BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year SEPT 16, 2015, 3:00 P.M. AGENDA FOR SPECIAL BPC/FPC/TPC COMBINED MEETING SS 202 Boardroom 1. Call Meeting to Order –3:00 pm 2. Introductions: Chris Gaines and Doug Edgmon are co-chairs. 3. ACTION REQUIRED: Approve Meeting notes 4. INFORMATION: Review 2016-17 Budget Calendar, Strategic Plan, Education Master Plan, Facilities Master Plan, Technology Master Plan, and other relevant District plans. Please review these items before this meeting. 5. INFORMATION: Review updated fiscal health checklist and budget forecast. This is a financial checklist developed by the Chancellor’s Office the District updates each year. Also review CR Budget Talking Points. 6. ACTION REQUIRED: Review and approve BPC Planning Agenda, Committee Charge, and Evaluation and Ranking Protocol. Please review before this meeting and email the co-chairs with advance comments. Final edits to be approved at this meeting. Also, a new draft rubric is being proposed. 7. ACTION REQUIRED: Approve a new Measure Q rebalancing recommendation. 8. INFORMATION: Review spreadsheet allocation of one-time mandate reimbursements with implementation of BPC’s recommendations on capital match set aside and pension set aside. 9. INFORMATION: Review and discuss timeline and preliminary plans for updating the Facilities and Technology Master Plans. Plan updates must be completed by December 15, 2015. 10. INFORMATION: Review and discuss timelines for departments to complete and submit program reviews and resource requests. 11. INFORMATION: Update on 2015-16 resource request rankings with comments on funding decisions. 12. INFORMATION: Begin a discussion on fees – Optional technology fee, materials fees, non-resident tuition, transportation fee, student center fee, etc. 13. INFORMATION: Safety update - Cell signals and previous recommendations to install cell boosters at Eureka campus. Also, review SWACC inspection report. 14. INFORMATION: Utility costs, savings and compliance. Electricity costs have increased due to new bldgs. and rate increases. Need to implement energy conservation: LED lights, energy star appliances such as breakroom refrigerators, computer soft power down, etc. Also, to meet State rules, we must remove bathroom paper towels and use hand dryers. 15. INFORMATION: Update on Utility Infrastructure and Seismic Strengthening State Bond project, Del Norte Science Lab project, PE Fields project, and new requests for State bond projects. 9/11/2015 12:12 PM -1- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year 16. INFORMATION/POTENTIAL ACTION ITEM: Discuss parking issues and a proposal to add 60 minute visitor spots, additional staff spots, additional handicap spots, and motorcycle parking. 17. INFORMATION: For self-supporting programs, we have begun assessing costs for operating these programs to the self-supporting funds. We need to adjust fees and charges to make sure that we cover the direct program costs, plus the operating costs. STANDING CLOSING ITEM: 1. Discuss: Plus, Minus, Delta/Closing the loop on this meeting. CR BPC website: http://inside.redwoods.edu/BudgetPlanning/ CR Accreditation website: http://www.redwoods.edu/accreditation/ 2. Tentative future BPC meeting dates, all times start at 3 pm: a. b. c. d. e. f. g. h. Wed, Oct 14 Wed, Nov 11 Wed, Dec 16 Wed, Jan 13 Wed, Feb 17 Wed, Mar 23 Wed, Apr 20 Wed, May 18 CCC confer is available for those unable to attend in person. PARTICIPANT DETAILS > Dial your telephone conference line: (888) 450-4821 > Cell phone users dial: 719-785-4469 > Enter your passcode: 390091 Participant Conference Feature *6 - Mute/unmute your line 9/11/2015 12:12 PM -2- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year 6. ACTION REQUIRED: Review and approve BPC Planning Agenda, Committee Charge, and Evaluation and Ranking Protocol. Please review before this meeting and email the co-chairs with advance comments. Final edits to be approved at this meeting. From the BPC website: Purpose Budget Planning Committee Planning Agenda: The Budget Planning Committee supports the District’s mission by gathering a broad constituency of members to the committee to accept, review and prioritize budget funding requests from planning committees across the District. The Committee acts as a central review function, so that funding requests are viewed in totality and across the District, so that crossdependencies are considered, and so that a balancing of interests is obtained in the final prioritized funding recommendations to the President/Superintendent. The committee will continue to focus on refining existing review processes, for example, to identify funding priorities that have a mandated or required component. The committee will review the results of its actions from the prior year to “close the loop” on its activities. The committee will work identify any requests that might possibly be accomplished with other sources, such as grant funds or that might be accomplished without additional funding and will communicate back to constituent groups on its recommendations for all funding requests. The committee will maintain an active web site with meeting notes, attachments, etc. Committee History Brief history of budget planning processes: Prior to 2008, the Financial Advisory Committee provided recommendations. To improve constituent participation, an integrated planning process was developed which included the change to the Budget Planning Committee (BPC). In general, the BPC receives and prioritizes funding requests from functional planning committees, such as Technology and Facilities, and other sources. BPC is the point where the various prioritized lists from the functional committees are brought together and prioritized from an “All District” perspective. Each year the BPC produces a district-wide prioritized list of funding recommendations. Typical Tasks Committee’s Charge: The Budget Planning Committee (BPC) is a forum for sharing of financial information. The BPC provides an opportunity for representatives of campus constituencies to make recommendations through the integrated planning process to the Chief Business Officer and the 9/11/2015 12:12 PM -3- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year President/Superintendent about budget development and other financial issues likely to have significant financial impact on the District. The BPC shall meet on a regular schedule, but not less than four (4) times each year. The BPC shall operate with the Chief Business Officer or designee as the administrative co-chair and a faculty co-chair appointed by the Academic Senate. Other membership shall be determined by the President/Superintendent and include representation across divisions, employee groups, and student representation. An Approved member is appointed by each of the constituency groups represented and should be designated to a two year term. Membership period among the representatives shall be staggered in order to have some level of continuity among committee members each fiscal year. The BPC shall provide recommendations in a timely manner so as not to impede District obligations. Agendas and meeting handouts shall be posted to a publicly accessible location, such as the BPC webpage. BPC recommendations will be by a majority vote of the committee and will be used as an advisory to the Chief Business Officer and the President/Superintendent. An annual Charge and Budget Calendar will be developed that will provide guidance to committee members regarding timelines for meaningful input. At a minimum, the annual budget calendar shall include: Review the impact of the Governor’s budgets and legislatively adopted budgets on the District’s financial condition. Review a multiyear (minimum three years) student enrollment and budget forecast to maintain a minimum fund balance percentage as determined by the Board of Trustees. Review integrated planning budget proposals from program review and other appropriate sources to make recommendations. Consider the impact of recommendations on future commitments and the Total Cost of Ownership (TCO). Review budget policies, procedures, and related accreditation requirements. Close the loop on previous resource allocations as to effectiveness in meeting District goals. Evaluate the effectiveness of the Committee’s charge and make recommendations for the next year. Members shall consider the following as the primary and overriding factors for all BPC recommendations: Compliance with Accreditation Standard 3, specifically: o Financial resources are sufficient to support student learning programs and services and to improve institutional effectiveness. o District planning reflects realistic assessment of financial resource availability, development of financial resources, partnerships, and expenditure requirements. o When making short-range plans, the District considers its long-range financial priorities to assure financial stability. o The District clearly identifies, plans, and allocates resources for payment of liabilities and future obligations. o The District has sufficient cash flow and reserves to maintain stability. 9/11/2015 12:12 PM -4- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year o The District plans for and allocates appropriate resources for the payment of liabilities and future obligations. Compliance with legal mandates and other accreditation requirements. Compliance with State Chancellor’s Office deadlines and rules. The maintenance of the minimum fund balance percentage as determined by the Board of Trustees. Additional factors related to the Mission, Education Master Plan, and institutional plans will be considered. BPC members will communicate with their constituencies prior to the time the committee makes recommendations to the Chief Business Officer and the President/Superintendent. BPC members are to communicate recommendations back to their constituents so that those groups will be informed and able to provide input. Evaluation and Ranking Protocol 1. Compliance with Federal, State and County mandates. 2. Relationship to and relative importance of the request to the institutional strategic plan and educational master plan and program review. 3. Potential impact on student learning, institutional operations, service levels, effectiveness/efficiencies, total cost of ownership. 4. Availability of alternatives and potential for deferral. 5. Funding history of the unit/area. 6. Degree to which delay will cause larger expenditures in the future and the degree to which annual operating expenditures will be reduced as a result of approving the request. Integrated Planning Functional Committees (IPFC) priorities should not be altered without sufficient justification; Priorities from various IPFC’s will have to be rank ordered; The Institutional rank order will contain requests from IPFC and operating units; Committee may decide to categorize requests and priorities according to various expenditure categories and recommend levels of funding for various categories of expenditures. 