATIONS UPDATE