College of the Redwoods Program Review Resource Requests for the 2013-14 Funding Cycle TPC BPC Tech Facility Equip Ongoing Rank Rank Total Total Total Cost Enrollment Services Dedicated computer lab space. (Computers are purchased, need identified space in new Student Svcs Bldg) 8 Health/PE Equipment: 3 Electronic Skinfold Calipers 1,200 3 Hand Held Body Fat Analyzers 225 3 Spin Bikes 3,000 3 Weight benches 1,950 Atheletics Website Improvements 51 - 64 Counseling/Advising Accessible Software updates- JAWSZoom Text, Kurzweil 1000, Dragon, Co-Writer (DSPS) Accessible Go-print Stations (DSPS) Update ADA accessible computers and peripherals-district-wide (DSPS) Library Replacement of Carpeting 6,375 200 19 64 3,000 4 43 29,800 200 5 44 7,800 200 7 50 97,200 200 99 Painting of interior of the LRC 100 Air conditioning for LRC 103 102 Funding source to improve book collections where quality and quantity are low. 98 VP Student Development Space for a Multicultural and Diversity Center Large meeting space for ASCR Expansion of space for the Writing Center in the LRC 8,500 8,500 90 78 12,000 5,000 93 5,000 9 17 21 24,000 10,000 100,000 11 600,000 12 386,000 38 1,000,000 9 150,000 500 38 16,000 200 24 160,000 200 Residential Life Upper deck of Mendocino hall repair and resurface Emergency Communication System ADA Compliance Asbestos Abatement 500 2,000 Electrical Upgrades Earthquake Retrofit Roof and Rain gutters for Mendocino Hall Lighting inside rooms Bathrooms refurbish 9/16/2013 10:55 AM 1 Resource Requests for 2013-14.xlsx BOT Summary College of the Redwoods Program Review Resource Requests for the 2013-14 Funding Cycle TPC BPC Tech Facility Equip Ongoing Rank Rank Total Total Total Cost Vanities , sinks and faucets 66 84,000 200 32 160,000 500 40 130,000 1,000 49 111,000 500 23 2,500 47 100,000 27 1,000,000 5,000 29 160,000 1,000 16 30,000 500 21 15,000 200 54 12,600 200 Carpet Replacement Heating system replacement Double pane windows Computer room ventilation Blacktop repair around Residence Halls Fire Control Sprinklers Plumbing Exterior lighting around the Residence Halls needs to be replaced Video camera recording rooms need ventilation fans installed Repair fire places Upward Bound Broadband upgrade needed to support the efficiency of technology and communication between Eureka and Del Norte sites. 19 Admn services EKA sewer connection – to connect to county and eliminate District wastewater treatment plant. Will result in lower annual operating expenses. Regulations continue to tighten, so eventually the District will need to upgrade. (Would likely require a COP). Repeat request. EKA dorm roof replacement and safety upgrades – The roof on one dorm was replaced, but the other dorm is in need of a new roof. This would replace the roof, make exterior repairs and address safety items. Funded with auxiliary revenues. EKA dorm room and heating system upgrade –Replace outdated gas wall heaters, replace carpet, replace leaky windows or doors as needed, and other improvements. Will result in lower annual operating expenses. Funded with auxiliary revenue. EKA Stadium renovation Repair worn out back wall: $100K Repair roof or remove roof completely due to seismic concerns: $500K Remove broken stadium lights due to safety concerns: $40K (Would likely require a COP). Repeat request. EKA Sheriff’s substation – The District previously provided a substation which greatly increased the frequency of sheriff’s office visits to the area. Cost would be for a portable building, but other options are being considered. Funded from safety credits and contributions from Housing and Parking. Security upgrades – Funds are needed to upgrade door locks, install phones, install intercoms, and other classroom security upgrades. Funds would be used to purchase a four wheel drive vehicle for the Security Dept. to allow access to some areas during an emergency. IT equipment, software, and service contracts – This will create a resource to begin to fund a centralized IT replacement cycle as well as other recurring costs. Funded through an allocation in the December 2012 reorganization plan. 9/16/2013 