9/11/2015 12:12 PM -5- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year 9. INFORMATION: Review and discuss timeline and preliminary plans for updating the Facilities and Technology Master Plans. Plan updates must be completed by December 15, 2015. FACILITIES MASTER PLAN – PRELIMINARY DRAFT – FOR DISCUSSION ONLY: Siskiyou Design Architects have been contacted to provide a proposal and pricing for assisting with updating the Facilities Master Plan. Angelina will provide a standard plan/report template. Preliminary draft list of themes/elements/drivers in the next Master Plan: a. Repair and update existing facilities. b. Basic maintenance items, address deferred maintenance/ADA/life safety deficiencies. c. Prepare requests for additional State bond funded projects: PE bldg as A3 seismic, entire Creative Arts Bldg as A3 – seismic, DN main/AJ/CTE/DN modulars as non-A3 requests. d. Minimize local match requirements in State projects. Ensure group 1 technology and equipment is maximized in all State bond projects. (District must buy group 2 equipment.) e. Utility saving upgrades: LED lights, weatherproofing, high efficiency boilers/HVAC/blowers/controls, replacing inefficient items with new, high efficiency items, drought-tolerant or no water landscaping, waterless urinals, solar projects, water reclamation projects. f. Simplify ADA compliance. Avoid new elevators, especially avoid second floor classrooms, avoid non-standard equipment, avoid equipment/vendors without a good support infrastructure on the west coast, design with ADA compliance in mind, not an afterthought, require upgrades to comply with current ADA codes, and avoid grand parented facilities, install automatic light switches. g. Long term plans for vacant/unusable facilities. 9/11/2015 12:12 PM -6- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year TECHNOLOGY MASTER PLAN – PRELIMINARY DRAFT – FOR DISCUSSION ONLY: Identify a consultant to assist with plan preparation, fellow community college technology expert? Angelina will provide a standard plan/report template. Preliminary draft list of themes/elements/drivers in the next Master Plan: a. Bring more technology into the class environment: Support and upgrade live, interactive class delivery, increase the baseline technology package in every CR classroom, upgrade faculty desktops/laptops/tablets more frequently as funding allows, port syllabus and handout materials to electronic copy and eliminate paper copies as a primary resource. b. Leverage technology to support safety and security: Maintain and enhance network security, eliminate unsecured servers and devices, support Rave, install cell boosters, install more emergency phones, install video billboards across the District, decommission end-of-life hardware and software. c. Support technology solutions to make life easier for students and staff, i.e. bulk software licenses that benefit students and staff, implement booklook and booknow, automate Pell book vouchers, implement online student education planning, reduce reliance on printing and go paperless in more areas across the District, provide students with online access to electronic forms and eliminate paper forms for students. d. Provide better fault tolerance and disaster recovery and remote access to technology. Move from an email server to an email service like Gmail?, move from an Ellucian server to Ellucian hosted service?, provide more vpn access as appropriate, purchase more laptops and tablets and fewer desktops. e. Increase bandwidth and availability at all locations. Deploy additional wireless nodes, engage CENIC for DN broadband link, engage CENIC for a KT/Hoopa solution, upgrade to high speed wireless and decommission wired ports, for example in dorm rooms, install cell boosters. f. Leverage student technology fee funds. Develop a plan for faster refresh of computer labs and to move computer labs to laptops and tablets and away from desktops. g. Provide more professional development, training, and workshops on a regular annual calendar. 9/11/2015 12:12 PM -7- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year 12. INFORMATION: Begin a discussion on fees – Optional technology fee, materials fees, non-resident tuition, transportation fee, student center fee, etc. Optional technology fee: The tech fee has been used to add wireless units, increase internet access, purchase new computers for computer labs and related items. This year tech fee will be used for cell signal boosters as well. Should BPC recommend an increase to the tech fee? Butte College implemented a $10 tech fee several years ago and then increased it to $20 per term. Additional funds might be used to accelerate lab computer refresh, purchase more lab furniture like newer computer desks, purchase more expensive apple products and more laptops and tablets and fewer desktop machines, provide dual monitors in labs. Some funds have been set aside for electronic notification boards (i.e. flat screens) across the District, and additional tech fee could add more screens. Technology lending plan to purchase equipment that students could check out. Originally, we had planned to fund a student tech help desk so students could help students with their technology (i.e. I think I have a virus, my tablet won’t connect, what’s a good phone on verizon?, I can’t get the latest COD to run on my laptop?) Additional funds could be used to upgrade remote broadcasting technology and color, for example to broadcast more games. Funds could be used for equipment and licenses fees for a low power or internet only student radio station. Materials fees: Should BPC study materials fees to see if additional courses would benefit from providing materials to students for their use? Non-resident tuition: Let’s talk about a competitive strategy for non-resident tuition rates. What are other colleges in the area charging and what should CR charge? Need to cover costs, but then what? Should BPC recommend pricing non-resident tuition using a competitive model? Transportation fee: Should CR charge a transportation fee? The students would need to vote to assess such a fee. Fee could be used to subsidize bus fares for students. Student Center fee: Should BPC support a student center fee? Again, an election would need to be held among students. The problem is that the student union needs to be fixed up, expanded or replaced and the State does not provide bond funds for student centers. The fee could be used to much needed upgrades to the cafeteria, to fully renovate the restrooms, repair HVAC and roofing, upgrade electrical, etc. Some of this will be covered indirectly through the Utility Infrastructure project, but not all of the repairs. 9/11/2015 12:12 PM -8- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2016-17 Budget Year 16. INFORMATION/POTENTIAL ACTION ITEM: Discuss parking issues and a proposal to add 60 minute visitor spots, additional staff spots, additional handicap spots, and motorcycle parking. We are making some changes to the parking areas and proposing some changes: Improved lighting with LED bulbs. LEDs put out a nice “white” light instead of orange light, use less power and put out more light. Final phase is to switch out the last of the outside lighting to LEDs this year and to start switching inside lights as well. New call boxes and upgrades to existing call boxes: We are also deploying several more cell signal boosters across the Eureka campus in addition to the one test unit on the roof of the Admin/Student Services bldg. However, these units have limited range and will not cover the parking lots. Instead, Steven and Burk are working to add more emergency call boxes in Eureka parking lots. The existing call boxes have a very poor call quality with lots of echo, so they are working to repair these units as well. We will add at least two handicap parking spots at the lower EKA parking lot nearest to the PE bldg. This is in response to a complaint received by the Chancellor’s Office. At the same time, we are proposing to convert the first two rows of that lower parking lot near the PE bldg. into staff parking. There is limited staff parking in that area, and the PE fields upgrade project will likely encroach on the existing staff parking. We are proposing to create some 60 minute visitor parking spots around campus. 9/11/2015 12:12 PM -9- bpc agenda2 9 16 2015.doc BUDGET PLANNING COMMITTEE (BPC) Planning for the 2015-16 Budget Year Wednesday, May 27, 2015 3:00 p.m.. SS 104 Summary Notes MEMBERS PRESENT Sue Alton, Michael Dennis, Doug Edgmon, Angelina Hill, Lee Lindsey, Tami Matsumoto, Steven Roper and Lorie Walsh. CALL TO ORDER The meeting was called to order by Michael Dennis ACTION There was discussion regarding the Resource Request rankings and Tami Matsumoto voiced concern regarding items labeled not ranked. Michael Dennis proposed removing any items on the list without a dollar amount indicated. There was also discussion regarding the process for notifying requestors of the rankings and allocation of funds. Angelina Hill stated that TPC will be meeting tomorrow and she will request that they rank the items that were missed (not ranked) and forward the information to Mr. Lindsey. Mr. Lindsey will update the list and send out to the committee for approval via email. Mr. Lindsey noted that the Chancellor’s office will begin taking projects from 5-year capital plan and begin inserting one project every other year for each college in the CCC system. He also noted that the projects that we have coming up in the future are very large and will require matching funds from the district. He stated that these funds could possibly come from the 3 “rainy day” fund that was approved by the BPC earlier this spring. ADJOURNED SUBMITTED BY 4:00 p.m. lw 2015-16 CR Budget Talking Points – Fall 2015 – Preliminary Draft The 2015-16 Final Budget is balanced, holds the fund balance above 6%, and meets regulatory requirements like FON and 50% Law. o Still waiting for complete budget numbers from the Chancellor’s Office. We are relying on the Governor’s promise of additional base budget increases to balance next year’s budget. Otherwise, CR will need to move quickly to make adjustments. o Governor’s 2016-17 budget will be out in late January 2016. CR’s payroll percentage is back above the statewide average. This is a red flag for long term fiscal stability. Payroll as a Percentage of Total Expenditures 2011-12 Actual Redwoods Average of 30 smallest Average statewide 2012-13 Actual 84.1% 81.9% 83.7% 84.7% 81.0% 83.2% 2013-14 Budget 80.3% 79.9% 81.3% 2014-15 Budget Est 2015-16 Budget Est 84.8% For long term fiscal stability, we need to deal with items where inflation is increasing faster than the growth in the State budget, i.e. 1% annual State COLA. o Utility costs, especially electricity. o Health and welfare benefits. o Salary steps. The Chancellors Office is funding CR on enrollment stability for this year, but we still need to focus on growing enrollments for next year. If we can’t grow enrollments, then we will see a significant impact on the budget. o We are evaluating the enrollment process with help and advice from EAB and Pamela Cox Otto. o We have several initiatives to promote enrollment growth, including: Pelican Bay Dual enrollment Distance Education Two year scheduling Marketing 1 85.2% 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request Admin Svc Del Norte campus life safety remediation package. Upgrade outside lighting: $50,000. Underway Repair damaged walkways: $50,000. Includes improved pathways to replace rock & dirt paths. Emergency call boxes: $35,000. For parking lots. Public Safety recommended against. Automated external defibrillator (AED): $15,000. Emergency alert siren: $20,000. Life Safety Backup power: $275,000. For DN cadaver rooms, data network, & basic campus lighting. Measure Q funded. Satellite phone & satellite internet equipment: $10,000. For emergency communications. Backup data connection: $25,000. For second internet service, possibly Charter internet cable modem, & for routing equipment to implement routing protocols for DN center data traffic. Project mgt, soft costs, etc: $50,000. Facilities Life Safety Upgrade Existing Waste Water Treatment Plant, so it will produce recycled water that can be used to irrigate the athletic fields and landscaping across the Campus. This is a new direction based on fact the Force Sewer Main Option is no longer a viable project. In Progress (GHD Architects currently working on Preliminary Plans for the State) Admin Svc Districtwide technology upgrade package. FT faculty computers: $100,000. Provide each FT faculty with a new laptop or notebook. Either departments or individual faculty would need to determine if apple/mac or pc better meets their Reduce costs academic needs. Computer upgrade: $50,000. Upgrade all CRTs & substandard computers to District minimum standard. Admin Svc Districtwide internet upgrade package. CENIC: $20,000. To increase bandwidth. FTES Growth Del Norte: $5,000. To increase bandwidth. Southern Humboldt (Garberville): $5,000. Does not currently have CR internet access. EKA wireless & Residence Life: $10,000. To increase bandwidth. CDC 9/7/2015 3:55 PM One-time $ Recurring $ FPC Ranking BPC FINAL Ranking TPC Ranking One-time Funding Allocations July 2015 430,000 Yes FPC/BPC 1 5,000,000 Yes FPC/BPC 2 Funded in Utility 2 Infrastructure Project for leech field. 