Yonge Street Rapidways Highway 7 to Gamble Road Public Consultation Centre | June 2, 2010 1 agenda Y2 – PIC: June 2, 2010 – 6:30pm to 8:30pm Presentation at 7pm Richmond Hill Centre for the Performing Arts Y2 – PIC: June 3, 2010 – 6:30pm to 8:30pm Presentation at 7pm Richmond Hill Presbyterian Church Open house includes: VivaNext – booth & general information Community Liaison Professional staff 2 province / metrolinx update Metrolinx’s Board unanimously approved new funding schedule $790M for rapidway projects to be constructed 2010-2015 $965M for rapidway projects to be constructed 2016-2020 Acquiring the necessary land for all segments Final approval from Provincial Treasury Board expected in June In total, over $3B available for vivaNext transit projects planned to 2020 3 viva system delivery 4 yonge subway update Work continues on the Yonge subway to advance preliminary engineering in order to better determine costs The project team anticipate public information session late 2010 Funding for this project is still outstanding 5 town of richmond hill 6 setting the stage – the big picture 7 transit plays a role in bringing vision to life 8 refocusing on the public realm 9 vivastation design elements 10 platform elements 11 wayfinding and accessibility 12 boulevard: 4-lane road Sidewalk at typical vivastation intersection 13 boulevard treatments 14 station intersection Examples of Viva standards Tree grate Intersection lighting Bicycle rack Tree planting Street bench 15 mid-block Treatment examples under development Boulevard finish Boulevard planting Boulevard planting 16 what is a rapidway? Four through lanes with left turn lanes Dedicated centre lane rapidways Fully landscaped boulevards and median plantings 17 18 yonge street rapidways from highway 7 to gamble road 19 yonge street: highway 7 to roosevelt drive Garden Avenue High Tech Road 20 yonge street: westwood lane to oak avenue Westwood Lane Bantry Avenue Oak Avenue Bantry-Scott Station 21 yonge street: carrville to hillcrest mall entrance Carrville Road Hillcrest Mall Entrance 16th-Carrville Station 22 yonge street: baif boulevard to youngehurst road Baif Boulevard Weldrick Road Weldrick Station 23 yonge street: may avenue to hopkins street May Avenue Harding Boulevard Hopkins Street Major Mackenzie Station 24 yonge street: major mackenzie drive to Major Mackenzie Drive heritage area (vehicles travel in mixed traffic) 25 yonge street: levendale road to oxford street Oxford Street 26 yonge street: elgin mills road to bernard avenue Elgin Mills Road Canyon Hill Avenue Bernard Station 27 yonge street: naughton drive to brookside road Brookside Road 28 yonge street: nottingham drive to gamble road Nottingham Drive Gamble Road Gamble Station 29 building a rapidway 30 minimizing construction impacts 31 commitment to supporting the local community Sign-up for e-updates 32 next steps Surveyors in the field – Summer 2010 Environmental assessments – Summer 2010 Council report with findings – 2011 Property Services will meet with affected owners directly Land acquired for the project – Summer 2011 Construction starts – Spring 2012 Construction ends – Winter 2020 33 thank you. 34