Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Estimated dollars per FTES Budget carryover estimate Revenue estimate @ 3936 FTES P2 Reallocations Total Revenue New CCTVs and scanners for labs on campus (one in each lab on campus; ADA compliance) Cell signal boosters DN Science Lab: Equipment & upgrades PE Fields: Equipment & upgrades Canvas contract, Shibboleth, DE or one-time Utility reserve if canvas paid by CO Library allocation: Koha integrated library software system: $65,000 ProQuest search engine for students in LRC for ADT’s Psychology, Anthropology, & Sociology: $10,000 Replace outside book return: $4,000 DN Science Lab: Emergency generator & equipment Address SWACC inspection deficiencies MOVED TO MEASURE Q - Q52 Original ADA Safety: Replace broken emergency classroom lights $25,000 Original ADA safety: Reduce lab risks: $15,000 Correct service windows in new admin/student svc bldg $15,000 Technology Infrastructure Upgrades - MOVED TO Q31 Report writer bolt on for Ellucian: $20,000 2014-15 Districtwide internet upgrade package: $10,000 Telepresence upgrade - Pelican Bay & high schools: $25,000 5 new virtual servers: $100,000 "Enhance Network band width for increased Video traffic intra-LAN LAN network upgrades to accommodate new Video loads for DE. WS-C2960S-48LPD-L=$6774, C3KXNM-10G= $1500, SFP-10G-LR= $3290, VS-S2T-10G Cat 6500 Supervisor 2T with 2 ports 10GbE and MSFC5 PFC4 =$15,600" Total: $27,164. Manufacturing Technology (life safety, Accreditation rpt, SWACC Inspection rpt) MOVED TO MEASURE Q - Q75 Career and Technical Ed Computer Lab Upgrades Lathes $40,000 Vertical Milling machine: $15,000 Student Tech Fee 131,351 109,416 240,767 Mandate Physical Plant Payments 553 130 240,767 50,000 2,178,401 (29,887) 2,148,514 Instructional Equipment 460,113 29,887 490,000 47,000 Gen Fund Capital 100,000 100,000 Total 3,029,281 3,029,281 47,000 25,000 30,000 20,000 100,000 30,000 100,000 25,000 230,000 20,000 100,000 100,000 40,000 40,000 140,000 170,000 - 20,000 96,000 116,000 - PE/Athletics equipment not covered by State bonds Basketball floor maintenance/refresh: $15,000 9/7/2015 3:58 PM 50,000 Preliminary Draft 100,000 1 100,000 Rebalance Bond Projects14.xlsx Maint Inst Eq Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Technology replacement cycle MOVED TO MEASURE Q - 31 15 laptops & mobile cart for Sciences: $25,000 Computers for Nursing lab: $6,000 Fine Arts 3D Printer :$6,300 Smart boards, projectors, 3D printing for Drafting Tech: $16,400 DSPS computers, server, technology: $40,000 30 student servers-CIS Networking lab: $50,000 Whiteboards and other class needs: $10,000 Vehicle replacement cycle Replace FWW 12 passenger van & CR driving school truck EKA, MN, & DN code remediation package for State funds requests. MOVED TO MEASURE Q Q10 Student Union: Life safety equipment & bldg upgrades PE: Stereo system for Fitness Center with auxiliary input and/or Blue tooth Improve student furniture & technology in each bldg Purchase computer tables, chairs, Macbooks, PC notebooks, USB charging lamps, benches, etc for students. Cost is estimated for Sci, Hum, AT, CA, AJ, DN main, DN student lounge, Dining, LRC, etc. Mandated improvements to wastewater plant MOVED TO MEASURE Q Project management Maintenance filters HR true up leave costs President - DN election costs Tom Henry contract EAB contract Student Svcs/Instruction: Fund with one-time budget, then reassess next bgt cycle Soccer/Volleyball EKA HS lease IR Pres Ofc Public Safety Ellucian/Datatel increase Marketing IS training HR Reserve for enrollment management initiatives & contingency Potential one-time payroll contingency (subject to negotiations) Reserve for PERS/STRS pension costs Planned one-time fund balance for emergencies & State bond match Total Allocations 9/7/2015 3:58 PM Student Tech Fee Mandate Payments 70,000 Physical Plant - Preliminary Draft Instructional Equipment Gen Fund Capital 10,000 Total 80,000 - - 1,000 1,000 28,000 28,000 26,000 20,000 20,000 25,000 30,000 34,000 241,000 73,057 149,057 20,000 20,000 25,000 30,000 34,000 90,000 90,000 60,000 15,000 1,370 22,000 50,000 9,000 18,000 60,000 15,000 1,370 22,000 50,000 9,000 18,000 100,000 100,000 401,630 401,630 300,000 300,000 700,000 700,000 2,148,000 2 50,000 50,000 490,000 73,057 3,002,057 Rebalance Bond Projects14.xlsx Maint Inst Eq Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Net Remaining Unallocated Fund balance as percent of total mandate pmts (BPC recommended at least 30%) 9/7/2015 3:58 PM Student Tech Fee (233) Mandate Physical Plant Payments 514 - Preliminary Draft Instructional Equipment - Gen Fund Capital 26,943 Total 27,224 32% 3 Rebalance Bond Projects14.xlsx Maint Inst Eq