40,000 4,490 1 Referral Some damaged walkways will be repaired and some emergency equipment 1 will be included in Science Lab upgrade in measure Q. Remainder not funded. 150,000 Life Safety Playground Fence Repair Life Safety ADA No 30,000 TPC/BPC No TPC/BPC Yes FPC/BPC 1 2 3 Partially funded. $49,200 for 41 3 computers below CR minimum standard in Tech replacement cycle Minimal funding needed. Upgrades in process. S. Humboldt 4 completed. In queue at CENIC for EKA & DN campuses. Not funded. Refer to Dean. Please open a 5 help ticket if not already done. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Admin Svc IT IT 9/7/2015 3:55 PM Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Eureka campus life safety remediation package. Tree removal: $40,000. Remove trees posing hazards to PE fields & across campus. See p. 6 of Keenan report, “Overhead branches low & dropping on to bleachers – Struck-by Hazard.”Underway Wastewater treatment facility: $250,000. For upgrades & studies to maintain regulatory compliance. Defer to State project Class B driver training: $20,000. Different solution, no class B vehicles Walking path: $25,000. To create a walking path between the residence halls & nursery by restricting traffic. A hazard exists for students walking along this driveway as there is no room for a sidewalk. Driveway would be designated emergency vehicles only. Walking path2: $15,000. To create a pathway between rear parking lot & residence halls where pedestrians currently walk over dirt path in between trees. Redwoods bldg C repairs: $250,000. For minimal basic repairs to the old Library. Three of the four HVAC units are broken, carpet needs to be replaced, fire alarm system needs maintenance, & other repairs are needed. Cost estimate is enough to repair some, but not all of the HVAC & Life Safety other needs. Repair damaged walkways: $350,000. Repair damaged pedestrian pathways, due to ground settling, root damage, rooted wooden spacers, & age. Also, correct areas where improved path does not connect to the rest of the campus. Correct unimproved pathways, i.e. rock & dirt paths that are well traveled. Parking lot lighting: $50,000. To better light the Residence hall parking lot, AJ parking lot, and other lots. Emergency call boxes: $75,000. For parking lots that do not have call boxes, such as AJ lot, residence hall lot, etc. Backup power: $275,000. Measure Q funds have been budgeted for backup power for the data/phone network & servers, to power elevators, & for limited basic campus lighting. This would fund additional backup power for the cadaver rooms which must stay cooled & for Dining refrigerators & freezers which would supply food during an extended emergency. Utility Infrastructure State Bond project. Satellite phone & satellite internet equipment: $20,000. For emergency communications. Covers a sat phone & sat internet for EKA, plus sat phone for EKA downtown, Shively, KT, & the Enhance Network band width for increased Video traffic intra-LAN LAN network upgrades to accommodate new Video loads for DE. WS-C2960S-48LPD-L=$6774 FTES Growth C3KX-NM-10G= $1500 SFP-10G-LR= $3290 VS-S2T-10G Cat 6500 Supervisor 2T with 2 ports 10GbE and MSFC5 PFC4 =$15,600 Telepresence rollout Enhance Telepresence rollout to Del Norte, KT and Eureka downtown. FTES Growth 2 SX-20s @$15,597 3 EX-90s @ $8,600 Various Licenses, cameras, microphones Life Safety ADA Referral FPC Ranking BPC FINAL Ranking TPC Ranking One-time Funding Allocations July 2015 Some walkway repairs are funded in process 6 in measure Q. Remainder not funded. 1,200,000 Yes FPC/BPC 27,164 No TPC/BPC 3 Partially funded at 7 $12,000 with Tech Infrastructure Upgrades No TPC/BPC 4 8 Not funded 116,207 2 Recurring $ 5,000 4 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Request Res Life Life Safety Install fire control sprinklers Res Life Res Life COUNSEL/ ADVISING Life Safety Asbestos abatement in res halls Life Safety Install new plumbing DSPS Exhibit D: Report of BPC Resource Requests (New report this year) Life Safety Earthquake Retrofit30 student servers for the CIS Networking lab ( Grant funding being sought through CTEA. Other Dollar amount covered by grants not known at this time.) Facilities Life Safety WWTP Equipment Upgrades, System Required to Control THM discharge Admin Svc EKA, MN, & DN code remediation package for State funds requests. Prepare project requests & required studies: $200,000. In 2012, building codes changes require stronger structural framing & other upgrades. Buildings including: AJ, AT, PE, DN main, MN Life Safety main, & all other buildings not renovated since 2012 now need life safety code upgrades. State bond funds may be used for this remediation. However, the District must expend funds up front to complete the preliminary planning paperwork for a state bond request. Cost estimate is to prepare project requests & architect, engineer, etc. fees for necessary preliminary studies. English Res Life Admin Svc Res Life 9/7/2015 3:55 PM Other additional computer lab classroom for english composition courses (28 -30 PC computers stations @ $1100 ea.) Life Safety Install emergency communications system in Residence Halls Academy of the Redwoods life safety remediation package. Repair walkway: $30,000. To replace Academy of the Redwoods (AR) modular bldg. concrete walkway that is sagging & failing. Life Safety Main AR bldg repairs: $70,000. Correct exterior rotted wood, leaky roof, etc. Remove dilapidated shed. Replace doors & windows, as needed. Project mgt, soft costs, etc: $10,000. Life Safety Refurbish bathrooms - shower stall, toilets plumbing? 3 One-time Funding Allocations July 2015 600,000 160,000 Yes Yes 6 10 10 11 NA FPC/BPC BPC/FPC TPC/FPC Student Tech 46,600 Res Life BPC FINAL Ranking TPC Ranking 9 New CCTVs and scanners for labs on campus (one in each lab on campus; ADA compliance) Resurface/repair blacktop around res halls, including parking areas (required for ADA compliance) FPC Ranking 5 ADA Life Safety Referral FPC/BPC 11,300 Res Life Life Safety ADA Yes 10 computers/5 for students, 5 for staff - EKA computers only Upgrade residence hall room heating. Life Safety Dorm heating: $200,000. Current gas wall heaters are worn out & in need of replacement. Funds will be used to replace with energy efficient room heating solution. Recurring $ 1,000,000 Other Admin Svc CIS One-time $ ? Yes TPC/BPC 200,000 Yes FPC/BPC 9 100,000 Yes FPC/BPC 14 1,000,000 Yes FPC/BPC 13 48,000 NA TPC/BPC 100,000 Yes FPC/BPC 5 12 6 13 Partially funded by Utility Infrastructure project. Remainder not funded. Not funded. Not funded. Funded. Purchased or in process Funded with $47,000 in New CCTVs and scanners for labs on campus (one in each lab on campus; ADA compliance) 14 Not funded. ADA parking 14 completed, otherwise not funded. 16 Not funded. 8 13 17 Fund with CTEA 18 Funded at $100,000 in Mandated improvements to wastewater plant Partially funded at $10,000 in EKA, MN, & 19 DN code remediation package for State funds requests. 200,000 Yes FPC/BPC 8 30,800 33,000 NA TPC/FPC/BPC 9 10,000 Yes TPC/FPC/BPC 7 110,000 Yes FPC/BPC 15 160,000 Yes FPC/BPC 7 Need to locate space. Not funded. Not funded. May fund 21 with Aux bgt. ADA walkway repair is in process with measure q bgt. Other 22 repairs are in queue for Maintenance as time/bgt allows. 23 Not funded. 19 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request IT Create a Network Operations Center dashboard to monitor application and network performance Reduce costs Evaluate and purchase a network Monitoring tool like IPSwitch Whatsup Gold or Solar Winds. One Server and Software license. Total cost=$12,668 Admin Svc FTES Growth Renovate & repurpose old diesel lab. MATH Other Other High-definition video display (repeat from 2011-12, 12-13) Bus/Econ Other Replace computers (desk-and-laptop) in HU 216/218 Res Life Admin Svc IT Res Life IT Admin Svc WT 9/7/2015 3:55 PM No FPC/BPC NA TPC/Student Tech 10 NA IELM /TPC 13 37,500 NA TPC/BPC 12 84,000 Yes FPC/BPC 11 We have some hi-def monitors in inventory. 27 Please open a ticket and list the room and other details. Funded in Tech 27 replacement cycle. Please open a ticket. 29 Not funded. 75,000 Yes FPC/BPC 17 30 Not funded. May fund with Aux bgt. 6,475 No TPC/BPC 30 130,000 to 260,000 Fund in Tech Infrastructure Upgrades bgt. Please open a ticket. NA FPC/BPC 3,525 No TPC/BPC Yes FPC/BPC 20 Not funded. Will try to 34 fund smaller pkg of security cameras. NA FPC/BPC 16 35 Not funded. 20,000 7,000 Life Safety Replace vanities, sinks, faucets Dining equipment. Life Safety Replace worn out equipment: $75,000. There is old worn out equipment, such as commercial cooking equipment, that needs to be replaced. Technology Package for KT Site Install KT Technology package. This site needs new switches and fiber as well as a new wireless FTES Growth system.1 12-port switch @ $878.00 one 24 port switch at $2397.00 Wireless at $600. Fiber run at $2600. Total = $6475 Reduce Replace heating system Costs Wireless diagnostic and design tool set. Wireless testing suite to utilize with our tablets. This is software only. Reduce costs Fluke Networks AM/A3000-US AirCheck Wi-Fi Tester for Windows $995. GLD-S3000G Gold Support $180 Three sets. Convert DN campus to cardlocks for all doors, upgrade alarm, & increase security cameras. Life Safety Del Norte (DN) center lock upgrade: $45,000. Replace all key locks with an integrated cardlock system, upgrade to a comprehensive security alarm, & increase the number of security cameras. Other TPC/BPC 475 385,000 Purchase 10 replacement laptops for math FNR No 12,668 45,000 $135,000 orignial and add another $200,000 Measure Q discussions to relocated welding lab to old diesel area. 4 N - 10,000 TPC Ranking One-time Funding Allocations July 2015 Referral Recurring $ FPC Ranking BPC FINAL Ranking Life Safety ADA One-time $ 14 24 Not funded. May purchase with dept bgt. Not funded. Will try 24 smaller project with Maintenance. 16 16 19 26 Not funded 32 Not funded. 20 33 Not funded. May purchase with dept bgt. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Life Safety ADA Recurring $ Referral FPC Ranking TPC Ranking Admin Svc Install full gutters & downspouts at buildings. Gutters: $70,000. Several buildings lack complete gutters & have “chains” instead of downspouts, & lack drainage for roof runoff. This results in a wet campus & increases mold & mildew growth. The campus has already experienced a costly repair to remediate mold damage Life Safety due to wetness from the side of a building seeping into the facility. Also, extra water creates slip hazards & makes it harder for students to walk on campus during & after rainstorms. This would provide funds to add full gutters to existing buildings, complete downspouts, & install drains to capture the water coming out of the downspouts to reduce the level of wetness. 