York Region Rapid Transit Corporation Davis Drive and Yonge Street Updates

advertisement
York Region Rapid Transit Corporation
Davis Drive and Yonge Street Updates
Town of Newmarket, Committee of the Whole
April 28, 2014
agenda
1.
Opening/Introduction
2.
Project update
3.
Summary of 2014 milestones
4.
Business Support
5.
Yonge Street
6.
Information sharing
1
construction status: utilities
› Newmarket-Tay Power – 95% complete
› New pole installation, framing, stringing, old pole removals
› Enbridge – 95% complete
› Telecommunications – 55% complete
› Utility relocation work will be complete by late 2014
2
construction status: retaining walls
› 15 retaining walls constructed
› Coping and handrail installation underway
› The last wall, on the northeast corner at Davis and Yonge, will be
completed this summer
3
construction status: structures
› Keith Bridge
› Bridge construction scheduled for completion November 2014
› Number of traffic lanes will be dependent on the staging of other work in
the vicinity of the bridge
› Tom Taylor Trail will re-open by the end of the year
› Union Hotel
› Remobilizing this spring, construction of the new foundations will begin
› Move to permanent location scheduled for this summer
construction status: structures
› Eastern Creek
› Culvert construction completed
› Number of travel lanes will be
dependent on traffic staging through
the area
› Western Creek
› South side widening will begin in July,
completion scheduled for this fall
› North side completed
5
construction status: road work
› Road widening
› This year the following segments will be
widened from:
› Yonge to Vincent on the north side
› Keith Bridge to Bolton on the north side
› Bolton to Roxborough on the south side
› Base-layer paving
› Will follow road widening
› Traffic staging
› There will continue to be one travel lane in
each direction with a dedicated left turn lane
[where possible] from Yonge to Roxborough
for the remainder of the year
6
construction status: road work
› Boulevards
› Planters with interlocking paving stones and concrete sidewalks will be
installed in segments this year
› A full boulevard will be constructed on the south side of Davis east of Parkside
7
construction status: vivastations
› The canopies are coming!
› The first two canopies will be constructed at Longford and Davis on the
eastbound and westbound platforms this year
› Construction of three other canopies will start later this year, including in
front of the hospital
› Construction of the final canopy will start next year
› There will be three centre-lane vivastations [6 canopies]
8
minimizing disruption is a top priority
9
summary of 2014 milestones
› A number of achievements will be reached this year:
› Utility completion
› Road widening
› Union Hotel move to permanent location
› Vivastation construction started and delivery of
first canopy steel structure
› Keith Bridge completion
› Boulevards in sections
› Completion of these milestones will be
communicated using a variety of tactics
10
business support program
› ShopDavis – Business Support Program
› Partner with the Newmarket Chamber of Commerce to
help support businesses during construction
› Campaigns include:
› Newspaper, radio, digital ads;
› On-street billboards;
› Community engagement;
› Social media posts;
› Website posts and online business profiles; and
› Education programs offered through the Chamber
11
yonge street bundle (Y2.1, Y2.2, Y3.2)
Y3.2
› Mulock to Davis Dr
› 2.4 km
› 3 stations
Y2.2
› Levendale Rd to 19th Ave
› 2.9 km
› 3 Stations
Y2.1
› Hwy 7 to Major Mackenzie
› 3.6 km
› 4 stations
yonge street project update
› Design Build Contract awarded
› Next steps: work plans, schedule development and design work
› Preliminary construction activities expected to begin later this year in
Newmarket
› Land acquisition completed in Newmarket, possession secured March 2014
› Substantial completion by the end of 2018
13
information sharing
14
partnering with communities to manage growth
16
YONGE & DAVIS
2.
1
ST.
Ph a s e
E
YONG
Future
Ph a s e
1.
A
B
V ivaNe
xt
B
A
R.
D
DAVIS
1
Ph a s e
d)
e
(dot t
4.
V ivaNe
xt
3.
N
Plan View of Yonge St. and Davis Dr.
TOWN OF NEWMARKE T PL ACEMAKING CONCEPTS
9
YONGE & EAGLE
2.
G
YON
E ST.
C
1.
C
T.
ES
EAGL
4.
3.
N
Plan view of Yonge St. and Eagle St.
TOWN OF NEWMARKE T PL ACEMAKING CONCEPTS
13
MAIN & DAVIS
.
N ST
MAI
1.
1.
DAVIS
DR.
V iva
Nex t
D
Ph a s
Future Potential
to widen ROW to
improve streetscape
Ph a s
D
E
e1
2.
e1
re
Futu
e
Phas
2.
re
Futu
e
a
Ph s
Plan View of Main St. and Davis Dr.
16
IBI GROUP | MARCH 2014
E
N
R.O.W
R.O.W
MAIN & DAVIS
PAINTED LETTERING
CORTEN STEEL PANEL
CORTEN STEEL POSTS
CORTEN STEEL PANEL WITH STAINLESS
STEEL LETTERS AND NEWMARKET LOGO
~ URBAN PARK ~
~ COMMERCIAL AREA ~
6.0 M CLEARANCE
PROPOSED NEWMARKET GATEWAY
4 LANE ROADWAY
CONCRETE SIDEWALK
WITH ACCENT UNIT PAVING
1.5M WIDTH GATEWAY STRIP - PLANTER AND SEAT WALL
1.5M WIDTH GATEWAY STRIP - PLANTER AND SEAT WALL
CONCRETE SIDEWALK
WITH ACCENT UNIT PAVING
Elevation D - Southwest and Southeast Corner of Main St.
TOWN OF NEWMARKE T PL ACEMAKING CONCEPTS
17
MAIN & DAVIS
MAIN & DAVIS
Perspective looking south along Main Street towards the future Urban Park
TOWN OF NEWMARKE T PL ACEMAKING CONCEPTS
19
Cross Section under Keith Bridge
East
West
Existing Walkway
New Walkway
River rock in concrete
South Elevation
TOM TAYLOR TRAIL LINK-DAVIS DRIVE UNDERPASS
5