2014 – 2024 YRRTC Business Plan 2014 Annual Update updated 2014 edocs #4891132 mission Our mission is to design and deliver an exceptional rapid transit system attracting, moving and connecting people to York Region’s urban centres and destinations. vision Our mission supports our vision where: • People can move quickly, conveniently and reliably without a vehicle. • Public transit is used extensively because it is attractive, easy to use, efficient and economical. • People live, work, shop and play in close proximity to public transit. • Employers locate in York Region because of its robust transit options for employees. •Development and public transit are planned together to shape communities, support a sustainable future and promote energy conservation. values We are committed to the following values in how we carry out our Mission, in an environment of respect, professionalism and dedication. • Where quality ideas, innovation and creativity are nurtured • Where financial and legislative integrity is fundamental • Where staff are provided opportunities for continuous learning and self-improvement • Where change is anticipated, managed and embraced • Where initiative, outstanding performance and team growth are recognized • Where working together and engaging with the community is our passion Funded Capital Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 • Spadina Subway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 • Project Schedule. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Open Rapidway Rapidway Construction (2010-2015)* Rapidway Construction (2012-2016)* NEWMARKET Wellington Street East Rapidway Construction (2014-2018)* WHITCHURCHSTOUFFVILLE Y3.1 Rapidway Construction (2015-2019)* Future Rapid Transit GO Transit Rail Lines Avenue RICHMOND HILL Highway 407 H2 [12.4km] Vaughan Metropolitan Centre [3.6km] Map not to scale Distances do not include transition lanes Leslie St e H2 Promenade VAUGH A N Finch Avenue Sheppard West * Subject to change reet 19 th -G am bl e reet H2.VMC H3.2 H3.4 Steeles Avenue TORONTO Spadina Subway – 2015 Completion – $2.6B Flow 2 H3 [6km] H3.1 H3.3 MARKHAM Y1 ll s Road • 10 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 VAUGH A N Le Y2.1 Finch Station Sheppard Avenue H4 Highway 7 Highway 407 Unionville GO Station Steeles Avenue M1 n Mi • 5 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Highway 7 MARKHAM Major MacKenzie Drive Do Heritage Area Richmond Hill Centre H1 OMSF Federal FLOW $170 M – Construction 2012 – 2014 reet s li e St • 2014 Update. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22 Bernard Y2.2 [2.9km] Yonge Str eet Western Gateway Stouffville Road [3.6km] Ke el e Strategic Operations y 400 • 10 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Jane St Highwa • 5 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Co m m er ce He le n • 2014 Update. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 H2.VMC – 2012 Construction Start with Metrolinx $1.755B Highway 50 Y2.1 – Yonge Street to Major Mac – 2014 Construction Start with Metrolinx $1.755B H3.3 – 2008 Construction Start with QuickWins $67.6M M aj or Cro s M ac by ke nz ie Highway Development Bayview Street Terminals Yonge Str eet • 10 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Bathurst Proposed Yonge Subway Extension 27 • 5 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 Bloomington Road Spadina Subway Extension (2011-2016)* Unfunded Capital Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 Aurora Road AURORA rham Lin • 5 Year Business Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 D1 – Davis Drive – 2010 Construction Start with Metrolinx $1.755B Don Mills Station H3.1 & H3.2 – 2010 Finch Avenue Construction Start with Metrolinx $1.755B TORONTO Sheppard Avenue Cornell York Du Y3.2 – Yonge Street – 2015 Construction Start with Metrolinx $1.755B y Road • FLOW Federal – Buses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 [2.4km] Kenned Newmarket GO Station 404 • FLOW Federal – Bus Terminals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Davis Drive Y3.2 • FLOW Federal – OMSF. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 D1 [2.6km] Highway Highway 9 Green Lane W ar de n • Metrolinx Funded Project (Highway 7). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 East Gwillimbury GO Station 404 G1 Y3.3 Highway • Metrolinx Funded Projects (Yonge Street). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Gr ee nL an e M ul oc k • Metrolinx Funded Projects (Highway 7 & Davis Drive). . . . . . . . . . . . . . . . . . . . . 5 D Dr avi ive s Funded Capital Projects 4 5 6 7 8 9 10 11 12 Projects Schedule - 2014 Cost Confidence Bundle Segment 2011 Q1 Q2 2012 Q3 Q4 Q1 Q2 2013 Q3 Q4 Q1 Q2 2014 Q3 Q4 Q1 Q2 2015 Q3 Q4 Q1 Q2 2016 Q4 Q1 Q2 Q3 2017 Q4 Q1 Q2 Q3 2018 Q4 Q1 Q2 Q3 2019 Q4 Q1 Q2 Q3 2020 Q4 Q1 Q2 Q3 Q4 Handover West - August 2013 Handover East - October 2014 Design - build and commissioning H3.1 / H3.2 Q3 Utility Relocation in service D1 Main Contract Cost Confidence Handover October 2015 Construction complete Spring 2016 Design - build and commissioning Utility Relocation Design Coordination Utility Relocation H2 - VMC Preliminary engineering in service Cost Confidence Handover October 2016 Construction complete Spring 2017 Design - build and commissioning Property Acquisition Utility Relocation Design Coordination Pre-Engineering in service Utility Relocation Preliminary engineering Metrolinx Bundle Y2.1, Y2.2, Y3.2 Supplementary studies Procurement Prepare documents RFQ RFP Anticipated Award Property Acquisition Property Acquisition - Y3.2 Property Acquisition - Y2.1 Property Acquisition - Y2.2 Utilities Utility Relocation Design Coordination Utility Relocation Design - Build Handover December 2018 Construction complete Spring 2019 Design - build and commissioning in service Pre-Engineering Preliminary engineering - H2 Prep Activities Procurement I.O. Bundle H2, H3.4 Preliminary engineering - H3.4 Prepare documents RFQ RFP Anticipated Award Property Acquisition Property Acquisition Utilities Utility Relocation Design Coordination contemplated Handover December 2019 contemplated Construction complete Spring 2020 Utility Relocation Design - Build Design - build and commissioning Facilities and Terminals in service OMSF PE Procurement Handover March 2015 Construction complete JUne 2015 Design - build and commissioning in service VMC Bus Terminal Cornell Terminal Park & Ride Program Pre. & final design Pre-qual Tender CONSTRUCTION and commissioning Procurement Pre. & final design Tender CONSTRUCTION and commissioning Planning, Design and Construction Schedule TBD Schedule TBD Unfunded Capital Projects 16 17 18 19 20 21 22 23 24 updated 2014 edocs #4891132 3 6 01 Hi g h w a y 7 E a s t | 12 th F l o o r | Markham | Ontario | L3R 0M3 | 9 0 5 8 8 6 6767 | 9 0 5 8 8 6 6969 | v i v a n ex t .co m