70,000 Yes FPC/BPC 22 Res Life Life Safety Increase lighting inside rooms 16,000 Yes FPC/BPC 18 10,000 NA IELM/BPC 11 NA TPC/BPC 17 Fine Arts Other Purchase gently used, high quality acoustic upright pianos ($4000-$5000 a piece). Depending on the price we can get 2 pianos. The current ones are at least 40 years old and are barely tunable. CIS Other Upgrade VMWare software on student server (Grant funding being sought through CTEA. Dollar amount covered by grants not known at this time.. Library Life Safety Replace missing, damaged chairs Facilities Life Safety Used Bobcat T-55 Track Loader/Trencher/Rototiller, used for installing water and electrical lines as well as preparing soil for landscaping 37 Not funded. Not funded at present. Hold for possible 38 funding at Jan 2016 mid-year review of onetime bgts. 39 Funded by CTEA 41,000 Yes BPC/FPC 23 Possibly partially funded with Tech Fee for computer chairs. 40 Otherwise In queue with other priorities in $40,000 Library allocation bgt. 20,000 Yes FPC/BPC 26 41 Not funded. - NA IELM 19 42 Purchase ProQuest search engine for student use in LRC to complete courses required for ADT’s Psychology, Anthropology, and Sociology. 10,000 10,000 NA TPC/BPC Student Tech 15 43 Purchase 15 computers for multi-purpose lab for noncredit math courses (could be used for other noncredit courses). 17,250 N NA TPC/BPC 21 44 280,000 No FPC/BPC 7,000 No TPC/BPC Yes FPC/BPC Other Purchase and install new desktop, scanner, hard-drive, and software in FW office. BSS Other MATH Other Admin Svc FTES Growth New large format modular classroom for Del Norte campus. Adult Ed FTES Growth 9/7/2015 3:55 PM - Grow noncredit FTES in the areas of basic skills, and other noncredit areas. Purchase four computers for noncredit staff. Smoke-free Del Norte Campus & Eureka Downtown Community Education site. Smoke free signage & handouts: $10,000. The Southern Humboldt Site (Garberville) opened as Life Safety a smoke & tobacco free site. This request is for funds for signage & other physical changes to convert the Del Norte Center & Community Education site in downtown Eureka. There would also be a related education & roll out plan with constituent input. 10,000 5 One-time Funding Allocations July 2015 Not funded. Will include gutters in new 35 project specifications as allowable. 4,000 FWW Admin Svc 2,300 BPC FINAL Ranking 2,000 30 45 23 25 46 Fund in Tech Infrastructure Upgrades bgt. Please open a ticket. In queue with other priorities in $40,000 Library allocation bgt. Funded. Purchased or in process Not funded. May use dept funds for small planning project. Funded. Purchased or in process 47 Not funded. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Request PHYS SCIENCE Other Six Computers for HU 211 PHYS SCIENCE Other 21 Organic Chemistry Lab Kits, $500 each CDC Res Life Exhibit D: Report of BPC Resource Requests (New report this year) Admin Svc Facilities FTES Growth Classroom furniture & lighting upgrades across campuses. Fine Arts Res Life PHYS SCIENCE Life Safety? SMART projector in CA 109 (Epson BrightLink) Reduce Other Replace windows with double pane Update SC 114 Chemistry lab to increase number seats and usable counter space, including removing equipment on counter tops which obstruct view and make available nitrogen gas Library Other Upgrade/replace Koha integrated library software system Fine Arts Other (4) Digital cameras @ ~$625 each (with tax and shipping)Nikon D3200 with lenses and a bag Admin Svc Facilities $500 (replace broken NA IELM 2,500 NA IELM/FPC 28 50 386,000 NA FPC/BPC 29 51 Not funded. 450,000 No FPC/BPC 32 Funded in Measure Q. 51 Project is underway with architect. 60,000 No FPC/BPC 34 1,900 NA TPC/BPC 111,000 CR Ticket Estimate for work completed in NA FPC/BPC 24 53 Not funded. Fund with Tech Infrastructure Upgrades 54 bgt. Please open a ticket. 55 Not funded. NA FPC/BPC 33 56 Not funded. NA IELM/FPC/ BPC 24 57 Not funded. 2,500 NA IELM/TPC 22 58 Not funded. 30,000 No TPC/BPC 28 59 14,000 Yes FPC/BPC 27 60 Not funded. No FPC/BPC 35 61 Not funded. No TPC/BPC $64,690 first year; Del Norte library technology upgrade. FTES Growth DN Library: $30,000. Expand computer stations (mac & pc) & sitting area in Del Norte (DN) Center library & reduce number of stacks, since students are using more online resources. Life Safety IELM 10,500 ComplianceReplacing materials preschool playground, Care Licensing Requirement Care Licensing Reduce Electrical Upgrade: increase electrical infrastructor; improve lighting, increase outlet power Costs New PE fields & upgrades. New PE fields: $450,000. The Physical Education (PE) fields are currently undergoing a limited FTES Growth life safety & ADA upgrade. Funds would expand the football field to a regulation soccer field, repair the tennis courts, & create other fields for expanded PE courses. NA 7,200 Gas Powered Gardener Vehicle to replace Electric Cart, the electric cart was not intended for the all-terrain use it has been subjected to. Admin Svc FTES Growth Renovate rooms in AJ for AR expansion. 50,000 Bus Ofc Engage other departments in assisting with more Business Office reports. Reduce costs Document imaging and Softdocs integration with business office processes such as Accounts Payable, Purchasing, and Accounts Receivable. 85,000 9/7/2015 3:55 PM 6 second year $24,886; third year $26,130; fourth year $27,437 10,000 TPC Ranking One-time Funding Allocations July 2015 Referral Recurring $ FPC Ranking BPC FINAL Ranking Life Safety ADA One-time $ 18 Not ranked 29 48 Funded. Purchased or in process 49 Not funded. Not funded. Refer to Dean. Not funded. Maintenance is working this project to reduce the cost. 61 Not funded. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area HPEK Facilities Fine Arts Admin Svc Package Other Exhibit D: Report of BPC Resource Requests (New report this year) Request Stereo system for Fitness Center with auxiliary input and/or Blue tooth Improve student furniture & technology in each bldg Purchase computer tables, chairs, Macbooks, PC notebooks, USB charging desk lamps, FTES Growth benches, etc for students to sit & to supplement student technology outside of the computer labs. Cost is estimated for Sci, Hum, AT, CA, AJ, DN main, DN student lounge, Dining, LRC, etc. Other Tables for CA 138 & CA 139 (Alulite Aluminum from School Outfitters)CA 138 = 4 36” X 72” and 8 36” X 96”CA 139= 6 36” X 72” and 4 36” X 96”36” X 72” are $387.99 each36” X 96” are $458.99 each Upgrade to high efficiency exterior windows/doors in residence halls. Reduce costs Dorm energy efficiency: $80,000. Existing windows are energy inefficient single glaze & are worn out. Funds will be used to replace with high efficiency windows & doors. Library Other MT Other 1,000 NA TPC/BPC (Student Tech) 25 63 Funded with Tech Fee as appropriate. 100,000 No TPC/BPC 30 63 Partially fund with Tech Fee as appropriate. 9,388 NA FPC/BPC 38 65 Not funded. 80,000 No FPC/BPC 31 66 Not funded. NA FPC/BPC 36 67 Not funded. NA FPC/BPC 37 68 Not funded. Additional study rooms or modular office furniture providing semi-private study/meeting areas, with 1 room reserved for use of A/F Identify space for wood routing laboratory TPC Ranking One-time Funding Allocations July 2015 Referral Recurring $ FPC Ranking BPC FINAL Ranking Life Safety ADA One-time $ Admin Svc Remove abandoned foundation in parking lot. Remove abandoned foundation: $40,000. Near the Academy of the Redwoods (AR) building, Life Safety there is an unused building foundation that obstructs a portion of the parking lot. The foundation would be leveled & that area of the lot would be corrected to create new parking spaces. 40,000 Yes FPC/BPC 40 69 Not funded. Admin Svc Generate revenue Storage facility for large equipment & items. Storage: $50,000. Items are currently stored in Redwoods bldg. C that will need to be relocated if the facility is leased. Also, there is a need for rolling stock to store construction items. This would fund a prefab storage structure & rolling work unit. 50,000 No FPC/BPC 39 69 Not funded. 150,000 NA FPC/BPC 41 71 75,000 No TPC/BPC 56 NA FPC/BPC Student Tech 44 NA IELM/TPC 25,000 No FPC/BPC UNKNOWN Yes TPC/BPC 25,000 No FPC/BPC AG Admin Svc Optimal FTES Livestock-handling facility FTES Growth Telepresence upgrade - Pelican Bay & high schools. Library Other Replace Keyboard trays in LRC 103; 30 stations 3,420 DM Other Replace multi-page scanner 4,000 Admin Svc CDC Admin Svc 9/7/2015 3:55 PM FTES Growth Additional outdoor tables & chairs across campuses. Outdoor tables & chairs: $25,000. Fixtures near the student union have been popular with students. This funding would allow the placement of similar tables & chairs at EKA & DN campuses to encourage informal exchanges & engagement. Life Safety Establish safety response between front office, classrooms & security Replace bathroom paper towel dispensers with hand dryers. Hand dryers: $25,000. Bathroom paper towel dispensers create trash & paper towels are Reduce costs expensive. Hand dryers are more sanitary. Cost estimate assumes that additional electrical runs may be needed. 7 - 12 72 Not funded. 73 Not funded. 26 74 Funded. Purchased or in process Not funded. May fund 75 with aux funds if available. 43 27 45 Funded in Measure Q. Project is underway. Proposal is OK to move 76 forward without funding. Not funded. May replace with hand 77 dryers in new projects as appropriate. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request NA IELM/ FPC 58 NA FPC/BPC 46 NA FPC/BPC 42 20,000 NA FPC/BPC 49 Previously funded with Measure Q. 79 Not funded. Not funded. 80 Maintenance is working this project. 81 Refer to Dean 6,000 maintenance NA FPC/BPC 50 81 Not funded. ? 13,000 copper or 7,000 NA FPC/BPC 55 81 Not funded. NA FPC/BPC 47 84 Not funded. 8,000 NA IELM/FPC 48 85 150,000 No FPC/BPC 52 86 1,500 NA FPC/BPC 53 86 NA FPC/BPC 54 88 NA FPC/BPC TPC/FPC Student Tech Cabinet 57 89 Athletics Other Batting cages 6,000 Paramedic Other 3,000 BSS Other Athletics Other Athletics Other DM Other Provide a minimum 8 foot by 8 foot storage area in close proximity to the HO classroom. Establish campus climate which acknowledges diverse needs by creating one stall gender neutral bathrooms on campus by converting signage in CA, Forum, Cafeteria and AJ handicap accessible restrooms. Increase equipment/travel budget 4-wheel quad runner/coaches and teammembers perform infield repairs; current quad runner 20 yrs. Old Identify permanent location for video shoots w/green screen Fine Arts Other Set of 5 new timpani Athletics Other Weight Training Equipment Admin Svc Other Purchase 2 laptops/tables for staff to use doing inventory (library inventory required by ACCJ) AG Other Track-laying tractor CDC Enrollment Services Admin Svc Admin Svc Admin Svc Admin Svc 9/7/2015 3:55 PM 1,000 20,000 FTES Growth Stadium lights. Library Cal Trans funded? Maintenance Tile Replacement-water fountains Other Space to establish a Student computer lab in SS/Admin Bldg. NA 20,000 20,000 Replace stadium bleachers. Replacement bleachers: $375,000. Replace with aluminum bleachers & press box. Old bleachers were unsafe. Project mgt, soft costs, etc: $40,000 Funded Districtwide backup data connection. District backup routing: $50,000. Upgrade to fiber backhaul to Suddenlink local office & Life Safety implement routing protocols & equipment upgrades to allow for route selection of all traffic to Suddenlink during any CENIC outage & vice versa. Will benefit entire District as web server, student portal, etc. will stay up during an outage. Other N 4,400 FTES Growth PT non-credit & other support in Southern Humboldt. Other N/A 50,000 FT maintenance position in Facilities. FT Maintenance staff: $60,000. New full-time (FT) position for Facilities, most likely a maintenance mechanic, painter, or electrician. An electrician is our highest priority due to life safety needs. We can fund this position with limited or no net increase to the general fund by funding with other funds & reducing existing GF budgets to cover the costs. This is Admin Svcs HIGHEST priority need at present. Funded 8 30,000 No Not ranked TPC Ranking One-time Funding Allocations July 2015 Referral Recurring $ FPC Ranking BPC FINAL Ranking Life Safety ADA One-time $ 78 Previously funded with Measure Q. Removal of existing lights funded with Measure Q. No funds for replacements. We have some refurb laptops in inventory. Please open a ticket. Fund with CalTrans budget. Please allocate in CalTrans bgt and open a PO. Not funded. 