10:55 AM 2 1 41 20,000 5,000 5 2,500,000 2 200,000 1,000 3 300,000 2,000 1 640,000 5,000 20 40,000 1,000 13 300,000 1,000 6 100,000 100,000 Resource Requests for 2013-14.xlsx BOT Summary College of the Redwoods Program Review Resource Requests for the 2013-14 Funding Cycle EKA ACSR and Multicultural Center, and Student Center upgrades – Convert Lakeview room for student gov’t offices and a new multicultural center, and make other needed improvements to the student center. Annually, funds could be used for continued maintenance and upgrades. Funds allocated pro-rata to centers and sites. (Could be funded from Student Center Fee if approved. Ongoing amount is a rough estimate of annual fee revenue.) District Wide Student Technology Upgrades – Additional augment to existing funding for student labs, wireless access, technical support personnel, and other technology available to students. Funds allocated pro-rata to centers and sites. (Could be funded from Technology Fee if approved. Ongoing amount is a rough estimate of annual fee revenue.) District Wide Energy Efficiency – These funds would be used for energy efficiency projects. Priority would be given to projects with potential rebates, etc. that leverage the available funds. Repeat request. TPC BPC Tech Facility Equip Ongoing Rank Rank Total Total Total Cost 45 6 Vehicle and Equipment Replacement Budget – This will create a resource to begin to fund the replacement of aging vehicles and equipment in Administrative Services, such as Maintenance, IT, and Security. A list of vehicles in the Maintenance Dept alone shows 39 vehicles with 26 of those vehicles over 12 year old, and the oldest vehicle that leaves campus property being a 27 year old Ford van. Request is to replace the oldest vehicles and create a fund to replace a fleet of 48 vehicles every 6 years (at $25K/vehicle). With a newer fleet, the District could steadily supply the Automotive Technology program with late model used vehicles for their program. Biology Eureka: Three sets (24 each) of stereoscopic compound microscopes Eureka: Two sets (24 each) of stereoscopic dissecting microscopes Eureka: Saltwater Aquarium $1,000 and Mendocino: Digital pH metersc(6) $4,200 Eureka: Service/Maintenance/Repair for Microscopes, Deionizer, Autoclave, etc. Eureka: Digital pH Meters (12; 6/lab for 2 labs) DN Life Science: Lab equipment budget. DN Life Science: Needs to have already-approved the lab remodel take place. Agriculture Livestock Handling Facility Behavioral/Social Science Room CA 109 requires updating to make it a "Smart Classroom". At present it has not been updated with smart technology. The projector should be placed from the ceiling so that the cart is no longer a physical hazard to students and faculty navigating across cords while the projector is pulled out for operation. A computer/sound cabinet (for the DVD/VCR/Sound System) is needed to avoid the same issues that makes this classroom extremely unsafe. Room CA 113 and 109 require updated computer technologies to allow for multiple video formats including online streaming. Business Office Report writer add-on to Datatel Check printer and softdocs implementation in Datatel Fixed Asset/depreciation maintenance software Document Imaging and Scanning and destruction of business office archives Computer station in lobby for student use CIS Router Upgrades Digital Media Cintiq drawing tablets for DM lab Drafting Tech Technology Infrastructure improvements & student access to technology in the CAD lab. Will request CTEA grant funds. English 29 New Computers for the Eureka Writing Center Renew district license for Lexia Reading Strategies for Older Students (SOS) $3,375 and 9 new chairs for the Eureka Writing Center $973 Fine Arts 3-D printer and 3-D design software. This will enable the 3-D courses, including 3-D design, ceramics, sculpture and jewelry to start teaching their students digital 3-D skills, which are increasingly important in the workplace. For the time being, the art department would like to start with free software like 123D Design. We should budget around $2,500 for the printer. SAM fees will