Page 1 Cameron University Banner Project May 29, 2016

advertisement

Page 1 Cameron University Banner Project

Meeting Agenda and Notes

April 13, 2020

Committee/Meeting Name

Date June 15, 2009

Location Admin 201

Banner Technical Team

Time Convened 10:00 am

Recorder

Time Terminated

Julie Duncan

10:50 am

Members Present Greg Duncan, Kelly Simon, Rick Clyburn, Chase Bailey, Julie Duncan, Debbie Goode, Angela Melton, Kurt Jn Marie,

Sherry Hendrix, Dawne Massey

Members Absent Cheryl Davis

Visitors

Topics

Minutes from June

8

Update from

Sherry

Okay

Discussion, Information

Ninette has announced that we will be implementing

TouchNet before we go live.

Patch management – we need to get all patches put in before the crp’s.

No new items. Outstanding issues for SGHE

Next meeting

Data Standards

Meeting

Action Taken, Decisions, Recommendations, Time Line ePrint training

ODS

June 22.

Made a decision on how to address the odd name formats, common matching, and new ethnicity implementation.

Report lists were handed out and everyone is supposed to review these. Rick will send the list of AR reports to Ninette and ask that she provide a list to Tom of any that need to be used in Banner.

Greg is signed up for Aug. 11-12 in Rochester, NY. Should a functional lead attend as well? We believe this allows the

Decided to see if Katia Mayfield can do this. person to put reports on the server so someone else can view them.

SGHE will be performing a remote ODS PROD install this The PROD database doesn’t exist. Where will this point to?

Page 2 Cameron University Banner Project

Meeting Agenda and Notes

April 13, 2020

Topics

Banner related purchases

Round 2 data conversion

Shared tables/rules/forms

Cognos named users and training schedule

Discussion, Information week as well as upgrading the TEST and PROD installs to the most current version

Sherry found a sample of maintaining the rules and tables from another manual and opened it up for discussion.

Discussed document.

Data standards team definition should be “who determines shared standards.” Functional team leads will be the ones who ensure data quality and integrity across the system.

Debbie is going to ask to increase the working owner license so that we have backups. We may need more report studio options. We’ll learn more about all of this next week after

Greg and Chase have some training.

Nolij – received sole source today – P.O is underway

Cognos Administrator license –c hecking on pricing

Completed 6/11/09 conference call w/ Laurene,

Duane and Kelli

(6/15) Greg is copying sunfire IFAS/IRISDB to sunray IFAS/IRISDB using 6/12 backup

ILTs have until close of business on 6/23 to enter data into PPRD

6/24 PPRD cloned to CONV

6/29/09 from 9 – 9:30: Scrum meetings

6/26 – GP extracts must be in outbound directory

6/29 – GP load by Kelli Flynn

7/2 – HR, FI and ST extracts must be in outbound directory

7/6 – HR load by Laurene Farley

7/6 – FI load by Kelli Flynn

7/6 – ST load by Duane Thowe

7/10 – AD extracts must be in outbound directory

Action Taken, Decisions, Recommendations, Time Line

Sherry will find out more. This question has been sent to

Mike before but we haven’t had an answer.

Cameron needs the pre-install checklist.

Decided that the information was good. Change

“representative” to “functional team lead” in all paragraphs.

We need to ask Paul if we can transfer licenses. One option might be for IT to learn it and then after training eventually transfer the licenses to the functional leads.

Continue to use the completed extracts spreadsheets during round 2.

Page 3 Cameron University Banner Project

Meeting Agenda and Notes

Topics Discussion, Information

7/13 – AD load by Laurene

7/13 – 7/17 SGHE will have tasks to check; Chase will be notified when TEST can be re-cloned

No exceptions to the minutes. Pre-Round 2

Conversion meeting

Common Matching No further discussion.

Workflow We need a prioritized list of what Juddson should consider working on.

April 13, 2020

Action Taken, Decisions, Recommendations, Time Line

Debbie will take this to the ILT.

Furniture

Task Lists

Debbie

Staples is compiling the quotes.

Debbie is going to review these.

Tech Team &

ITL

Update critical programs and third party software for ILT meeting in the near future

Continue to update:

W:\workgrps\its_share\Banner\BANNER Data handling.docx – OSRHE info needs to be added and which DBs it will be reported from

Data cleanup - ongoing process Tech Team &

Functional Areas

Julie Status of implementing new ethnicity codes - complete Remove from list.

Tech Team

Dawne

Tech Team &

ITL

Tech Team

Debbie

Decision re: no mods to Baseline Banner: possibly w/ the exception of fed & state mandates??

Waiting on Tom’s guidance from John McArthur re: OSRHE mandate change in preliminary enrollment reporting

Add all changes for Round 2 data conversion to spreadsheet Kurt posted at:

W:\workgrps\its_share\banner\error tracking

Research best practices for keeping 3 rd party software in sync with Banner upgrades and patches

Update Milestone Certification & keep up-to-date

Remove from list. This has been set up.

Page 4 Cameron University Banner Project

Scott & Debbie Physical Facilities needs a key control system

Meeting Agenda and Notes

Scott & Debbie Printer in Library for CRP: 9/1-9/3 & 9/22-9/24

Tech Team

Workflow

Candidates

Julie started a Go-Live Checklist document for things like this at w:\workgrps\its\banner

Please add to it so that we remember to do everything after each conversion. This should be our checklist of things that must be done after the conversion scripts but before we let the users in for testing. I put the one below and also that Greg needs to change the Banner ID seed number.

It will be helpful to link documents to the procedure that have the step by step process (or the instructions of what sql/shell program needs to run to do it) just in case someone wasn’t there that normally does it.

Anyone have a clue how to create a link and it goes to a separate Word document?

Purchasing

Entry of new employee or modification of existing employee from HR to

User Mgmt

Patch management procedures documented and request form. Greg, Chase &

Debbie

ILT Reviewing critical programs for go live and all programs required @ go live

April 13, 2020

Download