90 Not funded. Not funded. NA Funded Bleachers replaced with temporaries. Perm bleacher replacement not funded at present. Yes TPC/BPC No funding needed. In queue with CENIC instead of Suddenlink. NA Funded almost entirely from nongeneral fund for first 2 years. Not funded. May use temp position as appropriate. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area IT Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Replace 12 aging, obsolete, and EOL file servers in LRC and SST, Maint and Del Norte Life Safety Replace Nine File Servers that are more than NINE years old. 6 in LRC alone. These machines are obsolete and unserviceable, oldest machines left in operation. 21,000 Recurring $ 500 Advanced QoS Training $3,395 Advanced QoS training. Course code 5643 5 day course. Funded Install tsunami sirens $4,000 Install VoIP Tsunami/Emergency Sirens Must do roof penetrations for cabling. Need Certified Professional Installer Funded Install cell signal boosters around campus $6,000 Install Cell Signal Boosters across campus to increase safety levels. One unit for AJ, HU and CA and AT @ $1,200 Funded Staff Training-ICS 100/700 (In progress) A few staff members have completed this training. New employees are being encouraged to participate as well. In process Life Safety ADA Referral Yes TPC/BPC No VP bgt 2015-16 Yes Funded Yes Tech Fee bgt FPC Ranking TPC Ranking BPC FINAL Ranking One-time Funding Allocations July 2015 Funded with Tech Infrastructure upgrades as a high priority due to security risk. This is part of a larger $100,000 allocation for virtual servers. IT Other IT Other IT Other Facilities Other Facilities Other Replace Pathway Lighting with LED Fixtures-In Progress In process NA Funded Facilities Facilities Facilities Other Other Other Replace two Maintenance Vehicles (In Progress) Lifting Rescue Tripod (in Progress) Replace 6,000lb Forklift (Complete) NA NA NA Facilities Other Grade 3 WWTP Plant Operator-Interim (Currently due to lack of qualified applicants) Searching NA Facilities Facilities Other Other Sewer Inspection Camera Done Electrician Duplicate request Yes Yes Funded Funded Funded Search continues Funded Duplicate Facilities Other Maintenance Mechanic III 60,000 60,000 No Cabinet Facilities Other Locksmith 60,000 60,000 No Cabinet Funded As noted. Not funded. May use temp position as appropriate. Not funded. 53,000 53,000 No Cabinet Refer to Cabinet. 25,000 25,000 No Cabinet Refer to Cabinet. 34,000 34,000 No Cabinet Refer to Cabinet. Adult Ed Adult Ed Adult Ed 9/7/2015 3:55 PM NA Develop five noncredit certificates. Provide a part-time Noncredit Counselor to provide Counseling support and assistance creating FTES Growth noncredit educational plans to noncredit students. Noncredit educational plans will be required of noncredit students as part of the Noncredit SSSP. Develop one pathway for students to follow from noncredit to credit classes. FTES Growth Provide a part-time, temporary student services support to process student registrations and other provide student support services to noncredit students. Coordinate Noncredit and Adult Education planning with at least five other adult education providers or locations within the District. FTES Growth Provide a part-time, temporary noncredit class coordinator to track and schedule noncredit courses across the District in both CR and Community locations (such as both County Jails, the CCC Campus, Elementary and High School locations, etc.) 9 VP bgt 2015-16 Funded Partially funded in Tech Fee bgt As noted. In process as prop 39 funds allow. Funded Funded Funded As noted. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Recurring $ Life Safety ADA Referral FPC Ranking TPC Ranking BPC FINAL Ranking One-time Funding Allocations July 2015 Comm Ed Other Develop a new not-for-credit career training to meet local workforce needs. In prcoess NA As noted. Comm Ed Payroll Other Other Develop a new incumbent worker not-for-credit training. In process Implement the requirements of the Affordable Care Act. In process NA NA As noted. As noted. DSPS ADA Purchase new Assistive software licenses (will be out of compliance in March 2015; title V,Sec. 508), electric adjustable height tables, Access to assistive software in labs (ADA Compliance) 48,000 Ongoing support from General Fund New DSPS Van 90,000 50,000 Outreach materials (SSSP funding?) 1,000 CDC DSPS Counsel/ Advising Library CDC Optiman ADA Optimal FTES Student Maintenance Prof Dev Library Other Remove periodicals shelving/repurpose with new study carrels CDC Other Clean interior/exterior high windows; licensing requires things be clean Other Res Life In progress NA ADA Completed In progress Completed In progress NA Dir Counseling NA NA In progress In progress 5,000 NA Prof. Dev. Costs by another dept. NA In progress 22,500 905 Professional development funds 90,000 Yes 905 As noted. In progress In progress In queue with other priorities under professional development. In progress Not funded. Refer to Dean. Please open a help ticket if not already done. 330 330 NA Maintainence Faculty mentors for grads of UB who are attending CR to meet UB objective 5,000 5,000 NA BPC Not funded. Other Materials and food money for faculty mentoring program 1,000 1,000 NA BPC Not funded. Other 40" flat panel tv/DSPS waiting room/for information and announcements 600 NA In progress ADA ADA compliance repairs: walkways around res halls N/A Yes In Progress 150,000 Yes In Progress N/A Yes Utility Infrastructure NA Completed Completed 260,000 Yes Completed Completed 80,000 Yes Completed Yes Utility Infrastructure Completed Include in Utility infrastructure project as appropriate. Not funded. Please open ticket. Refer to Dean. Completed Completed Res Life Life Safety Replace roof & rain gutters-Mendo Hall Res Life Life Safety Replace security video cameras and video camera recording equipment Athletics ComplianceReinstate Men's soccer, implement Womens sport for Title IX compliance Title IX Res Life Life Safety Upper deck Mendo Hall; railings & stairways need replacing; deck resurfaced and sealed Res Life Life Safety Replace carpet in Mendo & Del Norte Halls Res Life Life Safety Replace exterior lighting around res halls Res Life Life Safety Replace lighting in Mendo Lounge CDC Athletics CDC Other Kitchen Hood Cleaning Other Ice Machine, Trainer's Room Life Safety Renovation Grant Items (207) Replacement Kitchen Floor 9/7/2015 3:55 PM In progress Increase student computer workstations; suggesting laptops; 30 ea Clean/pressure wash building andplayground concrete and walkways DSPS Upward Bound Upward Bound DSPS Yes Yes/unknown 70,000 Yes 30,000 Labor only 475 11,600 10 Yes Submit ticket NA NA Yes APHOC Dean Completed Completed Not funded. Work completed and in process. In Progress Include in Utility infrastructure project as appropriate. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Life Safety ADA Recurring $ Enrollment Services Other New Shredder 385 NA Library ADA Update DSPS scanners; they will not be compatible with new software updates; will be out of compliance in March, 2015 300 Yes Enrollment Services Other Adjust Advising funding Library Other Convert incandescent table lamps to CFL Lamps w/charging docks; strip LED lighting to underside of study carrel shelves Library Other Replace zigzag and kiosk computer stations…use existing furniture Res Life CDC Library 44,097 44,097 Costs by another dept. DT Other Replace network switches for AT107, to prevent cancelling casses due to malfunctioning network and confirm to CISCO platform Fine Arts Other SMART projector and custom whiteboard in for CA 107 (Epson BrightLink) MT Other Program Cost:Professional development related to ATMAE accreditation and program improvement (CTEA funds for full amount) In Progress HPEK Other 8 Dynamax Echo Slam Medicine Balls HPEK Other HPEK Deferred to next PR cycle Maintainence funds Completed Completed NA IELM NA IELM NA CTEA 400 NA IELM 6 TRX Suspension Training Equipment 800 NA IELM Other 4 Olympic Weight Bars 800 NA IELM HPEK Other 16 Stretch Bands 500 NA IELM HPEK Other 8 Kettlebells 500 NA IELM HPEK Other 3 Speed Ladders 200 NA IELM HPEK Other 4 Rogue P-R Pull Up System Bars 600 NA IELM 250 NA IELM NA MSBSS Dean HPEK MATH 9/7/2015 3:55 PM Life Safety 24 Traffic Cones Other Purchase MATLAB software 3 year upgrade 5,380 11 $2500 No N Fund with dept operating bgt Fund with dept operating bgt In Progress NA Yes NA 2,500 One-time Funding Allocations July 2015 NA 2,000 24,000 1,900 plus 300 BPC FINAL Ranking Completed NA - TPC Ranking Completed 200 4,000 Enrollment Services TPC/FPC Student Tech FPC Ranking NA NA Reduce Repair, remove or seal fireplaces Costs Other Wi-Fi Access through all CDC Life Safety Repair/replace security gate and patron counter Other Referral As noted. As noted. Completed Completed In queue with other priorities under computer replacement cycle. In queue with other priorities under computer replacement cycle. In queue with other priorities under professional development. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area DT Fine Arts Exhibit D: Report of BPC Resource Requests (New report this year) Package Request Reduce Costs Repeat request: improve heating and ventilation in the CAD lab (AT105 and AT107) Other WiFi for Creative Arts (Promised since Fall 2013 and was in last year’s Instructional Program Review). CA 105 and CA 109 still have no WiFi access. ADDCT Studies Other Expert Speaker for workshop presentation for all CR students and faculty and Humboldt county Fine Arts Other HUM/ COM Other Table arm chairs for CA 109 (told to put on Program Review by Garry Patrick) Additional Whiteboards added to other lecture rooms in the Humanities Building. (3 lecture rooms) DT Other Replace 20 chairs for AT107 Fine Arts Other HUM/COM Other Removal/repurposing of the Ceramics Lab in Del Norte Additional Whiteboards installed in HU 213 and HU 215 (approved last years Program Review and not completed) FWW Optimal FTES FWW Other FWW RN Optimal FTES Optimal FTES Life Safety ADA Referral ? NA Utility Infrastructure 1,248 NA Completed One-time $ 5,000 Recurring $ 5,000 ? 3,000 - 50,000 Advertising in local, state and national publications. Acquire and locate a metal container for storage of timber, thus freeing up space within the FW building for a finishing room. Printing and mailing of postcards and brochures related to the Mid Winter Show, the Spring Show, the Open House, and the intended SF show. Science and Health Night TPC Ranking BPC FINAL Ranking One-time Funding Allocations July 2015 Include in Utility infrastructure project as appropriate. Completed NA Prof. Develop. NA In progress In queue with other priorities under professional development. In progress NA In progress In progress NA IELM/FPC NA In progress NA IELM 700 $700 NA CTE Dean 4,500 - NA Hold 750 $75 0 NA CTE Dean 10,000 10,000 NA Hold NA Prof. Develop. Not funded. Refer to Dean. In progress Funded - already installed. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. In queue with other priorities under professional development. Not funded. Refer to VPI English Other Continued support for professional development in area of acceleration English Other Restore budget for visiting writers series to bring three professional writers a year to campus to augment the BOTY program 3,000 3,000 NA VPI BSS ADA Increase ADA accessibility and safety (equipment & furniture) and multimedia capabilities for SMART classrooms as well as address safety in CA 109 & 113 classrooms. 