Yonge Subway EA Public Consultation Centres – June 17 & 18 2008 Inter-regional connectivity 2 yonge subway advisory task force To be updated 3 advisory task force roles and responsibilities • Guide environmental assessment study for Yonge Street subway extension into York Region • Act as forum for stakeholder consultation to support delivery of a comprehensive transit network, intermodal connectivity and transitoriented development • Act as forum for discussions with City of Toronto stakeholders for the integration of facilities and operations north of Finch station 4 yonge subway study 5 Project Definition Tom Middlebrook, MRC 6 the yonge subway extension project Yonge-University-Spadina Line Bloor Line 7 station location considerations Current and future travel demand Surface transit connections Physical environment Ease of passenger access and egress Urban intensification Consideration of sensitive land uses Cost effectiveness 8 potential station locations 9 subway construction techniques 10 tunnel boring machine CONVEYOR BELT COMPLETED TUNNEL EXCAVATED SOIL SEGMENT ERECTOR ARM PRECAST TUNNEL LINING SEGMENTS ROTATING CUTTING HEAD TUNNEL BORING MACHINE SHOVE RAMS TUNNEL B ORING MACHINE (TBM) DOORS CUTTING TEETH ROCK CUTTING DISCS Sheppard Yonge Station Bayview Station Bessarion Station Cut and Cover Leslie Station Don Mills Station Tunnel Boring 11 tbm launch and related activities 12 tbm extraction 13 tunnel completion 14 cut-and-cover process 15 surface impacts of construction at stations 16 what comes with a subway? 17 finch to clark 18 terminal requirements at steeles avenue 19 heritage district 20 east don river crossing option 1 | bridge 21 east don river crossing option 2 | above the river 22 east don river crossing option 3 | under the river 23 richmond hill centre parking 24 terminal integration - york mills example 16 bus bays total GO Bus Terminal Entrance TTC Bus Terminal Entrance 7 bus bays 9 bus bays 25 project schedule 26 next steps Summer 2008 • • Stakeholder consultation – July 31 & August 26 Continued technical work to evolve preferred design Fall 2008 • Municipal presentations to Committees on preferred design including Toronto • • Public Meeting #2 – September 25 Public Meeting #3 – November/December 27