cover the cost of the plastic that the printer Replace old Mac Book Pro Five new digital pianos for CA 104 Wifi for the Creative Arts Building 9/16/2013 10:55 AM 3 7 60,000 60,000 50,000 50,000 15 100,000 5,000 24 500,000 200,000 72 69 69 59 74 58 75,000 25,000 5,200 10,000 8,400 6,000 500 500 100 500 200 6,000 103 150,000 67 5,000 1,000 8,000 250 11 68 10,000 250 19 13 19 35 53 52 37 55 11,000 25,000 12,000 15,000 5,000 2,000 4,000 2,000 1,500 500 57 10,000 500 14 85 6,000 200 3 29 12,000 500 9 94 28,739 500 12 71 3,375 973 18 76 2,500 800 19 75 2,300 250 250 100 6,000 90 12,000 500 Resource Requests for 2013-14.xlsx BOT Summary College of the Redwoods Program Review Resource Requests for the 2013-14 Funding Cycle Forestry and Natural Resources (FNR) High Definition monitor, $2,500 and Classroom computer $2,000 and Safety equipment (glasses, hard hats, etc..) $500. Maintenance 2 vans for maintenance mechanics TPC BPC Tech Facility Equip Ongoing Rank Rank Total Total Total Cost 19 48 4,500 500 200 17 40,000 500 42 20,000 500 14 4,000 200 28 30,000 500 29 50,000 500 8 40,000 200 34 30,000 200 35 55,000 500 New truck for gardeners Lifting rescue tripod 6,000 lb Forklift New Equipment to maintain the WWTP to new discharge standards New Exterior Lighting and security cameras Sewer Inspection Camera Replace existing Chlor Tec hypo generator and process grinder at WWTP Math Math Server Back-Up Power Supply and Back-Up Hard Drive Physical Sciences Physics – Air tracks and air sources. Physics: Digital photogates and accessory photogates $1,600 DC Power Supplies $500 New e/m system $3,500 New Ripple Tank $825 Mechanical Wave Source and Sine Wave Generators $1,300 Michelson Interferometer $2,200 Electroscopes $500 Electrometer, & Variable Organic Micro Faraday Lab Kits Ice (24)Pail, @$600 each Capacitor $650 Organic Macro Lab Kits (24) @$600 each pH meters (15) @$700.00 each Microgram balances (10) @$1000 each Steam distillation apparatus (12) @$100.00 each Spectronic 100 VIS Spectrometer (15) @$1400.00 each Heating/Stirring plates (24) @$500 each Centrifuge (4) @$2000.00 each UV/Vis Spectrometer (1) Explosion Proof Refrigerators (2) @$5000 each 9/16/2013 10:55 AM 4 19 63 6,000 250 16 61 400 100 59 5,000 100 62 11,075 500 77 14,400 100 79 14,400 100 80 10,500 100 97 10,000 100 83 12,000 100 85 21,000 100 89 12,000 95 8,000 90 5,000 85 15,000 100 100 Resource Requests for 2013-14.xlsx BOT Summary College of the Redwoods Program Review Resource Requests for the 2013-14 Funding Cycle Chemistry: Drying Ovens (2) @ $2000 each $4,000 CBL units (15) @$150.00 each $2,250 CBL Temperature probe(15) @$100.00 ech $1,500 CBL pH probes (15) @$100.00 each $1,500 CBL Voltmeter probe (15) @$100.00 each $1,500 Heating mantel and Transformer (24) @$500 each $2,400 Printer(3) @$300.00 each $900 High-Pressure Liquid Chromatograph and Detector (1) Ice machine (1) $1,000 Earth Sciences Supplies – replacement of specimens, hardness kits, maps, microscope bulbs, and other Earth Sciences (Geology, Oceanography, Geography, Phys Science Environmental Science courses) Operational Upgrades: Four US ECLIPSE Digital Balance Scales (500g x 0.1g): @$21.50 each and Meiji CK3900 CCD video camera and "C"-mount adapter. Registered Nurse (RN) Updated computers for AT 126, AT 103 & AT 115. Tegrity subscription Technology ,warranty support, and replacement for simulators and equipment used by all HO program students in the lab. Security 4-wheel drive vehicle TPC BPC Tech Facility Equip Ongoing Rank Rank Total Total Total Cost 72 18,286 500 86 100 15 85 1,700 19 80 10,000 500 19 96 40,000 40,000 10 80 30,000 5,000 33 30,000 500 Upgrade Eureka campus surveillance system 4 10,000 200 26 32,000 200 17 13,000 200 Replace Eureka Campus Marquee Signal Repeater for two-way radio system at the Eureka campus Updated software for incident reporting 2 46 15,000 250 Upgrade parking permit dispensing machines at the Eureka campus Welding Tech Safety lights 84 5,000 250 56 1,000 100 644,495 526,650 TOTAL REQUEST 548,314 GRAND TOTAL $ 9/16/2013 10:55 AM 5 9,123,100 9,671,414 $ 526,650 Resource Requests for 2013-14.xlsx BOT Summary