7,300 Unknown NA In progress In progress NA In progress In progress BIO/ ENV. SCIENCE ? FPC Ranking Del Norte Campus Science Wing Modernization ADA and OSHA safety regulations remodel to ADA/OSHA address ventilation, emergency shower, Smart Board technology and cadaver storage which meets requirements. 500,000 AJ Other Ceiling mounted projector for AJ 101 500 N NA IELM AJ Other Ceiling mounted projector for AJ 108 700 N NA IELM 550 550 NA CTE Dean CIS 9/7/2015 3:55 PM CertificationCISCO Networking Academy Annual Fee (required to be CISCO certified) Licensing 12 Fund with Tech Infrastructure Upgrades bgt. Please open a ticket. Fund with Tech Infrastructure Upgrades bgt. Please open a ticket. Not funded. Refer to Dean. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request CT Other Purchase building lot for house #41 PHYS SCIENCE Other Fossil and rock samples for Geology. This is an operational request for Eureka campus labs. CT MT Paramedic Life Safety ADA Referral 65,000 to 70,000 NA In progress 600 NA MSBSS Dean One-time $ AccredidationNABCEP annual solar fee (national certification fee required) Certification AccredidationPurchase Mastercam software annually (required) Certification Provide regular service and inspections of the ambulance vehicle to assure that it remains useful Other as a training aid and a method for transporting simulation equipment. 600 600 NA CTE Dean 2,400 2,400 NA CTE Dean 1,000 NA APHOC Dean NA MSBSS Dean NA IELM NA IELM NA CTE Dean PHYS SCIENCE Other 12 pH meters, $100 each 1,200 AJ Other Replace projector AJ 109 1,000 BSS Other Provide 2 PC computers in CA 113 computers to improve GE outcome of effective communication in Psychology courses taught in Creative Arts building. 2,300 AT ECE PHYS SCIENCE PHYS SCIENCE BSS PHYS SCIENCE PHYS SCIENCE PHYS SCIENCE ADDCT Studies FNR Paramedic 9/7/2015 3:55 PM CertificationAnnual Software license fees for certification Licensing Recurring $ 2,200 N 2,200 Other Art and Paper supplies for ECE classrooms; $225 for Eureka, $75 for DN 300 NA APHOC Dean Other Elasticity lab materials 200 NA MSBSS Dean Other Batteries (Physics) 100 NA MSBSS Dean Other Provide functional and up to date materials for courses required in ADT-Anthropology including casts and skeletal materials for ANTH 1, ANTH 1b, and ANTH 6 to use; annual budget to replace consumable/ limited-time use and broken items (tarps, plastic bags, trowels, flagging tape, dustpans, measuring tapes, metric graph paper, etc.; purchase of graduated soil sieves for ANTH 2 lab NA MSBSS Dean Other Assorted resisters, capacitors and inductors for Physics 4B 150 NA MSBSS Dean Other Slotted wire rack Physics 100 NA MSBSS Dean Other Rotational Inertia Samples 900 NA MSBSS Dean Other Instructional materials, e.g. DVDs ComplianceESRI site license required Certification Provide an ongoing budget for replacement of training equipment parts and disposable medical Other supplies. 13 3,500 500 2,000 2,000 NA IELM 2,000 2,000 NA CTE Dean 490 NA CTE Dean FPC Ranking TPC Ranking BPC FINAL Ranking One-time Funding Allocations July 2015 In progress Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Fund with Tech Infrastructure Upgrades bgt. Please open a ticket. We have refurb computers in inventory. Please open a ticket. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Not funded. Refer to Dean. Not funded. Refer to Dean. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ Recurring $ Life Safety ADA Referral NA IELM BSS Other Provide functional and up to date classroom materials for courses required in AAT-Psychology including hands on demonstration activities in Psych 1 (skull, eye, and brain models), and Psych 11 (measuring cups, cups, measuring tape, clay, play-dough, rulers, flash lights, disposable table cloths, crayons, poster board) Fine Arts Other Skil Jig Saw (includes tax) 60 NA HA Dean Fine Arts Other 8 Brute Commercial Trash Bins and Lids ($42.20 each with tax) 338 NA HA Dean FNR Other Replace hard hats 500 NA CTE Dean AT Other Classroom technology update NA IELM AT Other Vehicle replacement/fix/repair fund 2,000 NA IELM ECE Other WiFi access througout the CDC 2,000 NA Completed Fine Arts Other Milwaukee 18V Lithium Ion Drill and 18V Impact Driver (includes tax) 239 NA HA Dean Fine Arts Other Makita Belt Sander (includes tax) NA HA Dean Paramedic AT Other Other Apply vinyl lettering to ambulance identifying it as a training asset of the HO department. Vehicle replacement fund 2,000 10,000 N/A 10,000 NA NA Completed TPC/BPC MT Other Purchase 3 engine lathes (14 x 40) recommended from site visit, part of national certification 60,000 - NA IELM/TPC DT Other Studica - Auto Desk 1,500 1,500 NA IELM Fine Arts Other Pep 196.91 12” Guillotine Shear (Metals) 1,200 NA IELM MT Other Purchase 1 manual vertical milling machine (recommended from site visit; part of nationa certification) RHM Other Fine Arts Other MATH Other MT 2,000 500 ? 2,000 249 BPC FINAL Ranking One-time Funding Allocations July 2015 Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. ? Not funded. Refer to Dean. As noted. Not funded. Refer to Dean. Not funded. Refer to Dean. Completed Not funded. $45K funded for this and other MT requests. Not funded. Refer to Dean. Not funded. Refer to Dean. - NA IELM/TPC $45K funded with onetime mandate reimbursements for this and other MT requests. 500 none NA CTE Dean Not funded. Refer to Dean. NA Completed Completed NA BPC No cost Other Purhcase CNC Turning Center (CTE One-Time enhancement funds for full cost) 45,000 NA TPC/BPC Fine Arts Other Model QT6 Single 6lb capacity barrel tumbler (Metals) 200 NA APHOC Dean DT Other Ongoing operational cost for software maintenance, toner, ink, paper, incidental instructinal supplies NA CTE Dean 10,000 2,500 14 TPC Ranking 15,000 National certification DVD’s and texts plus textbook auxiliary materials that are not included in instructor materials and would be used to supplement instruction. Computer for the Art Gallery (Ticket #5492 submitted 4/14/14 @ 10:08am). Repurposing Instructor computer. Provide tutoring support for Math lab and Math Jam accelerated courses for math placement in 2014-15 districtwide. 9/7/2015 3:55 PM FPC Ranking N 2,500 Not funded. Refer to Dean. $45K funded with onetime mandate reimbursements for this and other MT requests. Not funded. Refer to Dean. Not funded. Refer to Dean. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted 2014-15 Planning for 2015-16 BPC Final Resource Request Rankings @ June 2015 Area Package Exhibit D: Report of BPC Resource Requests (New report this year) Request One-time $ MT Other Purchase CNC Vertical Machining Center (VMC) BSS Other Purchase posters and art that provide images of African American role models to be displayed in common areas of Eureka and Del Norte campus buildings. FWW Other Rental of Town Hall Fort Bragg, and ABC license for show opening. Mid-winter Show 2015. English Other 8 chairs ($130 each w/tax & ship) Fine Arts Other HUM/COM Other Recurring $ Life Safety ADA Referral 60,000 NA TPC/BPC 3,000 NA VPI NA CTE Dean 1,040 NA IELM Hand-held scanner – Makerbot Digitizer with one year Makerbot support 950 NA IELM CDs and videos in Spanish and French 200 NA HA Dean $20 per hour rental fee for approximately 120 hours of instruction. NA Cabinet 3,750 NA IELM NA In progress NA Cabinet 750 750 RHM Other Secure consistent use of a culinary kitchen for the RHM-10 course Fine Arts Other 3D printer- Makerbot Replicator 5th generation with one year MakerBot Support. Fine Arts Other Projector Screen for CA 126 and a stabilizer for the ceiling projector mount in CA 126. Other Program faculty are limited to 2 full-time persons and a number of associate faculty whose TLU allocations are maxed out per CRFO contract and whose expertise is not in curriculum development. The full-time faculty are requesting release time of 9 TLU’s each for this project, with the understanding that additional associate faculty will be needed to fill the gap. The expected amount of time a revision of this magnitude is estimated to take is 160 hours for each full-time faculty member for a total of 320 hours. 13,000 BSS Other Purchase furniture for hallways and common areas of Science and Humanities buildings to provide a place for students to meet and study. 45,000 NA In progress Fine Arts Other 4 light trees, for drawing 400 NA HA Dean LVN 9/7/2015 3:55 PM 15 FPC Ranking TPC Ranking BPC FINAL Ranking One-time Funding Allocations July 2015 $45K funded with onetime mandate reimbursements for this and other MT requests. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Dean. Not funded. Refer to Cabinet. Not funded. Refer to Dean. Funded - already installed. Not funded. Refer to Cabinet. Possibly funded at smaller amount with Tech Fee for computer chairs. Not funded. Refer to Dean. 2014-15 Resource Request FINAL Ranking VALUES 6-10-2015.xlsx Sorted Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Estimated dollars per FTES Budget carryover estimate Revenue estimate @ 3936 FTES P2 Reallocations Total Revenue New CCTVs and scanners for labs on campus (one in each lab on campus; ADA compliance) Cell signal boosters DN Science Lab: Equipment & upgrades PE Fields: Equipment & upgrades Canvas contract, Shibboleth, DE or one-time Utility reserve if canvas paid by CO Library allocation: Koha integrated library software system: $65,000 ProQuest search engine for students in LRC for ADT’s Psychology, Anthropology, & Sociology: $10,000 Replace outside book return: $4,000 DN Science Lab: Emergency generator & equipment Address SWACC inspection deficiencies MOVED TO MEASURE Q - Q52 Original ADA Safety: Replace broken emergency classroom lights $25,000 Original ADA safety: Reduce lab risks: $15,000 Correct service windows in new admin/student svc bldg $15,000 Technology Infrastructure Upgrades - MOVED TO Q31 Report writer bolt on for Ellucian: $20,000 2014-15 Districtwide internet upgrade package: $10,000 Telepresence upgrade - Pelican Bay & high schools: $25,000 5 new virtual servers: $100,000 "Enhance Network band width for increased Video traffic intra-LAN LAN network upgrades to accommodate new Video loads for DE. WS-C2960S-48LPD-L=$6774, C3KXNM-10G= $1500, SFP-10G-LR= $3290, VS-S2T-10G Cat 6500 Supervisor 2T with 2 ports 10GbE and MSFC5 PFC4 =$15,600" Total: $27,164. Manufacturing Technology (life safety, Accreditation rpt, SWACC Inspection rpt) MOVED TO MEASURE Q - Q75 Career and Technical Ed Computer Lab Upgrades Lathes $40,000 Vertical Milling machine: $15,000 Student Tech Fee 131,351 109,416 240,767 Mandate Physical Plant Payments 553 130 240,767 50,000 2,178,401 (29,887) 2,148,514 Instructional Equipment 460,113 29,887 490,000 47,000 Gen Fund Capital 100,000 100,000 Total 3,029,281 3,029,281 47,000 25,000 30,000 20,000 100,000 30,000 100,000 25,000 230,000 20,000 100,000 100,000 40,000 40,000 140,000 170,000 - 20,000 96,000 116,000 - PE/Athletics equipment not covered by State bonds Basketball floor maintenance/refresh: $15,000 9/7/2015 3:58 PM 50,000 Preliminary Draft 100,000 1 100,000 Rebalance Bond Projects14.xlsx Maint Inst Eq Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Technology replacement cycle MOVED TO MEASURE Q - 31 15 laptops & mobile cart for Sciences: $25,000 Computers for Nursing lab: $6,000 Fine Arts 3D Printer :$6,300 Smart boards, projectors, 3D printing for Drafting Tech: $16,400 DSPS computers, server, technology: $40,000 30 student servers-CIS Networking lab: $50,000 Whiteboards and other class needs: $10,000 Vehicle replacement cycle Replace FWW 12 passenger van & CR driving school truck EKA, MN, & DN code remediation package for State funds requests. MOVED TO MEASURE Q Q10 Student Union: Life safety equipment & bldg upgrades PE: Stereo system for Fitness Center with auxiliary input and/or Blue tooth Improve student furniture & technology in each bldg Purchase computer tables, chairs, Macbooks, PC notebooks, USB charging lamps, benches, etc for students. Cost is estimated for Sci, Hum, AT, CA, AJ, DN main, DN student lounge, Dining, LRC, etc. Mandated improvements to wastewater plant MOVED TO MEASURE Q Project management Maintenance filters HR true up leave costs President - DN election costs Tom Henry contract EAB contract Student Svcs/Instruction: Fund with one-time budget, then reassess next bgt cycle Soccer/Volleyball EKA HS lease IR Pres Ofc Public Safety Ellucian/Datatel increase Marketing IS training HR Reserve for enrollment management initiatives & contingency Potential one-time payroll contingency (subject to negotiations) Reserve for PERS/STRS pension costs Planned one-time fund balance for emergencies & State bond match Total Allocations 9/7/2015 3:58 PM Student Tech Fee Mandate Payments 70,000 Physical Plant - Preliminary Draft Instructional Equipment Gen Fund Capital 10,000 Total 80,000 - - 1,000 1,000 28,000 28,000 26,000 20,000 20,000 25,000 30,000 34,000 241,000 73,057 149,057 20,000 20,000 25,000 30,000 34,000 90,000 90,000 60,000 15,000 1,370 22,000 50,000 9,000 18,000 60,000 15,000 1,370 22,000 50,000 9,000 18,000 100,000 100,000 401,630 401,630 300,000 300,000 700,000 700,000 2,148,000 2 50,000 50,000 490,000 73,057 3,002,057 Rebalance Bond Projects14.xlsx Maint Inst Eq Proposed Allocation of 2015-16 One-Time Funds - BPC 2015-16 Proposed Allocations - BPC Info Item Preliminary Draft 6-15-2015 Net Remaining Unallocated Fund balance as percent of total mandate pmts (BPC recommended at least 30%) 9/7/2015 3:58 PM Student Tech Fee (233) Mandate Physical Plant Payments 514 - Preliminary Draft Instructional Equipment - Gen Fund Capital 26,943 Total 27,224 32% 3 Rebalance Bond Projects14.xlsx Maint Inst Eq State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Consideration of the 15 bulleted items on the State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” (#IIID-24) reveals that the College substantially meets the fifteen indicators of fiscal health. The College’s September 2015 self-evaluation with respect to each of the fifteen areas in the checklist is as follows: 1. Deficit Spending - Is this area acceptable? Yes, spending is under control. Is the College spending within their revenue budget in the current year? Yes. The 201516 Final Budget is balanced in large part due to a base budget increase supported by Governor Brown and the Legislature. Given conservative budgeting practices, this budget is balanced and is not out-of-control. The three year budget forecast can be balanced provided the Governor continues a multiyear base budget augment he promised for community colleges. If the State economy takes a downturn, then the State only has enough rainy day funds to avoid across-the-board cuts for perhaps one year. In that instance, the Governor might not have the resources available to uphold the commitment to base budget increases. The State could place scheduled increases to pension payments on hold temporarily or enact other forms of relief. If there is not enough relief to balance the District’s budget, then enrollments must grow for the College to avoid additional reductions-in-force (RIFs) and cuts. Has the College controlled deficit spending over multiple years? Yes, the College was depleting its fund balance and reducing its fund balance percentage in prior years. That has been stabilized and the fund balance is being held above 6% with a partial restoration of salary cuts. Is deficit spending addressed by fund balance, ongoing revenue increases, or expenditure reductions? Yes, deficit spending has primarily been controlled through spending cuts, including across-the-board payroll concessions. Some pay concessions were restored, with a goal of keeping the fund balance above 6% including restoration. Are College revenue estimates based upon past history? Yes. This year the District will be on enrollment stability, so FTES levels are fixed. The multiyear forecast includes a small enrollment decline to keep the forecast conservative. Revenue estimates have been created with appropriate procedures to avoid inflated or unrealistic estimates. The revenue estimate is reviewed and recommended to the President/Superintendent by the Budget Planning Committee. At present, the Chancellor’s Office has not released a complete advanced apportionment report, so base budget increases have been estimated. We will true up the budget to the Chancellor’s calculations once we receive their report. Does the College automatically build in growth-revenue estimates? No. Beginning in 2011-12, the College stopped budgeting with assumptions of growth funding. The multiyear forecast includes a small FTES decline. It is appropriate to answer “No” to this question as sustainable enrollment growth funding has not been coming from the State for several years, and the College has a recent history of flat or contracting enrollment. 2. Fund Balance – Is this area acceptable? Yes. 1 State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Is the College’s fund balance stable or consistently increasing? Yes. The fund balance is being maintained above 6% and is forecast to grow at a small rate over the three year multiyear forecast. The 2014-15 beginning fund balance increased more than expected due several advantageous closing adjustments for 2013-14. Then, the District agreed to partially restore some pay cuts, but only where the restoration would not drop fund balance below 6%. The District has demonstrated the wherewithal in recent years to make difficult budget cutting decisions. Should the Governor and the Legislature not provide sufficient augments to cover cost increases, the District will need to move quickly on additional budget balancing decisions. Is the fund balance increasing due to on-going revenue increases and/or expenditure reductions? Yes, fund balance is being managed to stay above 6% and forecasts are including modest fund balance growth. 3. Enrollment - Is this area acceptable? No. Full-time Equivalent Student (FTES) enrollments are not growing and continue to contract. The multiyear forecast includes another small enrollment drop. The District must stabilize enrollments to avoid having to implement budget cuts and “resizing the District’s services” for fewer students. Has the College’s enrollment been increasing or stable for multiple years? No, enrollments have been falling for several years. The only apparent relief was in 2014-15. However, that apparent enrollment growth is only due to the inclusion of both the leading and trailing summer enrollments in order to maximize stability funding the next year. Fall-to-fall-to-fall enrollments continue to disappoint. Are the College’s enrollment projections updated at least semiannually? Yes Are staffing adjustments consistent with the enrollment trends? Partially yes. Employee ranks were reduced over multiple years. However, if enrollments continue to decline, then additional reductions will be needed to downsize the college to a level appropriate for the smaller student population. The District cannot run a college that is staffed for an “aspirational level” of students. Does the College analyze enrollment and full time equivalent students (FTES) data? Yes Does the College track historical data to establish future trends between P-1 and annual for projection purposes? Yes Has the College avoided stabilization funding? No, the District is actively planning to maximize revenue through enrollment stability funding. This short-term tactic will continue so long as FTES enrollments continue to contract. 4. Unrestricted General Fund Balance – Is this area acceptable? Yes, the fund balance percent is above 6% and the Final Budget forecasts a slight improvement in the fund balance percentage. Is the College’s unrestricted general fund balance consistently maintained at or above the recommended minimum prudent level (5% of the total unrestricted general fund expenditures)? Yes, the District’s target is to incrementally increase the fund balance over multiple years and to not allow the fund balance to drop below 6%. 2 State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Administrative procedure 6200 Budget Preparation to include the following requirements on fund balance (See p. 8 of http://www.redwoods.edu/district/board/documents/February42014packet.pdf): The annual budget shall be reported to the Board at its September meeting as the Final Budget. Each year the Tentative and Final Budgets shall maintain an unrestricted general fund balance as follows: If the fund balance is below 5.0%, the budget shall restore the year-end fund balance to 5.0%; If the fund balance is below 10% but greater than 5.0%, the budget shall steadily increase the fund balance to a goal of 10% (equal to about 1.5 months of payroll expenditures); and If the fund balance is greater than 10%: The budget may maintain the fund balance or steadily reduce the fund balance to no less than 10%, or may increase the fund balance further, but shall include an explanation of the need to accumulate an excess fund balance above 10% (i.e. as a reserve for potential mid-year cut in State funding, to fund a multiyear strategic initiative, etc.). Is the College’s unrestricted fund balance maintained throughout the year? Yes. 5. Cash Flow Borrowing - Is this area acceptable? Yes Can the College manage its cash flow without interfund borrowing? Yes. At present the College is projecting to meet its cash flow needs without interfund borrowing. Is the College repaying TRANS and/or borrowed funds within the required statutory period? Yes 6. Bargaining Agreements - Is this area acceptable? Yes. Certain cost drivers, such as health and welfare benefits inflation are increasing faster than the 1% or so State COLA and these unfunded costs will need to be addressed to ensure long fiscal stability. Has the College settled bargaining agreements within new revenue sources during the past three years? No, the College settled both bargaining agreements with temporary payroll concessions instead. A no answer here is appropriate. Did the College conduct a pre-settlement analysis identifying an ongoing revenue source to support the agreement? Yes Did the College correctly identify the related costs? Yes Did the College address budget reductions necessary to sustain the total compensation increase? Yes. However, additional payroll cost reductions will be needed if enrollments do not begin to grow. 7. Unrestricted General Fund Staffing - Is this area acceptable? Yes Is the College ensuring it is not using one-time funds to pay for permanent staff or other ongoing expenses? Yes. 3 State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Is the percentage of College general fund budget allocated to salaries and benefits at or less than the statewide average? Yes, the College’s average was above the statewide average as noted on the State Chancellor’s Office Fiscal Trend Analysis reports. This is an area of concern to be addressed through District strategic planning. The chart below summarizes the State Chancellor’s Office fiscal trend data: Payroll as a Percentage of Total Expenditures 2011-12 Actual Redwoods Average of 30 smallest Average statewide 84.1% 81.9% 83.7% 2012-13 Actual 2013-14 Budget 84.7% 81.0% 83.2% 2014-15 Budget Est 80.3% 79.9% 81.3% 2015-16 Budget Est 84.8% 85.2% 8. Internal Controls - Is this area acceptable? Yes Does the College have adequate internal controls to insure the integrity of the general ledger? Yes Does the College have adequate internal controls to safeguard the College’s assets? Yes (#IIID-26). 9. Management Information Systems - Is this area acceptable? Partially yes. The District is currently implementing necessary procedures for Affordable Care Act (ACA) compliance. These procedures require employees to learn new screens and for various information to be updated in Human Resources records. These are significant changes and require much coordination between the Information Systems office and Human Resources and Payroll departments. Is the College data accurate and timely? Yes Are the county and State reports filed in a timely manner? Yes Although occasionally a report has been tardy, there have been no major delays in report submissions. Are key fiscal reports readily available and understandable? Yes 10. Position Control – Is this area acceptable? Yes Is position control integrated with payroll? No. Position control is maintained through a database and a practice of requiring multiple approvals for all hiring. The College has not seen problems with this procedure. Does the College control unauthorized hiring? Yes Does the College have controls over part-time academic staff hiring? Yes 11. Budget Monitoring - Is this area acceptable? Yes 4 State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Is there sufficient consideration to the budget, related to long-term bargaining agreements? Yes Are budget revisions completed in a timely manner? Yes Does the College openly discuss the impact of budget revisions at the Board level? Yes Are budget revisions made or confirmed by the Board in a timely manner after the collective bargaining agreements are ratified? Yes Has the College’s long-term debt decreased from the prior fiscal year? No. A no on this question is appropriate. Has the College identified the repayment sources for the long-term debt? Yes Does the College compile annualized revenue and expenditure projections throughout the year? Yes 12. Retiree Health Benefits - Is this area acceptable? Yes Has the College completed an actuarial calculation to determine the unfunded liability? Yes Does the College have a plan for addressing the retiree benefits liabilities? Yes, Total Compensation Systems provides and actuarial report and a supplemental report to ensure a prudent funding level in the Employee Benefits Fund. 13. Leadership/Stability - Is this area acceptable? Marginally, yes. The District had an unsuccessful search for a new President/Superintendent and now operates with an interim. A review of the management and administrator ranks reveals very few employees at or near the top of their step schedule, perhaps indicating excessive employee turnover. As of this report, these employee groups are the only employees who have not seen full restoration of their pay cuts. Has the College experienced recent turnover in its management team (including the Chief Executive Officer, Chief Business Officer, and Board of Trustees)? Yes, the President/Superintendent retired and was replaced by an interim after a failed search. 14. College Liability – Is this area acceptable? Yes Has the College performed the proper legal analysis regarding potential lawsuits that may require the College to maintain increased reserve levels? Yes Has the College set up contingent liabilities for anticipated settlements, legal fees, etc. N/A. The College has not identified any material items in this area. 15. Reporting – Is this area acceptable? Yes Has the College filed the annual audit report with the System Office on a timely basis? Yes Has the College taken appropriate actions to address material findings cited in their annual audit report? Yes. No new material findings were noted in the latest audit report and previous findings were cleared with a notation of repeat issues. 5 State Chancellor’s Office “Sound Fiscal Management Self-Assessment Checklist” September 2015 Update – PRELIMINARY DRAFT Has the College met the requirements of the 50 percent law? Yes Have the Quarterly Financial Status Reports (CCFS-311Q), Annual Financial and Budget Reports (CCFS-311), and Apportionment Attendance Reports (CCFS-320) been submitted to the System Office on or before the Stated deadlines? Yes. Summary of conclusions: Based on this self-assessment, three fiscal risks clearly stand out for the District. 1. The District must stabilize and increase student enrollments. 2. The District’s budget is built on the Governor meeting his commitment to provide additional base budget augments. If the Governor fails to deliver, other budget solutions will need to be rapidly implemented. 3. For long term fiscal stability, the District will need to address items where inflation is increasing faster than the growth in the State budget, i.e. 1% annual State COLA. These items include health and welfare benefits cost inflation which is typically in the range of a 6% annual increase and the cost of annual salary steps which are well in excess of the COLA. Salary steps should be helped by employee retirement and turnover, but only the relatively small ranks of administrators and manager are showing much turnover. 6 Measure Q Project Budgets August 2015 Rebalancing Physical & Life Sciences Repurpose or Demo New Academic Complex (Measure Q Match) Modernization & Engineering for Projects Career and Technical Ed Computer Lab Upgrades PE Physical Education Labs upgrades Contingency Reserve Automotive Technology Lab upgrade Welding area cover expansion Nursing facility upgrades Sewer inspection camera Emergency Response Training Center Check printer and related costs Construction Technology Lab upgrade Exterior paint and light upgrades Video cameras for PE/Ath Student Union Upgrade & Safety Needs Ag Dept Tompkins Hill barn replacement Repurposing vacated buildings, incl faculty ofcs Computers/tablets for PE/Ath head coaches Science Wing Modernization - Del Norte Portable Lease/Purchase - Del Norte Report writer bolt on for Ellucian/Datatel 15 laptops & mobile cart for Sciences 2 servers for mathematics dept textbooks, online testing, and Op Technology Infrastructure Upgrades Self Service Datatel module Document Imaging and Secure Storage Project Management Network Infrastructure Upgrades Security, Marquee Upgrades and Fire Alarm Campus Safety Alert Upgrades AJ Firing Range: Lighting & resurfacing AJ: Network cabling AJ: Replace decking and portable bldg AT: CAD lab ventilation repair Safety straps to secure Nitrixoxide tanks Vehicle replacement Ventilation in Writing Center Remove stadium hazard Large Format Modular Classrooms Address SWACC inspection deficiencies AJ storage ventilation and other life safety Tree Removal CA & AJ: Provide accessible student seating Accessible sidewalk to AR & connecting to existing footpath nea EKA main: Signage for entire campus EOPS Furniture for Ergonomic Updates Replace Maintenance Dept fork lift and tractor Replace the 3 or 4 oldest and least safe vehicles districtwide 9/11/2015 12:19 PM Q51 - Mandatory Q52 - Mandatory Project Code and Amount ADA Compliance Life Safety 592,471 99,247 50,000 70,000 400,000 5,000 45,000 3,293 16,000 44,000 90,000 496,050 359,777 66,500 50,000 65,000 325,000 300,000 13,000 15,000 10,000 15,000 3,000 240,000 38,000 375,000 245,000 28,500 9,000 90,000 50,000 91,000 Q16 MP4 Q10 Q75 Q56 Q56 Q60 Q61 Q62 Q65 Q67 Q68 Q69 Q70 Q71 Q72 Q73 Q74 Q80 Q30 Q29 Q59 Q35 Q55 Q31 Q63 Q36 Q77 Q78 Q54 750,000 3,289,985 735,023 250,000 1,340,822 138,082 350,000 135,000 29,211 25,000 25,000 250,000 14,039 10,000 50,000 100,000 90,000 20,000 825,000 24,000 10,669 11,000 1,665,167 85,000 169,000 625,000 221,000 55,000 Q32 Total Budget 750,000 3,289,985 735,023 250,000 2,429,343 597,106 350,000 135,000 29,211 25,000 25,000 250,000 80,539 10,000 100,000 165,000 90,000 20,000 1,200,000 24,000 10,669 11,000 1,665,167 85,000 169,000 625,000 221,000 300,000 13,000 15,000 10,000 70,000 15,000 3,000 240,000 38,000 375,000 700,000 28,500 9,000 90,000 55,000 45,000 3,293 16,000 44,000 181,000 1 Q51 Q52 Project adjustment adjustment adjustment 20,445 55,000 (497,106) (29,211) (1,759) (25,000) (19,323) (9,557) 102,264 5,280 (20,000) 55,000 (10,669) (11,000) 226,000 (40,000) 51,563 132,000 (2,341) (50,000) (13,000) (6,760) (10,000) (15,000) 40,400 (3,000) 50,000 (38,000) 67,588 (9,000) (5,599) 48,830 (3,293) (573) (44,000) (90,000) (91,000) New Total Budget 750,000 3,289,985 755,468 305,000 2,429,343 100,000 350,000 135,000 23,241 250,000 61,216 443 202,264 165,000 95,280 1,200,000 24,000 1,946,167 45,000 220,563 757,000 218,659 250,000 8,240 55,000 55,400 290,000 375,000 700,000 96,088 90,000 49,401 93,830 15,427 - Actuals & Encumbrance 5,000 3,289,948 745,468 217,965 595,835 339,629 23,241 246,869 61,216 443 152,264 67,952 95,280 237,714 16,000 1,669,901 19,565 160,563 453,689 218,659 46,377 8,240 55,400 218,504 59,999 76,610 49,401 93,830 15,427 New Available Budget 745,000 37 10,000 87,035 1,833,508 100,000 10,371 135,000 (0) 3,131 0 50,000 97,049 (0) 962,286 8,000 276,266 25,435 60,000 303,311 0 203,623 55,000 71,496 315,001 623,390 96,088 90,000 0 (0) - Note Move to closed projects Planning for state requests Add $55K for manuf tech: $40 Rebalance & delete Move to closed projects Rebalance & delete Rebalance & delete Move to Student Union Upgra Move to closed projects See row 15 plus 32,941 to ba Move to closed projects Rebalance & delete Rebalance & delete Rebalance & delete Rebalance & delete $76K bgt for single sign on, $ Rebalance and reduce $60K bgt for Bus Ofc convers Move to closed projects Rebalance and reduce Rebalance & delete Consolidate & delete Consolidate & delete True up to act & encumb., the Rebalance & delete Replace CR 18 wheeler Rebalance & delete Rebalance & delete Move to closed projects True up to act & encumb. Rebalance & delete (Orig ADA Move to closed projects Consolidate & delete Rebalance & delete 2015-16 Measure Q bgts1.xlsx July 2015 Cleanup Measure Q Project Budgets August 2015 Rebalancing Q51 - Mandatory Q52 - Mandatory Project Code and Amount ADA Compliance Life Safety CA Chairs for 105 Communications Cabling Data Work - From Q14 to OP to Here. AR Data cable. Air Sampling SSA Building Locks - 8 sets for $500 each Additional funding for DN Campus Exterior Lighting Upgrade to match EKA Remove and replace AJ portable & decking, and Firing range co 168,000 Shively Farm Water System 25,000 Mandated improvements to wastewater plant 100,000 Project Management, Estimator, Architect, Contingency 132,000 AT: Woodshop Dust Collector VOIP AJ carpet AT Carpet CA: Carpet for Creative Arts Bldg and other bldgs (Student Union). EVOQ AT: Repair walkways Emergency Generators (Q28) Closed Undefined costs from "Original ADA life safety" @ row 58 Undefined project costs from Accounting Spreadsheet @ row 226 NMR for AA-T Chemistry Energy savings, boilers, and bathroom repairs (Q52) Mendocino Center MOU Repairs Balance actual expenditures to accting spreadsheet 1,840,011 Check to BOT rpt 9/11/2015 12:19 PM - 24,000 14,988 10,000 5,012 25,000 183,252 100,000 70,000 70,000 280,000 Q76 Q28 3,667,079 11,292,998 Total Budget 24,000 14,988 10,000 5,012 25,000 168,000 25,000 100,000 132,000 183,252 100,000 70,000 70,000 280,000 16,800,088 - (0) 2 Q51 Q52 Project adjustment adjustment adjustment (24,000) (1,458) (5,012) (168,000) 100,000 (132,000) 7,172 20,084 (47,514) (8,045) (835) 3,074 11,246 12,343 16,809 55,248 2,846 2,250 208,304 100,000 (193,199) (1,145) 38,309 194,344 New Total Budget 14,988 8,542 25,000 25,000 200,000 190,424 123,158 22,486 61,955 279,165 11,246 12,343 16,809 55,248 2,846 2,250 208,304 100,000 38,309 16,800,088 Completed Actuals & Encumbrance 14,988 8,542 - 190,424 120,084 22,486 61,955 279,165 11,246 12,343 16,809 55,248 2,846 38,309 10,075,434 New Available Budget Note - Consolidate & delete Consolidate & delete (0) Consolidate & delete Consolidate & delete 25,000 Consolidate & delete 25,000 200,000 Consolidate & delete Move to closed projects 3,074 Cover deficits at row 138 & 20 0 Move to closed projects 0 Move to closed projects (0) Move to closed projects Move to closed projects 0 Move to closed projects (0) Cover deficit in closed project (0) Cover deficit in closed project Cover deficit in closed project 2,250 Already closed 208,304 New repair bgt - Life safety. $ 100,000 New Balancing figure 6,724,654 174,375 27,621,679 23,459,433 2015-16 Measure Q bgts1.xlsx July 2015 Cleanup